Items where Subject is "600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: Thesis
Number of items at this level: 1800.

Thesis

41119110019, APRILIA (2023) ANALISIS TKDN GABUNGAN BARANG DAN JASA PEKERJAAN STRUKTUR PADA PROYEK PEMBANGUNAN GEDUNG UPPPD CEMPAKA PUTIH. S1 thesis, Universitas Mercu Buana Jakarta.

ABDILAH, FAUZI (2022) ANALISIS KONSERVASI AIR BERBASIS ZERO RUN OFF SISTEM PADA PEMBANGUNAN MALL LIVING WORLD KOTA WISATA CIBUBUR KABUPATEN BOGOR JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

ABDILLAH, CHANDRA FANY (2020) PENINGKATAN KINERJA PROYEK BERBASIS BUILDING INFORMATION MODELING-QUANTITY TAKE OFF PADA CONCOURSE STASIUN LINGKAR REL TERPADU. S2 thesis, Universitas Mercu Buana Jakarta.

ABDILLAH, DIMAS FAUZAN (2023) ANALISIS IDENTIFIKASI BAHAYA KESELAMATAN DAN KESEHATAN KERJA (K3) MELALUI METODE JOB SAFETY ANALYSIS (JSA) PADA PROYEK PENGEMBANGAN RSUD KALIDERES. S1 thesis, Universitas Mercu Buana.

ABDILLAH, MUHAMAD RIZAL (2022) ANALISIS PENGARUH FAKTOR – FAKTOR PENGELOLAAN PEMANGKU KEPENTINGAN TERHADAP KINERJA PROYEK. S2 thesis, Universitas Mercu Buana Jakarta.

ABDULLAH, FAISAL (2022) ANALISIS PENILAIAN RISIKO TERHADAP ASPEK KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK MRT JAKARTA FASE 2 (Studi kasus : Paket CP-201 Stasiun MRT Monas). S1 thesis, Universitas Mercu Buana Jakarta.

ABDULLAH, MUHAMAD ALIALDI (2022) EVALUASI GEOMETRIK JALAN REL KERETA API PADA PETAK BEKASI-TAMBUN. S1 thesis, Universitas Mercu Buana Bekasi.

ABDULLAH, MUHAMAD ALIALDI (2022) EVALUASI GEOMETRIK JALAN REL KERETA API PADA PETAK BEKASI-TAMBUN. S1 thesis, Universitas Mercu Buana Bekasi.

ABDULLAH, RIZAL (2023) ANALISIS DAYA DUKUNG TIANG PANCANG MENGGUNAKAN DATA CPT DAN SPT PADA PROYEK PEMBANGUNAN APARTEMEN 6 LANTAI, DI JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Bekasi.

ABDULLAH, SAID (2019) PEKERJAAN KOLOM DAN PLAT LANTAI PADA PROYEK SMALL OFFICE HOME OFFICE - ANCOL. S1 thesis, Universitas Mercu Buana Jakarta.

ABDURRACHMAN, MUJAHID (2019) PELAKSANAAN PEKERJAAN BORED PILE PROYEK PEMBANGUNAN RUMAH SUSUN TINGKAT TINGGI PASAR JUMAT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ABIDIN, NUR (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN PROYEK OFFICE TOWER 2 CIPUTRA INTERNATIONAL - JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

ABIEZER, REMALYA MARIUS (2023) ANALISIS PEMILIHAN MODA ANTARA LIGHT RAIL TRANSIT (LRT) JAKARTA DAN MIKROTRANS JAKLINGKO JAK-59 MENGGUNAKAN METODE LOGIT BINER SELISIH. S1 thesis, Universitas Mercu Buana Jakarta.

ABIYYAH, RIFDAH (2020) KUAT TEKAN BETON RINGAN STRUKTURAL DENGAN MENGGUNAKAN STYROFOAM SEBAGAI SUBSITUSI AGREGAT. S1 thesis, Universitas Mercu Buana Bekasi.

ACHMAD, ALZA DADA (2023) EVALUASI BORED PILE SEBAGAI PENAHAN TANAH (EARTH STRUCTURE) PADA PROYEK UNDERGROUND PADESTRIAN TUNNEL BXC 2 - STASIUN JURANG MANGU. S1 thesis, Universitas Mercu Buana Jakarta.

ADHA, MUHAMMAD ALDI (2023) PENGARUH VOLUME KENDARAAN TERHADAP TINGKAT KERUSAKAN JALAN PADA JALAN RIGID PAVEMENT DI KECAMATAN TANJUNG PRIOK. S1 thesis, Universitas Mercu Buana.

ADHAMI, MALQI SIDIK (2018) METODE PELAKSANAAN SHEAR WALL PROYEK RUSUNAMI URBANTOWN@SERPONG Jl. Bukit Serua Ciputat – Tangerang selatan. S1 thesis, Universitas Mercu Buana Jakarta.

ADHIMA, BASTIAN ASAD (2021) ANALISIS DAERAH RAWAN KECELAKAAN LALU LINTAS PADA RUAS JALAN DI WILAYAH KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ADHIMA, BASTIAN ASAD (2020) PELAKSANAAN PEKERJAAN KOLOM KOMPOSIT PADA PROYEK INDONESIA 1. S1 thesis, Universitas Mercu Buana Jakarta.

ADIANA NURCHODIN, YUNID (2020) ANALISIS FAKTOR KETERLAMBATAN PEKERJAAN JACKING REINFORCEMENT CONCRETE PIPE (RCP) PADA SALURAN ARAMCO KM. 114+250 PADA JALAN TOL PURBALEUNYI. S1 thesis, Universitas Mercu Buana Jakarta.

ADITAMA, MAHESWARA VIDYA (2022) ANALISIS PENGARUH ESTIMATING SOFTWARE TERHADAP AKURASI KINERJA ANGGARAN MENGGUNAKAN REGRESI LINIER BERGANDA PADA KONSTRUKSI GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

ADITAMA, YUDI (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUMAH SAKIT SARI ASIH SANGIANG TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ADITAMA, YUDI (2021) PERBANDINGAN DESAIN STRUKTUR BANGUNAN APARTEMENT UNTUK 3 LOKASI KOTA MENGACU PADA SNI 1726-2019. S1 thesis, Universitas Mercu Buana Jakarta.

ADITHYA, ALVIN (2020) ANALISIS PERBANDINGAN PENJADWALAN ULANG PROYEK DENGAN PERBANDINGAN METODE CRITICAL PATH METHODE (CPM) DAN PROJECT EVALUATION AND REVIEW TECHNIQUE (PERT) (Studi Kasus : Pembangunan Kantor Unit Pengelola Pengembangan Tanaman Perkotaan Dinas Kehutanan). S1 thesis, Universitas Mercu Buana Jakarta.

ADITHYA, ALVIN (2019) PEMBANGUNAN RUNWAY 3 BANDARA SOEKARNO-HATTA Jl. Prancis Area Bandara, Soekarno-Hatta Tangerang, Banten. S1 thesis, Universitas Mercu Buana Jakarta.

ADITHYA, RANDHY (2020) ANALISIS KINERJA PELAYANAN ANGKUTAN UMUM (STUDI KASUS : MIKROTRANS JAK 36 TRAYEK CILANGKAP – CILILITAN). S1 thesis, Universitas Mercu Buana Bekasi.

ADITHYA, RIO CHANDRA (2019) METODE PELAKSANAAN PEKERJAAN GROUND ANCHOR SEBAGAI ELEMEN PENDUKUNG STRUKTUR PENAHAN TANAH. S1 thesis, Universitas Mercu Buana Jakarta.

ADITYA, NETY ROMY (2023) ANALISIS RISIKO PADA PEMBANGUNAN RUMAH MEWAH (STUDI KASUS PROYEK PEMBANGUNAN RUMAH MEWAH PADA JALAN KAYU PUTIH IIIB). S1 thesis, Universitas Mercu Buana.

ADIYASA, TIRTA (2022) PENGARUH SUBSTITUSI SEBAGIAN SEMEN DENGAN ABU DAUN BAMBU DAN BATOK KELAPA SEBAGAI SUBSTITUSI SEBAGIAN AGREGAT KASAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

ADIYATNA, FIKRI FAUZAN (2023) ANALISA PEMANFAATAN SUBSTITUSI LIMBAH ABU BAN BEKAS DAN ABU JERAMI PADI PADA CAMPURAN BETON TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

ADJI, RADEN YUDITYO AFRI (2019) PERENCANAAN MANAJEMEN SUMBER DAYA MANUSIA UNTUK PENINGKATAN PRODUKTIVITAS PRECAST BERBASIS PMBOK PADA PERUSAHAAN XYZ. S1 thesis, Universitas Mercu Buana Bekasi.

ADUMARTA, MONICA (2021) ANALISA PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK ENGINEERING, PROCUREMENT & CONSTRUCTION DENGAN MENERAPKAN METODE EARNED VALUE ANALYSIS (STUDI KASUS : PROYEK EPC PEMBANGUNAN 1 UNIT FASILITAS GAS EXTERNAL RU II DUMAI). S1 thesis, Universitas Mercu Buana Jakarta.

AFADIL, MAULANA HIZBI (2020) IDENTIFIKASI NILAI STABILITAS CAMPURAN BERASPAL DENGAN ABU SEKAM PADI DAN ECENG GONDOK PADA CAMPURAN AC-WC MENGGUNAKAN METODE UJI MARSHALL DAN WHEEL TRACKING. S1 thesis, Universitas Mercu Buana Jakarta.

AFANDI, MUHAMAD TOPAN (2018) PENGAMATAN PEKERJAAN STRUKTUR BAWAH (Sub Structure) PROYEK APARTEMEN SAMARA SUITES JL. GATOT SUBROTO JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AFANDY, ARIF (2017) DESAIN ALTERNATIF STRUKTUR ATAS JEMBATAN PADA JALAN KS.TUBUN TANGERANG-BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

AFANDY, ARIF and WIDODO, NANANG (2017) METODE PELAKSANAAN PELAT LANTAI PROYEK AEROPOLIS RESIDENCE 2 TOWER NEGLASARI – TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

AFIF, HILAL FADHLURROHMAN (2023) ANALISIS PRODUKTIVITAS PEKERJA BEKISTING ALUMINIUM FORMWORK SYSTEM DENGAN METODE PRODUCTIVITY RATING (Studi Kasus Pada Proyek Pembangunan Menara Danareksa). S1 thesis, Universitas Mercu Buana Jakarta.

AFRIANTI, MEY SILLVIA (2023) ANALISIS FAKTOR-FAKTOR PENYEBAB PEKERJAAN ULANG ATAU REWORK PADA PROYEK KONSTRUKSI (Studi Kasus : Proyek Apartemen Sky House BSD+ Phase 2). S1 thesis, Universitas Mercu Buana Jakarta.

AFRIANTI, RIFA (2018) PROYEK PEMBANGUNAN SOUTHGATE-TANJUNG BARAT JALAN RAYA TANJUNG BARAT No.163 JAGAKARSA JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

AFRIANTO, RUDI (2020) ANALISIS KETERLAMBATAN KERJA PADA PROYEK KONTRUKSI GEDUNG CP 101 LEBAK BULUS. S1 thesis, Universitas Mercu Buana Bekasi.

AFRIYANTO, ADE BAGUS (2022) ANALISIS RISIKO PEKERJAAN KONSTRUKSI BAJA DENGAN METODE SEVERITY INDEX (Studi Kasus : Proyek Pembangunan Gedung Infrastruktur Bandung Advance Science and Creative Engineering Space (Paket 3)). S1 thesis, Universitas Mercu Buana Jakarta.

AGDIANSYAH, RAENALDY (2019) OPTIMALISASI PELAYANAN FUNGSI STASIUN MASS RAPID TRANSIT LEBAK BULUS JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

AGISNI, FITRIA NUR (2022) ANALISIS KARAKTERISTIK KECELAKAAN LALU LINTAS (STUDI KASUS JALAN SULTAN ISKANDAR MUDA JAKARTA). S1 thesis, Universitas Mercu Buana Jakarta.

AGUNG, MASAGUS ADIPATI (2023) EVALUASI KINERJA OPERASIONAL TRANSPORTASI UMUM BUS TRANSJAKARTA KORIDOR 13B. S1 thesis, Universitas Mercu Buana Jakarta.

AGUNG, WAHYUDDIN DAMAR (2018) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU PADA PROYEK PEMBANGUNAN APARTEMEN THE PAKUBUWONO SPRING, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

AGUSMA, DIVY WIRA (2021) ANALSIS PEKERJAAN PONDASI BORED PILE, SECANT PILE SERTA PILE CAP BERBASIS SISTEM DINAMIK DAN TIME COST TRADE OFF PADA PROYEK BANGUNAN HUNIAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

AGUSTA, YOFAN SAMAN (2018) ANALISIS WAKTU PELAKSANAAN PEKERJAAN BEKISTING SEMI MODERN DAN KONVENSIONAL PEMBANGUNAN APARTEMEN GRAND TAMAN MELATI MARGONDA 2 DEPOK MENGGUNAKAN METODE WEBCYCLONE. S1 thesis, Universitas Mercu Buana Jakarta.

AGUSTIAN, ANGGA PERMANA (2017) ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN APARTEMENT PANCORAN RIVERSIDE MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA). S1 thesis, Universitas Mercu Buana Jakarta.

AGUSTIAN, HERY (2022) ANALISIS KENDALA KESIAPAN PENGGUNA BUILDING INFORMATION MODELLING (BIM) PADA PROYEK KONSTRUKSI DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

AGUSTIAN, WILDAN (2022) KAJIAN ANALISIS FAKTOR PENYEBAB WASTE BESI BETON PADA PROYEK HIGH RISE BUILDING (Studi Kasus : Proyek Tokyu Mega Kuningan ). S1 thesis, Universitas Mercu Buana Jakarta.

AGUSTIN, RIZKI AHYANI (2022) PERENCANAAN STRUKTUR DINDING PENAHAN TANAH SEMI BASEMENT (STUDI KASUS PROYEK LIMO HOUSE). S1 thesis, Universitas Mercu Buana Bekasi.

AHMAD, FAISAL (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PONDASI BOREDPILE DENGAN PONDASI MINIPILE PADA PROYEK JEMBATAN PENYEBERANGAN ORANG (JPO) STASIUN LIGHT RAIL TRANSIT (LRT) CIRACAS. S1 thesis, Universitas Mercu Buana Jakarta.

AHMAD, JALIL (2018) ANALISIS PEMILIHAN PEMASOK PIPA HDPE DI PT XYZ MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP). S1 thesis, Universitas Mercu Buana Jakarta.

AHSAN, ALFAN ARIF (2021) FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK DEPO MASS RAPID TRANSIT (MRT) LEBAK BULUS. S1 thesis, Universitas Mercu Buana Jakarta.

AHYUDIN, ASEP (2019) INSTALASI DAN KONFIGURASI BROADBAND WIRELESS ACCESS 10.5 GHZ SIEMENS PADA PELANGGAN PT. APLIKANUSA LINTASARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AINUNDYASARI, APRILLIA (2020) ANALISIS PELAYANAN INFRASTRUKTUR BRT DI PROVINSI DKI JAKARTA TERHADAP PERSPEKTIF WANITA. S1 thesis, Universitas Mercu Buana Bekasi.

AISAH, WAHYU NUR (2023) VALUE ENGINEERING (VE) DENGAN METODE ZERO-ONE PADA PROYEK PENGEMBANGAN RSUD KEMBANGAN JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AJENG KURNIA, GENDIS (2022) ANALISIS IDENTIFIKASI DAN MITIGASI BLACK SPOT JALAN H. AGUS SALIM-JALAN LINGKAR UNIVERSITAS ANDALAS, PADANG KOTA. S1 thesis, Universitas Mercu Buana Jakarta.

AJENGSARI, FEBI AFIFA (2021) ANALISIS FAKTOR KEAMANAN LERENG TANAH CLAY SHALE BERDASARKAN NILAI RESIDUALNYA. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, ARI PURNOMO (2018) LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, FATIK SUKMO (2024) ANALISIS GIRDER OVERHEAD CRANE TERHADAP PENGARUH CAMBER BERDASARKAN LENDUTAN IZIN MENURUT PERMENAKER NO. 8 TAHUN 2020. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, GALIH SAPTO (2023) ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN JARINGAN GAS BUMI RUMAH TANGGA KABUPATEN SUBANG. S1 thesis, Universitas Mercu Buana Bekasi.

AJI, JOHAN PRASETYO (2019) METODE PELAKSANAAN GEOFORCE SEGMENTAL RETAINING WALL PADA PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, MUHAMMAD ARVIN BAGASTIO (2021) PERANCANGAN DIAFRAGMA LANTAI PODIUM PADA STRUKTUR ATAS APARTEMEN 34 LANTAI BERLOKASI DI STASIUN RAWA BUNTU SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, RESTU PRASETYO (2022) PERBANDINGAN PERENCANAAN STRUKTUR GEDUNG TAHAN GEMPA BERDASARKAN SNI 03-1726-2012DENGAN SNI 03-1726-2019 PADA GEDUNG SARANA PENDIDIKAN. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, SURYO SISWO (2017) PERENCANAAN SISTEM DRAINASE PADA PROYEK THE PRIMROSE CONDOVILLA DI KOTA BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

AJIZI, BUDI NURHAMDANI (2024) IMPLEMENTASI INVENTORY CONTROL SYSTEM UNTUK MENGOPTIMALKAN PENGELOLAAN PERSEDIAAN WINDSHIELD GLASS. S2 thesis, Universitas Mercu Buana Jakarta.

AKBAR, ADILLAH (2023) ANALISIS PENGARUH FAKTOR PEMANGKU KEPENTINGAN, MANAJEMEN PELAKSANAAN TERHADAP KINERJA PROYEK DENGAN METODE RII DAN INTERVIEW PAKAR PADA PROYEK KERETA CEPAT JAKARTA - BANDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

AKBAR, AHMAD FAJRI NUR (2021) ANALISIS PERKUATAN STRUKTUR GEDUNG AKIBAT PENAMBAHAN LANTAI DENGAN MENGGUNAKAN SISTEM FIBER REINFORCED POLYMER (FRP) (Studi Kasus : Gedung Mako Polres Metro Tangerang Kota). S1 thesis, Universitas Mercu Buana Jakarta.

AKBAR, ILHAMI (2018) DESAIN PEMIPAAN PADA PENAMBAHAN WELLHEAD W-0320 DI PLATFORM BUKIT TUA - PETRONAS. S1 thesis, Universitas Mercu Buana Jakarta.

AKBAR, RIZAL FAUZI (2023) OPTIMALISASI WAKTU DAN BIAYA DARI PEKERJAAN PROYEK YANG TERSISA DENGAN METODE CRITICAL PATH, WHAT IF DAN LINEAR PROGRAMMING (Studi Kasus : Proyek Pembangunan Rumah Tinggal Pondok Indah). S1 thesis, Universitas Mercu Buana Jakarta.

AKBAR, SURYA ADIYU (2018) ANALISA KAPASITAS DRAINASE KAWASAN PERUMAHAN PONDOK UNGU PERMAI BLOK B KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

AL BANA, BACHTIAR RASYID (2022) PERBANDINGAN METODE PELAKSANAAN ERECTION FULL SLAB DI ATAS DANAU STA 0+440 – STA 0+550 PADA PROYEK PEMBANGUNAN JALAN TOL RUAS INDRALAYA – PRABUMULIH DITINJAU DARI BIAYA PELAKSANAAN DAN DURASI PEKERJAAN. S1 thesis, Universitas Mercu Buana Jakarta.

AL SHOLICHIN, BANNI DATU ARIEF (2021) ANALISIS KEPUASAN PENGGUNA TERHADAP MUTU PELAYANAN HALTE TRANSJAKARTA BERDASARKAN STANDAR PELAYANAN MINIMUM TRANSJAKARTA DENGAN METODE IMPORTANCE PERFORMANCE ANALYSIS (IPA) DAN CUSTOMER SATISFACTION INDEX (CSI) PADA MASA PANDEMI COVID - 19. S1 thesis, Universitas Mercu Buana Jakarta.

AL'AS, SULTON JAMAL (2018) PEMANFAATAN PENGGUNAAN CRUMB RUBBER SEBAGAI BAHAN TAMBAH (ADDITIVE) PADA CAMPURAN ASPHALT CONCRETE – BINDER COURSE (AC – BC), DENGAN METODE UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

ALAMSYAH, ILYAS NUR (2024) ANALISA KINERJA RUAS JALAN TERHADAP ANTRIAN DAN TUNDAAN DI PERLINTASAN JALAN REL KERETA API (Studi Kasus: Jalan Baru Kompas, Tambun, Kabupaten Bekasi). S1 thesis, Universitas Mercu Buana - Buncit.

ALAWI, MUHAMAD NUR YAHYA (2022) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PEKERJAAN PEMBESIAN STRUKTUR ATAS BANGUNAN. S1 thesis, Universitas Mercu Buana Jakarta.

ALFARIZ, FAJAR (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK FAKULTAS KEDOKTERAN UHAMKA. S1 thesis, Universitas Mercu Buana Jakarta.

ALFARIZ, FAJAR (2020) STUDI EVALUASI FUNGSI TROTOAR TERHADAP PEJALAN KAKI DI JALAN DAAN MOGOT. S1 thesis, Universitas Mercu Buana Jakarta.

ALFATTAH, MUHAMMAD (2022) ANALISIS LAJU KOROSI LOGAM STAINLESS STEEL 316L DI MEDIA AIR LAUT MENGGUNAKAN METODE ELEKTROKIMIA. S1 thesis, Universitas Mercu Buana Jakarta.

ALFIAN, (2020) ERENCANAAN SUPERSTRUCTURE 16 LANTAI MENGGUNAKAN SISTEM GANDA DENGAN RANGKA PEMIKUL MOMEN KHUSUS DI KABUPATEN KARAWANG SESUAI SNI 1726 : 2012. S1 thesis, Universitas Mercu Buana Bekasi.

ALFIAN, MUHAMMAD AGFI (2020) ANALISIS RISIKO PENGELOLAAN KAWASAN PASAR PRAMUKA JAKARTA UNTUK MENINGKATKAN KEPUASAN PELANGGAN. S1 thesis, Universitas Mercu Buana Bekasi.

ALFIAN, MUHAMMAD AGFI (2020) ANALISIS RISIKO PENGELOLAAN KAWASAN PASAR PRAMUKA JAKARTA UNTUK MENINGKATKAN KEPUASAN PELANGGAN. S1 thesis, Universitas Mercu Buana Bekasi.

ALFIANDY, ELFRANZA (2022) ANALISIS PERPINDAHAN MODA DARI KENDARAAN PRIBADI KE LIGHT TRAIL TRANSIT (LRT) JABODEBEK (STUDI KASUS : LINTAS PELAYANAN II III DUKUH ATAS CAWANG-BEKASI). S1 thesis, Universitas Mercu Buana Jakarta.

ALFIKI, RANDI (2019) PENGAMATAN PKERJAAN MEP PROYEK APARTMENT BREEZE TOWER BINTARO -TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ALFRIANDINI, ALFRIANDINI (2019) TINJAUAN PEKERJAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN THE LANA APARTEMENT ALAM SUTERA-TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ALHAMDI, ALDI (2022) ANALISIS PENGARUH PEMBERLAKUAN SISTEM JALAN SATU ARAH TERHADAP KINERJA RUAS JALAN DAN KEPUASAN PENGGUNA JALAN (Studi Kasus: Jl. Daan Mogot). S1 thesis, Universitas Mercu Buana Jakarta.

ALI, ANWAR (2019) FAKTOR KUNCI SUKSES DALAM IMPLEMENTASI SISTEM MANAJEMEN KESELAMATAN KERJA DENGAN METODE ANALYTICAL HIERARCHY PROCESS PADA PROYEK KONSTRUKSI DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

ALI, WILDAN (2020) PEKERJAAN DROP PANEL PEMBANGUNAN PONDOK INDAH MALL 3 & OFFICE TOWERS. S1 thesis, Universitas Mercu Buana Jakarta.

ALIANSYAH, NOVAN VIKY (2023) ANALISIS KEBUTUHAN PARKIR DAN TINGKAT KEPUASAN PENGGUNA JASA PARKIR STASIUN KEBAYORAN JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ALIF, RICKY MUHAMAD (2021) ANALISIS PELAKSANAAN PEKERJAAN INSTALASI BEKISTING DENGAN PERBANDINGAN PEMAKAIAN BEKISTING ALUMINIUM DAN BEKISTING SISTEM (PERI). S1 thesis, Universitas Mercu Buana Jakarta.

ALIF RAMADHAN KHAER, ANANDA (2022) ANALISIS KEBUTUHAN RUANG PARKIR SEPEDA MOTOR MALL PIK AVENUE, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

ALIFANSYAH, MUHAMMAD ZIDANE ALIFANSYAH (2022) ANALISIS RISIKO PEKERJAAN STRUKTUR ATAS PADA PROYEK PEMBANGUNAN APARTEMEN COLLINS BOULEVARD. S1 thesis, Universitas Mercu Buana Jakarta.

ALIFIAN, RIZAL WAHYU (2018) PELAKSANAAN PEKERJAAN KONSTRUKSI BORE PILE DAN METODE PENGUJIANNYA PROYEK APARTEMEN EMERALD BINTARO JAYA. S1 thesis, Universitas Mercu Buana Jakarta.

ALIFIAN, RIZAL WAHYU (2019) PENGARUH AIR ROB TERHADAP KARAKTERISTIK CAMPURAN ASPAL PEN 60/70 UNTUK LAPIS PERMUKAAN DI MUARA ANGKE, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

ALIM, FARID HAKIM (2021) ANALISIS PERBANDINGAN PADA PELAKSANAAN PEKERJAAN BEKISTING PLAT LANTAI MENGGUNAKAN BEKISTING RING-LOCK SCAFFOLDING DAN ALUMA SYSTEM TERHADAP PERBANDINGAN BIAYA DAN PEKERJA (STUDI KASUS : KINGLAND AVENUE). S1 thesis, Universitas Mercu Buana.

ALKAF, FAHMI (2020) ANALISIS METODA PEKERJAAN PASANGAN DINDING BATA MERAH, PASANGAN DINDING BATA RINGAN DAN PASANGAN DINDING PANEL PRECAST DITINJAU DARI SEGI BIAYA DAN WAKTU (STUDI KASUS PADA PROYEK SOUTH SIDE APARTMENT – MARRAKECH SUITES, SUKMAJAYA, DEPOK, JAWA BARAT). S1 thesis, Universitas Mercu Buana Bekasi.

ALKALAS, NURSENA MAGISTA (2020) MANAJEMEN RISIKO PROYEK TERHADAP WAKTU DAN BIAYA PADA PROYEK REVITALISASI TERMINAL 2F BANDARA SOEKARNO-HATTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ALKINDY, GHIVARI (2022) STABILITAS TORSI DAN KINERJA STRUKTUR BANGUNAN BERTINGKAT KETIDAKBERATURAN SUDUT DALAM DENGAN PERKUATAN DINDING GESER OPTIMAL. S2 thesis, Universitas Mercu Buana Jakarta.

ALPIANSYAH, ALPIN (2019) ANALISIS PERKUATAN TANAH LUNAK DENGAN MENGGUNAKAN MINI PILE PADA PEKERJAAN OPRIT JEMBATAN (Studi Kasus : Sungai CiSelaraja Sta. 26+600 Jalan Tol Serang-Panimbang). S1 thesis, Universitas Mercu Buana.

ALVIAN, RISTU (2018) KINERJA RECLAIMED ASPAHALT PAVEMENT (RAP) DENGAN CAMPURAN ASPAL PENETRASI 60/70 DAN RESIDU OLI PADA "WARM MIX ASPHALT". S1 thesis, Universitas Mercu Buana Jakarta.

ALVIANO, YOLANDA (2020) STUDI KOMPARASI ANALISIS ELEMEN PELAT LENTUR DENGAN MENGGUNAKAN METODE NAVIER DENGAN SOFTWARE ELEMEN HINGGA. S1 thesis, Universitas Mercu Buana Jakarta.

ALWANDA, APRILLIANI (2019) ANALISIS PERBANDINGAN MUTU DAN BIAYA PADA PEKERJAAN WATERPROOFING DAK KONVENSIONAL (SIKA) DAN WATERPROOFING DAK PENETRON (Studi Kasus : Proyek Perumahan Discovery Aluvia, Bintaro Jaya, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ALWI, MOHAMAD BISRI FAESAL (2021) ANALISIS WASTE ALUMINIUM COMPOSITE PANEL (ACP) PADA PROYEK GEDUNG BERTINGKAT DENGAN METODE FISHBONE DIAGRAM (Studi Kasus: Proyek Vasanta Innopark). S1 thesis, Universitas Mercu Buana Jakarta.

AMAL, MUHAMAD ICHLAZUL (2023) ANALISIS KETERLAMBATAN STRUKTUR BAWAH PADA PEKERJAAN PANCANG DI PROYEK BANGKA OFFICE JAKARTA. S1 thesis, UNIVERSITAS MERCU BUANA.

AMALIA, SUCI (2022) ANALISIS PEMILIHAN MODA TRANSPORTASI RUTE TANGERANG-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AMALIAH, RISQI TRI FIQIH (2023) PERBANDINGAN KUAT TEKAN BETON F'C 30 MPA MENGGUNAKAN VARIASI BAHAN TAMBAH SILICA FUME PADA PERENDAMAN AIR TAWAR DAN AIR LAUT. S1 thesis, Universitas Mercu Buana Jakarta.

AMANDHITA, VELINDYA PUTRI (2020) STRUKTUR BERATURAN PADA DENAH TIDAK SIMETRIS DENGAN DIMENSI DAN BENTUK KOLOM TIDAK SERAGAM. S1 thesis, Universitas Mercu Buana Jakarta.

AMAR, SAIFUL (2024) ANALISIS PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI RUMAH TINGGAL DENGAN METODE TIME COST TRADE OFF (Studi Kasus : Pekerjaan Pembangunan Proyek rumah tinggal di Perumahan Rempoa Indah Bintaro Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

AMARRULLOH, MUCHAMMAD AYUB (2019) ANALISIS KESELAMATAN PADA PERLINTASAN SEBIDANG LINTASAN KERETA API (Studi Kasus Perlintasan Sebidang Di Jalan Panjang Kedoya Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

AMARULLOH, MUCHAMMAD AYUB (2018) PELAKSANAAN PRESSURE GROUTING PADA PROYEK APARTEMEN GREEN CLEOSA. S1 thesis, Universitas Mercu Buana Jakarta.

AMATULLAH, FATHIYA (2020) ANALISIS POLA PENEMPATAN DAN JUMLAH STASIUN HUJAN BERDASARKAN PERSAMAAN KAGAN RODDA PADA DAS CILIWUNG. S1 thesis, Universitas Mercu Buana Bekasi.

AMBADAR, HELMI UMAR (2021) ANALISIS PENYEBAB TERJADINYA SENGKETA KONSTRUKSI KONTRAK EPC PADA PROYEK BROWNFIELD. S2 thesis, Universitas Mercu Buana Jakarta.

AMBODO, RICO TRI (2021) ANALISIS RISIKO BIAYA DAN WAKTU KONSTRUKSI AKIBAT PERUBAHAN DESAIN PADA PEKERJAAN STRUKTUR TOWN HOUSE (Studi Kasus : Proyek Arumaya Residences, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

AMIN, MOH. AMIRUL (2019) METODE PELAKSANAAN PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI PADA PROYEK APARTEMEN LRT URBAN SIGNATURE CIRACAS JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

AMINUDIN, CHOIRUL FAZRIN (2022) ANALISIS KINERJA RUAS DAN SIMPANG EMPAT BERSINYAL JALAN RAYA SEMPLAK KOTA BOGOR MENGGUNAKAN METODE MKJI 1997. S1 thesis, Universitas Mercu Buana Bekasi.

AMIRUDIN, MUHAMMAD (2022) ANALISIS PENGARUH HAMBATAN SAMPING DAN ZEBRA CROSS TERHADAP KAPASITAS JALAN (STUDI KASUS: JALAN RAYA CIRACAS JAKARTA TIMUR DI DEPAN PASAR JAYA CIRACAS). S1 thesis, Universitas Mercu Buana Bekasi.

AMITRI, GUNTUR GUMELAR (2019) “PERBAIKAN TANAH MENGGUNAKAN METODE PVD PADA PROYEK RUNWAY 3” (STUDI KASUS : BANDAR UDARA SOEKARNO-HATTA). S1 thesis, Universitas Mercu Buana Jakarta.

AMONICA, AMARAH HER (2022) KLAIM VARIATION ORDER PADA JENIS KONTRAK DESIGN AND BUILD LUMPSUM DI PROYEK PEMERINTAH (Studi Kasus: Proyek Pembangunan Gedung Pelayanan Kanker Terpadu RSUP Fatmawati). S1 thesis, Universitas Mercu Buana Jakarta.

AMRIZAL, MUHAMMAD NAUFAL (2022) ANALISIS PERBANDINGAN BIAYA DAN MUTU PANEL BETON CAMPURAN FLY ASH DAN BOTTOM ASH DENGAN PANEL BETON KONVENSIONAL (Studi Kasus Panel Beton Precast pada Proyek Pemagaran Coal Yard PLTU Suralaya Banten). S1 thesis, Universitas Mercu Buana Jakarta.

AMRY, MUHAMMAD (2018) ANALISIS KONTRAK KONSTRUKSI RANCANG-BANGUN (Design-Build) DAN IMPLEMENTASINYA DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

ANAM, SYAFI'UL (2019) Analisis Penanggulangan Banjir Pada Sistem Drainase Di Perumahan Jatibening Permai Kota Bekasi. S1 thesis, Universitas Mercu Buana.

ANANDA, KARINA (2021) ANALISIS DAYA DUKUNG PONDASI TIANG BOR BERDASARKAN DATA PENYELIDIKAN TANAH (SPT) DAN HASIL KENTLEDGE STATIC COMPRESSION LOADING TEST Studi Kasus Proyek IKEA Store 2 Jakarta Garden City. S1 thesis, Universitas Mercu Buana Jakarta.

ANDANAWARIH, MUHAMMAD FIRAS (2018) ANALISIS PEMANCANGAN TIANG MENEMBUS LAPISAN LENSA DENGAN METODE WAVE EQUATION MENGGUNAKAN PROGRAM KOMPUTER. S1 thesis, Universitas Mercu Buana Bekasi.

ANDAYANI, AMALIA RIZQI (2023) ANALISIS KEBUTUHAN ANGKUTAN TAKSI DI BANDAR UDARA INTERNASIONAL HALIM PERDANAKUSUMA DENGAN METODE LOGIT BINER SELISIH. S1 thesis, Universitas Mercu Buana Jakarta.

ANDESIA, PADAL (2020) ANALISIS LAYANAN TRANSJAKARTA BERDASARKAN STANDAR PELAYANAN MINIMUM DITJEN PERHUBUNGAN DARAT DAN IMPORTANCE PERFORMANCE ANALYSIS (STUDI KASUS : KORIDOR 5 RUTE KAMPUNG MELAYU – ANCOL). S1 thesis, Universitas Mercu Buana.

ANDHIKA, WINDI (2017) ANALISIS KOMPONEN DAN PEMODELAN RASIO BIAYA TIDAK LANGSUNG TERHADAP NILAI KONTRAK PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

ANDIAJI, FARIZA PUTRA (2022) PENGARUH PEMANFAATAN LIMBAH GENTENG SOKKA SEBAGAI AGREGAT KASAR DAN PENAMBAHAN SERAT KACA (FIBERGLASS) SEBAGAI BAHAN CAMPURAN RESIN EPOKSI PADA KUAT TEKAN BETON POLIMER. S1 thesis, Universitas Mercu Buana Bekasi.

ANDIANTO, DENIS (2020) ANALISIS FAKTOR-FAKTOR PENYEBAB PEMBENGKAKAN BIAYA (COST OVERRUN) PADA BIAYA TIDAK LANGSUNG (INDIRECT COST) PADA PROYEK METRO GALAXY PARK. S1 thesis, Universitas Mercu Buana Bekasi.

ANDINI, HANIFAH KARTIKA (2023) PENILAIAN RISIKO (RISK ASSESMENT) KESEHATAN DAN KESELAMATAN KERJA (K3) PADA PEKERJAAN GEDUNG BERTINGKAT TINGGI DENGAN ANALISIS MARKOV (Studi Kasus : Pembangunan Hotel Soll Marina, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ANDIVA, HARVAN ALANS (2022) ANALISIS KETERLAMBATAN PROYEK PADA PERKERJAAN LANJUTAN PEMBANGUNAN RAWAT INAP KLAS III RUMAH SAKIT UMUM DAERAH SIJUNJUNG. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRA PUTRA, ADE (2022) ANALISIS TINGKAT KECELAKAAN LALU LINTAS DAN PENANGANANNYA DENGAN METODE EQUIVALENT ACCIDENT NUMBER DAN BATAS KONTROL ATAS (STUDI KASUS JALAN RAYA SERANG KILOMETER 11- KILOMETER 25 KABUPATEN TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

ANDREAN, KRISNA FEZY (2022) DAMPAK PUTAR BALIK ARAH (U-TURN) TERHADAP KINERJA RUAS JALAN CIPUTAT RAYA, CIRENDEU, KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ANDREAS, RONNY EDISON (2021) ANALISIS FAKTOR PENYEBAB BIAYA TAMBAH AKIBAT PENURUNAN KUALITAS KONSTRUKSI BANGUNAN BERSUBSIDI ( Studi kasus : Proyek pembangunan Ciruas Land). S1 thesis, Universitas Mercu Buana Jakarta.

ANDREYANI, NI PUTU WULAN (2019) ANALISIS DAMPAK LALU LINTAS PEMBANGUNAN APARTEMEN URBAN SKY DI CIKUNIR KOTA BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRI, ANDRI (2018) EVALUASI PENERAPAN KONSEP GREEN BUILDING UNTUK KRITERIA APPROPRIATE SITE DEVELOPMENT PADA PERANCANGAN GEDUNG SEKOLAH YADIKA 1 DAN 2 TEGAL ALUR. S1 thesis, Universitas Mercu Buana.

ANDRIAN, (2023) ANALISISKINERJARUASJALANDANSIMPANGTAKBERSINYAL DENGANMETODEMKJI1997(STUDIKASUSSIMPANGTIGALENGAN JALANRAYACILINGSI-JALANRAYAJONGGOL. S1 thesis, Universitas Mercu Buana Bekasi.

ANDRIAN, FANISYA PUTRI (2019) PENGARUH PENGGUNAAN LIMBAH KERAMIK SEBAGAI SUBTITUSI AGREGAT KASAR DENGAN CURRING AIR LAUT TERHADAP KUAT TEKAN BETON TAHAN SULFAT BERBASIS FLY ASH. S1 thesis, Universitas Mercu Buana Bekasi.

ANDRIANTO, FAJAR and GUNAWAN, LUKMAN HAKIM (2017) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN GEDUNG PERKANTORAN OFFICE ONE JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIAWAN, FADLI (2018) ANALISIS KARAKTERISTIK PARKIR KENDARAAN PADA AREA PARKIR MALL TANGERANG CITY, KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIAWAN, FADLI and DAVYT, AL- QORANA (2017) PELAKSANAAN PEKERJAAN RAFT FOUNDATION PADA PROYEK APARTEMEN SILK TOWN TOWER ALEXANDRIA. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIHASWORO, GALIH (2020) METODE PELAKSANAAN PEKERJAAN BALOK, PELAT, KOLOM DAN PILE CAP PROYEK THAMRIN NINE TOWER Mohammad Husni Thamrin - Jakarta Pusat. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIYANI, SEPTARIA (2022) EVALUASI FONDASI TIANG PANCANG T105 DENGAN KAPASITAS TANGKI 20.000 M3 PADA TANAH REKLAMASI STUDI KASUS DI NIPA STORAGE TANK TERMINAL PROJECT PULAU NIPA, KEPULAUAN RIAU. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIYANTO, ANDRIYANTO (2021) ANALISIS SHOCK WAVE PADA PERLINTASAN KERETA API SEBIDANG (Studi Kasus Perlintasan Sebidang Di Jalan Tubagus Angke Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIYANTO, ANDRIYANTO (2020) PEKERJAAN PONDASI BORED PILE PADA PROYEK PASAR SAMBOJA JATINEGARA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIYANTO, MUHAMAD RIZKI (2024) ANALISIS PENGARUH ADANYA U-TURN (PUTAR BALIK ARAH) PADA RUAS JALAN RAYA DAAN MOGOT TERHADAP KARAKTERISTIK LALU LINTAS (STUDI KASUS : U-TURN KM 11). S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIYANTO, TRIO (2022) ANALISIS DAMPAK PENAMBAHAN JAM KERJA LEMBUR DAN TENAGA KERJA TERHADAP PENYELESAIAN PROYEK (STUDI KASUS PROYEK GEDUNG SEKOLAH GLOBAL SEVILLA PULOMAS). S1 thesis, Universitas Mercu Buana Jakarta.

ANGGI SAPUTRO, BENI (2020) PENGARUH PENAMBAHAN ABU TEMPURUNG KELAPA TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

ANGGRAENI, ELFERA IKA (2020) ANALISIS RISIKO PEKERJAAN PONDASI PADA PROYEK PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA UNTUK MENINGKATKAN KINERJA WAKTU. S1 thesis, Universitas Mercu Buana Bekasi.

ANGGRAENI, ENDAH RATNA (2021) PEMILIHAN TEKNOLOGI MATERIAL RAMAH LINGKUNGAN DENGAN PENDEKATAN ASPEK TEKNIS DAN BIAYA PADA BANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

ANGGRAENI, NUR NAHDIAH (2022) ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER (CCO) PADA PROYEK PEMBANGUNAN DEALER MOTOR X. S1 thesis, Universitas Mercu Buana Jakarta.

ANGGRAINY, STEFANNY VIRA (2023) KARAKTERISTIK MARSHALL PADA CAMPURAN COLD PAVING HOT MIX ASBUTON (CPHMA) DENGAN PENAMBAHAN FILLER LIMBAH BAN KARET BEKAS TERHADAP VARIASI PERENDAMAN. S1 thesis, Universitas Mercu Buana Jakarta.

ANISAUFI, DIAS NANDA (2023) ANALISIS KINERJA DAN KEPENTINGAN PELAYANAN ANGKUTAN UMUM KERETA API JURUSAN TEGAL - SEMARANG (Studi Kasus:Kereta Api Joglosemarkerto). S1 thesis, Universitas Mercu Buana Jakarta.

ANJARASMARA, ANJARASMARA (2020) KAJIAN DAYA SERAP TERHADAP GAYA GESER DAN TINGGI EFEKTIF DINDING GESER DENGAN MEMPERHITUNGKAN VARIASI RASIO SISI PANJANG : LEBAR TAPAK (STUDI KASUS GEDUNG BERTAPAK T). S1 thesis, Universitas Mercu Buana.

ANJIS, FAJAR ABDUL (2021) ANALISIS FAKTOR KETERLAMBATAN DAN PENGENDALIAN PROYEK PEMBANGUNAN GEDUNG CONDOVILLAS GREEN (Summarecon Serpong). S1 thesis, Universitas Mercu Buana Jakarta.

ANNISA PUTRI, IHSANNIA (2023) PENGARUH PERUBAHAN DESAIN PADA STRUKTUR BAWAH TERHADAP COST OVERRUN PADA PROYEK PEMBANGUNAN RUMKIT TK.III LANTAMAL XII PONTIANAK, KALIMANTAN BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

ANSHORI, HAFIZ (2017) ANALISIS PENJADWALAN PEKERJAAN DINDING DENGAN MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (Studi Kasus : Proyek Primrose Condovilla, Summarecon Bekasi, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

ANTONI, PRIYO (2020) ANALISIS FUNGSI TROTOAR TERHADAP PEJALAN KAKI DI JALAN KEMBANGAN RAYA. S1 thesis, Universitas Mercu Buana Jakarta.

ANTONI, PRIYO (2019) PROYEK JALAN TOL DEPOK ANTASARI PAKET 1 SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ANUGRAH, RYANDRA RIZKY (2018) PENGARUH SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) TERHADAP PRODUKTIVITAS TENAGA KERJA (Studi Kasus Proyek Bangunan Industri PT.X Ciracas Jakarta Timur). S1 thesis, Universitas Mercu Buana Bekasi.

ANVER, TRIO (2021) PERENCANAAN STRUKTUR ATAS 17 LANTAI GEDUNG THE KENSINGTON OFFICE TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

ANWAR, FAISAL (2021) EVALUASI KINERJA OPERASIONAL DAN PELAYANAN BUS AKAP TRAYEK TANGERANG -MADIUN ( STUDI KASUS PT.SUDIRO TUNGGA JAYA ). S1 thesis, Universitas Mercu Buana Jakarta.

ANWARDI, PUTRI OKTAVIAN (2020) ANALISIS SIMPANG TIGA LENGAN TAK BERSINYAL DAN RUAS JALAN PADA JL. RAYA KARANG SATRIA – KABUPATEN BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

APRIANDAH, APRIANDAH (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUMAH SAKIT SARI ASIH SANGIANG TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

APRIANTO, MOHAMAD RIZKIE (2020) DESAIN ALTERNATIF HOTEL DI SLIPI DENGAN KONFIGURASI LETAK, TEBAL, DAN KETINGGIAN EFEKTIF DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

APRILIA, MASAYU GESSY (2022) ANALISIS RISIKO KETERLAMBATAN PENGADAAN MATERIAL TERHADAP PROYEK PEKERJAAN PENINGKATAN KUALITAS PERMUKIMAN KUMUH KABUPATEN BOGOR, KAWASAN BOJONGGEDE. S1 thesis, Universitas Mercu Buana Jakarta.

APRILIAN, MUHAMMAD TRI (2023) ANALISIS PRODUKTIVITAS ALAT BERAT DENGAN WAKTU DAN BIAYA PADA PEKERJAAN CUT AND FILL ( STUDI KASUS : PROYEK INDAH KIAT –KARAWANG TIMUR ). S1 thesis, Universitas Mercu Buana Bekasi.

APRILIANI, ANGGI DWI (2023) ANALISIS TINGKAT KINERJA PELAYANAN TERHADAP KEPUASAN PENUMPANG PADA KERETA REL LISTRIK (KRL) COMMUTER LINE DI STASIUN MANGGARAI. S1 thesis, Universitas Mercu Buana Bekasi.

APRILIUM, JIHAD KSATRIA (2022) KOMPARASI PERANCANGAN PERKERASAN KAKU MENGGUNAKAN MDPJ 2017 DAN AASHTO 1993 PADA JALAN TOL TRANS SUMATERA RUAS PEKANBARU – DUMAI SEKSI 4A. S1 thesis, Universitas Mercu Buana Bekasi.

APRILIYANINGSIH, EKA (2021) ANALISIS TINGKAT KESELAMATAN LALU LINTAS PADA SIMPANG TIGA DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (TCT) ( STUDI KASUS: PERSIMPANGAN JL.BINTARO PUSPITA RAYA- JL. PONDOK BETUNG). S1 thesis, Universitas Mercu Buana Jakarta.

APRILYA, MILA MARLY (2021) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PADA PEMASANGAN ALUMUNIUM COMPOSITE PANEL DAN CORRUGATED METAL SHEET (Studi Kasus: Proyek Gudang Area Office Tahap 1 – Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.

APRIYANTO, ARIF (2018) PELAKSANAAN PEKERJAAN BORE PILE PROYEK APARTEMEN EMERALD BINTARO TOWER B. S1 thesis, Universitas Mercu Buana Jakarta.

APRYZAN, MUHAMMAD RANAFIF (2020) ANALISIS PERBANDINGAN BIAYA DAN PRODUKTIVITAS BATCHING PLANT PADA SEMEN PORTLAND BIASA DAN SEMEN PORTLAND SLAG DALAM CAMPURAN BETON DENGAN METODE ANALISIS HARGA SATUAN PEKERJAAN DAN ANALISIS PRODUKTIVITAS ALAT BERAT (Studi Kasus : Batching Plant PT. Waskita Beton Precast Proyek Bandara Yogyakarta International Airport). S1 thesis, Universitas Mercu Buana Jakarta.

AR, MOH MAHFUD JUNAIDI (2022) ANALISIS KINERJA WAKTU DAN BIAYA AKIBAT PERUBAHAN SPESIFIKASI MATERIAL PADA PROYEK APARTEMEN DENGAN METODE EARNED VALUE( Studi Kasus: Proyek Pembangunan Apartemen Gateway Park Bekasi ). S1 thesis, Universitas Mercu Buana Jakarta.

ARAYNIRI, FADHIL (2020) PELAKSANAAN PEKERJAAN GROUND ANCHOR LAYER 3 DENGAN MENGGUNAKAN DAGU SEBAGAI PENAHAN WALLERBEAM PADA PROYEK MENARA BRI GATOT SUBROTO MENTENG ATAS JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ARDI, FANI (2018) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO METODE PELAKSANAAN SHEAR WALL (Jalan Raya Jombang No. 42, Parigi, Pondok Aren, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ARDIANSAH, ANDI (2023) ANALISIS KINERJA SIMPANG BERSINYAL DENGAN METODE MANUAL KAPASITAS JALAN INDONESIA (MKJI) 1997 DAN GELOMBANG KEJUT (SHOCKWAVE) (Studi Kasus Jalan Tanah Tinggi Barat Bungur Kec. Senen Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

ARDIANSYAH, (2018) STUDI KOMPARASI PENGGUNAAN SODIUM GLUKONAT DAN SUKROSA SEBAGAI RETARDER PADA BETON MUTU TINGGI ( HIGH STRENGHT CONCRETE ). S1 thesis, Universitas Mercu Buana Bekasi.

ARDIANSYAH, FIKRI (2022) Analisis Pelaksanaan Total Quality Management (TQM) Pada Proyek Bangunan Tinggi di Jakarta. S2 thesis, Universitas Mercu Buana Jakarta.

ARDIANSYAH, M. KHOLIS (2023) PENINGKATAN KINERJA BIAYA GREEN RETROFITTING BATCHING PLANT BERBASIS VALUE ENGINEERING DAN LIFE CYCLE COST ANALYSIS. S2 thesis, Universitas Mercu Buana.

ARDIANSYAH, VIKI (2023) ANALISIS PEMILIHAN VENDOR MENGGUNAKAN MULTI CRITERIA DECISION MAKING ( MCDM ) DENGAN METODE ANALITYCAL HIERARCHY PROCESS ( AHP ). S1 thesis, Universitas Mercu Buana Jakarta.

ARDIANTO, AFIF IHSAAN (2021) ANALISIS KARAKTERISTIK DAN KEBUTUHAN FASILITAS AREA PARK AND RIDE PADA STASIUN JURANG MANGU, TANGERANG SELATAN, BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

ARDIANTORO, AKHMAD RIVA'I (2019) STUDI EKSPERIMENTAL PENGGUNAAN AGREGAT KASAR BUATAN (HIDROTON) DAN FLY ASH TERHADAP KUAT TEKAN BETON RINGAN. S1 thesis, Universitas Mercu Buana Bekasi.

ARDILA, MEILY (2019) ANALISA KINERJA SUPPLY CHAIN PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG DENGAN KONSEP LEAN CONSTRUCTION (STUDI KASUS PROYEK THAMRIN NINE JAKARTA). S1 thesis, Universitas Mercu Buana.

ARDIWICAHYO, FADHILLAH (2022) ANALISIS PEMILIHAN MODA TRANSPORTASI UMUM (STUDI KASUS: BUS TRANSJAKARTA DAN MRT RUTE LEBAK BULUS – BLOK M). S1 thesis, Universitas Mercu Buana Jakarta.

ARDIYANSYAH, RAFI (2022) PENGARUH PENGGUNAAN LIMBAH BETON SEBAGAI SUBSTITUSI AGREGAT KASAR DAN SERBUK BESI SEBAGAI SUBSTITUSI AGREGAT HALUS TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

ARDIYANTO, (2019) PERBANDINGAN EFISIENSI PENGGUNAAN PROFIL CASTELLATED BEAM DENGAN CORRUGATED BEAM PADA PERENCANAAN STRUKTUR BAJA GEDUNG BERLANTAI BANYAK. S1 thesis, Universitas Mercu Buana Bekasi.

ARDIYATO, AHMAD HERLANDY (2017) EVALUASI WAKTU PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI 2 DENGAN MENGGUNAKAN METODE PRECENDENCE DIAGRAM METHOD (PDM). S1 thesis, Universitas Mercu Buana Jakarta.

ARGIANSYAH, YOGI (2017) ANALISIS PENGARUH FAKTOR - FAKTOR KETERLAMBATAN TERHADAP PEMBENGKAKAN BIAYA PROYEK - PROYEK PERUMAHAN(STUDI KASUS : PELAKSANAAN PROYEK KONSTRUKSI PERUMAHAN DI KABUPATEN TANGERANG). S1 thesis, Universitas Mercu Buana.

ARIANTI, ADE (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN PERMATA HIJAU SUITES Jalan Raya Kebayoran Lama No.55, Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

ARIANTO, FATHONI (2018) ANALISIS KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI PADA SIMPANG PULO RIBUNG JALAN RAYA PEKAYON KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

ARIEF, ILHAM MUHAMMAD (2019) PELAKSANAAN PEKERJAAN BORED PILE PROYEK PEMBANGUNAN RUMAH SUSUN TINGKAT TINGGI PASAR JUMAT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ARIF, BISMAR (2021) IDENTIFIKASI RISIKO KEGAGALAN TENDER E-PROCUREMENT KONTRAKTOR PT. ABC PADA KEMENTERIAN X. S1 thesis, Universitas Mercu Buana Jakarta.

ARIF, FAISHOL (2022) SIMULASI NUMERIK PENGGUNAAN BASE ISOLATION UNTUK STRUKTUR SEDERHANA TAHAN GEMPA. S2 thesis, Universitas Mercu Buana Jakarta.

ARIFIANTI, AYU SETYA (2019) ANALISA KETERSEDAAN LAHAN PARKIR BAGI PENGHUNI APARTEMENT GREEN PARKVIEW. S1 thesis, Universitas Mercu Buana Jakarta.

ARIFIN, FACHRUL (2019) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP PELAYANAN DAN FASILITAS TRANSPORTASI BERBASIS INTEGRASI DI JAKARTA (STUDI KASUS KAWASAN INTEGRASI DUKUH ATAS). S1 thesis, Universitas Mercu Buana Bekasi.

ARIFIN, MUHAMMAD (2021) STUDI PERANCANGAN ULANG GEDUNG APARTEMEN DI JAKARTA BARAT DENGAN SISTEM OUTRIGGER DAN BELT-TRUSS. S1 thesis, Universitas Mercu Buana Jakarta.

ARIFIN, RIDWAN (2021) EVALUASI TINGKAT PELAYANAN PEJALAN KAKI TERHADAP FASILITAS PEDESTRIAN DI DEPAN UIN SYARIF HIDAYATULLAH (STUDI KASUS: JALAN IR H JUANDA, TANGERANG SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

ARIYANI, PUTRI DWI (2022) EVALUASI KINERJA STRUKTUR GEDUNG BERTINGKAT DENGAN METODE ANALISIS DINAMIK RESPON SPEKTRUM MENGGUNAKAN GEMPA PADANG (Studi Kasus: Gedung F, Gandum Mas Kencana, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

ARIYANTI, DHEA SAVITRI (2022) ANALISIS FAKTOR DOMINAN PENYEBAB TIDAK TERCAPAINYA TARGET KINERJA WAKTU PROYEK MENGGUNAKAN FREQUENCY ADJUSTED IMPORTANCE INDEX (FAII) DAN RISK SCALE (Studi kasus: proyek pembangunan proyek Light Rail Transit (LRT) lintas pelayanan 2 jembatan penyebrangan orang (JPO) Kuningan,Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ARJON, ARJON (2023) POTENSI SENGKETA DI PROYEK KONSTRUKSI BANGUNAN GEDUNG BANK PEMERINTAH DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

ARRASYID, MUHAMMAD FIQRI HASBI HARUN (2023) ANALISIS PERBANDINGAN METODE PLAT LANTAI PRECAST DENGAN METODE PLAT LANTAI KONVENSIONAL DITINJAU DARI SEGI WAKTU (Studi kasus : Proyek Pembangunan Gereja Kemah Tabernakel PIK 2). S1 thesis, Universitas Mercu Buana Jakarta.

ARTETI, NOVI (2020) FAKTOR-FAKTOR YANG MEMPENGARUHI KEIKUTSERTAAN KONTRAKTOR PADA PROSES TENDER PELAKSANAAN KONSTRUKSI DI PUSAT LITBANG KEBIJAKAN DAN PENERAPAN TEKNOLOGI – BALITBANG – KEMENTERIAN PUPR. S2 thesis, Universitas Mercu Buana Jakarta.

ARVAN, MUHAMMAD (2021) ANALISIS PERBANDINGAN BIAYA, WAKTU SERTA PENERAPAN REKAYASA NILAI TERHADAP PEKERJAAN BEKISTING KONVENSIONAL DENGAN BEKISTING ALUMUNIUM PADA PROYEK RUSUN STASIUN RAWABUNTU. S1 thesis, Universitas Mercu Buana Jakarta.

ARYANI, DESTRINA DWI (2019) ANALISIS PENGARUH PENAMBAHAN SHEAR WALL TERHADAP SIMPANGAN STRUKTUR GEDUNG AKIBAT GEMPA BERDASARKAN SNI 1726-2012 (STUDI KASUS : UNIVERSITAS ATMAJAYA – TANGERANG). S1 thesis, Universitas Mercu Buana Bekasi.

ARYANTI, ANINDYA SEKAR (2020) PENGARUH MUATAN BERLEBIH TERHADAP USIA PEKERASAN JALAN (STUDI KASUS: RUAS JALAN KERAWANG TIMUR 1 - CIPULARANG). S1 thesis, Universitas Mercu Buana Jakarta.

ASHADI, REZA FERIAL (2019) PENERAPAN METODA PENJADWALAN MANUAL-PROGRAM EVALUATION AND REVIEW TECHNIQUE (M-PERT) DAN SISTEM PENGAWASAN BERBASIS GEOGRAPHIC INFORMATION SYSTEM (GIS) PADA MEGA PROYEK INFRASTRUKTUR JEMBATAN SELAT SUNDA. S2 thesis, Universitas Mercu Buana Jakarta.

ASHARI, AGUNG (2018) PELAKSANAAN PONDASI BORED PILE PROYEK BOARDING HOUSE KUNINGAN JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

ASLAMIYA, ASLAMIYA (2021) ANALISIS PENGENDALIAN KUALITAS DINDING PRACETAK DENGAN MENGGUNAKAN PENDEKATAN SIX SIGMA DENGAN METODE DMAIC. S1 thesis, Universitas Mercu Buana Jakarta.

ASMORO, FAJAR ANJAS (2021) ANALISIS DAYA DUKUNG DAN PENURUNAN FONDASI BORED PILE BERDASARKAN DATA PENYELIDIKAN TANAH DAN UJI PEMBEBANAN (Studi Kasus : Proyek Permata Hijau Suites, Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

ASMORO, FAJAR ANJAS (2020) METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT, KOLOM, DAN BALOK PROYEK BUITENZORG BASKET HALL - BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

ASRI, SUPRIADI (2020) PENINGKATAN KINERJA WAKTU DENGAN METODE BUILDING INFORMATION MODELING (BIM 3D) DAN CRITICAL PATH METHOD (CPM) PADA PEKERJAAN STRUKTUR BAJA BANGUNAN GEDUNG BERTINGKAT SANGAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

ASTRIWI, DIAN PUTRI (2023) ANALISIS PRODUKTIVITAS TENAGA KERJA LAPANGAN UNTUK MENGETAHUI EFEKTIVITAS PEKERJAAN PABRIKASI KOLOM DENGAN PERHITUNGAN LUF MENGGUNAKAN METODE WORK SAMPLING PADA BANGUNAN KOMERSIAL. S1 thesis, Universitas Mercu Buana Jakarta.

ATHALLAH, MUHAMMAD RAKHA (2022) ANALISIS KINERJA SIMPANG EMPAT BERSINYAL DAN RUAS JALAN RAYA NAROGONG MENGGUNAKAN PERANGKAT LUNAK VISSIM (Studi Kasus : Simpang Jl. Masjid Bojong – Jl. Kemang Pratama Raya, dan Jl. Raya Narogong – Jl. Raya Siliwangi, Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

AUDA, AFI AULIA (2022) ANALISIS WAKTU DENGAN PRECEDENCE DIAGRAM METHOD MENGGUNAKAN APLIKASI PRIMAVERA UNTUK EVALUASI PENJADWALAN PROYEK( STUDI KASUS : PROYEK CITIPLAZA KABUPATEN TANGERANG ). S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, AGUSTINA EKA PUTRI (2018) FAKTOR – FAKTOR YANG MEMENGARUHI WAKTU PENYELESAIAN PEKERJAAN KONTRAK DESIGN AND BUILD METODE BERBASIS KINERJA PROYEK WISMA ATLET KEMAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, DINAL (2022) MODEL DINAMIS MODULAR CONSTRUCTION RESIDENTIAL HIGH-RISE BUILDING BERBASIS RISK MANAGEABILITY UNTUK MENINGKATKAN KINERJA WAKTU PROYEK. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, HUSNA MEGA AL (2019) ANALISA KINERJA JALAN DAN SIMPANG TAK BERSINYAL PADA RUAS JALAN ARIA PUTRA-KEDAUNG-BUKIT RAYA KOTA TANGERANG SELATAN DENGAN METODE MKJI 1997. S1 thesis, Universitas Mercu Buana Bekasi.

AULIA, RATNA AYU (2021) ANALISIS PENGENDALIAN BIAYA PADA PROYEK PEKERJAAN STRUKTUR BETON BERTULANG BANGUNAN PENUNJANG PABRIK HYUNDAI MOTOR MANUFACTURE BUILDING CIKARANG. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, SYIFA PUTRI (2019) PELAKSANAAN KONSTRUKSI PLAT, BALOK DAN KOLOM PROYEK PEMBANGUNAN APARTEMEN ARANDRA RESIDENCE Cempaka Putih - Jakarta Pusat. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, ZAHRA (2023) DESAIN ULANG STRUKTUR APARTEMEN TOWER SA THE STATURE JAKARTA MENGGUNAKAN CORE WALL BERDASARKAN SNI 1726-2019. S1 thesis, Universitas Mercu Buana Jakarta.

AVIANI, RAHMADIA NUR and RIFQI, MUHAMAD (2017) PERENCANAAN STRUKTUR STASIUN FATMAWATI MASS RAPID TRANSIT (MRT) JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AWALIA, ANISA RIZKA (2023) ANALISIS FAKTOR-FAKTOR PENYEBAB KOMPLAIN DARI KONSUMEN TERHADAP KEPUASAN KONSUMEN ATAS KINERJA DEVELOPER PADA PROYEK PEMBANGUNAN APARTEMEN SENTRA TIMUR RESIDENCE. S1 thesis, Universitas Mercu Buana Jakarta.

AWALUDIN, MUHAMAD (2023) ANALISIS PANJANG ANTRIAN AKIBAT PALANG PINTU KERETA API (STUDI KASUS DI JALAN PERCETAKAN NEGARA, JAKARTA PUSAT). S1 thesis, Universitas Mercu Buana Jakarta.

AYU AINURRAHMA, ANGGITA (2020) PERBANDINGAN PENGARUH PENGGUNAAN LIMBAH ABU AMPAS TEBU (AAT) DAN LIMBAH SERBUK BATU BATA MERAH SEBAGAI FILLER PENGGANTI PADA CAMPURAN LASTON AC-WC (ASPHALT CONCRETE-WEARING COURSE) DENGAN SISTEM HOT MIX PADA UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

AYUNINGTIAS, HANA SARY (2020) ANALISIS FAKTOR PENYEBAB AMANDEMEN KONTRAK PADA PELAKSANAAN PROYEK PEMBANGUNAN BENDUNGAN CIAWI (DRY DAM) DI KABUPATEN BOGOR. S1 thesis, Universitas Mercu Buana Bekasi.

AYUNINGTYAS, MEGHAN OCHTIANTY (2019) ANALISIS KETERLAMBATAN PEKERJAAN STRUKTUR DAN FINISHING MENGGUNAKAN CPM (CRITICAL PATH METHOD) ( Studi Kasus : Proyek Sampoerna Karawang). S1 thesis, Universitas Mercu Buana Jakarta.

AYUNINGTYAS, PUPUT (2022) PENGARUH PENAMBAHAN JALUR TERHADAP OPERASI KERETA API JARAK JAUH (Studi Kasus Proyek Double Double Track Paket B, Emplasemen Stasiun Bekasi Km 25+000 sampai dengan Km 27+400). S1 thesis, Universitas Mercu Buana Jakarta.

AZALIA, KIRANA ALAMANDA (2023) ANALISIS KECELAKAAN LALU LINTAS DENGAN METODE ANGKA EKIVALEN KECELAKAAN (AEK) SERTA KINERJA PADA RUAS JALAN RAYA SERANG KABUPATEN TANGERANG (Studi kasus : Jalan Raya Serang KM 23 Balaraja - Jalan Raya Serang KM 35 Jayanti Kabupaten Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

AZHAR, SHAFY MUHAMMAD (2021) PENGARUH KUAT TEKAN BETON NORMAL TERHADAP SILICA FUME SEBAGAI PENGGANTI SEBAGIAN SEMEN. S1 thesis, Universitas Mercu Buana Jakarta.

AZHARI, RASHMA SALSABILLA (2022) EVALUASI KINERJA PELAYANAN STASIUN KERETA API MADIUN. S1 thesis, Universitas Mercu Buana Jakarta.

AZIZ, FIRMANUDIN (2023) ANALISIS PEMANFAATAN LIMBAH WADAH TELUR SEBAGAI SUBTITUSI AGREGAT HALUS DAN PEMANFAATAN LIMBAH GENTENG TANAH MERAH SEBAGAI SUBTISUSI AGREGAT KASAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

AZIZ, MUHAMMAD NUR ABDUL (2022) ANALISIS KINERJA TROTOAR PASCA PEMBANGUNAN FLYOVER TANJUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

AZIZ, SAEFUL (2023) ANALISIS STABILITAS CAMPURAN BERASPAL PG 70 PADA GRADASI SENJANG MENGGUNAKAN ALAT WHEEL TRACKING MACHINE. S1 thesis, Universitas Mercu Buana Jakarta.

AZIZ, WIWIT ABDUL (2022) PENGARUH AIR LAUT PADA BETON DENGAN MENGGUNAKAN GROUND GRANULATED BLAST FURNACE SLAG SEBAGAI SUBSTITUSI SEMEN TERHADAP SETTING TIME DAN KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

AZIZAH, SEKAR SEPTRIANITA (2020) ANALISIS LENDUTAN JANGKA PANJANG PADA PELAT DUA ARAH DENGAN SISTEM FLAT SLAB?DROP PANEL. S1 thesis, Universitas Mercu Buana Jakarta.

AZIZAH, SEKAR SEPTRIANITA (2020) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI PADA PROYEK APARTEMEN TAMAN SARI BINTARO MANSION. S1 thesis, Universitas Mercu Buana Jakarta.

AZKIA, NISA (2023) ANALISIS PENYEBAB VARIATION ORDER DAN PENGARUHNYA TERHADAP BIAYA PADA PROYEK APARTEMEN SKY HOUSE BSD+ PHASE 2 TANGERANG. S1 thesis, UNIVERSITAS MERCU BUANA.

AZMI, NIDA (2021) ANALISIS KERUSAKAN PERKERASAN JALAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) PADA JALAN LOKASI BERADA DI KOTA TANGERANG (Studi Kasus : Jalan KH Hasyim Ashari dan Jalan H Mansyur). S1 thesis, Universitas Mercu Buana Jakarta.

AZMI, WAFAUL (2023) ANALISIS IMPLEMENTASI BUILDING INFORMATION MODELLING DAN FOTOGRAMETRI PADA PEKERJAAN PELEBARAN JALAN TOL. S1 thesis, Universitas Mercu Buana Jakarta.

Anugrah, Ahmad Bayu (2017) ANALISIS PANJANG ANTRIAN SIMPANG BERSINYAL MENGGUNAKAN METODE MKJI 1997 (STUDI KASUS SIMPANG GAPLEK JALAN R.E MARTADINATA,TANGERANG SELATAN)”. S1 thesis, Universitas Mercu Buana Jakarta.

Astuti, Rini kusuma (2017) TINJAUAN KAPASITAS DIMENSI HIDROLIS BANGUNAN PELIMPAH (SPILLWAY) PADA BENDUNGAN SAGULING, JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

BACHTIAR, MUHAMMAD YUSUF SIDIK (2021) PENJADWALAN ULANG ATAS KETERLAMBATAN PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE DIAGRAM METHOD (PDM) MENGGUNAKAN SOFTWARE MS. PROJECT PROFESSIONAL 2016 (Studi Kasus : Proyek Cluster Matana Fase 1,Jakarta Garden City, Cakung, Jakarta Timur). S1 thesis, Universitas Mercu Buana Jakarta.

BADRIATINNISAK, BADRIATINNISAK (2020) KAJIAN TINGGI EFEKTIF DAN DAYA SERAP DINDING GESER TERHADAP GAYA LATERAL PADA STRUKTUR SISTEM GANDA DENGAN VARIASI TINGGI KOLOM (Studi kasus: Gedung Tapak T). S1 thesis, Universitas Mercu Buana Jakarta.

BADRIATINNISAK, BADRIATINNISAK (2019) PEMBANGUNAN PROYEK JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN METODE KONSTRUKSI BORED PILE DENGAN PENGUJIAN PILE DRIVING ANALYZER (PDA) TEST. S1 thesis, Universitas Mercu Buana Jakarta.

BADRIZA, ARDYAN (2021) ANALISA STABILITAS TIMBUNAN TINGGI DENGAN PERKUATAN GEOTEXTILE (Studi Kasus: North Area Theme Park Lido by MNC Land). S1 thesis, Universitas Mercu Buana Jakarta.

BAIHAQI, AHMAD (2018) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN APARTEMEN DAAN MOGOT CITY JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

BAIHAQI, MUHAMMAD AZMI (2019) ANALISIS KINERJA JALAN DAN SIMPANG BERSINYAL DENGAN METODE MKJI DI SIMPANG KALIBATA (JALAN RAYA PASAR MINGGU) JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

BAIQUNI, MUHAMMAD ADNAN (2019) EVALUASI GEDUNG DAN PERBANDINGAN MENGGUNAKAN SNI GEMPA SNI 1726:2012 DENGAN RSNI 3 2019 “STUDI KASUS RED PLANET HOTEL PADANG”. S1 thesis, Universitas Mercu Buana Jakarta.

BANDANGAN, ALAN (2020) PENGARUH SUBSTITUSI BATU KAPUR SEBAGAI SEMEN DAN LIMBAH PLASTIK SEBAGAI AGREGAT KASAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

BAROKAH, SITI (2022) ANALISIS PERBANDINGAN ESTIMASI BIAYA PELAKSANAAN PEKERJAAN PELAT BETON DIDASARKAN PERATURAN MENTERI PUPR 2016, SNI 2008 DAN AHSP 2020 PADA KONSTRUKSI GEDUNG (Studi kasus : Proyek Pembangunan Rumah Susun Polsek Menteng - Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

BARRI, AHMAD (2019) EVALUASI BIAYA PEKERJAAN PONDASI MENGGUNAKAN BORED PILE DENGAN SPUN PILE PADA PROYEK MONROE TOWER JABABEKA. S1 thesis, Universitas Mercu Buana Bekasi.

BARUS, RAFLO (2020) ANALISA PENGARUH BEBAN BERLEBIH TERHADAP UMUR RENCANA STUDI KASUS JALAN TOL TANGERANG-MERAK KM 72 S/D KM 77. S1 thesis, Universitas Mercu Buana Bekasi.

BASKARA, RESTRA OKI (2021) ANALISIS PRODUKTIVITAS PEKERJA BEKISTING HORIZONTAL MENGGUNAKAN METODE WORK SAMPLING (STUDI KASUS : PROYEK CARSTENSZ RESIDENCE TOWER C). S1 thesis, Universitas Mercu Buana Jakarta.

BASKARA, RESTRA OKI (2020) ANALISIS PRODUKTIVITAS PEKERJA BEKISTING HORIZONTAL MENGGUNAKAN METODE WORK SAMPLING (STUDI KASUS : PROYEK CARSTENSZ RESIDENCE TOWER C). S1 thesis, Universitas Mercu Buana Jakarta.

BASKORO, IMAM SINDU (2020) PENGARUH VARIASI KADAR LIMBAH ABU AMPAS TEBU TERHADAP PARAMETER MARSHALL DI LAPISAN LASTON AC-WC. S1 thesis, Universitas Mercu Buana Bekasi.

BASYIR, RIZAL (2018) PEMODELAN DEBIT ANDALAN SUB DAS CITARIK DENGAN METODE MULTILAYER PERCEPTRON BACKPROPAGATION. S1 thesis, Universitas Mercu Buana Jakarta.

BAWONO, DAPIT (2023) ANALISIS BETON GEOPOLYMER BERBAHAN DASAR LIMBAH FLY ASH PLTU LONTAR DENGAN VARIASI MOLARITAS AKTIVATOR (NAOH). S1 thesis, Universitas Mercu Buana Bekasi.

BENZELA, HELMY RUBAYA (2019) ANALISIS KINERJA SIMPANG BERSINYAL RAWA PANJANG TERKAIT KEBIJAKAN GANJIL-GENAP PADA PINTU TOL BEKASI BARAT. S1 thesis, Universitas Mercu Buana Bekasi.

BESSIE, STEAVEN CHRISTIAN (2022) EVALUASI KONDISI PERKERASAN JALAN DAN PREDIKSI UMUR SISA LAYAN JALAN DI WILAYAH BANTEN ( STUDI KASUS : Ruas Jalan Raya Prancis Dadap Kab. Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

BIANCHA, SHAYFINSHA INGE QUEEN (2022) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PROYEK (Studi Kasus: Proyek Pelebaran jalan Simorejo-Simambung, Bojonegoro, Jawa Timur). S1 thesis, Universitas Mercu Buana Jakarta.

BIHALALIKA, PANDHUM (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE. S1 thesis, Universitas Mercu Buana Jakarta.

BIMANTORO, ANDHIKA BAGUS (2023) EVALUASI KINERJA SIMPANG BERSINYAL DENGAN MENGGUNAKAN SOFTWARE PTV VISSIM (Studi Kasus : Simpang Ciledug, Kota Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

BONAVENTURA, JANSEN CAESAR (2018) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI 1997 DI SIMPANG KELAPA DUA (JALAN AKSES UI) KOTA DEPOK. S1 thesis, Universitas Mercu Buana Bekasi.

BRAYIES, SALSABILA ABDUL HAKIM (2021) PENGARUH PENAMBAHAN SERAT GONI (RAMI) TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

BRIANDANU, GRANICO (2021) ANALISIS RESPON DINAMIK STRUKTUR DENGAN MODIFIKASI BASE ISOLATION : LEAD RUBBER BEARING STUDI KASUS HOTEL DI BANDUNG JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

BUDI, MUH. HILDANI SEPTIA (2018) ANALISIS KINERJA SIMPANG TIGA LENGAN TAK BERSINYAL DAN RUAS JALAN BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA (MKJI 1997) (Studi Kasus Simpang Jati Makmur, Jl. Jati Makmur, Pondok Gede, Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

BUDIANTO, EKO ARIF (2021) PENINGKATAN KINERJA PROYEK BERBASIS LEAN SIX SIGMA DAN TIME COST TRADE OFF PADA PROYEK GUDANG AMUNISI. S2 thesis, Universitas Mercu Buana Jakarta.

BUDIMAN, ARIEF (2024) ANALISIS FAKTOR KERUSAKAN DAN KRITERIA UNTUK PENENTUAN SKALA PRIORITAS PENANGANAN JALAN NASIONAL DI WILAYAH SOREANG KABUPATEN BANDUNG DENGAN PENDEKATAN ANALYTICAL HIERARCHY PROCES (AHP). S2 thesis, Universitas Mercu Buana Jakarta.

BUDIYANTO, ASEP (2020) PERBANDINGAN NILAI EQUIVALENT SINGLE AXLE LOAD/ESAL (W18) AKIBAT MUATAN BERLEBIH KENDARAAN DENGAN METODE AASHTO 1993 DAN BINA MARGA PADA RUAS JALAN CAKUNG – CILINCING. S1 thesis, Universitas Mercu Buana Jakarta.

BUDYNINGTYAS, ANGGREINI (2020) ANALISIS RISIKO PADA MASA PEMELIHARAAN PROYEK KONSTRUKSI TERHADAP PERUSAHAAN PENYEDIA JASA (Studi Kasus : Proyek Gedung Reseach Institute Pangandaran). S1 thesis, Universitas Mercu Buana Jakarta.

BULAN, SIRCHA NADIA LEPONG (2019) METODE DAN WAKTU PELAKSANAAN OPERASIONAL KONSTRUKSI PROYEK APARTEMEN EMBARCADERO. S1 thesis, Universitas Mercu Buana Jakarta.

BUSRO, NUKMAN DIARDI (2022) ANALISIS KARAKTERISTIK PENGGUNAAN JEMBATAN PENYEBRANGAN ORANG (JPO) (Studi Kasus : Jl. Raya Bogor, Kramat Jati, Jakarta Timur). S1 thesis, Universitas Mercu Buana Bekasi.

Budyatna, Nirwan (2024) EVALUASI PENGGUNAAN SISTEM PROTEKSI KEBAKARAN AKTIF DAN PASIF PADA GEDUNG PUSKESMAS KECAMATAN XYZ. S1 thesis, Universitas Mercu Buana - Buncit.

Bulan, Sircha Nadia Lepong (2021) PERANCANGAN ULANG STRUKTUR BANGUNAN HOTEL DENGAN METODE ANALISIS TIME HISTORY YANG DITAMBAHKAN DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

CAHYADI, IMAM ARIF (2018) METODE PELAKSANAAN STRUKTUR ATAS LANTAI 6 - 8 PROYEK NEW FACTORY PHASE II ( Office ) PT. SANKEI DHARMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

CAHYANI, DAMAR BUDI NUR (2022) “EVALUASI PERENCANAAN PEMBANGUNAN TRACK DIAMOND CROSSING (STA 12+083 – 12+106)” (STUDI KASUS PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI s/d JATINEGARA (PAKET A) (TAHAP II) “PEKERJAAN MAIN LINE II”). S1 thesis, Universitas Mercu Buana Jakarta.

CAHYANI, HAJAR CRISIA (2023) ANALISIS RISIKO FAKTOR K3 DAN KUALITAS SUMBER DAYA MANUSIA TERHADAP PELAKSANAAN PEMBANGUNAN GEDUNG DENGAN FAULT TREE ANALYSIS METHOD. S2 thesis, Universitas Mercu Buana Jakarta.

CAHYANI, JIHAN ANINDYA (2021) ANALISIS PERBANDINGAN DAYA DUKUNG FONDASI BORED PILE MENGGUNAKAN DATA HASIL UJI SPT DENGAN HASIL PENGUJIAN DINAMIS PADA PROYEK DOUBLE-DOUBLE TRACK. S1 thesis, Universitas Mercu Buana Jakarta.

CAHYANTO, NANANG DWI (2018) UPAYA NORMALISASI SUNGAI CBL BEKASI DALAM RANGKA PEMBUATAN JALUR TRANSPORTASI SUNGAI (Studi Kasus: Proyek Pembangunan Normalisasi Sungai Cbl Sepanjang 12 Km Oleh PT Cikarang Listrindo Tbk). S1 thesis, Universitas Merecu Buana Bekasi.

CAHYO, AHMAD NUR (2019) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE SECANT PILE PROYEK TOL DEPOK-ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.

CAHYONO, DIMAS PURWO (2021) EVALUASI KINERJA STRUKTUR PORTAL BERDINDING PENGISISI DENGAN PENDEKATAN EQUIVALENT DIAGONAL STRUT PADA KAWASAN PANTAI KITA JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

CAHYONO, ZEFANYA RANDA (2019) PELAKSANAAN PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE) PROYEK PEMBANGUNAN APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

CATHELINA, SEIRA DIWAMA (2019) ANALISIS PENGARUH CONTRACT CHANGE ORDER TERHADAP BIAYA DAN WAKTU (STUDI KASUS: PEMBANGUNAN PRASARANA JARINGAN UTILITAS PAKET 3 LOKASI JAKARTA BARAT, JAKARTA TIMUR, JAKARTA PUSAT, DAN JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

CHAERUNISYA, NASHA (2020) ANALISIS PENGENDALIAN BIAYA DAN WAKTU PEKERJAAN KONSTRUKSI PADA KINERJA PROYEK (Studi pada Proyek Pembangunan Gedung Parkir Polda Metro Jaya). S1 thesis, Universitas Mercu Buana.

CHAIRULOH, (2018) Kelas B. Indo DKV 2019 1. Nada Azachiah R - 42319210019 2. Adella - 42319210008 3. Muhammad Nurrachman 42319210037 4. Erwin Nugroho - 42319210013 5. Wibby Nanda Saputra 42319210004 6. Zufar Sabila Rosyad 42319210022. S1 thesis, Universitas Mercu Buana Bekasi.

CHAIRUNISA, AISYAH (2020) ANALISIS EFEKTIFITAS DAN PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN BOREPILE DI PROYEK LANJUTAN PEKERJAAN ASKSESIBILITAS BANDARA SOEKARNO - HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

CHAIRUNISA, AISYAH (2020) PERBANDINGAN EFEKTIFITAS BIAYA DAN WAKTU PADA PEKERJAAN PEMANCANGAN DENGAN METODE PONTON DAN METODE URUGAN TANAH DI AREA DANAU SELATAN DAN UTARA PROYEK LANJUTAN PEKERJAAN ASKSESIBILITAS BANDARA SOEKARNO-HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

CHALIMIN, AHMAD (2020) ANALISIS KARAKTERISTIK DAN KINERJA SIMPANG BERSINYAL RAWA PANJANG TERKAIT KEBIJAKAN GANJIL-GENAP PADA PINTU TOL BEKASI BARAT. S1 thesis, Universitas Mercu Buana Bekasi.

CHANDRA, SERLINA (2019) ANALISIS PERKUATAN STRUKTUR DENGAN METODE CONCRETE JACKETING (Studi Kasus Apartemen St.Moritz CBD Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

CHASANI, FARIS (2019) PENGAMATAN STRUKTUR KOLOM BALOK DAN PELAT LANTAI PADA PROYEK PEMBANGUNAN APARTEMENT CENTRO CITY JALAN MACAN DAAN MOGOT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

CHODLI, SHOEFUL (2019) EVALUASI KINERJA RUAS JALAN DAN SIMPANG TIGA LENGAN TAK BERSINYAL (studi kasus : Jl. Serang Cibarusah– Jl. Cikarang – Jl. Serang Setu kabupaten bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

CHOFID, MUHAMAD SOFWAN (2018) ANALISIS KEPUASAN PELANGGAN TERHADAP PELAYANAN KERETA REL LISTRIK (KRL) COMMUTERLINE RUTE ST. CAWANG – TANAH ABANG. S1 thesis, Universitas Mercu Buana Bekasi.

CHOIRUL, (2020) IDENTIFIKASI FAKTOR KETERLAMBATAN DALAM PEKERJAAN BANGUNAN PELIMPAH (SPILLWAY) PADA PROYEK BENDUNGAN CIPANAS KAB.SUMEDANG. S1 thesis, Universitas Mercu Buana Bekasi.

CHRISCAHYANTI, ERVIANA DWI (2018) ANALISIS PEMILIHAN MATERIAL RAMAH LINGKUNGAN DENGAN METODE VALUE ENGINEERING DAN ANALYTICAL HIERARCHY PROCESS (AHP) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

CHRISTIAN, JOSE (2017) Pengamatan Struktur Bangunan Proyek Apartemen Breeze Tower Jl. Bintaro Utama Sektor 3A Tangerang Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

CHRISTY, NAZHA ALI (2022) ANALISIS KERUSAKAN MESIN 3516 B PADA TRUK 793 C BERDASARKAN OLI MENGGUNAKAN DATA KEAUSAN UJI LABORATORIUM SCHEDULE OIL SAMPLING (SOS) DENGAN METODE FAILURE MODE EFFECT ANALYSIS (FMEA). S1 thesis, Universitas Mercu Buana Jakarta.

CINDY TRI, MENANTI (2021) ANALISIS RISIKO KECELAKAAN KERJA PADA PEKERJAAN BEKISTING BALOK DAN PELAT DENGAN METODE HIRADC (Studi kasus : Proyek Pembangunan Bintang Toedjoe Plant Deltamas). S1 thesis, Universitas Mercu Buana Jakarta.

CITRA PITALOKA OKTAVIANA BERLIAN, WAODE (2022) ANALISA POLA PENGOPERASIAN WADUK DURIANGKANG SEBAGAI SUMBER KEBUTUHAN AIR BAKU MASYARAKAT KOTA BATAM. S1 thesis, Universitas Mercu Buana Jakarta.

CORICO, EGI (2021) PENANGGULANGAN MASALAH BANJIR DENGAN METODE WATERSHED MANAGEMENT DENGAN BERBASIS DATA LIDAR DAN FOTO UDARA DI ANAK SUNGAI MAHAKAM KOTA SAMARINDA (STUDI KASUS : SUNGAI KARANG MUMUS, SAMARINDA KALIMANTAN TIMUR). S1 thesis, Universitas Mercu Buana Jakarta.

Chaniago, Nur Aflah Dzakwaniah (2023) Analisis Kinerja Simpang Tak Bersinyal dan Ruas Jalan pada Simpang Kodim, Depok, Jawa Barat Menggunakan Perangkat Lunak Vissim. S1 thesis, UNIVERSITAS MERCU BUANA.

DAMAYANTI, FRISKA (2022) PERBANDINGAN NILAI MODIFIKASI RESPONS RIIL STRUKTUR MOMEN KHUSUS TERHADAP STRUKTUR MOMEN BIASA DENGAN METODA PUSHOVER TESIS. S2 thesis, Universitas Mercu Buana Jakarta.

DANASTRI, FARRAS (2020) ANALISA KETERSEDIAAN LAHAN PARKIR DI STASIUN RAWA BUNTU AKIBAT PEMBANGUNAN RUSUN TOD. S1 thesis, Universitas Mercu Buana Jakarta.

DANASTRI, FARRAS (2019) PENCEGAHAN PENGGEMBUNGAN PADA KOLOM PROYEK SUSHI MASA TOWER (Gading Serpong - Kota Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

DANI, MUHAMMAD (2019) REDESAIN DINDING PENAHAN TANAH BASEMENT MENGGUNAKAN METODE KONVENSIONAL DAN ELEMEN HINGGA (Studi Kasus : RSKD. Duren Sawit, Jl. Duren Sawit Baru–Jakarta Timur). S1 thesis, Universitas Mercu Buana Jakarta.

DANIEL, ONDI (2019) ANALISIS KARAKTERISTIK DAN PERILAKU PENYEBERANGAN ORANG PADA FASILITAS PENYEBERANGAN ZEBRA CROSS DAN PELICAN CROSS (STUDI KASUS RUAS JALAN M. H. THAMRIN). S1 thesis, Universitas Mercu Buana.

DARAYANI, WIWIT (2014) PROYEK APARTEMEN U RESIDENCE 2 PELAKSANAAN PEKERJAAN KOLOM, PELAT DAN BALOK. S1 thesis, Universitas Mercu Buana Jakarta.

DARMANSYAH, MUHAMMAD (2019) DESAIN ALTERNATIF PENGGUNAAN BRACING DAN SHEARWALL PADA BANGUNAN DENGAN LAYOUT U. S1 thesis, Universitas Mercu Buana Jakarta.

DARMAWAN, M FAHMI (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH RAFT FOUNDATION PADA PROYEK PEMBANGUNAN TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

DARMAWAN, MUHAMAD IVAN (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN PERMATA HIJAU SUITES Jalan Raya Kebayoran Lama No.55, Jakarta Selatan. S1 thesis, Universitas Mercu Buana.

DARMAWAN, RIZKY (2022) ANALISIS TINGKAT PELAYANAN ANGKUTAN UMUM TRANSJAKARTA RUTE KALIDERES - MONAS. S1 thesis, Universitas Mercu Buana Jakarta.

DARMAWANTI, ERLINA AGUSTIN (2023) ANALISIS RISIKO FAKTOR-FAKTOR PELAKSANAAN TERHADAP KINERJA BIAYA, WAKTU DAN TENAGA KERJA PADA PROYEK PEMBANGUNAN JALAN KERETA API LINTAS PADANG-PARIAMAN. S2 thesis, Universitas Mercu Buana Jakarta.

DARSONO, MEYTA YALA PUSPITA (2023) ANALISIS KEBUTUHAN RUANG PARKIR DI STASIUN MANGGARAI DAN KINERJA RUAS JALAN MANGGARAI 1. S1 thesis, Universitas Mercu Buana Bekasi.

DARUSALLAM, MUHAMMAD HENRY (2021) ANALISIS ESTIMASI BIAYA PERUBAHAN STRUKTUR KONVENSIONAL MENJADI STRUKTUR PRECAST (STUDI KASUS PROYEK GEDUNG DORMITORY KAMPUS POLITEKNIK ENJINIRING PERTANIAN INDONESIA). S1 thesis, Universitas Mercu Buana Jakarta.

DAWANI, ANNISA AYU (2021) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP KUALITAS PELAYANAN MRT JAKARTA (Studi Kasus: Stasiun Bendungan Hilir Mrt Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

DEA, MARTA (2019) ANALISA KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN RAYA BEKASI – JALAN PENGGILINGAN. S1 thesis, Universitas Mercu Buana.

DEBATARAJA, LERWIXS SUNJAYA (2020) EVALUASI TQI (TRACK QUALITY INDEX) JALUR KERETA API DAERAH OPERASI 2 BANDUNG (STUDI KASUS: UPT RESOR JALAN REL 2.8 BANDUNG). S1 thesis, Universitas Mercu Buana Jakarta.

DELVARENDY, RAHMAYUDI (2021) MEJA BELAJAR LIPAT MULTIFUNGSI UNTUK UMUR 6 s/d 12 TAHUN DENGAN BAHAN PIPA PVC BEKAS. S1 thesis, Universitas Mercu Buana Jakarta.

DEODATUS, LEONARDUS KEVIN (2020) STUDI EKSPERIMENTAL PENAMBAHAN FIBER POLYPROPYLENE TERHADAP KUAT TEKAN DAN KUAT LENTUR BETON. S1 thesis, Universitas Mercu Buana Bekasi.

DERMAWAN, ANDI SETIA (2020) ANALISA PERCEPATAN DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN LABORATORIUM DO-160 LAPAN BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

DERMAWAN, ANDI SETIA (2020) ANALISA PERCEPATAN DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN LABORATORIUM DO-160 LAPAN BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

DERMAWAN, FAIZAL (2021) ANALISIS PENGENDALIAN WAKTU DAN BIAYA PEKERJAAN KONSTRUKSI DENGAN BAHAN ALTERNATIF DALAM PROYEK PERUMAHAN MENGGUNAKAN MICROSOFT PROJECT (STUDI KASUS: PERUMAHAN PENTA PARK JOGLO). S1 thesis, Universitas Mercu Buana Jakarta.

DERMAWAN, RAKHMAD RIZKY (2018) METODE PELAKSANAAN PEKERJAAN BALOK, PELAT, KOLOM DAN SHEAR WALL PROYEK YUKATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

DESTIANI, WINDY PUSPITA (2019) ANALISIS KONSEP BUILDING INFORMATION MODELING TERHADAP PERENCANAAN KONSTRUKSI PROYEK-PROYEK GEDUNG DI KOTA BESAR PULAU JAWA. S1 thesis, Universitas Mercu Buana Bekasi.

DESTYA, FADILA (2020) PERBANDINGAN EFEKTIFITAS BIAYA DAN WAKTU PADA PEKERJAAN PEMANCANGAN DENGAN METODE PONTON DAN METODE URUGAN TANAH DI AREA DANAU SELATAN DAN UTARA PROYEK LANJUTAN PEKERJAAN ASKSESIBILITAS BANDARA SOEKARNO - HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

DESTYA, FADILA (2020) UPAYA PERCEPATAN WAKTU PADA PROYEK LANJUTAN PEKERJAAN AKSESIBILITAS BANDARA SOEKARNO-HATTA UNTUK MENCAPAI WILDLY IMPORTANT GOALS (WIG). S1 thesis, Universitas Mercu Buana Jakarta.

DEWANDARU, RIZKY ADITYA (2019) ANALISIS STAKEHOLDER PADA OPTIMALISASI INFRASTRUKTUR PASAR TRADISIONAL DI PROVINSI DKI JAKARTA BERBASIS PMBOK. S1 thesis, Universitas Mercu Buana.

DEWANGGA, TRISNA (2023) ANALISIS PENGARUH SUBSTITUSI PARSIAL SEMEN DAN AGREGAT HALUS MENGGUNAKAN FLY ASH DAN CANGKANG KERANG DARAH TERHADAP CAMPURAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

DEWI, KIKI PATRICIA (2022) ANALISIS PENGARUH PENAWARAN HARGA KONTRAKTOR TERHADAP HASIL KEWAJARAN HARGA DENGAN METODE SEM-PLS PADA TENDER PEKERJAAN KONSTRUKSI PROYEK PEMERINTAH. S1 thesis, Universitas Mercu Buana Jakarta.

DEWINTARI, WAHYU NISA (2021) ANALISIS PENJADWALAN ULANG MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (PDM) (Studi Kasus : Pelaksanaan Proyek Hotel Grand Mercure Malang ). S1 thesis, Universitas Mercu Buana Jakarta.

DHARMAWAN, ALDI (2022) ANALISIS FAKTOR KESELAMATAN KERJA YANG MEMPENGARUHI PERFORMA PELAKSANAAN PEMBANGUNAN PROYEKKONSTRUKSI GEDUNG BERTINGKAT (Study khusus : Proyek Pembangunan Gedung Bertingkat Perkantoran Dan Hunian, Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

DHIANTO, BOBBY RAHMA (2018) ANALISIS PELAYANAN BUS PEMADU ANTAR MODA TERHADAP KEPUASAN PENUMPANG (Studi Kasus : Bus DAMRI Rute Karawang – Soekarno Hatta). S1 thesis, Universitas Mercu Buana Bekasi.

DHURIA, SHELLA (2019) ANALISIS DAYA DUKUNG FONDASI TIANG PADA TANAH BERLENSA DI BORE HOLE 3 (Studi Kasus : Proyek Gedung Menara Mandiri Wijayakusuma, Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

DIAMANTA, NYDIA (2019) DESAIN ALTERNATIF GEDUNG KANTOR PUSAT PT YODYA KARYA DENGAN EFEKTIVITAS KETINGGIAN DAN LETAK DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

DIANTO, WAHYU ROHMAD (2021) ANALISIS PENERAPAN MANAJEMEN MUTU PEKERJAAN KONSTRUKSI BAJA PADA PROYEK DASWIN OFFICE TOWER KUNINGAN JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

DIANUGRAHA, AHMAD FERDY (2023) ANALISIS ULANG STRUKTUR ATAS GEDUNG PERKULIAHAN AKIBAT PENAMBAHAN LANTAI DAN ATAP BAJA SESUAI DENGAN SNI-1726-2019 DAN SNI-2847-2019. S1 thesis, Universitas Mercu Buana Jakarta.

DIENA, RIEZKY FAUZAN PUTRA (2019) METODE PELAKSANAAN PEKERJAAN SHEAR WALL PROYEK APARTEMEN SOUTHGATE PHASE 2 TANJUNG BARAT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

DILLAH, ARDIANSYAH RACHMAN (2022) ANALISIS PENJADWALAN ULANG PROYEK MENGGUNAKAN CPM DAN FAST TRACKING UNTUK EFISIENSI WAKTU DAN EFEKTIFITAS BIAYA (Studi Kasus : Proyek Renovasi Kandang Farm Sierad Grand II, Sukabumi). S1 thesis, Universitas Mercu Buana Jakarta.

DIPUTRA, BAYU GARTIKA (2019) PELAKSANAAN PEKERJAAN BEKISTING BALOK PROYEK RSUD CENGKARENG. S1 thesis, Universitas Mercu Buana Jakarta.

DIRGANTARA, YOVERO AJI (2022) STUDI ASESMEN PENAMBAHAN STRUKTUR RANGKA BAJA PADA KUBAH MASJID DI WILAYAH JAKARTA SELATAN DENGAN STAGE CONSTRUCTION ANALYSIS. S1 thesis, Universitas Mercu Buana Jakarta.

DIRGANTORO, MUHAMMAD RISKA (2023) ANALISIS PENGARUH VARIATION ORDER PADA PROYEK SISTEM PENGOLAHAN AIR LIMBAH (SPAL). S2 thesis, Universitas Mercu Buana Jakarta.

DITTA, MEGA PURNAMA (2022) EVALUASI PENJADWALAN PROYEK KONSTRUKSI AKIBAT KETERLAMBATAN MENGGUNAKAN METODE GANTT CHART PADA APLIKASI MANPRO DAN MICROSOFT PROJECT (Studi kasus: Proyek Grange Park Fatmawati – Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

DIVINA, AYESHA (2022) OPTIMALISASI BIAYA DAN WAKTU PROYEK PANTAI MUTIARA DENGAN MEMBANDINGKAN ANTARA PENAMBAHAN JAM KERJA DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF. S1 thesis, Universitas Mercu Buana Jakarta.

DWI ARIFIANTO, FAJAR (2021) ANALISIS PENYEBAB CONTRACT CHANGE ORDER TERHADAP KINERJA BIAYA DAN WAKTU KONSTRUKSI JALAN TOL CIBITUNG - CILINCING. S1 thesis, Universitas Mercu Buana Jakarta.

DWI CAHYANTO, NANANG (2018) UPAYA NORMALISASI SUNGAI CBL BEKASI DALAM RANGKA PEMBUATAN JALUR TRANSPORTASI SUNGAI (Studi Kasus: Proyek Pembangunan Normalisasi Sungai Cbl Sepanjang 12 Km Oleh PT Cikarang Listrindo Tbk). S1 thesis, Universitas Mercu Buana Bekasi.

DWIMULYO, GUNAWAN (2019) OPTIMALISASI PENEMPATAN DAN BIAYA OPERASIONAL TOWER CRANE PADA PROYEK NEW YOGYAKARTA INTERNATIONAL AIRPORT (NYIA). S1 thesis, Universitas Mercu Buana Jakarta.

DWINANDA, MEGA (2018) FAKTOR – FAKTOR PENYEBAB KETERLAMBATAN PADA PELAKSANAAN PROYEK SALURAN KABEL TEGANGAN TINGGI (SKTT) 150 KV CURUG - CIKUPA. S1 thesis, Universitas Mercu Buana Jakarta.

DWIYANTO, ABDULAH (2019) KAJIAN EFEKTIFITAS PENGGUNAAN PELICAN CROSSING BAGI PENYEBRANG JALAN (Studi Kasus : Jalan M. H. Thamrin, Jakarta). S1 thesis, Universitas Mercu Buana Bekasi.

DYANA, DWI BAGUS A'AN (2021) KAJIAN ALTERNATIF MENGHITUNG TINGGI EFEKTIF DINDING GESER DENGAN OPTIMASI KETINGGIANNYA SECARA BERTAHAP Study Kasus Gedung 25 Tingkat Bertapak Persegi Panjang Tipis. S1 thesis, Universitas Mercu Buana Jakarta.

DZULFIKAR, HASBI (2022) ANALISIS TINGKAT PELAYANAN (LEVEL OF SERVICE) PADA JALAN SUDIRMAN (DKI JAKARTA) DENGAN METODE HCM 2000. S1 thesis, Universitas Mercu Buana Jakarta.

DZULFIKAR, MUHAMMAD (2018) KAJIAN TERHADAP PENYESUAIAN PERATURAN PEMBEBANAN JEMBATAN SNI 1725:2016 DENGAN BMS-1992 PADA BEBAN KENDARAAN DENGAN MENGGUNAKAN JEMBATAN SEDERHANA DAN MENERUS. S1 thesis, Universitas Mercu Buana Jakarta.

EDIAR, TIKI (2019) PENGAMATAN STRUKTUR KOLOM, BALOK DAN PELAT PT.HUTAMA KARYA (Persero). S1 thesis, Universitas Mercu Buana Jakarta.

EFENDI, MUHAMAD (2021) ANALISIS DAMPAK LALU LINTAS PASCA PEMBANGUNAN FLY OVERTANJUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

EFFENDI, HARIS HERMAWAN (2021) PENGARUH KOMPENSASI DAN KEPUASAN KERJA TERHADAP KINERJA PEGAWAI NEGERI SIPIL MELALUI MOTIVASI SEBAGAI VARIABEL MEDIASI PADA DIREKTORAT KELAIKUDARAAN DAN PENGOPERASIAN PESAWAT UDARA DIREKTORAT JENDERAL PERHUBUNGAN UDARA KEMENTERIAN PERHUBUNGAN RI. S2 thesis, Universitas Mercu Buana Jakarta.

EFRILIANA, EFRILIANA (2023) IDENTIFIKASI FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK RUKAN AMSTERDAM BEACH VIEW PANTAI INDAH KAPUK - JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

ELHAK, MUHAMAD ALFARIZI (2020) ANALISIS KARAKTERISTIK PARKIR DI RUMAH SAKIT SELAMA PANDEMI COVID-19 (STUDI KASUS RUMAH SAKIT PERMATA CIBUBUR). S1 thesis, Universitas Mercu Buana.

ELOKLADESELI, NONI (2018) ANALISA DAMPAK LALU LINTAS PADA PUSAT PERBELANJAAN YANG TELAH BEROPERASI DITINJAU DARI TARIKAN PERJALANAN (STUDI KASUS : CIBUBUR JUNCTION). S1 thesis, Universitas Mercu Buana Bekasi.

ELVASARIMA HASUGIAN, ANASTASIA (2022) ANALISIS PENERAPAN KLAUSUL-KLAUSUL ISO 9001 : 2015 TERHADAP KUALITAS PEKERJAAN PADA PROYEK MENARA JAKARTA. S2 thesis, Universitas Mercu Buana Jakarta.

ELVIANI, RISTASIWI (2018) ANALISIS KELEMBAGAAN PROYEK LIGHT RAIL TRANSIT (LRT) JAKARTA FASE II VELODROME – TANAH ABANG MENGGUNAKAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA. S1 thesis, Universitas Mercu Buana Bekasi.

ENDAWATI, ENDAWATI (2023) EVALUASI FAKTOR PERUBAHAN DESAIN, KETERSEDIAAN MATERIAL DAN PRODUKTIVITAS TENAGA KERJA TERHADAP KINERJA BIAYA PADA PROYEK BANGUNAN PERKANTORAN. S2 thesis, Universitas Mercu Buana Jakarta.

ERNAWATI, RINA (2018) PEMBANGUNAN PROYEK GEDUNG INDONESIA – 1 JALAN MH. THAMRIN NO. 13, JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

ERNAWATI, RINA (2019) PERENCANAAN COUPLING BEAM DENGAN METODE DUAL SYSTEM STUDI KASUS PADA PROYEK APARTEMEN DI BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

ERWINT, DERY (2022) ANALISIS PERAN K3 DALAM PENGENDALIAN AKSI PREMANISME PADA SAAT PELAKSANAAN PROYEK KONSTRUKSI (STUDI KASUS PROYEK PERUMAHAN GARDENS AT CANDI SAWANGAN, DEPOK). S1 thesis, Universitas Mercu Buana Jakarta.

FABIANI, AYU NAMIRA (2021) PENGARUH VARIASI RENDAMAN PADA KUAT TEKAN BETON NORMAL DAN BETON DENGAN SUBSTITUSI FLY ASH PENGGANTI SEMEN SEBAGIAN. S1 thesis, Universitas Mercu Buana Jakarta.

FACHREZY, FERDIANSYAH (2021) PENGARUH KUAT TEKAN BETON NORMAL TERHADAP PENGGUNAAN BATA RINGAN SEBAGAI PENGGANTI SEBAGIAN AGREGAT HALUS. S1 thesis, Universitas Mercu Buana Jakarta.

FACHRIAN, DIMAS FRENZAL (2023) ANALISA PERBANDINGAN STRUKTUR BANGUNAN GEDUNG BERDASARKAN WILAYAH GEMPA, MENGACU PADA SNI 1726 : 2012. S1 thesis, Universitas Mercu Buana Jakarta.

FACHRUDIN, IFAN (2022) ANALISIS MANAJEMEN MUTU BETON PADA KERUSAKAAN SCALLING, COLD JOINT BALOK KOLOM DAN PLAT LANTAI PROYEK PEMBANGUNAN RUMAH TINGGAL - DJOKO SUSANTO. S1 thesis, Universitas Mercu Buana Jakarta.

FADHILAH, MUHAMAD AKBAR (2021) ANALISA PEMILIHAN MODA TRANSPORTASI MASSAL KERETA API DAN ANGKUTAN ANTAR KOTA DALAM PROVINSI (AKDP) BOGOR – SUKABUMI. S1 thesis, Universitas Mercu Buana Jakarta.

FADHLI, AZHARI NAUFAL (2022) ANALISI FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN ( STUDI KASUS : PROYEK TOWER A REGENT MANGKULUHUR CITY ). S1 thesis, Universitas Mercu Buana Jakarta.

FADI, AHMAD (2018) IDENTIFIKASI RISIKO KETERLAMBATAN PEKERJAAN STRUKTUR PEMBANGUNAN WAREHOUSE PADA PROYEK OFFICE-WAREHOUSE FACILITY UNITED TRACTORS SITE BINUNGAN. S1 thesis, Universitas Mercu Buana Bekasi.

FADILAH, MOHAMAD IMAM SURADI (2020) MENINGKATKAN KINERJA WAKTU BANGUNAN WASTEWATER TREATMENT PLANT DENGAN SUPPLY CHAIN MANAGEMENT DAN BIM. S2 thesis, Universitas Mercu Buana Jakarta.

FADILLAH, ARRAZQA DION (2019) PROYEK PEMBANGUNAN JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU (METODE PELAKSANAAN BORED PILE DENGAN UJI PEMBEBANAN PILE DRIVING ANALYZER (PDA TEST)). S1 thesis, Universitas Mercu Buana Jakarta.

FADILLAH, DERI (2022) ANALISIS PERCEPATAN WAKTU DAN BIAYA PELAKSANAAN PROYEK GUDANG DENGAN PENAMBAHAN JAM KERJA LEMBUR MENGGUNAKAN METODE TIME COST TRADE OFF (PROYEK PEMBANGUNAN GUDANG JURUMUDI BARU TANGERANG). S1 thesis, Universitas Mercu Buana Bekasi.

FADILLAH, RACHMAD (2022) PENERAPAN METODE EARNED VALUE ANALYSIS DAN VARIANCE ANALYSIS PADA PEMBANGUNAN PROYEK PLTU PALU-3 2x50 MW (Studi Kasus : Pembangunan Proyek Pembangkit Listrik Tenaga Uap Palu-3 2x50 MW). S1 thesis, Universitas Mercu Buana Jakarta.

FADILLAH, RIZKI (2018) PERANCANGAN MENARA LEMHANNAS DAN GEDUNG PANCA GATRA JL. MERDEKA SELATAN NO. 10 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FADLI, IKLAM CHOERU (2023) QUANTITY TAKE-OFF BERBASIS BIM (BUILDING INFORMATION MODELLING) PADA PROYEK PENGEMBANGAN PELABUHAN PATIMBAN PAKET 5 UNTUK MENINGKATKAN AKURASI PERHITUNGAN. S1 thesis, Universitas Mercu Buana Bekasi.

FADLI, MUHAMMAD (2023) ANALISIS QUANTITY TAKE-OFF DENGAN MENGGUNAKAN METODE KONVENSIONAL DAN METODE BUILDING INFORMATION MODELING (BIM) DI PROYEK BENDUNGAN RUKOH PAKET 2. S1 thesis, Universitas Mercu Buana Jakarta.

FADLI, SATRIO (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU ANTARA PLAT LANTAI KONVENSIONAL DAN BONDEKS (STUDI KASUS : PROYEK STASIUN INTEGRASI LRT-HSR HALIM). S1 thesis, Universitas Mercu Buana Jakarta.

FADLIANTO, SHALLI (2019) ANALISIS KARAKTERISTIK PARKIR KENDARAAN PADA AREA PARKIR STASIUN PASAR SENEN. S1 thesis, Universitas Mercu Buana Jakarta.

FADLIANTO, SHALLI and ARISMA, TRIO FIKI (2017) PROYEK GRAHA CIKINI OFFICE CIKINI, JAKARTA PUSAT "METODE PEKERJAAN PELAT LANTAI KOMPOSIT BAJA DENGAN MENGGUNAKAN METODE BONDEK". S1 thesis, Universitas Mercu Buana Jakarta.

FAHAM, AHMAD (2020) PENGARUH PENGGUNAAN KAPUR PADAM SEBAGAI SUBTITUSI SEMEN DAN LIMBAH KERAMIK ATAU UBIN SEBAGAI SUBTITUSI AGREGAT KASAR PADA CAMPURAN BETON TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

FAHMI, MUHAMMAD (2019) PEMODELAN DEBIT ANDALAN SUB DAS CIKAPUNDUNG DENGAN METODE MULTILAYER PERCEPTRON BACKPROPAGATION. S1 thesis, Universitas Mercu Buana Jakarta.

FAHREZI, MUHAMAD FATHUR (2020) ANALISIS SOFT SKILL DAN HARDSKILL TERHADAP KINERJA KARYAWAN KONTRAKTOR PROYEK LIGHT RAILWAY TRANSIT STATION (STASIUN LRT JABODEBEK). S1 thesis, Universitas Mercu Buana Jakarta.

FAHRUDIN, BAYU (2022) ANALISIS SISTEM PENERAPAN MANAJEMEN MUTU PADA PEKERJAAN BETON (Study kasus : Proyek Tower EKKI - Podomoro Golf View Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

FAISAL, DEDE (2017) ANALISIS KINERJA SIMPANG BERSINYAL PADA JAM PUNCAK LALU LINTAS Studi Kasus : Perempatan Cengkareng Jalan Daan Mogot Km. 13 Jalan Lingkar Luar, Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

FAIZ, MUHAMMAD IRFAN (2021) ANALISIS MINAT PENDUDUK JAKARTA TERHADAP ANGKUTAN UMUM DI ERA PANDEMI. S1 thesis, Universitas Mercu Buana Jakarta.

FAIZIN, MUHAMMAD ROIHAN NUR (2023) ANALISIS PEMANFAATAN STYROFOAM SEBAGAI BAHAN CAMPURAN PADA AGREGAT KASAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

FAJAR, ABDIL MALIK (2024) ANALISIS TORSI PADA RODA SEPEDA MOTOR LISTRIK HASIL KONVERSI DARI MOTOR BAKAR 110 CC BERDASARKAN BEBAN DAN VARIASI KECEPATAN. S1 thesis, Universitas Mercu Buana Jakarta.

FAJAR, RAHMAD ADNAN (2020) EVALUASI KINERJA PARKIR DI STASIUN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

FAJAR UTOYO, SIGIT (2023) ANALISIS KONDISI PERKERASAN JALAN DAN PREDIKSI SISA UMUR LAYAN JALAN DI KOTA BEKASI (STUDI KASUS JALAN RAYA NAROGONG - CILEUNGSI). S1 thesis, Universitas Mercu Buana Jakarta.

FAJRI, AGUS NUR (2018) PENGARUH ASPAL POLIMER CRUMB RUBBER PADA CAMPURAN LASTON AC-WC DENGAN KARAKTERISTIK UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

FAJRIYATI, DINA (2019) ANALISIS PERBANDINGAN SISTEM STRUKTUR PELAT METAL DECK, PRECAST HALF SLAB DAN PRECAST SLAB FULL PANEL (Studi Kasus Rusunawa UII Sleman). S1 thesis, Universitas Mercu Buana Jakarta.

FALAH, ANRIANTO (2020) PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA DKI JAKARTA TAHAP IB SEKSI A ZONA 5 JALAN RAYA BEKASI, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

FALAH, YOGA RAUDHATUL (2022) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001 : 2015 PADA PROYEK PEMBANGUNAN DAN PENGEMBANGAN UNIVERSITAS NEGERI JAKARTA (TAHAP-2). S1 thesis, Universitas Mercu Buana Jakarta.

FAQIH, RIYANDI NURUL (2022) ANALISIS FAKTOR DAYA SAING TERHADAP KEBERHASILAN PENAWARAN TENDER DENGAN RASCH MODEL DAN ANALYTICAL HIERARCHY PROCESS (AHP) (Studi Kasus: Perusahaan Konstruksi Kelas Menengah di Pulau Jawa). S1 thesis, Universitas Mercu Buana Jakarta.

FARHAN, ACHMAD (2023) ANALISIS BIAYA TINGKAT KOMPONEN DALAM NEGERI(TKDN) UNTUK LELANG PROYEK KONSTRUKSI PENATAAN ALUN-ALUN KABUPATEN CIANJUR. S1 thesis, Universitas Mercu Buana Jakarta.

FARHAN, HADI (2019) IDENTIFIKASI VARIABEL PENYEBAB KETERLAMBATAN PADA PEKERJAAN BEKISTING PHENOL FILM DAN BEKISTING BONDEK PROYEK DEPO LRT JAKARTA KELAPA GADING-VELODROME. S1 thesis, Universitas Mercu Buana Bekasi.

FARHAN, MUHAMMAD (2020) ANALISIS KECELAKAAN LALU LINTAS DAN PENANGANAN DENGAN METODE AEK DAN BKA UNTUK MENENTUKAN DAERAH RAWAN KECELAKAAN (STUDI KASUS AREA JALAN PEMDA KABUPATEN BOGOR ). S1 thesis, Universitas Mercu Buana Bekasi.

FARHAN, RIKI ZAKI (2021) ANALISIS PENGENDALIAN RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PEKERJAAN STRUKTUR ATAS PROYEK BANGUNAN TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

FARIDZ, MIFTAH (2020) ANALISIS CCD (CURENT COLLECTOR DEVICE/ SHOE) PADA SARANA LRT JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FARIT, FARIT (2023) "PERENCANAAN STAGING SWITCH OVER 6 MANGGARAI" (STUDI KASUS PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI s/d JATINEGARA (PAKET A) (TAHAP II)). S1 thesis, Universitas Mercu Buana Jakarta.

FARUKI, AHMAD (2022) DESAIN ALTERNATIF STRUKTUR ATAS BANGUNAN SEKOLAH DENGAN MODIFIKASI LETAK DAN KETINGGIAN DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

FASSA, IQRAMULLAH ALTRIAZ (2022) PERBANDINGAN ANALISIS STRUKTUR TOWER SUTT 150 KV MENGGUNAKAN RESPONSE SPECTRA DAN TIME HISTORY. S1 thesis, Universitas Mercu Buana Jakarta.

FATAHILLAH, FARHAN (2022) PENGARUH CAMPURAN BETON TERHADAP PENGGUNAAN FLY ASH DAN BUBUK CANGKANG TELOR AYAM SEBAGAI SUBTITUSI SEMEN PADA KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

FATIHAH, AZIZAH NOOR (2023) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PEKERJAAN PADA PROYEK PEMBANGUNAN 2 UNIT JEMBATAN TIMBANG KAPASITAS 70 TON MEULABOH, ACEH BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

FATIMAH, JENNIKA RAHMITA (2023) ANALISIS PENERAPAN COMMON DATA ENVIRONMENT (CDE) MENGGUNAKAN MODEL UNIFIED THEORY OF ACCEPTANCE AND USER OF TECHNOLOGY (UTAUT) TERHADAP PENINGKATAN KINERJA PADA PROYEK BENDUNGAN. S1 thesis, Universitas Mercu Buana Jakarta.

FATIMAH, NINING (2022) PENJADWALAN ULANG PROYEK DHARMAWANGSA TOWER AKIBAT PANDEMI COVID-19 DENGAN MENGGUNAKAN METODE PDM (PRECEDENCE DIAGRAM METHOD). S1 thesis, Universitas Mercu Buana Jakarta.

FATIMAH, NINING (2018) PROYEK APARTEMEN WEST VISTA (Jln. Lingkar Luar Barat No. 8 Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

FATIN, SABILA FAIRUZ (2019) KAJIAN PENERAPAN MATERIAL PADA SELUBUNG BANGUNAN YANG MEMPENGARUHI KENYAMANAN TERMAL PERPUSTAKAAN UMUM BANK INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

FATMAWATI, ADELIA RIZKY (2020) STUDI KOMPARASI PENGGUNAAN NAFTALENA DARI LIMBAH TAR BATU BARA DENGAN NAFTALENA KAMPER SEBAGAI ADMIXTURE BETON. S1 thesis, Universitas Mercu Buana Bekasi.

FATMAWATI, FATMAWATI (2023) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN WALL PANEL TREATMENT (STUDI KASUS : PROYEK PEMBANGUNAN INTERIOR RUMAH MEWAH). S1 thesis, Universitas Mercu Buana Jakarta.

FATONI, ADRIAN (2020) PENGARUH PENGGUNAAN ABU BOILER CANGKANG KELAPA SAWIT YANG DISUBTITUSIKAN TERHADAP SEMEN DAN SERBUK KACA YANG DISUBTITUSIKAN TERHADAP AGREGAT HALUS TERHADAP NILAI KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

FATQURAHMAN, FAHDHANI ZULFI (2021) ANALISIS PENJADWALAN ULANG PROYEK HIGH RISE BUILDING MENGGUNAKAN PDM (PRECEDENCE DIAGRAM METHOD) BERBASIS MICROSOFT PROJECT 2019 (Studi Kasus : Proyek Apartemen Tamansari Iswara – Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

FATTAH, MUHAMMAD DHIKA ADHITYA ABDUL (2024) ANALISIS PENGARUH PEMBAYARAN SECARA LANGSUNG DARI PIHAK OWNER KEPADA NOMINATED SUBCONTRACTOR TERHADAP KINERJA PROYEK. S2 thesis, Universitas Mercu Buana Jakarta.

FAU, RAYMOND DANIL FERNANDO (2021) EVALUASI KINERJA STRUKTUR DENGAN METODE ANALISIS NONLINIER STATIC PUSHOVER (NSP) PADA STUDI KASUS HOTEL DI WILAYAH PASAR BARU JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZA, MAULIDA NOOR (2021) ANALISIS KERUSAKAN PERKERASAN JALAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) PADA JALAN KARET KOTABUMI DAN JALAN MOHAMMAD TOHA KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZAN, AHMAD DZIKRI (2024) PERBANDINGAN PENGARUH LEAD RUBBER BEARING (LRB) DAN FRICTION PENDULUM BEARING (FPB) PADA PERILAKU STRUKTUR JEMBATAN (STUDI KASUS JEMBATAN TOL LAYANG DALAM KOTA JAKARTA). S2 thesis, Universitas Mercu Buana Jakarta.

FAUZAN, ARIEF (2021) ANALISIS PENGARUH WASTE MATERIAL TERHADAP KINERJA BIAYA PADA PROYEK KONSTRUKSI BANGUNAN GUDANG. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZAN, ARIEF (2019) PRESERVASI JALAN CILEGON - TANJUNG LESUNG. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZI, AKBAR (2019) PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK (Studi kasus pada Proyek Pembangunan Pengendali Banjir, Fasilitas Ground Water Tank, dan Fasilitas Parkir di Kompleks Kementerian PUPR). S1 thesis, Universitas Mercu Buana Jakarta.

FAUZI, IRKHAM (2021) EVALUASI KINERJA PROYEK DITINJAU BERDASARKAN WAKTU DAN BIAYA MENGGUNAKAN METODE KONSEP NILAI HASIL (Studi Kasus : Pembangunan Perumahan PIK 2 Cluster Springville Tipe Alamanda 10x15). S1 thesis, Universitas Mercu Buana Jakarta.

FAUZI, IRVAN (2021) ANALISIS KARAKTERISTIK PARKIR KENDARAAN PADA AREA PARKIR SEPEDA MOTOR STASIUN KEBAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZI, MAULANA RIZKY (2022) EFISIENSI ELEMEN STRUKTUR SHEARWALL PADA GEDUNG BERLAYOUT L DENGAN PENAMBAHAN DILATASI KONSOL STUDI KASUS PROYEK PEMBANGUNAN RUSUN PADAT KARYA JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZI, MUHAMMAD CHAIRUL (2023) ANALISIS METODE PERBAIKAN PADA BETON BERTULANG PADA KOLOM DAN BALOK SERTA PENGARUH DARI SEGI WAKTU DAN BIAYA (Studi kasus: proyek Harisma Data Center Cikarang). S1 thesis, Universitas Mercu Buana.

FAUZIAH, NURUL NURILLAHI (2023) PENGARUH ON STREET PARKING TERHADAP KINERJA RUAS JALAN (Studi Kasus Pertokoan Jalan Suniaraja Bandung). S1 thesis, Universitas Mercu Buana Jakarta.

FAUZIAH, RATU AYU (2018) PROYEK PEMBANGUNAN GEDUNG LABORATORIUM PRASETIYA MULYA TAHAP 3 BSD TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FAWZI, ANJAR AHMAD RIZZAL (2018) Evaluasi Kinerja Simpang Bersinyal dan Ruas Jalan Dengan Metode MKJI 1997 (Studi Kasus : Simpang RS. Bella Jalan Ir. H. Juanda Kota Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

FAWZI, ANJAR AHMAD RIZZAL (2018) Evaluasi Kinerja Simpang Bersinyal dan Ruas Jalan Dengan Metode MKJI 1997 (Studi Kasus : Simpang RS. Bella Jalan Ir. H. Juanda Kota Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

FAWZI, MUHAMMAD (2018) METODE PELAKSANAAN GROUND ANCHOR PADA PROYEKMENARA BRI GATOT SUBROTO JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

FAZA, AHMAD ROFID (2019) EVALUASI KINERJA FASILITAS HALTE DAN RUAS JALAN BUS TRANSJAKARTA RUTE PERJALANAN PONDOK GEDEPULOGADUNG. S1 thesis, Universitas Mercu Buana Bekasi.

FAZRI, ROMY AL (2022) ANALISA TINGKAT KEPUASAN PENGGUNA ANGKUTAN UMUM KRL COMMUTER PADA MASA PANDEMI COVID-19 (Studi Kasus : Rute Tanah Abang - Rangkas). S1 thesis, Universitas Mercu Buana Jakarta.

FEBRIANSYAH, ADITYA RAHMAT (2019) ANALISIS BALOK BETON SEDERHANA DENGAN PEMBEBANAN INKREMENTAL TERPUSAT MENGGUNAKAN METODE ELEMEN HINGGA. S1 thesis, Universitas Mercu Buana Jakarta.

FEBRIANTO, HARIS (2018) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PEMBAYARAN PROYEK KONSTRUKSI (STUDI KASUS : PROYEK YANG DIKERJAKAN OLEH KONTRAKTOR PT. X). S1 thesis, Universitas Mercu Buana Bekasi.

FEBRIYANTO, RYAN (2020) PEKERJAAN PELAT LANTAI DAN KOLOM PADA PROYEK APARTEMEN URBAN SKY - BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

FEBRIYANTO, RYAN (2021) PENERAPAN KONSEP EARN VALUE ANALISYS UNTUK ANALISIS KINERJA BIAYA DAN WAKTU PELAKSANAAN PADA PROYEK RANCANG BANGUN RUSUN UMUM STASIUN TANJUNG BARAT JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FERANDY, IWANDA (2022) ANALISA TINGKAT KEPUASAN PENGGUNA TROTOAR (STUDI KASUS JALAN JENDRAL SUDIRMAN JAKARTA). S1 thesis, Universitas Mercu Buana Bekasi.

FERDIAN, REZI (2020) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PROYEK RSIA BRAWIJAYA SAHARJO TEBET JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

FERDINA, DERI (2020) PERENCANAAN OPTIMASI POLA TATA TANAM DAERAH IRIGASI KABUPATEN SOLOK SUMATERA BARAT. S1 thesis, Universitas Mercu Buana Bekasi.

FERDY SABILI, MUHAMMAD (2023) ANALISIS EARNED VALUE PEKERJAAN TIMBUNAN PADAT SUBGRADE 16 AREA DK60+763 – DK61+101 PADA PROYEK PEMBANGUNAN KERETA CEPAT JAKARTA – BANDUNG SEKSI 2. S1 thesis, Universitas Mercu Buana Jakarta.

FERIYANSYAH, RIFKI (2023) ANALISIS PERBANDINGAN PELAT LANTAI BETON KONVENSIONAL, BONDEK DAN PRECAST HALF SLAB DITINJAU DARI SEGI BIAYA DAN WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

FERNANDA, FINSA AZIZ (2019) PENGARUH PENGENDARA SEPEDA MOTOR TERHADAP TINGKAT KECELAKAAN LALU LINTAS DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (TCT) (STUDI KASUS: JALAN RAYA NAROGONG KOTA BEKASI). S1 thesis, Universitas Mercu Buana Bekasi.

FERNANDUS, IRWAN (2023) ANALISIS PERBANDINGAN METODE SECANT PILE DENGAN METODE GEOTEXTILLE HIGH TENGSILE DARI LINGKUP BIAYA DAN WAKTU (STUDI KASUS: PROYEK BOCIMI SEKSI 2). S1 thesis, UNIVERSITAS MERCU BUANA.

FIGI, MUHARROM FACHLAN (2019) METODE PELAKSANAAN PEMASANGAN HALF SLAB PADA PROYEK MALL BOXIES 123. S1 thesis, Universitas Mercu Buana Jakarta.

FIRDAOS, SUSANTO (2020) MEMINIMALISIR REWORK BERBASIS SISTEM DINAMIK PADA PROYEK WAREHOUSE. S2 thesis, Universitas Mercu Buana Jakarta.

FIRDAUS, GILANG FAJAR (2023) Analisis Pengaruh Perlintasan Sebidang Jalan Dengan Rel Kereta Api Terhadap Karakteristik Lalu Lintas (Studi Kasus Perlintasan Sebidang Jalan di Jalan KH. Agus Salim Bekasi Timur). S1 thesis, Universitas Mercu Buana Bekasi.

FIRDAUS, M. (2019) MODIFIKASI PERENCANAAN GEDUNG BAILEYS LAGOON CITY - CIPUTAT DENGAN MENGGUNAKAN STRUKTUR KOMPOSIT BAJA BETON. S1 thesis, Universitas Mercu Buana Jakarta.

FIRDAUS, MOHAMMAD (2022) ANALISIS SAMBUNGAN TIPE SENDI PADA BASEPLATE, PEDESTAL DAN ANGKUR UNTUK BANGUNAN INDUSTRI (STUDI KASUS : BUILDING 45 PT. PRATAMA ABADI INDUSTRI, TANGERANG, BANTEN). S1 thesis, Universitas Mercu Buana Bekasi.

FIRDAUS, MUHAMMAD GALUH (2020) PENGARUH SUBTITUSI BIJI PLASTIK SEBAGAI AGREGAT HALUS DAN SUBTITUSI LIMBAH GYPSUM SEBAGAI SEMEN TERHADAP KUAT TEKAN BETON RINGAN. S1 thesis, Universitas Mercu Buana Bekasi.

FIRDAUS, MUHAMMAD RIZKY (2019) PENGARUH BUKAAN TERHADAP KENYAMANAN TERMAL RUANG IBADAH GEREJA HKBP KEBON JERUK. S1 thesis, Universitas Mercu Buana Jakarta.

FIRDAUS, SYAHRIZAL (2019) ANALISIS KERUSAKAN DAN PENANGANAN JALAN DENGAN METODE PAVEMENT CONDITION INDEX (Studi Kasus: Jl. Cilangkara Kab. Bekasi). S1 thesis, Universitas Mercu Buana.

FIRMANSYAH, ARDI (2019) KAJIAN TIPOLOGI FASADE BANGUNAN KHAS PECINAN PADA KORIDOR JALAN KISAMAUN PASAR LAMA - TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FIRMANSYAH, FIRMANSYAH (2020) EVALUASI KINERJA STRUKTUR GEDUNG RUMAH SAKIT 11 LANTAI BERLOKASI DI PONTIANAK BERDASARKAN PERFORMANCE-BASED DESIGN. S1 thesis, Universitas Mercu Buana Jakarta.

FIRMANSYAH, FIRMANSYAH (2022) KAJIAN EFEKTIFITAS SISTEM PERKAKUAN PERBESARAN KOLOM DAN BALOK ( SABUK ) GEDUNG APARTEMEN 20 LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

FITAMALA, RICHA (2021) Pengaruh Campuran Pasir dan Semen PCC pada Tanah Lempung Ekspansif Terhadap Parameter Kuat Tekan Bebas (Unconfined Compression Strength Test (UCS)). S1 thesis, Universitas Mercu Buana Jakarta.

FITRI, DEA (2022) ANALISIS PERBANDINGAN PENGGUNAAN BEKISTING PECAFIL DENGAN BEKISTING KONVENSIONAL (BATAKO) UNTUK PEKERJAAN PONDASI DAN TIE BEAM (Studi kasus: Perluasan Pabrik Indo-Ice cream PT. Indolakto, Sukabumi). S1 thesis, Universitas Mercu Buana Jakarta.

FITRI, MAHARANI ELSA (2021) ANALISA PERBANDINGAN DAYA DUKUNG FONDASI BORED PILE MENGGUNAKAN DATA STANDARD PENETRATION TEST (SPT) DENGAN PILE DRIVING ANALYZER (PDA) TEST DAN CAPWAP PADA JEMBATAN CITARUM PROYEK JALAN TOL JAKARTA – CIKAMPEK II SELATAN PAKET 3. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIA, ANI (2019) PEKERJAAN MEP PADA PROYEK PURI ORCHARD APARTEMENT. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIA, FEBRIOLA NOVA (2024) ANALISIS PENGARUH KEAHLIAN PEKERJA, KONDISI LINGKUNGAN KERJA DAN INSTRUMENTASI CRANE TERHADAP PENERAPAN STANDARD OF PROSEDURE PADA PENGGUNAAN TOWER CRANE. S2 thesis, Universitas Mercu Buana Jakarta.

FITRIANA, SITI UMAMAH (2020) PELAKSANAAN PEKERJAAN SHEARWALL PROYEK PEMBANGUNAN EMBARCADERO PARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIANSYAH, FAJRI (2019) PENGARUH PERLINTASAN SEBIDANG JALUR KERETA API DENGAN JALAN JOMBANG RAYA TERHADAP KARAKTERISTIK LALU LINTAS. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIANTI, DIAN APRILIA (2018) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG ASTRA BIZ CENTER, BSD CITY. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIYANTO, ANANG NUR (2019) KORELASI DIMENSI SHEARWALL TERHADAP PERIODE GETAR DAN GAYA GEMPA DASAR STRUKTUR DENGAN SISTEM GANDA PADA GEDUNG 32 LANTAI. S1 thesis, Universitas Mercu Buana.

FLIXYEN, YONATHAN CARLO (2019) PENGAWASAN PROYEK HUTAMA KARYA OFFICE JL. LETJEN M. T. HARYONO KAV 8-9 CIPINANG CEMPEDAK, JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

FREDERICK, BRIANDO (2018) KOMPARASI KINERJA STRUKTUR BANGUNAN TINGGI MENGGUNAKAN SISTEM SHEARWALL DAN KOMBINASI SISTEM SHEARWALL-OUTRIGGER (Studi Kasus : Grand Indonesia Office Tower). S1 thesis, Universitas Mercu Buana Bekasi.

FRIDAYANTI, MIESKE KARINA (2018) ANALISIS KINERJA SIMPANG TIGA TAK BERSINYAL DAN RUAS JALAN SULTAN AGUNG – JALAN ALEXINDO BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

FUAD, ACHMAD (2019) PENGUNAA PA N AIR PA NAS HID DA SUH RASI PA U REND DA BET AH UNT ON MU UK ME TU TING NURUNK GI. S1 thesis, Universitas Mercu Buana.

FUAT, ANIS (2018) PERANCANGAN INSTALASI PENERANGAN DI KANTOR TAIYUAN JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FURQOON, MUHAMAD (2020) EFEKTIFITAS PERGANTIAN MODA PADA PENGGUNA BUS TRANSJAKARTA KORIDOR 8 DI RUAS JALAN PANJANG ARTERI KELAPA DUA RAYA, JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

FURQOON, MUHAMAD (2020) PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DAN PILE CAP PADA PROYEK KLAPA VILLAGE Pondok Kelapa - Jakarta Timur. S1 thesis, Universitas Mercu Buana Jakarta.

Faradzaq, Raihan Nur (2022) ANALISA TINGKAT KESELAMATAN LALU LINTAS PADA PERSIMPANGAN JALAN DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (STUDI KASUS PERSIMPANGAN JL. KH MAS MANSYUR – JL. KH HASYIM ASHARI ). S1 thesis, Universitas Mercu Buana Jakarta.

Fauziyah, Rifa (2024) EVALUASI KEKUATAN STRUKTUR GEDUNG PUSAT PEMULIHAN ASET KEJAKSAAN AGUNG RI BERDASARKAN SNI GEMPA 1726-2019 DAN SNI BETON STRUKTURAL 2847-2019. S1 thesis, Universitas Mercu Buana - Buncit.

GANNY, FAZAR (2022) ANALISIS KUALITAS PEKERJAAN SIPIL PROJECT INFRASTRUKTUR MENARA TELEKOMUNIKASI PT. TOWER BERSAMA INFRASTRUCTURE, Tbk. REGIONAL JABODETABEK. S1 thesis, Universitas Mercu Buana Jakarta.

GEMINO, JOVANKA PUNGGAWA (2021) ANALISIS RISIKO TERJADINYA KECELAKAAN TERHADAP KINERJA PROYEK MENGGUNAKAN METODE APMM (ACCIDENT POTENTIAL MEASUREMENT METHOD) (STUDI KASUS PROYEK PEMBANGUNAN APARTEMEN PACIFIC GARDEN STYLE, KOTA TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

GERALDO, ANDRE (2021) ANALISIS PENURUNAN UMUR RENCANA JALAN AKIBAT BEBAN MUATAN KENDARAAN YANG BERLEBIH (Studi Kasus :Jembatan Timbang Kemang, Kec.Kemang, Bogor, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

GHUFRONIANDI, ILHAM (2024) ANALISIS PENGARUH U-TURN TERHADAP KINERJA RUAS JALAN DANKARAKTERISTIK ARUS LALU LINTAS DI RUAS JALAN TRANSYOGI MENGGUNAKAN PKJI-2023. S1 thesis, Universitas Mercu Buana - Buncit.

GINANJAR, YUSUP (2019) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (STUDI PADA PROYEK MENARA BNI). S1 thesis, Universitas Mercu Buana Jakarta.

GINANJAR, YUSUP (2018) PROYEK PEKERJAAN KONSTRUKSI PEMBANGUNAN GEDUNG ASEAN SECRETARIAT (ASEC). S1 thesis, Universitas Mercu Buana Jakarta.

GINTING, ALDESWIN (2021) ANALISIS MANAJEMEN SUMBER DAYA MANUSIA UNTUK PENINGKATAN KINERJA PROYEK KONTRUKSI (Studi Kasus Pada Pembangunan Perumahan Di Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

GINTING, WINSTON EDY GALAHTA (2022) ANALISIS PENGARUH DIBERLAKUKANNYA SISTEM DUA ARAH DAN SISTEM SATU ARAH TERHADAP KINERJA LALU LINTAS DI JALAN ARIF RAHMAN HAKIM KOTA DEPOK. S2 thesis, Universitas Mercu Buana Jakarta.

GRACIO, PAUL CESAR (2023) PERBANDINGAN PENGGUNAAN BETON BERTULANG DAN BETON SERAT BAJA TERHADAP WAKTU DAN BIAYA PADA PEKERJAAN PELAT LANTAI PROYEK YOSHINO WAREHOUSE EXTENSION. S1 thesis, Universitas Mercu Buana Jakarta.

GREUCENZKY, GRIFF (2022) “PENGARUH RESIN SEBAGAI PENGGANTI SEMEN (POLIMER) DAN KERAMIK SEBAGAI SUBSTITUSI AGREGAT HALUS PADA BETON MUTU TINGGI”. S1 thesis, Universitas Mercu Buana Bekasi.

GUMELAR, ESSA (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH RAFT FOUNDATION PADA PROYEK PEMBANGUNAN TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

GUMELAR AMITRI, GUNTUR (2020) ASSESSMENT STRUKTUR BAJA EKSISTING TERHADAP PENAMBAHAN OVERHEAD CRANE 10 TON. S1 thesis, Universitas Mercu Buana Jakarta.

GUNADI, MARSIANTO (2023) ANALISIS KETERLAMBATAN STRUKTUR BAWAH PADA PEKERJAANDINDING PENAHAN TANAH DI PROYEK PEGADAIAN TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

GUNAWAN, AVINSKA VALERIA (2020) EVALUASI WAKTU PENJADWALAN PROYEK DENGAN MENGGUNAKAN APLIKASI MS. PROJECT (STUDI KASUS: PROYEK PT. YAN CHUANG YEN INDONESIA, CIKANDE). S1 thesis, Universitas Mercu Buana.

GUNAWAN, BANI BUDIADI (2019) METODE PELAKSANAAN PELAT DAN BALOK PADA PROYEK DAAN MOGOT CITY APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, GILANG FAJAR (2019) ANALISA PENGGUNAAN DAN METODE PELAKSANAAN PEKERJAAN DINDING DENGAN CLAY BRICK PADA PROYEK ORICC. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, GILANG FAJAR (2020) KAJIAN PENGARUH VARIASI PERSENTASE BUKAAN TERHADAP DAYA SERAP DINDING GESER. S1 thesis, Universitas Mercu Buana.

GUNAWAN, INDAH (2021) EVALUASI SALURAN DRAINASE DI JALAN ARJUNA SELATAN JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, MULAT DANARDONO (2021) ANALISIS KEPUASAN PENUMPANG TERHADAP KUALITAS PELAYANAN BUS AKAP PO. MAJU LANCAR DENGAN METODE SERVQUAL (STUDI KASUS : TRAYEK KREO - WONOSARI). S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, RAHMAT (2021) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PEKERJAAN STRUKTUR ATAS BANGUNAN TINGKAT TINGGI PADA PROYEK THE STATURE JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

GURNING, GEORGIO CALVIN SALOMO (2018) METODE PELAKSANAAN RAFT PONDASI DAN PILECAP PADA PROYEK PEMBANGUNAN GATEWAY PARK OF LRT (Jl. Kapin Raya Kampung Baru, RT.9/RW.8, Pondok Kelapa Pondokgede, Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

GUSAENI, AHMAD (2023) ANALISIS PEMILIHAN MODA TRANSPORTASI UMUM RUTE BEKASI - JATINEGARA (STUDI KASUS KRL DAN TRANSJAKARTA). S1 thesis, Universitas Mercu Buana Jakarta.

GUSBIAN, TRI (2023) ANALISIS FAKTOR-FAKTOR PENGARUH KINERJA WAKTU DAN BIAYA PEKERJAAN PENINGKATAN JALAN DI KABUPATEN SERANG. S2 thesis, Universitas Mercu Buana Jakarta.

GUSRA, NAILATUL FADHILAH (2020) ANALISIS KINERJA BIAYA DAN WAKTU PELAKSANAAN PROYEK MENGGUNAKAN METODE NILAI HASIL (EARNED VALUE ANALYSIS) (Studi Kasus : Proyek Pembangunan Bendungan Napun Gete, Nusa Tenggara Timur ). S1 thesis, Universitas Mercu Buana Jakarta.

HABIBAH, NURUL FAHIMMATUL (2019) ANALISIS KEBUTUHAN RUANG PARKIR DAN KINERJA RUAS JALAN DI ARION MALL RAWAMANGUN, JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

HABIBI, ROBI (2022) ANALISIS FAKTOR – FAKTOR PENYEBAB REWORK PADA PROYEK KONSTRUKSI (STUDI KASUS: APARTEMENT CARTENSZ RESIDENCE). S1 thesis, Universitas Mercu Buana Jakarta.

HABIBI, TB. MUHAMMAD NAZMI (2020) ANALISA PERBANDINGAN MORTAR KONVENSIONAL DAN MORTAR INSTAN (RAPI) TERHADAP PASANGAN DINDING BATU BATA DAN PLESTERAN DI TINJAU DARI MUTU, BIAYA, DAN WAKTU. S1 thesis, Universitas Mercu Buana Bekasi.

HADI, DARIL KUSUMA (2019) EVALUASI AKSESIBILITAS PEJALAN KAKI STASIUN BERBASIS TRANSIT ORIENTED DEVELOPMENT (STUDI KASUS STASIUN CISAUK TANGERANG). S1 thesis, Universitas Mercu Buana.

HADI, DEGA SETYAWAN (2020) ANALISIS PERBANDINGAN METODE ERECTION FULLSLAB PRECAST TERHADAP BIAYA DAN WAKTU (Studi Kasus: Proyek Jalan Tol Cibitung Cilincing Seksi 3). S1 thesis, Universitas Mercu Buana Bekasi.

HADI, TOMMI PRASTYA (2019) ANALISIS KECELAKAAN LALU LINTAS (Studi Kasus : Ruas Jalan KH Hasyim Ashari, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

HADI, TOMMI PRASTYA (2019) ANALISIS KECELAKAAN LALU LINTAS (Studi Kasus : Ruas Jalan KH Hasyim Ashari, Tangerang). S1 thesis, Universitas Mercu Buana.

HADIANTO, INDRASTO NUR (2022) Analisis Faktor Penyebab Pembengkakan biaya (COST OVERRUNS) Pada Proyek Konstruksi Gedung. S1 thesis, Universitas Mercu Buana Jakarta.

HADUN, HADUN (2019) PENGAMATAN PEKERJAAN M.E.P PROYEK THE AYOMA APARTMENT, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HAFIDH, MUHAMMAD (2023) OPTIMASI PENGGUNAAN COLD PAVING HOT MIX ASBUTON DENGAN SEMEN SEBAGAI FILLER UNTUK PELAKSANAAN TAMBALAN. S1 thesis, Universitas Mercu Buana Bekasi.

HAKIKI, RIZKI FADILAH (2018) ANALISA LALU LINTAS PADA SIMPANG BERSINYAL JL. RAYA BOGOR KM 22, PASAR REBO JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

HAKIM, MALVA ALDI (2022) ANALISIS BIAYA OPERASIONAL KENDARAAN (BOK) ANGKUTAN KOTA SEMARANG (RUTE PENGGARON – JOHAR) (Studi Kasus : Trayek Penggaron-Johar PP (C.3). S1 thesis, Universitas Mercu Buana Jakarta.

HALIM, DRIWANSYAH EKO (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK MPP OFFICE BUILDING. S1 thesis, Universitas Mercu Buana Jakarta.

HALIZA, ALFINA NOVIA NUR (2023) ANALISIS PENERAPAN PROGRAM KESEHATAN DAN KESELAMATAN KERJA (K3) PADA PROYEK PEMBANGUNAN STUDI KASUS : GEDUNG IT MANDIRI, SLIPI, JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

HAMDANI, A HABIB (2023) PEMANFAATAN ABU SEKAM PADI SEBAGAI BAHAN SUBSTITUSI SEMEN DAN LIMBAH KACA SEBAGAI AGREGAT KASAR PADA CAMPURAN BETON MUTU 30 MPA UNTUK PERKERASAN JALAN LOKAL PRIMER. S1 thesis, Universitas Mercu Buana Bekasi.

HAMID, ABDUL (2018) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN NINES PLAZA & RESIDENCE - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HAMID, ABDUL (2018) PROYEK GEDUNG APARTAMEN THE PAKUBUWONO SPRING. S1 thesis, Universitas Mercu Buana Jakarta.

HAMONANGAN, SONNY CHRISTOPHER (2018) ANALISIS KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI DI SIMPANG TOL TIMUR A (JL. H. M JOYO MARTONO) KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

HAMZAH, MUHAMMAD (2022) ANALISIS KAPASITAS SISTEM DRAINASE DENGAN STORM WATER MANAGEMENT MODEL (SWMM) PADA PERUMAHAN CEMARAJAYA KABUPATEN KARAWANG JAWA BARAT. S1 thesis, Universitas Mercu Buana Bekasi.

HANAFI, GAMAL (2022) ANALISIS IMPLEMENTASI SISTEM MANAJEMEN MUTU BERDASARKAN ISO 9001:2015 PADA PROYEK GEREJA KEMAH TABERNAKEL. S1 thesis, Universitas Mercu Buana Jakarta.

HANDAYANI, FITRIA (2022) ANALISIS PERKUATAN LERENG GALIAN DENGAN MENGGUNAKAN BORED PILE PADA STA. 20+525 (L/S) PROYEK JALAN BEBAS HAMBATAN CILEUNYI – SUMEDANG – DAWUAN SEKSI 2 PHASE II. S1 thesis, Universitas Mercu Buana Jakarta.

HANDAYANI, LUSI (2018) ANALISA KINERJA OPERASIONAL BUS MAYASARI BAKTI RUTE CILEUNGSI – BLOK M. S1 thesis, Universitas Mercu Buana Bekasi.

HANDOKO, FEBRI (2019) ANALISIS PERENCANAAN BIAYA PADA PROYEK REVITALISASI BANGUNAN GEDUNG HOTEL (Studi kasus : Proyek Renovasi The Sultan Hotel & Residence, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

HANDOYO, ARI RAHMAN (2022) ANALISIS WASTE BESI BETON DAN PENYEBABNYA PADA PROYEK PEMBANGUNAN BANGUNAN GEDUNG BERTINGKAT (Studi Kasus: GEDUNG F, GANDUM MAS KENCANA, TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

HANIFAN, BALQI (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK KEBAYORAN APARTEMENT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HANUKUSUMA, NUR (2019) ANALISIS PENYEBAB KETERLAMBATAN PROYEK TERHADAP PENJADWALAN PROYEK (STUDI KASUS PROYEK PEMBANGUNAN LRT DI DAERAH X). S1 thesis, Universitas Mercu Buana.

HARDI, BAYU WICAKSONO (2022) ANALISIS PENGARUH KONDISI CCD (CURENT COLLECTOR DEVICE/ SHOE) PADA SARANA TERHADAP PERJALANAN LRT JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

HARDI PAMUNGKAS, OKY (2016) PERANCANGAN SISTEM DRAINASE PEMUKIMAN CLUSTER PELICAN, SUMMARECON SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

HARDIYANTI, DESIE and HALQI, ADAM AQSHA (2017) METODE PELAKSANAAN PEKERJAAN BORED PILE DAN PILE CAP PROYEK RUSUN TINGKAT TINGGI PASAR RUMPUT (Kawasan Pasar Rumput – Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

HARIANDI, REGI (2020) TINJAUAN STABILITAS STRUKTUR TUBUH BENDUNGAN DRY DAM CIAWI CIPAYUNG, KABUPATEN BOGOR, PROVINSI JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

HARIANTO, HARIANTO (2017) DESAIN ALTERNATIF STRUKTUR ATAS JEMBATAN BOX GIRDER DENGAN METODE SPAN BY SPAN STUDI KASUS JEMBATAN LAYANG TENDEAN – BLOK M – CILEDUK. S1 thesis, Universitas Mercu Buana Jakarta.

HARIANTO, HARIANTO (2016) DESAIN ALTERNATIF STRUKTUR ATAS JEMBATAN BOX GIRDER DENGAN METODE SPAN BY SPAN STUDI KASUS JEMBATAN LAYANG TENDEAN-BLOK M-CILEDUK. S1 thesis, Universitas Mercu Buana Jakarta.

HARIS, MAITSA ANGGRAINI (2021) APLIKASI E-COMMERCE KOSTUM COSPLAY BERBASIS WEBSITE. S1 thesis, Universitas Mercu Buana.

HARIWAHYUTIRTO, CATUR (2022) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP FASILITAS DAN PELAYANAN TERMINAL TAWANG ALUN KABUPATEN JEMBER. S1 thesis, Universitas Mercu Buana Bekasi.

HARIYADI, DIDIN (2018) ANALISIS PERBANDINGAN PENGGUNAAN PERANCAH BAJA KONVENSIONAL DAN PERANCAH BAJA MODIFIKASI PADA PEKERJAAN FACADE STASIUN MRT LEBAK BULUS. S1 thesis, Universitas Mercu Buana Bekasi.

HARIYADI, DIDIN (2018) ANALISIS PERBANDINGAN PENGGUNAAN PERANCAH BAJA KONVENSIONAL DAN PERANCAH BAJA MODIFIKASI PADA PEKERJAAN FACADE STASIUN MRT LEBAK BULUS. S1 thesis, Universitas Mercu Buana Bekasi.

HARIYANTO, AGUS (2023) ANALISIS PENYEBAB KETERLAMBATAN BERBASIS MANAJEMEN RISIKO PROYEK PEMBANGUNAN NEW STORE MITRA 10, BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

HARJUNA, MUHAMMAD DAFA (2023) ANALISIS PEMANFAATAN LIMBAH BATA RINGAN SEBAGAI BAHAN SUBTITUSI AGREGAT HALUS TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

HARNANDA, KHRESNA RIZKY (2020) STUDI KOMPARASI ANALISIS STRUKTUR ATAS DENGAN MATERIAL BETON BERTULANG DAN BAJA (STUDI KHASUS: GEDUNG KANTOR JALAK HARUPAT BANDUNG). S1 thesis, Universitas Mercu Buana Bekasi.

HARSANTO, PAULUS EKO (2019) PEKERJAAN STRUKTUR BALOK KANTILEVER TERTINGGAL PEMBANGUNAN GEDUNG D BADAN POM JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

HARTA, BUDHI (2020) ANALISIS KEPUASAN PENUMPANG TERHADAP KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) DUKUH ATAS. S1 thesis, Universitas Mercu Buana Jakarta.

HARTATI, SRI (2020) TINJAUAN PERENCANAAN DIMENSI HIDROLIS BANGUNAN PELIMPAH ( SPILLWAY ) BENDUNGAN CIDANAU KABUPATEN SERANG BANTEN. S1 thesis, Universitas Mercu Buana.

HARTAWATI, WIDYA PURI (2021) PENGARUH PENGGANTIAN AGREGAT KASAR PUING BETON DAN PENGGANTIAN FILLER BOTTOM ASH PADA CAMPURAN LASTON AC-BC TERHADAP KARAKTERISTIK UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

HARTONO, DUDEN DODI (2023) ANALISIS PENGARUH PERAN KONSULTAN MANAJEMEN KONSTRUKSI TERHADAP KINERJA PELAKSANAAN PROYEK TOWER TELEKOMUNIKASI. S2 thesis, Universitas Mercu Buana Jakarta.

HARTONO, ENGGAR (2022) EVALUASI GEOMETRIK JALAN REL PADA JALUR KERETA API MANGGARAI – JATINEGARA. S1 thesis, Universitas Mercu Buana Bekasi.

HARYONO, EKO (2019) ANALISIS BATU DOLOMIT (BATU PUTIH) SEBAGAI PENGGANTI AGREGAT KASAR PADA PERKERASAN JALAN DENGAN UJI MARSHALL MENGGUNAKAN SISTEM HOT MIX PADA CAMPURAN ASPAL BETON AC-WC. S1 thesis, Universitas Mercu Buana Jakarta.

HASAN, AHMAD FADLI (2023) ANALISIS EFEKTIVITAS PERBAIKAN MANAJEMEN LALU LINTAS (Studi Kasus: Simpang Tiga Rawa Hingkik, Kabupaten Bogor). S1 thesis, Universitas Mercu Buana Bekasi.

HASAN, FAJAR AKHIRUDDIN (2017) ANALISIS PROSES TENDER DENGAN KOMBINASI METODE BLOCK TENDER DAN PEMILIHAN LANGSUNG MELALUI PENDEKATAN ANALYTICAL HIERARCHY PROCESS. S1 thesis, Universitas Mercu Buana Jakarta.

HASAN, FAJAR SOKHIBUL (2018) ANALISIS PERKUATAN STRUKTUR BALOK TERHADAP KUAT TEKAN DAN LENTUR MENGGUNAKAN FRP DENGAN METODE JACKETING PROYEK TRANSMART CIBUBUR KOTA DEPOK. S1 thesis, Universitas Mercu Buana Bekasi.

HASAN, IQBAL (2021) ANALISIS PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHI KINERJA TOWER CRANE LUFFING JIB PADA PROYEK NASDEM TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

HASENDA, CARRERA PUTRI (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN NINES PLAZA & RESIDENCE - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HASIHOLAN, BENNY (2020) PERENCANAAN SISTEM DRAINASE DI JALAN KENANGA KECAMATAN MERAWANG KABUPATEN BANGKA PROVINSI BANGKA BELITUNG. S1 thesis, Universitas Mercu Buana Jakarta.

HASSIM, M. GUFRON FUAD (2022) ANALISIS DAMPAK PENUNDAAN PEKERJAAN TERHADAP BIAYA DAN WAKTU KONSTRUKSI (Studi Kasus : Proyek Apartement Arandra Residence, Cempaka Putih, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

HENDRAWAN, DANI (2022) EVALUASI KELAYAKAN INVESTASI PERUMAHAN JAYA ANCOL SEAFRONT KOTA JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

HENINDIA, ROFI (2022) ANALISIS FAKTOR – FAKTOR PENYEBAB KETERLAMBATAN PADA PEKERJAAN PONDASI TIANG PANCANG PROYEK PEMBANGUNAN GEDUNG BERTINGKAT SEDANG. S2 thesis, Universitas Mercu Buana Jakarta.

HERDIANA, DUDY (2021) KAJIAN EVALUASI SISTEM PENGADAAN CALON KONTRAKTOR PEMELIHARAAN ALAT PENERANGAN JALAN (APJ) PADA DINAS PERHUBUNGAN PROVINSI BANTEN MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP). S1 thesis, Universitas Mercu Buana Jakarta.

HERJUNO, DAVIA JUSERIA PUTRI (2022) KAJIAN PENGARUH PENAMBAHAN SERBUK GYPSUM DAN SEMEN PADA TANAH LEMPUNG TERHADAP STABILITAS TANAH (Lokasi: Dusun Kalangan, Desa Bangunjiwo, Kabupaten Bantul, Daerah Istimewa Jogjakarta). S1 thesis, Universitas Mercu Buana.

HERMAN, (2022) ANALISIS KEPUASAN STAKEHOLDER DALAM IMPLEMENTASI PEMELIHARAAN JALAN LONG SEGMENT DENGAN METODE IMPORTANCE PERFORMANCE ANALYSIS (IPA) DAN CUSTOMER SATISFACTION INDEX (CSI) (STUDI KASUS: JALAN RAYA CIREBON – KUNINGAN – CIAMIS). S1 thesis, Universitas Mercu Buana Bekasi.

HERMANTO, JOKO (2024) KINERJA STRUKTUR DERMAGA BATU BARA TERHADAP BEBAN GEMPA RIWAYAT WAKTU STUDI KASUS : PROYEK PLTU JAWA 9 & 10 CILEGON - BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

HERMAWAN, BAGUS BAYU (2019) METODE PELAKSANAAN PEKERJAAN SHEAR WALL PADA PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

HERMAWAN, DANNY (2013) METODE PELAKSANAAN STRUKTUR ATAS PROYEK THE APARTEMENT KENCANA PONDOK INDAH JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HERMAWAN, DHANI (2019) METODE PELAKSANAAN PEMASANGAN HALF SLAB PADA PROYEK MALL BOXIES 123. S1 thesis, Universitas Mercu Buana Jakarta.

HERMAWAN, MUCHAMMAD INDRA SEPTIA (2021) FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PEKERJAAN KONSTRUKSI PROYEK JHL EPISODE GADING SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

HERYANTO, RIZKY (2020) PENGARUH AIR LAUT TERHADAP KARAKTERISTIK CAMPURAN ASPAL PEN 60/70 UNTUK LAPIS PERMUKAAN (STUDI KASUS: JALAN PLUIT KARANG AYU BARAT, PLUIT, JAKARTA UTARA). S1 thesis, Universitas Mercu Buana Jakarta.

HESRIZARNA, MAHARDIKA (2019) ANALISA KARAKTERISTIK LAHAN PARKIR DAN PENGARUHNYA TERHADAP KINERJA JALAN STUDI KASUS MALL BASSURA CITY, JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

HIA, SAMUEL ANDRY PURNAMA (2021) STUDI EVALUASI KEBUTUHAN PELAYANAN PEJALAN KAKI JALAN KH. HASYIM ASHARI NO. 1 CIPONDOH KOTA TANGERANG (Depan Sdn1, Kantor Kecamatan Dan Puskesmas Cipondoh). S1 thesis, Universitas Mercu Buana Jakarta.

HIA, `SAMUEL ANDRY PURNAMA (2018) PROYEK PEMBANGUNAN GEDUNG SARANA PARKIR BASEMENT LAPANGAN BHAYANGKARA MABES POLRI, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAH, NURUL MUSYAFA ULUL (2020) ANALISIS PERBANDINGAN DESAIN PLATE GIRDER PADA JEMBATAN NON-KOMPOSIT ANTARA PERATURAN AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 2017 DENGAN SNI 1729:2015. S1 thesis, Universitas Mercu Buana Bekasi.

HIDAYANI, AYUK NUR (2020) ANALISIS PRODUKTIVITAS PASSENGER HOIST TERHADAP PEKERJAAN PELAT LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, ABDUL KHANIEF (2017) EVALUASI KINERJA RUAS JALAN GATOT SUBROTO CIMONE - TANGERANG. S1 thesis, Universitas Mercu Buana.

HIDAYAT, IMAM (2022) ANALISIS IDENTIFIKASI RISIKO PENYEBAB KETERLAMBATAN PENYELESAIAN PEMBANGUNAN PROYEK APARTEMEN SAUMATA SUITES DI ALAM SUTERA, TANGERANG SELATAN DENGAN METODE HOUSE OF RISK (HOR). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, IVAN TYASSUNU (2023) ANALISIS PERBANDINGAN METODE PELAT KONVENSIONAL DAN HALF SLAB PRECAST DITINJAU DARI SEGI WAKTU PELAKSANAAN (Studi Kasus : Percepatan Penyelenggaraan Kereta Api Ringan / Light Rail Transit Terintegrasi Di Wilayah Jakarta, Bogor, Depok dan Bekasi Lintas Pelayanan 03.4 (Depo)). S1 thesis, Universitas Mercu Buana Bekasi.

HIDAYAT, MOCHAMAD NUR (2021) EVALUASI PEMANCANGAN TIANG MENEMBUS TANAH BERLENSA DENGAN METODE PERSAMAAN GELOMBANG MENGGUNAKAN PROGRAM GRLWEAP. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, MOH. (2018) PROYEK APARTEMENT T PLAZA JL. PENJERNIHAN 1 PEJOMPONGAN JAKARTA PUSAT (Metode Pelaksanaan Dinding Shear Wall). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, MUHAMAD AZIS WAHYU (2018) STUDI VISKOSITAS PADA ASPAL MENGGUNAKAN ALAT VISKOSITAS DINAMIS, VISKOSITAS KINEMATIS, VISKOSITAS SAYBOLT FUROL DAN DYNAMIC SHEAR RHEOMETER (DSR). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, MUHAMMAD NAUFAL (2021) ANALISIS TEGANGAN PIPA PADA SISTEM PERPIPAAN STRIPPER REBOILER MENUJU AMINE STRIPPER COLUMN MENGGUNAKAN METODE NUMERIK. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RADIK FANDI (2019) PROYEK PEMBANGUNAN DAAN MOGOT CITY DAN MEISTERSTADT BATAM (PT. Megatika Internasional). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RIZAL (2020) LAPORAN PELAKSANAAN PEKERJAAN STRUKTUR ATAS PROYEK TRANS PARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, SOFYAN (2020) EVALUASI DRAINASE JALAN KEDUNGWARINGIN – PEBAYURAN, KEDUNGWARINGIN BEKASI MENGGUNAKAN PROGRAM EPA SWMM 5.0. S1 thesis, Universitas Mercu Buana Bekasi.

HIDAYAT, SYARIF (2019) REDESIGN PONDASI COOLING TOWER (TIANG PANCANG) DENGAN PONDASI KSLL ( KONSTRUKSI SARANG LABA-LABA ). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, SYARIF (2017) STEEL CONSTRUCTION ERECTION NEW GREEN FIELD FOOD PET PLAN PROJECT (JL. Modern Industri No. IV Kawasan Modern Cikande Industrial Estate, Cikande, Serang 42186 - BANTEN). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, TAUFIK (2020) ANALISIS PENERAPAN REKAYASA NILAI (VALUE ENGINEERING) PADA PROYEK KONSTRUKSI (STUDI KASUS : PEMBANGUNAN GUDANG BAHAN BAKU BONTANG – KALIMANTAN TIMUR). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, TAUFIK (2021) EVALUASI DAYA DUKUNG PONDASI BOREDPILE (Studi Kasus Proyek Bintaro Jaya Xchange Tahap 2). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, TAUFIK (2021) STUDI PERANCANGAN STRUKTUR DERMAGA JETTY PADA TERMINAL PETI KEMAS KAPASITAS 60.000 DEADWEIGHT TONNAGE (DWT). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, TAUFIK (2021) STUDI PERANCANGAN STRUKTUR DERMAGA JETTY PADA TERMINAL PETI KEMAS KAPASITAS 60.000 DEADWEIGHT TONNAGE (DWT). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, YADI (2018) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PADA PROYEK APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYATULLAH, RIZKY (2019) ANALISIS EFEKTIVITAS LAYANAN ANGKUTAN UMUM MASS RAPID TRANSIT ATAU MRT STUDI KASUS LEBAK BULUS – BUNDARAN HI. S1 thesis, Universitas Mercu Buana Bekasi.

HIFZHI, MUHAMMAD (2021) APLIKASI BETON RINGAN MORTAR BUSA SEBAGAI ALTERNATIF PENGGANTI TIMBUNAN KONVENSIONAL. S1 thesis, Universitas Mercu Buana Jakarta.

HIKMAYADI, DENI DWI (2021) PENGARUH SUBTITUSI LIMBAH STYROFOAM DAN PENGGANTIAN SEMEN BENTONIT SEBAGAI FILLER TERHADAP KARAKTERISTIK MARSHALL PADA CAMPURAN LASTON AC-BC. S1 thesis, Universitas Mercu Buana Jakarta.

HILALA, IDRUS (2019) DAMPAK PERUBAHAN RENCANA AWAL (BASIC DESIGN) ALINYEMEN VERTIKAL DENGAN PENAMBAHAN CLIMBING LANEDAN ESCAPE LANE TERHADAP TINJAUAN KENYAMANAN PENGGUNA JALAN TOL DAN KINERJA WAKTU PROYEK (Studi kasus : Jalan Tol Trans Sumatera Ruas Bakauheni - Sidomulyo STA. 0+000 - STA. 39+400). S1 thesis, Universitas Mercu Buana.

HISMAWAN, SEKAR SUKMANING (2021) PENGARUH PARKIR OJEK ONLINE TERHADAP KINERJA RUAS JALAN DI STASIUN TANGERANG (STUDI KASUS : JL. KIASNAWI, KOTA TANGERANG, BANTEN). S1 thesis, Universitas Mercu Buana Jakarta.

HS, DEWITRI ASTI IFO (2020) ANALISIS PERBANDINGAN BIAYA & WAKTU METODE DIVERSION SERTA DEWATERING PEKERJAAN BOX CULVERT PADA PROYEK PEMBANGUNAN WADUK CAKUNG TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

HUDA, NURUL (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK APARTMENT T PLAZA PEJOMPONGAN JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

HUDA, YOLANDA OKTOVINA NURUL (2022) PENGARUH BAHAN LIMBAH PECAHAN KERAMIK DENGAN PENAMBAHAN VARIASI SERAT SERABUT KELAPA TERHADAP KUAT TEKAN, KUAT TARIK BELAH, ABSORPSI DAN UPV TEST PADA BETON. S2 thesis, Universitas Mercu Buana Jakarta.

HUSIN, HUSIN (2022) KAJIAN HUBUNGAN TINGGI EFEKTIF DAN DAYA SERAP DINDING GESER DENGAN VARIASO RASIO TINGGI KOLOM ( STUDI KASUS BANGUNAN BERTAPAK PERSEGI PANJANG TIPIS ). S1 thesis, Universitas Mercu Buana Jakarta.

HUSIN, HUSIN (2020) PELAKSANAAN PEKERJAAN SHEARWALL PROYEK PEMBANGUNAN EMBARCADERO PARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

Hanifudin, Ahmad Rif’an (2022) PERENCANAAN STRUKTUR GEDUNG BETON BERTULANG BERDASARKAN SNI-1726-2019 dan SNI-2847-2019 ( STUDI KASUS GEDUNG APARTEMENT 8 LANTAI BEKASI SOUTH CITY ). S1 thesis, Universitas Mercu Buana Jakarta.

Hartanto, Budi (2024) ANALISIS PERCEPATAN WAKTU PENYELESAIAN KETERLAMBATAN PROYEK MENGGUNAKAN METODE CRASH PROGRAM (Studi Kasus : Pembangunan Gedung Pelayanan SATPAS dan FASUM – Cirebon Kota). S1 thesis, Universitas Mercu Buana - Buncit.

Haryanto, Ridwan Budi (2019) ANALISIS KINERJA PENUMPANG TERHADAP PELAYANAN BUS GUNUNG HARTA RUTE JAKARTA MALANG. S1 thesis, Universitas Mercu Buana Jakarta.

Herawati, Rizki Widya (2023) ANALISIS KENYAMANAN PEJALAN KAKI TERHADAP PEMANFAATAN TROTOAR DI ERA NEW NORMAL (STUDI KASUS: JALAN K.H. MAS MANSYUR - JAKARTA PUSAT). S1 thesis, Universistas Mercu Buana.

Hermawan, Pian (2024) ANALISIS PENGENDALIAN BANJIR PADA RUAS JALAN D.I. PANJAITAN KECAMATAN JATINEGARA KOTA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana - Buncit.

IDOLA, RAHMAT (2022) ANALISIS PENERAPAN METODE EARNED VALUE PADA PROYEK PENYIAPAN LOKASI PEMBORAN (WELLPAD) (Study Kasus : Proyek Penyiapan Lokasi Pemboran PPS-G PT. Pertamina Hulu Rokan Region 1 Zona 1 – Field Jambi). S1 thesis, Universitas Mercu Buana Jakarta.

IHSAN, IHSAN (2022) ANALISIS PENGARUH BIAYA TIDAK LANGSUNG (INDIRECT COST) TERHADAP KINERJA MUTU DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI. S2 thesis, Universitas Mercu Buana Jakarta.

IHSAN, MUHAMAD (2019) PRESERVASI JALAN LINGKAR BARAT - BTS. KOTA SERANG - BTS. KOTA TANGERANG DITINJAU DARI SEGI KEAMANAN, KESEHATAN, DAN KESELAMATAN KERJA (K3) SERTA PENGENDALIAN MUTU PROYEK. S1 thesis, Universitas Mercu Buana Jakarta.

IHWANUDIN, REDI (2023) ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK BANGUNAN TINGKAT TINGGI DENGAN METODE FMEA (FAILURE MODE & EFFECT ANALYSIS) DAN METODE FTA (FAULT TREE ANALYSIS) (Studi kasus : Proyek Apartement Indonesia One). S1 thesis, Universitas Mercu Buana.

IKHSAN, MUHAMMAD SYAAMIL (2023) ANALISIS RISIKO PELAKSANAAN MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (K3) BERBASIS CONSTRUCTION EXTENSION DI PROYEK RANCANG GEDUNG KEJAKSAAN AGUNG RI. S1 thesis, Universitas Mercu Buana Bekasi.

IKHSANUDIN, DWI (2022) PENGARUH KOMPETENSI, HARD SKILL DAN SOFT SKILL SUMBER DAYA MANUSIA TERHADAP KINERJA WAKTU KARYAWAN TIM PROYEK PT. TRADA STETIKA (STUDI KASUS PROYEK PEMBUATAN GUDANG KEMANG). S1 thesis, Universitas Mercu Buana Jakarta.

ILHAM, MUHAMMAD RAZKY (2021) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PADA PROYEK KONSTRUKSI APARTEMENT SAVYAVASA WIJAYA LUXURY RESIDENCE SAAT PANDEMI COVID - 19. S1 thesis, Universitas Mercu Buana Jakarta.

ILHAMSYAH, GUSTI BAYU (2022) ANALISIS CIRCULAR HOLLOW COLUMN CONCRETE DALAM PROSES HEAVY LIFTING. S1 thesis, Universitas Mercu Buana Bekasi.

ILYAS, REZA MUHAMAD (2018) PERENCANAAN STRUKTUR RANGKA BAJA TAHAN GEMPA DENGAN MENGGUNAKAN APLIKASI KOMPUTER. S1 thesis, Universitas Mercu Buana Bekasi.

IMANSYAH, ASEP NUR (2017) METODE PELAKSANAAN (KOLOM TRANSFER)LANTAI 12 DI PROYEK PEMBANGUNAN GEDUNG APARTEMENT CITRA LAKE CITRA GARDEN 6 CENGKARENG. S1 thesis, Universitas Mercu Buana Jakarta.

IMANUEL, YONA (2022) ANALISIS PENINGKATAN KINERJA PROYEK ACCESS BRIDGE (LRT) - JABODEBEK, MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO). S1 thesis, Universitas Mercu Buana Jakarta.

IMRAN RIZKIANTO S., RADEN (2018) EVALUASI EFEKTIFITAS JEMBATAN PENYEBEREANGAN ORANG (JPO) PADA JALAN JEND. A. YANI DI DEPAN MAL MEGABEKASI KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

INDARTO, RISKI (2017) METODE PEKERJAAN BEKISTING BONDEK PADA PELAT LANTAI PROYEK PEMBANGUNAN MENARA BNI PEJOMPONGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

INDRATAMA, SANDI (2022) PENGARUH PENAMBAHAN FLY ASH DAN SERBUK KACA TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

INDRIANA, DWI SHINTA (2022) RESPON DINAMIK RUMAH TINGGAL SATU LANTAI DENGAN BERBAGAI JENIS DENAH DAN KETINGGIAN STRUKTUR DI LOKASI RAWAN GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

INDRIANI, PUTRI (2023) ANALISA PENGARUH PANJANG ANTRIAN KENDARAAN DI RUAS JALAN PADA PENUTUPAN PALANG PINTU PERLINTASAN KERETA API (STUDI KASUS JALAN KH. SOLEH ALI, KOTA TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

INDRIAWAN, DJODY (2023) EVALUASI KINERJA OPERASIONAL DAN PELAYANAN BUS AKAP TRAYEK TANGERANG-NGAWI MENGGUNAKAN METODE IMPORTANCE PERFORMANCE ANALYSIS (IPA). S1 thesis, Universitas Mercu Buana Jakarta.

INDRIYANI, RETNO AJENG MEGA (2018) KAJIAN KARAKTERISTIK ALIRAN SUNGAI CIMANDIRI CIREUNGHAS SUKABUMI MENGGUNAKAN PROGRAM HEC-RAS. S1 thesis, Universitas Mercu Buana Jakarta.

INGGRIANI, FITRIA ELVA (2021) EVALUASI KELAYAKAN GEOMETRIK DAN RUANG BEBAS JALUR KERETA API STUDI KASUS : PETAK JALAN KM 4 +800 S/D 5 + 500 ANTARA SUDIRMAN – MANGGARAI. S1 thesis, Universitas Mercu Buana Jakarta.

INSANI, RIZKI SYIFA (2021) ANALISIS PENYEBAB KETERLAMBATAN PELAKSANAAN PEKERJAAN STRUKTUR BANGUNAN PARKIR PROYEK LOT BIDEX BSD, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

IQBAL, M. (2023) Analisis Life Cycle Cost Pada Pembangunan Kost 4 Lantai dan 53 Kamar Kemanggisan Palmerah-Jakarta Barat. S1 thesis, Universitas Mercu Buana Bekasi.

IRAWAN, ALRYAN MUHAMMAD (2022) ANALISIS PENGGUNAAN SERBUK KACA DAN ZAT EPOXY TERHADAP KUAT TEKAN DAN KERAPATAN BETON DENGAN PENGARUH MAGNESIUM SULFAT. S1 thesis, Universitas Mercu Buana Jakarta.

IRAWAN, ANDHY (2022) ANALISIS KETERSEDIAAN DAN KEBUTUHAN AIR IRIGASI DAERAH IRIGASI CIKAMUNDING SERANG BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

IRAWAN, ARIF (2024) EVALUASI TEKNO EKONOMI PROYEK AUTOMATED PEOPLE MOVER SYSTEM BANDAR UDARA INTERNASIONAL SOEKARNO HATTA. S2 thesis, Universitas Mercu Buana Jakarta.

IRDIANSAH, IVAN (2019) APARTEMEN DAAN MOGOT CITY METODE PELAKSANAN CORE WALL. S1 thesis, Universitas Mercu Buana Jakarta.

IRFAN, MUHAMAD (2022) ANALISIS PERCEPATAN PEKERJAAN PONDASI BORED PILE DENGAN PENAMBAHAN JUMLAH ALAT DAN WAKTU KERJA STUDI KASUS ( STUDI KASUS : DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA ( PHASE 2) CIVIL WORK ). S1 thesis, Universitas Mercu Buana Jakarta.

IRFAN, RIYAN MUHAMMAD (2019) PELAKSANAAN PEMBANGUNAN GEDUNG WISMA BARITO PASIFIC 2 SLIPI - JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

IRFANANDA, M. (2017) PERENCANAAN DIMENSI HIDROLIS BANGUNAN AIR BENDUNG PADA SUNGAI CISIMEUT BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

IRFANSYAH, REIZA (2020) PENGARUH FAKTOR PEMILIK PROYEK, PERENCANA-PEMBANGUN DAN KARAKTERISTIK PROYEK TERHADAP KINERJA RANCANG BANGUN BANDARA. S2 thesis, Universitas Mercu Buana Jakarta.

IRMANZAH, IRMANZAH (2021) ANALISIS FAKTOR PEMILIK, PERENCANA DAN KONTAKTOR PELAKSANA TERHADAP KINERJAPROYEK BANDAR UDARA PERINTIS. S2 thesis, Universitas Mercu Buana Jakarta.

IRVANA, CHIBBAN MUFTI (2023) ANALISIS KINERJA SIM PANG BERSINYAL DAN RUAS JALAN PADA JALAN CILEDUG RAYA - JALAN SWADARMA RAVA, PESANGGRAHAN, JAKARTA SELATAN MENGGUNAKAN PERANGKAT LUNAK VISSIM. S1 thesis, Universitas Mercu Buana Jakarta.

ISABELLA, MARIMAR (2018) IDENTIFIKASI VARIABEL KETERLAMBATAN PEKERJAAN SUBSTRUCTURE (RAFT FOUNDATION) PADA KONSTRUKSI BANGUNAN BERTINGKAT PROYEK X DI CIBUBUR. S1 thesis, Universitas Mercu Buana Bekasi.

ISKAMTO, DEDE (2022) ANALISIS PERKUATAN DAN DETAILING STRUKTUR RUKO AKIBAT PENAMBAHAN LANTAI MEZANIN DENGAN CFRP SESUAI SNI 1726:2019 DAN SNI 8971:2021. S1 thesis, Universitas Mercu Buana Jakarta.

ISKANDAR, DENI (2018) KINERJA CAMPURAN ASPAL AC - WC DENGAN ASPAL PERTAMINA PENETRASI 60/70 DENGAN TAMBAHAN CAMPURAN PLASTIK BOTOL BEKAS DAN SERAT KELAPA. S1 thesis, Universitas Mercu Buana Jakarta.

ISKANDAR, IRFAN NASEH (2019) ANALISIS PILE CAP DENGAN METODE STRUT AND TIE PADA PEMBANGUNAN INFRASTRUKTUR DI KOTA SUKABUMI. S1 thesis, Universitas Mercu Buana Bekasi.

ISLAHUDIN, AHMAD (2022) PENGARUH PENAMBAHAN SENAR FLUOROCARBON PADA CAMPURAN BETON TERHADAP KUAT TEKAN DAN KUAT LENTUR BETON. S1 thesis, Universitas Mercu Buana Bekasi.

ISMAIL, FIRDAUS (2021) PERANCANGAN ELEMEN BATAS PADA SISTEM DINDING STRUKTURAL KHUSUS SESUAI SNI 2847:2019 (Studi Kasus: Gedung Perkantoran 22 Lantai di Kota Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ISMANTO, ADI (2019) DESAIN ALTERNATIF STRUKTUR ATAS MESS BERTINGKAT PT. NIKOMAS GEMILANG SERANG-BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

ISMANTO, HADI (2018) ANALISIS PENYELESAIAN SENGKETA KONSTRUKSI (Dewan Sengketa Vs Arbitrase) BERDASARKAN FIDIC CONDITION of CONTRACT 2017. S2 thesis, Universitas Mercu Buana Jakarta.

ISTAMI, ALDI FAJAR (2023) ANALISA TINGKAT KESELAMATAN LALU LINTAS PADA PERSIMPANGAN JALAN DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (TCT) (STUDI KASUS: PERSIMPANGAN JL. SUROTOKUNTO - JL. WIRASABA, KARAWANG). S1 thesis, Universitas Mercu Buana Jakarta.

ISTANA, SATRIA (2018) PERBANDINGAN EFISIENSI BIAYA MAT FOUNDATION DENGAN RING WALL FOUNDATION PADA STRUKTUR FONDASI FUEL OIL TANK STUDI KASUS PROYEK PLTMG 15 MW TANJUNG SELOR, KALIMANTAN UTARA. S1 thesis, Universitas Mercu Buana Bekasi.

ISTIGHFARI, SITI SHAFIRA (2022) EVALUASI KAPASITAS LAHAN PARKIR RODA DUA DI GEDUNG PERKANTORAN B.J HABIBIE THAMRIN – JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

ISTIGHOZAH, AZIZAH (2021) ANALISIS PERBANDINGAN SISTEM STRUKTUR PELAT LANTAI METODE PRECAST HALF SLAB DAN METODE KONVENSIONAL. S1 thesis, Universitas Mercu Buana Jakarta.

IWAN, IWAN (2021) ANALISIS KINERJA KONTRAKTOR FORMWORK MENGGUNAKAN METODE LEAN CONSTRUCTION (Studi Kasus : MPP Project Office, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

IZZA, ABDA (2022) PENGARUH LIMBAH KERAMIK SEBAGAI BAHAN SUBSTITUSI PASIR DAN FLY ASH SEBAGAI BAHAN SUBSTITUSI SEMEN TERHADAP KUAT TEKAN MORTAR BUSA. S1 thesis, Universitas Mercu Buana Bekasi.

JAENUDIN, AGUN (2020) ANALISIS TEBAL PERKERASAN RIGID PAVEMENT REKONTRUKSI RUAS JALAN BAYAH – CIBARENOK – BTS. PROVINSI JAWA BARAT (AKSES PANTAI SELATAN JAWA). S1 thesis, Universitas Mercu Buana Jakarta.

JAILANI, MOCHAMAD AGUS KODIR (2021) ANALISIS KINERJA DAN KEPUASAN PELAYANAN PENUMPANG TERHADAP BUS RAPID TRANSIT (BRT) TRANS TANGERANG KORIDOR 3 (RUTE CILEDUG – TANGCITY). S1 thesis, Universitas Mercu Buana Jakarta.

JAILANI, MOCHAMAD AGUS KODIR (2019) PROYEK PEMBANGUNAN JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU (METODE PELAKSANAAN BORED PILE DENGAN UJI PEMBEBANAN PILE DRIVING ANALYZER (PDA TEST)). S1 thesis, Universitas Mercu Buana Jakarta.

JAJULI, IRFAN NURDIN (2019) PENGARUH VARIASI TINGGI TINGKAT DAN BENTUK DENAH TERHADAP POLA SENDI PLASTIS DAN KINERJA STRUKTUR GEDUNG BERATURAN TAHAN GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

JAMBAK, RIYANDIKA PRIHATIYANTO (2020) METODE PELAKSANAAN PILE CAP PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN (TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

JAMBAK, RIYANDIKA PRIHATIYANTO (2022) PENGARUH FILLER ABU ARANG TEMPURUNG KELAPA TERHADAP CAMPURAN BETON ASPAL LAPIS AUS (AC-WC) DENGAN METODE UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

JANUARTO, JANUARTO (2018) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH DALAM PRODUKTIVITAS TENAGA KERJA BERBASIS LINE OF BALANCE PADA BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

JATININGTYAS, MAULIA (2022) PENGARUH PENAMBAHAN LIMBAH KARET BAN TERHADAP KARAKTERISTIK MARSHALL PADA CAMPURAN BETON ASPAL. S1 thesis, Universitas Mercu Buana Jakarta.

JATMIKA, SIDIQ (2020) ANALISIS KEBUTUHAN PARKIR PLAZA BINTARO JAYA KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

JATMIKO, GUNTUR (2020) PERENCANAAN GEDUNG PARKIR MENGGUNAKAN FLAT SLAB & DROP PANEL SEBAGAI PENGGANTI BALOK KONVENSIONAL DENGAN MENGANALISA NILAI MOMEN LENTUR & GAYA GESER BERDASARKAN SNI 1726-2012 STUDI KASUS HOTEL HARRIS AND YELLOW JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Bekasi.

JATMIKO, NUGROHO DWI (2018) ANALISIS SIMPANG TAK BERSINYAL SIMPANG SUSUN JATIWARINGIN (GERBANG TOL PONDOK GEDE BARAT) DAN KINERJA RUAS JALAN JATIWARINGIN RAYA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

JIHAD, KHALIFAH (2024) ANALISA KEKASARAN MANNING (MANNING'SVALUE) TERHADAP DEBIT AIR DENGAN MENGGUNAKAN HEC-RAS PADA SUNGAI CILIWUNG. S1 thesis, Universitas Mercu Buana Jakarta.

JOHANNES, ROBBI (2020) STRATEGI PENINGKATAN RIDERSHIP STASIUN PEGANGSAAN DUA LRT JAKARTA. S1 thesis, Universitas Mercu Buana.

JOHARA, ROSITA MUTIARA (2022) ANALISIS PRODUKTIFITAS METODE PELAKSANAAN STRUKTUR BAJA FAÇADE MENGGUNAKAN METODE TIME STUDY (STUDI KASUS PEKERJAAN PEMBANGUNAN PROYEK STADION di Kawasan SPORT CENTER BANTEN). S1 thesis, Universitas Mercu Buana Jakarta.

JULIANA, SISKA (2020) ANALISIS HIDROGRAF SATUAN SINTETIK NAKAYASU DAN SNYDER PADA DAERAH ALIRAN SUNGAI CIKANDANG, JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

JULIANTO, ANDI DWI (2023) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2015 PADA PROYEK PEMBANGUNAN/REHABILITAS POLDER KELAPA GADING (KALI BETIK & ARTHA GADING) DAN POLDER PULO MAS. S1 thesis, Universitas Mercu Buana Bekasi.

JULIANTO, JEREMIA (2018) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN DENGAN MKJI 1997 (STUDI KASUS PADA SIMPANG KRANGGAN JL. ALTERNATIF CIBUBUR, BEKASI). S1 thesis, Universitas Mercu Buana Bekasi.

JULYANA, SISKA (2019) PELAKSANAAN KONSTRUKSI PLAT, BALOK DAN KOLOM PROYEK PEMBANGUNAN APARTEMEN ARANDRA RESIDENCE Cempaka Putih - Jakarta Pusat. S1 thesis, Universitas Mercu Buana Jakarta.

JULYANDIKA, SAKA (2023) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN KOLOM ANTARA METODE PRECAST DAN METODE KONVENSIONAL (STUDI KASUS : PROYEK RUMAH TINGGAL - PIK 2). S1 thesis, Universitas Mercu Buana Jakarta.

JUMANTORO, ILHAM (2024) ANALISIS DAYA DUKUNG FONDASI BORED PILE (STUDI KASUS STASIUN INDONESIA JAKARTA - BANDUNG HIGH SPEED RAILWAY KARAWANG). S1 thesis, Universitas Mercu Buana Jakarta.

JUMIANTO, ARI (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR BALOK PRESTRESS PADA PROYEK SUSHI MASA TOWER Gading Serpong - Tangerang. S1 thesis, Universitas Mercu Buana Jakarta.

JUNIANSAH, ANAN (2023) ANALISIS KINERJA WAKTU DAN BIAYA DENGAN EARNED VALUE CONCEPT, PDM, DAN SIMULASI MONTE CARLO (Studi kasus: Proyek SMAI Al Azhar 22 Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.

JUNIAR, MAGHVIRA (2020) PERENCANAAN PROYEK DI PT. ARKONIN. S1 thesis, Universitas Mercu Buana Jakarta.

Junianto, M Rizki (2018) METODE PELAKSANAAN PEKERJAAN BALOK, PELAT, KOLOM DAN SHEAR WALL PROYEK YUKATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KAESAR, ALFIN (2022) ANALISIS PENERAPAN MANAJEMEN MUTU TERHADAP KINERJA BIAYA PADA PROYEK TUNAS TOYOTA CIPUTAT. S1 thesis, Universitas Mercu Buana Jakarta.

KAFILAH, FARID AHMAD (2023) ANALISIS PANJANG ANTRIAN AKIBAT PENUTUPAN PALANG PINTU KERETA API MENGGUNAKAN METODE MKJI 1997 dan GELOMBANG KEJUT GUNA MENGETAHUI KINERJA LALU LINTAS (STUDI KASUS: JL. PAHLAWAN SERIBU, TANGERANG SELATAN). S1 thesis, Universitas Mercu Buana.

KALOKA, MUHAMMAD WIRA (2020) ANALISA DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK AKSESIBILITAS BANDARA SOEKARNO HATTA. S1 thesis, Universitas Mercu Buana Bekasi.

KAMAL, IRFAN (2022) ANALISIS KECELAKAAN LALU LINTAS DENGAN METODE ANGKA EKIVALEN KECELAKAAN (AEK) DAN UPPER CONTROL LIMIT (UCL) SERTA KINERJA RUAS JALAN RAYA NAROGONG. S1 thesis, Universitas Mercu Buana Bekasi.

KAMILA, PUTI (2020) ANALISA PERBANDINGAN DAYA DUKUNG TIANG PANCANG DIVERIFIKASI DENGAN PENGUJIAN PILE DRIVING ANALYZER (PDA) DAN CAPWAP (STUDI KASUS:KONSTRUKSI PILE SLAB PROYEK PEMBANGUNAN JALAN TOL CIBITUNG-CILINCING). S1 thesis, Universitas Mercu Buana Jakarta.

KARLINA, DEVIYANTI (2022) ANALISIS PENILAIAN RISIKO PADA PROYEK PEMBANGUNAN GEDUNG BERTINGKAT(Studi Kasus: Gedung F, Gandum Mas Kencana, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

KARNO, TRI (2019) PELAKSANAAN PEMBANGUNAN GEDUNG WISMA BARITO PASIFIC 2 SLIPI -JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

KARNO, TRI (2020) PENGARUH PENAMBAHAN LIMBAH PLASTIK TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

KARO-KARO, RIKKI SUBAGIA (2018) PELAKSANAAN PEKERJAAN BORE PILE PADA PROYEK LIGHT RAIL TRANSIT JABODEBEK KM 3 + 600 – KM 4 + 100 JALUR A TOL CIKAMPEK. S1 thesis, Universitas Mercu Buana Jakarta.

KAROMI, LUTFI AKLIL (2021) PERENCANAAN PENJADWALAN PROYEK RUMAH TINGGAL 4 LANTAI PONDOK INDAH METODE PERT & KURVA "S". S1 thesis, Universitas Mercu Buana Jakarta.

KARTAWIREJA, AHMAD FERDYANSYAH (2018) PEKERJAAN PEMBUATAN STRUKTUR AUTOMATEDPEOPLE MOVER SYSTEM (APMS) BANDARA INTERNASIONAL SOEKARNO-HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

KARTIKA, ANNEKE ARIFIDANTI (2022) PENGARUH GROUND GRANULATED BLAST FURNACE SLAG DAN FLY ASH SEBAGAI BAHAN SUBSTITUSI SEMEN TERHADAP PERMEABILITAS DAN KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

KEMALA, MUTHIA (2020) ANALISIS TINGKAT KEPUASAN PENGGUNA RUMAH TIDAK LAYAK HUNI PROGRAM BANTUAN STIMULAN PERUMAHAN SWADAYA (BSPS) (STUDI KASUS NAGARI KAMBANG TIMUR KECAMATAN LENGAYANG KABUPATEN PESISIR SELATAN, SUMATERA BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

KENCANA, BETHARI ADHINITAMA RUCITRA (2023) ANALISIS EFEKTIFITAS ZONA SELAMAT SEKOLAH (ZOSS) TERHADAP KESELAMATAN PENYEBERANG JALAN (STUDI KASUS SDN SEMANAN 09 PAGI JAKARTA BARAT). S1 thesis, Universitas Mercu Buana.

KENZO, HIMALAYA BIMA (2022) ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PEKERJAAN SANITARY LANDFILL MENGUNAKAN METODE ANALITHIC HIRARKI PROSES. S2 thesis, Universitas Mercu Buana Jakarta.

KERAF, YOHANA KRISANTY GETRUDIS (2021) ANALISA KEHILANGAN ENERGI PADA JARINGAN PERPIPAAN PDAM KABUPATEN FLORES TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

KERRY, ARIEF KURNIA (2022) ANALISIS TINGKAT PELAYANAN MODA TRANSPORTASI PENGHUBUNG ANTAR TERMINAL BANDARA INTERNATIONAL SOEKARNO – HATTA (KERETA LAYANG). S1 thesis, Universitas Mercu Buana Jakarta.

KESAWA, AWANG AL HALIM (2022) ANALISA PENGARUH PENUTUPAN PALANG PINTU PERLINTASAN KERETA API TERHADAP KINERJA LALU LINTAS (STUDI KASUS JALAN MAULANA HASANUDIN, PORIS PLAWAD). S1 thesis, Universitas Mercu Buana Jakarta.

KESUMA, JORGHI ISRA TEDJA (2023) ANALISIS PERBANDINGAN METODE KERJA, WAKTU DAN BIAYA PADA PEKERJAAN KUSEN PINTU ALUMINIUM DAN UPVC DI GEDUNG ABU MANSYUR DAN KEMPEK, CIREBON. S1 thesis, Universitas Mercu Buana Bekasi.

KHAERUNISSA, (2018) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP KINERJA PERUSAHAAN DAN PELAYANAN KERETA API BANDARA (AIRPORT RAILINK SERVICE). S1 thesis, Universitas Mercu Buana Bekasi.

KHAERUNISSA, (2020) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP KINERJA PERUSAHAAN DAN PELAYANAN KERETA API BANDARA (AIRPORT RAILINK SERVICE). S1 thesis, Universitas Mercu Buana Bekasi.

KHAIRULLAH, TAUFIK (2020) MENARA BRI GATOT SUBROTO (Metode Pelaksanaan Raft Foundation). S1 thesis, Universitas Mercu Buana Jakarta.

KHARIRI, GUS (2018) FAKTOR KADAR LUMPUR PADA AGREGAT HALUS TERHADAP DOSIS ADMIXTURE TIPE F DAN SEMEN (STUDI KASUS DI PABRIK WIKA BETON KARAWANG). S1 thesis, Universitas Mercu Buana Bekasi.

KHASANAH, SITI NUR (2020) ANALISIS KINERJA PROYEK KONSTRUKSI TERHADAP BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE CONCEPT (Studi Kasus: Proyek Konstruksi Sandwich Panel Sarihusada). S1 thesis, Universitas Mercu Buana Jakarta.

KHASANAH, SITI NUR (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE) PADA PROYEK PEMBANGUNAN CIPUTRA INTERNATIONAL PROPAN TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

KHODAM, MUHAMMAD IQBALUL (2023) PENGARUH PEMANFAATAN ABU SEKAM PADI SEBAGAI SUBTITUSI SEMEN SERTA PEMANFAATAN LIMBAH KACA SEBAGAI SUBSTITUSI AGREGAT HALUS PADA CAMPURAN BETON TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

KIRENIUS, ROBINTANG (2020) DESAIN TEBAL PEKERASAN PERENCANAAN BANDAR UDARA KANGEAN - MADURA , JAWA TIMUR. S1 thesis, Universitas Mercu Buana.

KOMARUDIN, AGI (2019) EVALUASI DAN REDESIGN TEBAL PERKERASAN LENTUR PADA RUAS JALAN BOULEVARD GADING SERPONG TANGERANG. S1 thesis, Universitas Mercu Buana.

KRESYA, REZA (2017) TINJAUAN KHUSUS PEKERJAAN STRUKTUR RAFT PONDASI PROYEK CITRA TOWERS KEMAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

KRISNAYANA, ANGGADA (2019) PELAKSANAAN PEKERJAAN BEKISTING (FORM WORK) STRUKTUR ATAS HORIZONTAL DAN VERTIKAL PADA PROYEK MENARA JAKARTA KEMAYORAN, JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

KRISTANTO, KRISTANTO (2017) ANALISIS FAKTOR - FAKTOR YANG MEMPENGARUHI KINERJA WAKTU DAN BIAYA SEBAGAI DASAR PERTIMBANGAN PENGAMBILAN KEPUTUSAN SISTEM PENUNJUKAN LANGSUNG PADA CONTRACT OF FIXED UNIT RATE (Studi Pada PT. Adimas Pandu Serasi Dalam Proyek Interior PT. Bank Permat. S1 thesis, Universitas Mercu Buana Jakarta.

KRISTIANTO, ERIK (2019) INSTALASI GPS TRACKER PADA KENDARAAN BERBASIS WEB. S1 thesis, Universitas Mercu Buana Jakarta.

KRISTIANTO, ROBERTUS HERU (2020) ANALISA KINERJA JALAN DAN PERENCANAAN JALUR KHUSUS SEPEDA MOTOR PADA JALAN BOULEVARD BINTARO JAYA (Studi Kasus :Jalan Boulevard Bintaro, Tangerang Selatan ). S1 thesis, Universitas Mercu Buana Jakarta.

KRISTIAWAN, EBEN HAEZER ADE (2023) IDENTIFIKASI KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PADA KONSTRUKSI BAJA DI PROYEK PEMBANGUNAN GEDUNG JCDC (JAKARTA CHILD DEVELOPMENT CENTER). S1 thesis, Universitas Mercu Buana.

KRISTIAWAN, PRASETYO (2019) DESAIN ALTERNATIF STRUKTUR ATAS GEDUNG SEQUIS CENTER DENGAN MENGGUNAKAN COREWALL Sudirman, Jakarta Pusat. S1 thesis, Universitas Mercu Buana Jakarta.

KRISTIAWAN, PRASETYO (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK MPP OFFICE BUILDING. S1 thesis, Universitas Mercu Buana Jakarta.

KRISTIYANTO, KRISTIYANTO (2024) PENINGKATAN COST PERFORMANCE PADA GREEN RETROFITTING BANGUNAN KANTOR BERTINGKAT TINGGI SESUAI PEDOMAN BANGUNAN GEDUNG HIJAU (BGH) DENGAN ANALISIS BLOCKCHAIN-BIM. S2 thesis, Universitas Mercu Buana Jakarta.

KRYSTYAN, GYAN AGYE TRY (2019) PELAKSANAAN PEKERJAAN SHEAR WALL PADA PROYEK APARTMENT PROSPERITY RESIDENCE-THE LOTUS. S1 thesis, Universitas Mercu Buana Jakarta.

KUNCAHYO, DIMAS PUTRO (2019) EVALUASI DAYA DUKUNG DAN PENURUNAN PONDASI SPUN PILE PADA PROYEK OVER PASS PARIGI (JORR II). S1 thesis, Universitas Mercu Buana Jakarta.

KUNCORO, AGUNG (2022) EVALUASI AKSESIBILITAS PEJALAN KAKI STASIUN BERBASIS TRANSIT ORIENTED DEVELOPMENT (STUDI KASUS STASIUN TANAH ABANG JAKARTA ). S1 thesis, Universitas Mercu Buana Jakarta.

KUNCORO, MA'RUF SATRIA (2021) PENGARUH PENAMBAHAN ARANG BATOK KELAPA SEBAGAI BAHAN PENGGANTI SEBAGIAN AGREGAT HALUS TERHADAP CAMPURAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIA, SEKAR MAULINA (2023) ANALISIS PENJADWALAN PROYEK DENGAN METODE CPM PADA RUMAH SUSUN PONPES ABU MANSHUR PLERED - CIREBON. S1 thesis, Universitas Mercu Buana Bekasi.

KURNIADI, WIDI (2019) METODE PELAKSANAAN PEKERJAAN BALOK & PLAT JEMBATAN PENGHUBUNG TOWER SUITE-1 DAN TOWER SUITE-2 PROYEK MENARA JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAJI, ALAM (2021) ANALISIS SISTEM DRAINASE DI WILAYAH PERUMAHAN SERPONG LAKEVILLE. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIANTO, ARDIAN TOFIK (2023) ANALISIS PERCEPATAN WAKTU DAN BIAYA PENYELESAIAN KETERLAMBATAN PROYEK MENGGUNAKAN METODE CRASHING PADA PEKRJAAN STRUKTUR BANGUNAN POWER HOUSE (Studi Kasus : Proyek Revitalisasi Jaringan Listrik Istana Negara). S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ADHE (2022) ANALISIS FAKTOR YANG MEMPENGARUHI MOTIVASI PEKERJA PROYEK KONTRUKSI BERDASAR TEORI KEBUTUHAN MASLOW PADA PROYEK JAKARTA INTERNATIONAL STADIUM. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, AGUNG (2017) ANALISIS WORKABILITAS dan KEKUATAN CAMPURAN PERKERASAN KAKU DENGAN BAHAN ADDITIVES FLY ASH dan POZZOLITH 425 R -BASF. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ANDREW (2019) EVALUASI ANALISIS HIDROLOGI PERENCANAAN BANGUNAN KONSOLIDASI DAM (KD) 1-1 SUNGAI JENEBERANG, DESA LONJOBOKO’, KECAMATAN PARANGLOE, KABUPATEN GOWA, SULAWESI SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ANGGAH (2022) ANALISIS FAKTOR PRODUKTIVITAS TENAGA KERJA PADA PABRIKASI PRECAST LINING CONCRETE PT. XYZ UNTUK PROYEK RENTANG IRIGASI DI MAJALENGKA. S1 thesis, Universitas Mercu Buana Bekasi.

KURNIAWAN, ARIEF (2019) ANALISIS KINERJA DAN PERBAIKAN PERKERASAN JALAN METODE COLD MIXED RECYCLING FOAM BITUMEN (CMFRB) PADA RUAS JALAN TOL CIPALI. S1 thesis, Universitas Mercu Buana Bekasi.

KURNIAWAN, ASEP (2019) LAPORAN KERJA PRAKTEK STRUKTUR PROYEK GEDUNG SOUTHGATE - SERVICE APARTEMENT Tanjung Barat-Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, DENI (2013) PROYEK PEMBANGUNAN APARTMENT TOWER AMBASSADOR 2, ST MORITZ KEMBANGAN – JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, DWI (2022) ANALISIS KONFLIK OUTPUT BIM SEBAGAI IMPLEMENTASI BIM FASE PRA KONSTRUKSI PADA PROYEK ARUMAYA RESIDENCES. S1 thesis, Universitas Mercu Buana Bekasi.

KURNIAWAN, FANY (2023) OPTIMALISASI KINERJA RUAS JALAN DI PERLINTASAN SEBIDANG JALAN PERJUANGAN KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

KURNIAWAN, ILHAM (2020) ANALISA PERBANDINGAN SISTEM STRUKTUR MENGGUNAKAN DUAL SYSTEM DAN OUTRIGGER SYSTEM PADA STUDI KASUS GEDUNG J-BOX TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, M FEBRI (2022) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH PEMILIHAN MODA TRANSPORTASI (Studi Kasus Harmoni Menuju KotaTua). S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, MARCELLINUS ALFONS (2022) ANALISIS FAKTOR KETERLAMBATAN PENYELESAIAN PROYEK LRT JABODEBEK LINTAS PELAYANAN II MENGGUNAKAN STRUCTURAL EQUATION MODELLING. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, MOCHAMMAD RIZKY (2021) ANALISIS FORECASTING PEMELIHARAAN REL PADA LENGKUNG KM 2+400 – 2+800 DI MRT JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, MOCHAMMAD RIZKY (2021) ANALISISFORECASTINGPEMELIHARAAN REL PADA LENGKUNGKM 2+400–2+800DI MRT JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, MUHAMAD RUDI (2018) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK KONTRUKSI GEDUNG BERTINGKAT (Studi Kasus : Proyek Palm Regency Apartement & Mall, Ciledug, Tangerang ). S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, RIZKY (2024) OPTIMALISASI DESAIN FASAD GEDUNG RUMAH SAKIT MELALUI KONSERVASI ENERGI SELUBUNG BANGUNAN DENGAN METODE REKAYASA NILAI. S2 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, YUSUP (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR KANTILEVER LANTAI 2 PADA PROYEK URBANTOWN SERPONG - CIPUTAT - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KUSMARA, RD. MOHAMMAD. ROFI. (2018) PEMANFAATAN ABU SEKAM PADI SEBAGAI BINDER ALTERNATIF PADA GEOPOLIMER BETON DITINJAU UJI KUAT TARIK BELAH. S1 thesis, Universitas Mercu Buana Bekasi.

KUSNANDAR, PONCO and HASAN, FUAD (2017) TINJAUAN KHUSUS PEKERJAAN STRUKTUR PEMBESIAN PONDASI PILECAP PROYEK NEW OFFICE BUILDING. S1 thesis, Universitas Mercu Buana Jakarta.

KUSNANTO, SRI (2023) EVALUASI KINERJA STRUKTUR BANGUNAN 8 LANTAI MENGGUNAKAN ANALISA PUSHOVER SESUAI DENGAN ASCE 41-17 DAN ATC 40. S1 thesis, Universitas Mercu Buana Jakarta.

KUSSUMARDIANADEWI, B. DETTY (2018) PEKERJAAN FINISHING PENUTUP LANTAI BERBASIS VALUE ENGINEERING PADA BANGUNAN PERKANTORAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

KUSTIAH, HENI (2022) ANALISIS FAKTOR PENGARUH VARIATION ORDER PADA PROYEK JALAN DAN JEMBATAN YANG MENIMBULKAN SENGKETA KONTRAK KONSTRUKSI. S2 thesis, Universitas Mercu Buana Jakarta.

KUSUMA, KUSUMA (2020) PERENCANAAN SUMUR RESAPAN MODULAR TANK DALAM PEMANFAATAN AIR HUJAN UNTUK KEBUTUHAN AIR BAKU DI DESA WENINGGALIH, KECAMATAN JONGGOL, KABUPATEN BOGOR, JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

KUSUMA, KUSUMA (2020) PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN SEKSI 3 (STA. 27+650 - STA. 34+225) METODE PELAKSANAAN KONSTRUKSI BORE PILE DENGAN PENGUJIAN PILE DRIVING ANALYZER TEST (PDA) & METODE PELAKSANAAN PEMASANGAN ERECTION STEEL BOX GIRDER. S1 thesis, Universitas Mercu Buana Jakarta.

KUSUMANINGTYAS, NELLA (2023) PERAN KRITIKAL QUANTITY SURVEYOR PADA TAHAP PENGADAAN DAN PELAKSANAAN KONTRAK JASA KONSTRUKSI INFRASTRUKTUR DI PROVINSI BANTEN. S2 thesis, Universitas Mercu Buana Jakarta.

KUSUMASTUTI, DHANIA (2023) ANALISIS ESTIMASI BIAYA KONSTRUKSI BERBASIS VALUE ENGINEERING DAN LIFE CYCLE COST PADA BENDUNGAN URUGAN BATU. S2 thesis, Universitas Mercu Buana Jakarta.

KUSUMAWARDANI, MEIVITA (2018) PEKERJAAN STRUKTUR LIFT PANORAMIC PROYEK GALERIA MALL VIVO SENTUL-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

KUSUMAWARDANI, MEIVITA (2019) PERENCANAAN SUMUR RESAPAN UNTUK MENGURANGI DEBIT LIMPASAN AIR PERMUKAAN DI PERUMAHAN DINAR MAS RW 26, SEMARANG. S1 thesis, Universitas Mercu Buana Jakarta.

KUSUMAWATI, IVANNY (2019) PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP BIAYA, MUTU DAN WAKTU PADA PROYEK RUMAH SAKIT (STUDI KASUS : PROYEK RUMAH SAKIT SARI ASIH CIPONDOH)FT/SIP. 19 398. S1 thesis, Universitas Mercu Buana Jakarta.

KUSWANTO, PINGGIR (2019) EVALUASI PELAYANAN BANGUNAN TROTOAR TERHADAP KETERPAKAIAN DAN KENYAMANAN PEJALAN KAKI (STUDI KASUS JALAN MELAWAI KEB. BARU JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

KUSWOYO, (2021) ANALISIS PENJADWALAN WAKTU PROYEK UNTUK PERCEPATAN DENGAN METODE MATRIKS. S1 thesis, Universitas Mercu Buana Jakarta.

Kharisma, Ayomi Hadi (2017) PERENCANAAN DIMENSI HIDROLIS BANGUNAN AIR BENDUNG PADA SUNGAI MANAU JAMBI. S1 thesis, Universitas Mercu Buana Jakarta.

Kurniawaan, Kuntoro Dedid (2024) ANALISIS KINERJA JALAN AKIBAT PALANG KERETA API (STUDI KASUS JALAN W.R SUPRATMAN KOTA TANGERANG SELATAN). S1 thesis, Universitas Mercu Buana - Buncit.

Kurniawan, Mohammad Firman Adi (2024) PERBANDINGAN DRIFT RASIO PADA BANGUNAN GEDUNG KANTOR TAMPAK MEMANJANG AKIBAT PENGARUH DILATASI. S1 thesis, Universitas Mercu Buana - Buncit.

LADIKA, LADIKA (2020) ANALISIS PENGARUH KOMPETENSI, GAYA NEGOSIASI DAN KECERDASAN EMOSIONAL DALAM KEMAMPUAN PEMANGKU KEPENTINGAN UNTUK HASIL NEGOSIASI SENGKETA KONTRUKSI DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

LAKSANA, GELEGAR ANGGA (2019) PERENCANAAN PEMBANGUNAN T HOTEL SANUR BALI. S1 thesis, Universitas Mercu Buana Jakarta.

LAKSANA, PUTRA (2017) METODE PELAKSANAAN STRUKTUR ATAS BETON PRATEGANG PROYEK WISMA KARTIKA GROGOL Jl. Kyai Tapa No. 101 Grogol, Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

LAKSANA, PUTRA (2017) PERENCANAAN ULANG TEBAL PERKERASAN LENTUR JALUR PANTURA SUBANG JAWA BARAT BERDASARKAN METODE ANALISIS KOMPONEN SNI 1732-1989-F DAN METODE AASHTO 1993. S1 thesis, Universitas Mercu Buana Jakarta.

LAKSMANA, BREVI WAHYU (2018) ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PENGADAAN 8 UNIT JEMBATAN PANEL / BAILEY DI PT X. S1 thesis, Universitas Mercu Buana Bekasi.

LARASATI, ANINDHYA MUSTIKA (2022) ANALISIS KEANDALAN STRUKTUR JEMBATAN KERETA API RANGKA BAJA (STUDI KASUS JEMBATAN BAJA BH77). S2 thesis, Universitas Mercu Buana Jakarta.

LARASATI, SYAFIRA AULIA (2022) EVALUASI KINERJA STASIUN RAWA BUNTU BERDASARKAN STANDAR PELAYANAN MINIMUM. S1 thesis, Universitas Mercu Buana Jakarta.

LATIF, RIDHWAN (2017) EARNED VALUE ANALYSIS PROYEK PEMBANGUNAN SMP NOAH DI PASAR REBO - JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

LEANDER, FERRY (2023) ANALISIS KAPASITAS RUANG PARKIR MOTOR DAN TINGKAT KEPUASAN PENGGUNA JASA PARKIR DI STASIUN KERETA API PORIS. S1 thesis, Universitas Mercu Buana Jakarta.

LEANDRO, LUVI ANDRI (2021) PENGARUH PENGGUNAAN FILLER ABU SEKAM PADI DAN ZEOLIT TERHADAP KINERJA CAMPURAN ASPAL AC – WC MENGGUNAKAN METODE WARM MIX. S1 thesis, Universitas Mercu Buana Jakarta.

LEATEMIA, IVANA YESIKA (2019) PERUBAHAN KARAKTERISTIK FASAD PADA BANGUNAN KOLONIAL GEREJA GPIB IMMANUEL (Studi Kasus: Depok Lama, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

LEDRI, ZAKARIAS RIVANTUS (2023) ANALISIS RUAS JALAN TRANS FLORES LABUAN BAJO – RUTENG (NUSA TENGGARA TIMUR). S1 thesis, Universitas Mercu Buana Bekasi.

LESMANA, OLOAN (2019) ANALISIS KINERJA RUAS JALAN RAYA SERPONG - CISAUK TERHADAP PERLINTASAN SEBIDANG PADA JALAN RAYA SERPONG - CISAUK. S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, ANDINI PUTRI (2023) EFEKTIVITAS PENAMBAHAN LIMBAH ABU TEMBAKAU ROKOK SEBAGAI SUBSTITUSI SEMEN DENGAN POZZOLITH TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana.

LESTARI, DIAH AYU (2021) PENGARUH KUAT TEKAN BETON NORMAL TERHADAP PENGGUNAAN CANGKANG KERANG HIJAU SEBAGAI PENGGANTI SEBAGIAN AGREGAT HALUS. S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, OCTY TRI (2019) PERENCANAAN PROYEK PEMBANGUNAN MALL ABEPURA ABEPURA - PAPUA. S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, PUTRI AYU (2022) ANALISIS SAMBUNGAN ANTAR PANEL DINDING PRECAST PADA PEMBANGUNAN RUMAH 2 LANTAI DENGAN SISTEM JOINT EMBEDDED. S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, WAHYU PUJINING (2021) OPTIMALISASI PENGELOLAAN DAERAH IRIGASI KRISAK KECAMATAN SELOGIRI KABUPATEN WONOGIRI. S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, WIDYA TRI (2023) ANALISIS PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK MESS MALAHAYATI DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF. S1 thesis, Universitas Mercu Buana Jakarta.

LISTIANAH, SOVINA (2023) ANALISIS PENGARUH METODE PELAKSANAAN, TENAGA KERJA DAN PENGAWASAN TERHADAP TIMBULNYA RISIKO LONGSOR DI PROYEK JALAN TOL CINERE - JAGORAWI SEKSI III. S1 thesis, Universitas Mercu Buana Jakarta.

LISTIANTO, INDRA (2021) EVALUASI KINERJA PELAYANAN TERMINAL GIRI ADIPURA DAN BUS AKAP PO. AGRA MAS DI KABUPATEN WONOGIRI. S1 thesis, Universitas Mercu Buana Jakarta.

LISTYOWATI, ERVINA (2021) ANALISIS DAYA DUKUNG DAN PENURUNAN TIANG BORED PILE MENGGUNAKAN METODE ANALITIS, dan HASIL UJI PEMBEBANAN (Studi Kasus Proyek Pembangunan LRT JABODEBEK Ruas Cawang-Cibubur Pier TMKR 47, TMKR 48, TMKR 49, TMKR50). S1 thesis, Universitas Mercu Buana Jakarta.

LOMBU, JANTER MICHELSON (2020) PERENCANAAN KONTRUKSI TOWER SUTET 500kV TYPE TOWER SLIM. S1 thesis, Universitas Mercu Buana Jakarta.

LUBIS, DAVID CHRISTIAN UTOMO (2019) ANALISIS PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHI KINERJA TOWER CRANE. S1 thesis, Universitas Mercu Buana Jakarta.

LUBIS, DAVID CHRISTIAN UTOMO (2019) ANALISIS PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHI KINERJA TOWER CRANE. S1 thesis, Universitas Mercu Buana.

LUBIS, DAVID CHRISTIAN UTOMO (2019) PROYEK APARTEMENT CENTRO CITY TOWER WESTPOINT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

LUBIS, NADIA TUTUR MELINA (2024) ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK KONSTRUKSI BANGUNAN HOTEL MENGGUNAKAN METODE FMEA DAN FTA (STUDI KASUS : PEMBANGUNAN HOTEL HILTON DI KOTA BARU PARAHYANGAN - BANDUNG BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

LUKMAN, DIKI (2022) ANALISIS KAPASITAS RUANG PARKIR KAWASAN RUMAH SAKIT UMUM PUSAT FATMAWATI JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

LUQYANA, (2020) ANALISIS DAN PERILAKU DINAMIS STRUKTUR PORTAL AKIBAT BEBAN MESIN BERPUTAR. S1 thesis, Universitas Mercu Buana Bekasi.

LUQYANA, (2020) ANALISIS DAN PERILAKU DINAMIS STRUKTUR PORTAL AKIBAT BEBAN MESIN BERPUTAR. S1 thesis, Universitas Mercu Buana Bekasi.

LUTHFI, RIEZA MUNAWAR (2023) PENINGKATAN KUALITAS BAHAN BAKAR EXCAVATOR DENGAN SISTEM FILTRASI TRIPLE STAGE FILTER. S1 thesis, Universistas Mercu Buana.

MA'SUM, ARIF MUHAMMAD (2023) PERBANDINGAN KONTRAK LUMP SUM DAN UNIT PRICE PADA PELAKSANAAN PEKERJAAN PAGAR (Studi Kasus : Proyek PT. United Tractors Tbk - Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

MADIHAH, JIHAN (2023) ANALISIS FAKTOR PENGARUH DESAIN PERENCANAAN, PENGADAAN MATERIAL,PENANGANAN MATERIAL, PELAKSANAAN PEKERJAAN DAN SISA MATERIAL TERHADAP KERUGIAN BIAYA PADA PROYEK BANGUNAN GEDUNG BERTINGKAT TINGGI DI JAKARTA. S2 thesis, Universitas Mercu Buana Jakarta.

MAFRURI, MUSTOFA (2019) PEKERJAAN BANGUNAN PARKIR PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT BPRS HIK CILEDUG. S1 thesis, Universitas Mercu Buana Jakarta.

MAHARANI, ROSA KARTIKA (2021) ANALISIS KETERLAMBATAN PROYEK JALUR PEJALAN KAKI (STUDI KASUS: JALUR PEDESTRIAN JALAN KANDANG RODA - PAKANSARI). S1 thesis, Universitas Mercu Buana Jakarta.

MAHARANI, SEPTIANA NUR (2023) EVALUASI KELONGSORAN GALIAN TANAH PADA PROYEK HOTEL FAIRFIELD BY MARRIOTT KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Bekasi.

MAHARDHIKA, CYNTHIA (2023) ANALISIA PERBANDINGAN METODE KERJA HALF PRECAST DENGAN CAST IN SITU PADA PEKERJAAN PENGECORAN TAHAP PERTAMA STRUKTUR PILE CAP TAMBATAN DERMAGA UNTUK MENINGKATKAN KINERJA BIAYA DAN WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

MAHARDIKA, GEMA (2019) ANALISIS KEBUTUHAN RUANG PARKIR PT PEGADAIAN (PERSERO) MENGGUNAKAN METODE SATUAN RUANG PARKIR (SRP). S1 thesis, Universitas Mercu Buana.

MAHARDIKA, INDRA (2018) PENGAWASAN PROYEK DAAN MOGOT CITY JL. DAAN MOGOT KM.16, RT.9/RW.6, SEMANAN, KALIDERES, JAKARTA BARAT, 15699. S1 thesis, Universitas Mercu Buana Jakarta.

MAHENDRA, MOHAMAD IRSYAD (2023) IMPLEMENTASI BUILDING INFORMATION MODELING DENGAN COMMON DATA ENVIRONMENT PADA TAHAP PELAKSANAAN KONSTRUKSI DENGAN METODE ANALISIS STATISTIK DESKRIPTIF (STUDI KASUS: PROYEK GEDUNG IT MANDIRI BUMI SLIPI). S1 thesis, Universitas Mercu Buana Jakarta.

MAILUHU, CHELSEA FIFIAN (2023) ANALISIS TITIK RAWAN KECELAKAAN (BLACKSPOT) DAN DAERAH RAWAN KECELAKAAN (BLACKSITE) PADA RUAS JALAN RAYA DAAN MOGOT KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

MALIK, ADAM ABDUL (2022) PENGARUH OPERASIONAL KENDARAAN BERAT PADA JAM KERJA TERHADAP EFISIENSI KINERJA RUAS JALAN (STUDI KASUS: JL. LETJEN S. PARMAN JAKARTA BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

MALINDA, VINA (2020) ANALISIS PERILAKU DAN KINERJA STRUKTUR RANGKA BRESING EKSENTRIK SHORT LINK TIPE MULTISTORY X-BRACE DENGAN PANJANG LINK DAN RATIO L/H BERVARIASI. S1 thesis, Universitas Mercu Buana Bekasi.

MANAO, AGUSMAN (2023) IMPORTANCE PERFORMANCE ANALYSIS (IPA) DAN CUSTOMER SATISFACTION INDEX (CSI) ANGKUTAN UDARA LOW COST BUDGET JAKARTA - MEDAN. S1 thesis, Universitas Mercu Buana.

MANDALA, ANDREAN (2020) FAKTOR KUNCI SUKSES PENERAPAN LAST PLANNER SYSTEM PADA PEKERJAAN KONTRUKSI. S2 thesis, Universitas Mercu Buana Jakarta.

MANDALA, FINN (2017) PEKERJAAN STRUKTUR ATAS GEDUNG PERKANTORAN DAN FASILITASNYA. S1 thesis, Universitas Mercu Buana Jakarta.

MANIHURUK, MAYASARI (2018) ANALISA KINERJA RUAS JALAN DAN SIMPANG JALAN JEND GATOT SUBROTO SETELAH PEMBANGUNAN SIMPANG SUSUN SEMANGGI. S1 thesis, Universitas Mercu Buana Jakarta.

MANIK, JOHANNES PRATAMA (2023) PENGARUH PERLAKUAN PERENDAMAN SERAT SERABUT KELAPA DENGAN MENGGUNAKAN NaOH TERHADAP KUAT TEKAN DAN KUAT LENTUR PAVING BLOCK FIBER. S1 thesis, Universitas Mercu Buana Bekasi.

MANULLANG, SAHALA BOY MANGATUR (2022) ANALISIS PELAKSANAAN PEKERJAAN PROYEK JALUR KERETA API DENGAN CRITICAL PATH METHOD DAN VALUE ENGINEERING. S2 thesis, Universitas Mercu Buana Jakarta.

MARDHIKA, LUQMAN (2018) METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN. S1 thesis, Universitas Mercu Buana Jakarta.

MARDIANA, NANA (2018) ANALISA KINERJA RUAS JALAN DAN SIMPANG TIDAK BERSINYAL (Studi Kasus Jln. Wibawa Mukti II-Simpang Sakura-Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

MARDIANTO, TRI WAHYU (2020) ANALISIS PERBANDINGAN BIAYA DAN WAKTU SALURAN PEMBUANG DENGAN METODE PENGECORAN COR IN-SITU, SHEET PILE DAN SOLDIER PILE PADA PROYEK BENDUNGAN CIAWI. S1 thesis, Universitas Mercu Buana Bekasi.

MARDIYANTO, MUHAMAD (2018) PROYEK BHUVANA RESORT CIAWI-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

MARDOTILLAH, DODI (2019) PERENCANAAN DIAFRAGMA, KORD & KOLEKTOR AKIBAT PENGARUH GEMPA SESUAI SNI GEMPA 1726 : 2012. S1 thesis, Universitas Mercu Buana Jakarta.

MARIFAH, LUSI (2023) ANALISIS PENGARUH WASTE MATERIAL DAN MANAGEMENT MATERIAL PADA PROYEK RUSUNAWA DENGAN LEAN CONSTRUCTION UNTUK MENINGKATKAN KINERJA BIAYA PROYEK. S2 thesis, Universitas Mercu Buana Jakarta.

MARSHELA, DINDA AMELIA (2022) ANALISIS PENGENDALIAN WAKTU PADA PROYEK GAPURA ANGKASA OFFICE KEMAYORAN JAKARTA PUSAT DENGAN MENGGUNAKAN METODE KESEIMBANGAN GARIS (LINE OF BALANCE). S1 thesis, Universitas Mercu Buana Jakarta.

MARYADI, (2018) STABILISASI TANAH LEMPUNG MENGGUNAKAN CLEAN SET CEMENT UNTUK MENINGKATKAN CBR TANAH PADA PERKERASAN JALAN KAWASAN MM2100. S1 thesis, Universitas Mercu Buana Bekasi.

MARYADI, RIFKI (2022) PERENCANAAN CAMPURAN BETON DENGAN PEMAKAIAN MATERIAL SLAG FURNACE SEBAGAI PENGGANTI SEBAGIAN SEMEN. S1 thesis, Universitas Mercu Buana Jakarta.

MASYATI, MASYATI (2022) ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK GEDUNG RUANG KELAS UIN SULTHAN THAHA SAIFUDIN – JAMBI. S1 thesis, Universitas Mercu Buana Jakarta.

MAUDYA, CLARISSA (2018) ANALISIS KINERJA SIMPANG TAK BERSINYAL DAN RUASJALAN IR. H. JUANDA BULAN-BULAN, BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

MAULANA, ABDUL (2018) PENGARUH FILLER SERBUK BATU BATA MERAH DAN GYPSUM PADA CAMPURAN AC-WC DENGAN SISTEM HOT MIX PADA PENGUJIAN MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, AHMAD (2022) ANALISIS FAKTOR PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG MASJID AT-TAQWA SEBAGAI FASILITAS PENUNJANG UNIVERSITAS MUHAMMADIYAH JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

MAULANA, AHMAD (2022) ANALISIS KINERJA PROYEK DITINJAU DARI BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE DAN EARNED SCHEDULE (Studi Kasus : Proyek Pembangunan Jalan BSD City, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, DAFID (2021) ANALISA KELAYAKAN PEMBANGUNAN JALAN LINGKAR UTARA BREBES-TEGAL DARI SEGI LALU-LINTAS DAN EKONOMI. S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, IRPAN (2021) ANALISIS MITIGASI RISIKO KETERLAMBATAN PEMBANGUNAN PROYEK KANDANG DAN PENUNJANG BREEDER FARM 2 - PEKANBARU. S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, MUHAMMAD RAFLI (2022) ANALISIS WASTE MATERIAL KONSTRUKSI PEKERJAAN ARSITEKTURAL DENGAN MENGGUNAKAN METODE PARETO DAN FISHBONE DIAGRAM (Studi Kasus :Proyek Pembangunan Neurorestorasi Rumah Sakit Pusat Otak Nasional PROF. Dr. dr. Mahar Mardjono Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, SABIQ WISNU (2023) ANALISIS FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG NORTH POINT DI KOTA TANGERANG TERHADAP WAKTU DENGAN MENGGUNAKAN METODE SPSS. S1 thesis, Universitas Mercu Buana Bekasi.

MAULANA, TEGUH (2018) ANALISIS KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI DI SIMPANG SUMIR (JALAN RAYA HANKAM) KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

MAULIDAH, LAELATUL (2020) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS PROYEK APARTEMEN NINES PLAZA & RESIDENCE SUNBURST CBD BSD LOT I.9, KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MAULUDIN, MUHAMAD (2018) ANALISIS KEBUTUHAN AIR IRIGASI DI DAERAH IRIGASI SALURAN TARUM UTARA (STUDI KASUS : ZONA SALURAN TARUM UTARA BAGIAN BARAT). S1 thesis, Universitas Mercu Buana Bekasi.

MAULUDIN, PUPUNG (2020) ANALISIS BIAYA DAN WAKTU OPTIMAL MENGGUNAKAN METODE LEAST COST SCHEDULING ( Studi Kasus : Proyek Front One Hotel Splendor, Tanjung Duren – Jakarta Barat ). S1 thesis, Universitas Mercu Buana Jakarta.

MAULUDIN, PUPUNG (2019) METODE PELAKSANAAN SHEAR WALL DAN CORE WALL PROYEK PEMBANGUNAN MALL, RUKO DAN APARTEMENT CHADSTONE CIKARANG KABUPATEN BEKASI - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

MAURIZKA, NARA PANDAN (2018) METODE PELAKSANAAN PELAT DAN BALOK PADA PROYEK DAAN MOGOT CITY APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

MAYNDRO, NIKI DZUL (2018) PENGAMATAN STRUKTUR PROYEK APARTEMEN EMERALD BINTARO PT. CATURBANGUN MANDIRIPERKASA. (Jl. Jombang Raya, Parigi. Pondok Aren. Tangerang selatan). S1 thesis, Universitas Mercu Buana Jakarta.

MAYRITA, MEUTIA INDAH (2019) ANALISIS KINERJA BIAYA DAN WAKTU MENGGUNAKAN METODE NILAI HASIL (STUDI KASUS PROYEK SOUTHGATE TANJUNG BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

MEIDIYANTO, HARI (2019) IMPLEMENTASI LINE OF BALANCE DAN M-PERT PADA PEKERJAAN WASTEWATER TREATMENT PLANT. S2 thesis, Universitas Mercu Buana Jakarta.

MEILIAN, ESA (2020) METODE PELAKSANAAN PILE CAP PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN (TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

MEIRANI, DIANA (2019) GEOFORCE SEGMENTAL RETAINING WALL JEMBATAN TAHANG I DAN IV PANTAI INDAH KAPUK 2. S1 thesis, Universitas Mercu Buana Jakarta.

MEISAROH, MYRNA (2021) PENINGKATAN KINERJA BIAYA BERBASIS BUILDING INFORMATION MODELING (BIM) BASED QUANTITY TAKE-OFF PADA PEKERJAAN STRUKTUR BANGUNAN RUMAH SAKIT. S2 thesis, Universitas Mercu Buana Jakarta.

MELIA, ADINDA NOVI (2022) ANALISIS TINGKAT KESELAMATAN LALU LINTAS PADA PERSIMPANGAN DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (TCT) (Studi Kasus: Persimpangan Jalan Raya Pos Pengumben – Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

MELINDA, MELINDA (2021) RE-DESAIN GEDUNG PODIUM 13 LANTAI APARTEMEN CARSTENZS RESIDENCE DI TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MENDROFA, LEONARDO (2019) ANALISIS KINERJA RUAS JALAN DAN SIMPANG BERSINYAL JALAN RAYA KEBAYORAN LAMA - JALAN PALMERAH BARAT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

MENDROFA, LEONARDO (2018) METODE PELAKSANAAN PEKERJAAN SHEARWALL PADA PROYEK ARANDRA RESIDENCE CEMPAKA PUTIH , JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

MERLIANSYAH, (2023) ANALISISPENYEBABKEGAGALANTENDERKONSTRUKSI MELALUISISTEME-PROCUREMENTDIPTX TAHUN2020SAMPAIDENGANTAHUN2022. S1 thesis, Universitas Mercu Buana Bekasi.

MIANSYAH, DELSA (2022) ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN CUT AND FILL PADA PROYEK FARM CIGEULIS PANDEGLANG BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

MIFTHAUDIN, MUHAMAD (2021) ANALISA KARAKTERISTIK PENGGUNA JALAN TERHADAP KINERJA TROTOAR. S1 thesis, Universitas Mercu Buana Jakarta.

MISWANDA, ARI (2021) ANALISIS DAMPAK PERUBAHAN DESAIN TERHADAP WAKTU DAN BIAYA PADA PELAKSANAAN PROYEK RENOVASI DAN PENYAMBUNGAN JEMBATAN PENYEBERANGAN ORANG (JPO) KAMPUS I DAN II UNTAR. S1 thesis, Universitas Mercu Buana Jakarta.

MONALISA, MONALISA (2023) KAJIAN EVALUASI RUANG TERBUKA HIJAU (RTH) DI KAWASAN INDUSTRI PULOGADUNG JAKARTA TIMUR BERBASIS PERATURAN KEMENTERIAN PERINDUSTRIAN MENUJU GREEN-BLUE OPEN SPACE. S2 thesis, Universitas Mercu Buana Jakarta.

MORIZA, MORIZA (2019) ANALISIS PENERAPAN PENGAKUAN PENDAPATAN DAN BEBAN ATAS JASA KONSTRUKSI BERDASARKAN PSAK NO.34 2017 (Studi Kasus Pada PT.X). S1 thesis, Universitas Mercu Buana Jakarta.

MOYO, ARI (2020) ESTIMASI KEBUTUHAN AIR DAN SUMBER AIR ALTERNATIF PADA GEDUNG PATRA JASA TAHUN 2020 - 2025. S1 thesis, Universitas Mercu Buana Bekasi.

MUAMAR, ALIF (2023) ANALISIS PERBANDINGAN BIAYA, WAKTU DAN MUTU PELAKSANAAN PEKERJAAN TANGGA ANTARA METODE BETON KONVENSIONAL DENGAN PRECAST (STUDY KASUS : PROYEK JHL EPISODE TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

MUBAROK, OKI RIZKY (2018) ANALISIS KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI 1997 (STUDI KASUS SIMPANG JEMBATAN BESI TELUK PUCUK BEKASI UTARA). S1 thesis, Universitas Mercu Buana Bekasi.

MUBARROK, NAFI'UL (2020) ANALISA EFISIENSI DAN EFEKTIVITAS OPERASIONAL GANJIL GENAP DAN ANGKUTAN MASSAL MRT TERHADAP KINERJA LALU LINTAS RUAS JALAN JEND. SUDIRMAN SAMPAI DENGAN JALAN RA. KARTINI. S1 thesis, Universitas Mercu Buana Jakarta.

MUCHAYAROH, ONE NILLA CHELSY (2018) ANALISIS FAKTOR-FAKTOR PENYEBAB PEKERJAAN TAMBAH KURANG (VARIATION ORDER) PADA PEKERJAAN FACADE TERHADAP BIAYA PADA PROYEK HARCO GLODOK JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

MUCHYIDIN, FAHMI (2017) ANALISIS FAKTOR - FAKTOR PENYEBAB TERJADINYA PEMBENGKAKAN BIAYA UPAH TENAGA KERJA PADA PROYEK DI PT. XXX JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

MUGHNI SAEFULLAH, ABDURRAHMAN (2022) PERANCANGAN STRUKTUR ATAS GEDUNG BETON BERTULANG SISTEM GANDA DENGAN EVALUASI KINERJA STRUKTUR MENGGUNAKAN ANALISIS PUSHOVER. S1 thesis, Universitas Mercu Buana Jakarta.

MUHAMAD, AKBAR (2022) ANALISA PERENCANAAN BOLTED FIELD SPLICE PADA STRUKTUR JEMBATAN PLAT GIRDER PROFIL I BERDASARKAN AASHTO LRFD 2020. S1 thesis, Universitas Mercu Buana Jakarta.

MUHAMMAD, DENDY HASSELD (2022) ANALISA KINERJA BIAYA DAN WAKTU PADA PELAKSANAAN PROYEK FARM QUALITY GOLDFISH MENGGUNAKAN METODE ANALISA NILAI HASIL (EARNED VALUE ANALYSIS). S1 thesis, Universitas Mercu Buana Jakarta.

MUHAMMAD, FADHIL (2019) ANALISIS KINERJA BIAYA DAN WAKTU PADA PELAKSANAAN PROYEK INFRASTRUKTUR DENGAN METODE EARNED VALUE? (STUDI KASUS PROYEK BENDUNGAN SERBAGUNA KARIAN). S1 thesis, Universitas Mercu Buana Jakarta.

MUHAMMAD, IFAN RAMANDA (2022) ANALISIS PENETAPAN KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) PADA STASIUN LIGHT RAIL TRANSIT (LRT) DI KOTA PALEMBANG DI TINJAU TERHADAP ASPEK TRANSPORTASI DAN LINGKUNGAN. S2 thesis, Universitas Mercu Buana Jakarta.

MUHAMMAD ALAMIN IMAM UTOMO, UTOMO (2022) ANALISA PENGARUB METODE PEMADATAN BETON SEGAR TERBADAP KUAT TEKAN,KUAT TAmK BELAB, DAN SEGREGASI PADA BETON DENGAN PENAMBABAN ADMIXTURE. S1 thesis, Universitas Mercu Buana Jakarta.

MUHAMMAD SURURI, FIBRI BAHTIAR (2020) ANALISA TEGANGAN PIPA PADA SISTEM PERPIPAAN REBOILED CONDENSAT DRUM MENUJU CONDENSATE STABILIZER. S1 thesis, Universitas Mercu Buana Jakarta.

MUHARAM, ILHAM (2020) PENGARUH PENAMBAHAN FILLER KACA PADA CAMPURAN LASTON AC-WC TERHADAP KARAKTERISTIK UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

MUHARAM, RIDWAN (2022) ANALISIS PERBANDINGAN PENGENDALIAN PROYEK MENGGUNAKAN APLIKASI PROJECT MANAGEMENT INFORMATION CENTRE (PREMIER) DENGAN METODE MANUAL PADA PROYEK PEMBANGUNAN PIPA DISTRIBUSI GAS BUMI (Studi Kasus Pembangunan Pipa Gas ke Calon Pelanggan PT HLI Green Power). S1 thesis, Universitas Mercu Buana Jakarta.

MUHARAM, SAEFUL (2023) ANALISIS PENGARUH LIMBAH KACA BOTOL SEBAGAI SUBSITUSI AGREGAT KASAR DAN LIMBAH ISOLATOR KERAMIK SEBAGAI SUBSITUSI AGREGAT HALUS TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

MUHARRAM, PANDU (2022) PERENCANAAN ULANG KINERJA DAN DETAIL STRUKTUR PADA GEDUNG SISTEM GANDA (STUDI KASUS : OFFICE KECAMATAN C, KOTA TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

MUHDIN, RIZKY UZWAN (2022) ANALISIS TITIK RAWAN KECELAKAAN (BLACK SPOT) PADA RUAS JALAN TOLE ISKANDAR – RUAS JALAN SILIWANGI KOTA DEPOK. S1 thesis, Universitas Mercu Buana Bekasi.

MUHSIN, INDRA ALI (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA MENGGUNAKAN METODE CRASHING ANTARA JAM KERJA LEMBUR DAN PENAMBAHAN TENAGA KERJA (Studi Kasus: Pembangunan Rumah Contoh BSD City - Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

MUIN, ABDUL (2020) ANALISA BANJIR TAHUNAN DAS CISANGGARUNG KABUPATEN CIREBON. S1 thesis, Universitas Mercu Buana Bekasi.

MUKMININ, EKA KHAERUL (2019) METODE PELAKSANAAN PEKERJAAN BALOK DAN PELAT PROYEK PUSLABFOR POLRI SENTUL BOGOR JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

MUKTI, HALI (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

MULIA, FAJAR (2021) ANALISA EFEKTIFITAS MARKA YELLOW BOX. S1 thesis, Universitas Mercu Buana Jakarta.

MULIANI, TIANA NUR (2024) ANALISA PERUBAHAN PENJADWALAN BERBASIS BUILDING INFORMATION MODELING (BIM) PROYEK DERMAGA MERAK. S1 thesis, Universitas Mercu Buana Jakarta.

MULYANA, AGUS (2022) STUDI PENGARUH VARIASI CAMPURAN FLY ASH DAN GGBFS (GROUND GRANULATED BLAST FURNACE SLAG) SEBAGAI SUBSTITUSI 30% SEMEN TERHADAP KUAT TEKAN DAN SETTING TIME BETON NORMAL. S1 thesis, Universitas Mercu Buana Jakarta.

MULYONO, EKA JUNI ARIF (2024) IMPLEMENTASI KONSEP GREEN RETROFITTING RIVER (ENVISION) PADA KONSERVASI SUNGAI BERBASIS BLOCKCHAIN- BIM UNTUK MENINGKATKAN KINERJA BIAYA. S2 thesis, Universitas Mercu Buana Jakarta.

MUNTHE, AGITA KAMICA BERU (2021) EVALUASI KINERJA RUAS JALAN TERHADAP ADANYA AREA PICK UP POINT OJEK ONLINE PADA JALAN MANGGARAI UTARA 1. S1 thesis, Universitas Mercu Buana Jakarta.

MURSIDI, ABDUL HALIL MUBARAQ (2019) PERANCANGAN ALTERNATIF STRUKTUR GEDUNG 15 LANTAI DENGAN EFEKTIFITAS TATA LETAK DAN KETINGGIAN DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

MURTADHO, ARIFQI (2019) ANALISA STABILISASI TANAH LUNAK DENGAN MENGGUNAKAN METODE PRE-LOADING DAN PREFABRICATED VERTICAL DRAIN (PVD) PADA PROYEK JALAN TOL DEPOK - ANTASARI PAKET 1 SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MURWATI, SITI (2018) ANALISA PONDASI TIANG PANCANG DENGAN PENGUJIAN CONE PENETRATION TEST/SONDIR PADA BANGUNAN WATER FEATURE PROYEK LAVON SWANCITY CIKUPA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

MURWATI, SITI and TAUFIK, TAUFIK (2017) METODE PELAKSAAN PEKERJAAN PONDASI RAFT PADA PROYEK MENARA JAKARTA KEMAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

MUSHENY, GINA FITRIANI AYU (2020) ANALISIS PERBANDINGAN BIAYA DAN METODE PEKERJAAN PERKUATAN STRUKTUR BALOK BETON MENGGUNAKAN METODE CONCRETE JACKETING DAN SERAT KARBON. S1 thesis, Universitas Mercu Buana Bekasi.

MUSLIM, MUHAMAD (2021) EFEKTIVITAS PEMANFAATAN DRAINASE VERTIKAL “RAINSAVE” DALAM MEREDUKSI LIMPASAN PERMUKAAN DI PERUMAHAN CIRIUNG CEMERLANG KABUPATEN BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

MUSLIM, MUHAMAD (2021) EFEKTIVITAS PEMANFAATAN DRAINASE VERTIKAL “RAINSAVE” DALAM MEREDUKSI LIMPASAN PERMUKAAN DI PERUMAHAN CIRIUNG CEMERLANG KABUPATEN BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

MUSLIM, NUR HANIF (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR KANTILEVER LANTAI 2 PADA PROYEK URBANTOWN SERPONG - CIPUTAT - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MUSTAKIM, MINA (2019) METODE PELAKSANAAN PEKERJAAN BALOK DAN PELAT PROYEK PUSLABFOR POLRI SENTUL BOGOR JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

MUSTAQIM, SEPTIAN SETO GILANG (2018) STRUKTUR PROYEK GEDUNG MABES POLRI SISI BARAT KEBAYORAN BARU-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MUSTOFA, AGUS (2019) ANALISA RUAS JL. LINGKAR DAN KAPASITAS RUANG PARKIR OFF STREET KENDARAAN RODA EMPAT MALL BINTARO XCHANGE (Studi Kasus : Mall Bintaro Xchange). S1 thesis, Universitas Mercu Buana Jakarta.

MUSTOFA, SETIAWAN (2019) STUDI EKSPERIMENTAL BETON MUTU TINGGI BERBASIS FLY ASH TERHADAP WAKTU IKAT, PANAS HIDRASI DAN KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

MUYADI, HARDY (2019) ANALISA KINERJA TERMAL TERHADAP FASADE BANGUNAN DENGAN SOFTWARE REVIT PADA BANGUNAN HK OFFICE. S1 thesis, Universitas Mercu Buana Jakarta.

MUZAKI, AHMAD (2018) ANALISIS KOMPARASI PENGARUH PENGGUNAAN CRUMB RUBBER SEBAGAI SUBSTITUSI AGREGAT HALUS TERHADAP PERILAKU LENTUR BETON PERKERASAN KAKU (RIGID PAVEMENT). S1 thesis, Universitas Mercu Buana Bekasi.

MU’ID, ABDUL (2023) PERBANDINGAN KAPASITAS DAYA DUKUNG PONDASI TIANG PANCANG DAN PONDASI BORED PILE PADA PEKERJAAN PEMBANGUNAN JEMBATAN PENYEBRANGAN SEPEDA PROYEK REVITALISASI WADUK SETIABUDI BARAT. S1 thesis, Universitas Mercu Buana Bekasi.

Malik, Achmad Fajar (2023) ANALISIS RISIKO PENYEBAB KETERLAMBATAN PADA TAHAP PELAKSANAAN KONSTRUKSI PROYEK LRT JABODEBEK BERBASIS PMBOK UNTUK MENINGKATKAN KINERJA WAKTU. S1 thesis, UNIVERSITAS MERCU BUANA.

Masriani Sitompul, Carolina (2016) ANALISIS INDEKS KERENTANAN PESISIR SEBAGAI UPAYA PENANGGULANGAN ABRASI DI PANTAI ANYER KABUPATEN SERANG PROVINSI BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

N, PRADANA BAYU S (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE. S1 thesis, Universitas Mercu Buana Jakarta.

NABABAN, CLAUDIUS LISIAS BARITA (2023) OPTIMALISASI KINERJA SIMPANG BERSINYAL TIGA LENGAN MENGGUNAKAN SOFTWARE PTV VISSIM (STUDI KASUS PERSIMPANGAN JALAN KH HASYIM ASHARI). S1 thesis, Universitas Mercu Buana.

NABAWI, NAUFAL ALTHOF (2023) ANALISIS SISTEM PENGELOLAAN LIMPASAN HUJAN DENGAN METODE ZERO RUN OFF PADA KAWASAN GEDUNG PERKANTORAN CIKINI JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

NABELLA, AGNES (2021) STABILISASI MENGGUNAKAN SERBUK BATA UNTUK MEMPERBAIKI DAYA DUKUNG TANAH LATERIT (LOKASI : JALAN PENGHUBUNG DESA PENYANG DAN DESA TANAH PUTIH, KALIMANTAN TENGAH). S1 thesis, Universitas Mercu Buana Jakarta.

NABIL, NABIL (2024) EVALUASI PRASARANA UMUM STANDAR INTERNASIONAL PELABUHAN MARINA ANCOL JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

NABILAH YUDANI, DEANADA (2022) ANALISIS PUSHOVER PADA EVALUASI KINERJA STRUKRUR GEDUNG MENGGUNAKAN MODIFIKASI SEISMIC ISOLATION BERUPA HIGH DAMPING RUBBER BEARING (HDRB). S1 thesis, Universitas Mercu Buana Jakarta.

NADIATURROHMAH, NIDA (2021) KOMPARASI MODEL CURAH HUJAN LIMPASAN (RUNOFF) DAN KECENDERUNGAN PERUBAHAN KURVA DEBIT ALIRAN (Studi Kasus: DAS Ciliwung). S1 thesis, Universitas Mercu Buana Jakarta.

NAHWANI, AHMAD (2021) ANALISIS JARINGAN AIR BERSIH BERBASIS INFRASTRUCTURE LEAKAGE INDEX (ILI) DAN GEOGRAPHIC INFORMATION SYSTEM (GIS) UNTUK PENINGKATAN REVENUE. S2 thesis, Universitas Mercu Buana Jakarta.

NAIBAHO, DESI DEVIANTA (2019) ANALISIS SIKLUS PEMASANGAN FORMWORK UNTUK OPTIMALISASI WAKTU PELAKSANAAN PROYEK (STUDI KASUS: PROYEK PEMBANGUNAN HOTEL TERMINAL 3 ULTIMATE). S1 thesis, Universitas Mercu Buana.

NAIM, MUCHAMAD SAIBI (2019) KOMPARASI PENGGUNAAN AIR LAUT (SEA WATER) DAN AIR TAWAR (FRESH WATER) PADA CAMPURAN BETON MUTU TINGGI DENGAN GULA TEBU (SUKROSA) SEBAGAI RETARDER. S1 thesis, Universitas Mercu Buana Bekasi.

NAINGGOLAN, MONIKA ELISABETH (2021) MANAJEMEN RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PERUSAHAAN JASA KONSTRUKSI PT. ALKAGRA SENIGLASS DESIGN INTERIOR/EXTERIOR KACA. S1 thesis, Universitas Mercu Buana Jakarta.

NAINGGOLAN, PRISTON (2022) PELAKSANAAN PEKERJAAN BEKISTING KOLOM, SHEARWALL, BALOK & PLAT PADA PROYEK CONTROL BUILDING SCBD JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

NAJIB, MUHAMMAD (2018) ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG PADA TANAH GRANULER (Studi Kasus : Proyek Gudang PT Inbisco Niagatama Semesta Serang). S1 thesis, Universitas Mercu Buana.

NAJIB, SULTHON (2020) PELAKSANAAN PEKERJAAN STRUKTUR BORE PILE PADA PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER – KUNCIRAN. S1 thesis, Universitas Mercu Buana Jakarta.

NAJMUDDIN, FAHMI TRY (2018) ANALISIS BIAYA PELAKSANAAN PEKERJAAN BEKISTING TABLE FORM DENGAN SISTEM ZONING PADA PROYEK PEMBANGUNAN APARTEMEN VERDE II CONDOMINIUMS (EAST TOWER). S1 thesis, Universitas Mercu Buana Jakarta.

NALAHUDDIN, MUKLISH (2019) STUDI KASUS PERENCANAAN COUPLING BEAM DENGAN METODE SRPMK DAN DINDING GESER PADA PROYEK THE STATURE JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

NARKAYA, YAYA (2019) DESAIN ALTERNATIF STRUKTUR BAGIAN ATAS HOTEL SANTIKA DENGAN MENGGUNAKAN SHEAR WALL DAN WAFFLE SLAB. S1 thesis, Universitas Mercu Buana Jakarta.

NASIRUDIN, DEFID (2022) ANALISIS PENANGANAN PENGENDALIAN BANJIR KEL. PAKU JAYA KEC. SERPONG UTARA KAB. TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

NATAPRAWIRA, HANDY MUHARAM (2023) "PENGARUH PENAMBAHAN LUMPUR LAPINDO DENGAN VARIABEL PEMISAHAN NACL TERHADAP KUAT TEKAN". S1 thesis, Universitas Mercu Buana Jakarta.

NAUFAL, ALWAN MUHAMMAD (2018) IDENTIFIKASI NILAI STABILITAS CAMPURAN BERASPAL DENGAN ABU AMPAS TEBU PADA CAMPURAN AC-BC MENGGUNAKAN METODE UJI MARSHALL DAN WHEEL TRACKING. S1 thesis, Universitas Mercu Buana Jakarta.

NAUVAL, ALFADIN AZZAHRAWAANI EL (2018) PEKERJAAN BEKISTING KONVENSIONAL PADA PLAT LANTAI APARTEMENT BELLEVUE PLACE - JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

NAUVAL, ALFADIN AZZAHRAWAANI EL (2018) PERENCANAAN STRUKTUR DERMAGA TANJUNG BATU BANGKA BELITUNG DENGAN KAPASITAS 6000 DWT. S1 thesis, Universitas Mercu Buana Jakarta.

NAWAWI, MOH. (2018) PENERAPAN LEAN CONSTRUCTION DI PEKERJAAN MEKANIKAL, ELEKTRIKAL, PLUMBING (MEP) PADA PROYEK BANGUNAN TINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

NAWAWI, MUHAMAD (2022) ANALISIS KEPUASAN STAKE HOLDER DALAM IMPLEMENTASI PEMELIHARAAN JALAN LONG SEGMENT DENGAN METODE IMPORTANCE PERFORMANCE ANALYSIS (IPA) DAN COSTUMER SATISFACTION INDEX (CSI) (STUDI KASUS : JALAN RAYA CIAWI-BENDA). S1 thesis, Universitas Mercu Buana Bekasi.

NGUSMAN, (2018) ANALISA FAKTOR PENYEBAB KETERLAMBATAN WAKTU PADA PEKERJAAN STRUKTUR ATAS PROYEK APARTEMEN KALIANA CILEUNGSI. S1 thesis, Universitas Mercu Buana Bekasi.

NIANTOMI, KIKI (2020) PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN SEKSI 3 (STA. 27+650 - STA. 34+225) METODE PELAKSANAAN KONSTRUKSI BORE PILE DENGAN PENGUJIAN PILE DRIVING ANALYZER TEST (PDA) & METODE PELAKSANAAN PEMASANGAN ERECTION STEEL BOX GIRDER. S1 thesis, Universitas Mercu Buana Jakarta.

NIDYASARI, RACHMELIA (2022) ANALISIS PENYEBAB KETERLAMBATAN BERDASARKAN PERSEPSI STAKEHOLDER DENGAN IMPORTANCE INDEX DAN SIMULASI MONTE CARLO (Studi Kasus : Pekerjaan Struktur Lantai 1 Pada Pembangunan Proyek CLS XL - Tanjung Pakis, Karawang – Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

NIHAYATI, (2019) ANALISIS KINERJA PELAYANAN ANGKUTAN UMUM AREA URBAN DENGAN METODE SERVQUAL (STUDI KASUS : TRANSJAKARTA D11 RUTE TERMINAL DEPOK - BKN). S1 thesis, Universitas Mercu Buana Bekasi.

NILAMSARI, NOVIRATRI (2024) FAKTOR-FAKTOR PENYEBAB DAN DAMPAK KETERLAMBATAN PEMBAYARAN DARI PEMILIK PROYEK KONSTRUKSI KEPADA KONTRAKTOR (STUDI KASUS PROYEK LABORATORIUM SNSU BSN SERPONG). S1 thesis, Universitas Mercu Buana - Buncit.

NINGRUM, HANA YULIA (2021) PERBANDINGAN STRATEGI PENAWARAN HARGA PADA PROSES PELELANGAN PROYEK DENGAN METODE FRIEDMAN DAN METODE GATES (Studi Kasus: Peningkatan Jalan Purwoharjo - Gintung dan Jalan Purwoharjo - Susukan Kabupaten Pemalang). S1 thesis, Universitas Mercu Buana Jakarta.

NINGRUM, NOVITA SETIYARSI CAHYA (2018) IDENTIFIKASI POTENSI BAHAYA KERJA PADA PROYEK INSTALASI VERTICAL DRAIN DAN GEOTEXTILE DI KAWASAN INDUSTRI KENDAL. S1 thesis, Universitas Mercu Buana Jakarta.

NINGSIH, RANDIKA YULIA (2019) IDENTIFIKASI FAKTOR DOMINAN RISIKO PEKERJAAN ERECTION PCI GIRDER TERHADAP KINERJA KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK FLYOVER. S1 thesis, Universitas Mercu Buana Jakarta.

NINGSIH, RANDIKA YULIA (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH PILE CAP PADA PROYEK PEMBANGUNAN JEMBATAN SUNGAI TAHANG SEDAYU INDO CITY - PANTAI INDAH KAPUK 2. S1 thesis, Universitas Mercu Buana Jakarta.

NIZERY, CHIKA PUSPITA RETNOANDANI (2018) ANALISIS OPTIMALISASI PENEMPATAN TOWER CRANE PADA BANGUNAN BERTINGKAT TINGGI (Studi Kasus : Apartemen Green Sedayu, Cengkareng). S1 thesis, Universitas Mercu Buana Jakarta.

NONTO, MOHAMMAD ALI (2020) ANALISIS PERBANDINGAN DESAIN STRUKTUR FULL SLAB PRECAST, FLAT SLAB (DROP PANEL) DAN PELAT KONVENSIONAL. S1 thesis, Universitas Mercu Buana Jakarta.

NOPIYANTO, KOKO (2020) ANALISIS DAN DESAIN STRUKTUR BANGUNAN GEDUNG BERDASARKAN SNI 1726:2019 DAN SNI 2847:2019 STUDI KASUS JOTTI DAKAR OFFICE. S1 thesis, Universitas Mercu Buana Jakarta.

NOPRIANSAH, AHMAD (2021) ANALISIS KRITERIA DAN BOBOT PENILAIAN TAHAP EVALUASI PEMILIHAN PEMASOK DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) PADA PROYEK PABRIK BIODIESEL. S2 thesis, Universitas Mercu Buana Jakarta.

NOVARIA, RINALDY (2019) TINJAUAN PEKERJAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN THE LANA APARTEMENT ALAM SUTERA-TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

NOVAYANA, JEDI (2018) ANALISIS DAERAH RAWAN KECELAKAAN DAN UPAYA MENGURANGI TINGKAT KECELAKAAN LALU LINTAS DI BEKASI ( STUDI KASUS JALAN RAYA SILIWANGI – JALAN RAYA NAROGONG ). S1 thesis, Universitas Mercu Buana Bekasi.

NOVIANA, RENI (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BASEMENT PROYEK APARTEMEN CENTRO CITY TOWER WESTPOINT. S1 thesis, Universitas Mercu Buana Jakarta.

NOVIANI, SHANTI ASTRI (2021) PENGARUH PENGGUNAAN METODE BUILDING INFORMATION MODELING (BIM) 3D, 4D, DAN 5D DALAM MEMINIMALKAN DAMPAK KLAIM YANG DITIMBULKAN OLEH PENYEDIA JASA. S2 thesis, Universitas Mercu Buana Jakarta.

NOVIANTO, KURNIAWAN (2021) ANALISIS KETERLAMBATAN PROYEK PERPANJANGAN RUNWAY BANDARA SUPADIO PONTIANAK. S1 thesis, Universitas Mercu Buana Jakarta.

NOVINUGRAHA, TANGGUH (2021) KEBUTUHAN TEMPAT PEMBERHENTIAN ( HALTE ) DI RUAS JALAN LEBAK BULUS-BANGO KOTA JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

NOVITASARI, BETTY (2018) EVALUASI TEBAL PERKERASAN RUAS JALAN UNGARAN -BAWEN PROVINSI JAWA TENGAH. S1 thesis, Universitas Mercu Buana Jakarta.

NOVITASARI, CHRYSTIN INDAH (2023) ANALISIS KINERJA DAN KEPUASAN PENUMPANG TERHADAP PELAYANAN TRANSJAKARTA KORIDOR 2A AKIBAT RELOKASI HALTE HARMONI CENTRAL BUSWAY. S1 thesis, Universitas Mercu Buana - Buncit.

NOVITASARI, SONEKA (2022) ANALISIS LOKASI RAWAN KECELAKAAN LALU LINTAS DI RUAS JALAN D.I.PANJAITAN KOTA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

NOVRIANI, FEBRIANA DEWI (2019) Pemanfaatan Limbah Plastik Jenis PET (Poly Ethylene Terephthalate) Sebagai Bahan Campuran Aspal AC-WC Menggunakan Metode Uji Marshall. S1 thesis, Universitas Mercu Buana.

NUGRAHA, ANDHIKA ADITYA (2023) EVALUASI SIMPANG BERSINYAL PADA SIMPANG JALAN RAYA SERANG - JALAN RAYA BITUNG DENGAN METODE PEDOMAN KAPASITAS JALAN INDONESIA ( PKJI 2014 ). S1 thesis, Universitas Mercu Buana.

NUGRAHA, ANDRIAN (2024) PENERAPAN ANALISIS MANAJEMEN WAKTU DENGAN METODE CPM DAN PERT (STUDI KASUS : PROYEK REVITALISASI TERMINAL PENUMPANG TIPE A PATRIA - BLITAR). S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, JATI (2022) ANALISA KINERJA PROYEK AKIBAT ADANYA ADDENDUM TERHADAP WAKTU DAN BIAYA MENGGUNAKAN METODE KONSEP NILAI HASIL (Studi Kasus : Proyek Pembangunan Taman Cluster X – Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, LUKAS ASEP MINTA (2021) STUDI PENGENDALIAN BIAYA DAN PENJADWALAN PROYEK MENGGUNAKAN EARNED VALUE CONCEPT GEDUNG SEKOLAH STRADA YOS SUDARSO. S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, MOCHAMAD RIFKY ADITYA (2023) ANALISIS KINERJA SIMPANG DAN RUAS JALAN SETELAH PEMBERLAKUAN KEBIJAKAN SATU ARAH DI JALAN RAYA SERPONG, KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, PRAYOGA (2023) ANALISIS FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT DENGAN MENGGUNAKAN METODE FAULT TREE ANALYSIS (Studi Kasus: Proyek Pembangunan Gedung Rumah Sakit Bethsaida). S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, RAMA (2019) PEKERJAAN ARSITEKTURAL PADA PROYEK AMAZANA SERPONG RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, SIDIQ ARYA PUTRA NAYANTAKA (2020) PENGARUH PERILAKU PEKERJA TERHADAP IMPLEMENTASI KEAMANAN, KESELAMATAN, KESEHATAN DAN KEBERLANJUTAN (K4). S2 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, ANDHI BAYU (2021) EVALUASI PENURUNAN TANAH AKIBAT TIMBUNAN MENGGUNAKAN METODE ASAOKA (Studi Kasus : Proyek MNC Theme Park Lido, Bogor ). S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, ARVIANTO EKO (2019) EVALUASI KINERJA DAN PERKUATAN STRUKTUR GEDUNG GUNA ALIH FUNGSI LANTAI PADA KANTOR CAMAT KEMBANGAN JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, AZARYA PRASETYO (2022) ANALISIS KINERJA LAYANAN TRANSJAKARTA SELAMA MASA PSBB DENGAN METODE IMPORTANCE PERFORMANCE ANALYSIS (STUDI KASUS: KORIDOR 3 KALIDERES – PASAR BARU). S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, BINTANG (2022) EVALUASI TARIF LAYANAN TRANSJABODETABEK REGULER PERUM PPD (STUDI KASUS : PONDOK CABE – PASAR SENEN ). S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, DANANG JOYO (2021) PENGARUH KUAT TEKAN BETON NORMAL TERHADAP PENGGUNAAN LIMBAH KERAMIK SEBAGAI PENGGANTI SEBAGIAN AGREGAT HALUS. S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, DWI TRI (2023) ANALISIS PENGARUH PENGGUNAAN CRITICAL CHAIN PROJECT MANAGEMENT METHOD TERHADAP PERENCANAAN WAKTU PELAKSANAAN PROYEK JALAN LAYANG TOL. S2 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, MUHAMMAD IHSAN AJI (2022) PENGARUH PENGGUNAAN PECAHAN KERAMIK SEBAGAI SUBSTITUSI AGREGAT KASAR DENGAN PENGGUNAAN BUTIRAN KERAMIK SEBAGAI SUBSTITUSI AGREGAT HALUS TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

NUGROHO, MUHAMMAD ILHAM (2022) EVALUASI KINERJA OPERASIONAL ANGKUTAN KOTA MIKROTRANS JAK LINGKO (STUDI KASUS : JAK 53 : POS PENGUMBEN – GROGOL VIA SLIPI JAYA). S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, NOFIANTO (2022) “Pengaruh Penggunaan Styrofoam Sebagai Substitusi Agregat Kasar Serta Penggunaan Abu Daun Bambu Sebagai Substitusi Semen Terhadap Kuat Tekan Beton”. S1 thesis, Universitas Mercu Buana Bekasi.

NUGROHO, RUDY (2022) ANALISIS FAKTOR-FAKTOR PENYEBAB KLAIM DI MASA PENDEMI PADA PROYEK PEMBANGKIT LISTRIK DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, WIBIANTO ADI (2023) PENGARUH PENAMBAHAN LIMBAH BETON SEBAGAI SUBTITUSI AGREGAT KASAR DAN QUARRY DUST SEBAGAI SUBTITUSI AGREGAT HALUS TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

NUGROHO, WIDYA ADI (2019) ANALISIS KEBUTUHAN DAN KARAKTERISTIK LAHAN PARKIR KENDARAAN DENGAN MENGGUNAKAN SISTEM PARK AND RIDE DI STASIUN BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

NUGROHO, WISMOYO AGUNG (2020) FAKTOR-FAKTOR YANG MEMPENGARUHI PENGENDALIAN MUTU PADA PELAKSANAAN STRUKTUR BETON PROYEK PONDOK INDAH MALL 3 & OFFICE TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

NUR, MOHAMAD IRVAN (2021) PERBANDINGAN PENGARUH PENGGUNAAN ABU BATU PADA CAMPURAN BETON DENGAN KUAT TEKAN TARGET 20 MPA DAN 40 MPA. S1 thesis, Universitas Mercu Buana Jakarta.

NUR, MUHAMMAD (2022) PENINGKATAN KINERJA BIAYA DAN WAKTU BERBASIS LEAN SIX SIGMA DAN TIME COST TRADE OFF PADA BANGUNAN KANTOR BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

NUR DIANTORO, DWI (2023) PEMANFAATAN LIMBAH GENTENG BETON SEBAGAI SUBSITUSI SEBAGIAN AGREGAT KASAR DAN FLY ASH SEBAGAI SUBSITUSI SEMEN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

NUR'ARIPIN, RIZAL (2023) ANALISIS GEOMETRIK JALAN RAMP AKSES BEKASI BARAT 2 AKIBAT PEMBANGUNAN PROYEK KERETA API CEPAT JAKARTA-BANDUNG. S1 thesis, Universitas Mercu Buana Bekasi.

NURAINI, ATIFA (2021) PENGARUH PENAMBAHAN FLY ASH PADA TANAH DAERAH CENGKARENG, JAKARTA BARAT TERHADAP NILAI CBR. S1 thesis, Universitas Mercu Buana Jakarta.

NURANTO, ADI (2023) POTENSI SENGKETA KONTRAK KONSULTAN PENGAWAS AKIBAT PERPANJANGAN WAKTU KONTRAKTOR PADA PROYEK PEMERINTAH PROVINSI DKI JAKARTA BERDASARKAN FIDIC WHITE BOOK. S2 thesis, Universitas Mercu Buana Jakarta.

NURARDIANSYAH, RIDI (2020) STUDI PERENCANAAN SISTEM INSTALASI PENGOLAHAN AIR LIMBAH BLACK WATER INDUSTRI BERBASIS SEWAGE TREATMENT PLANT (STP) DI PT XYZ, DI KABUPATEN BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

NURARDIANSYAH, RIDI (2020) STUDI PERENCANAAN SISTEM INSTALASI PENGOLAHAN AIR LIMBAH BLACK WATER INDUSTRI BERBASIS SEWAGE TREATMENT PLANT (STP) DI PT XYZ, DI KABUPATEN BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

NURBIAN, HARTO (2022) PERENCANAAN STRUKTUR BANGUNAN GUEST HOUSE 3 LANTAI DENGAN ATAP ROOF GARDEN MENGGUNAKAN SOFTWARE ANALISIS STRUKTUR. S1 thesis, Universitas Mercu Buana Bekasi.

NURBIYANTORO, EDI (2014) PEKERJAAN JEMBATAN PADA ANAK KALI ANGKE (JORR) W2 PAKET – 4 (JOGLO-ULUJAMI). S1 thesis, Universitas Mercu Buana Jakarta.

NURCAHYA, WAHID ASMARA AJI (2019) EVALUASI KINERJA TERMAL SELUBUNG BANGUNAN PADA BANGUNAN RUMAH TINGGAL DIPERUMAHAN SEKTOR V BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

NURDIANSYAH, ALDI BAHRUL (2018) ANALISIS EFEKTIFITAS PENGGUNAAN PERALATAN LAUNCHING GANTRY DENGAN METODE KONSTRUKSI SPAN BY SPAN. S1 thesis, Universitas Mercu Buana Bekasi.

NURFADILLAH, HANINDHITA (2022) ALTERNATIF PENJADWALAN DENGAN MENGGUNAKAN CRITICAL PATH METHOD (CPM)( Studi Kasus : Rumah Tinggal Meruya DJOKO SUSANTO, Karang Tengah , Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

NURFAJRI, ADITYA (2023) ANALISIS PERBANDINGAN METODE KONTRUKSI TELESCOPIC CANOPY COLUMN DAN KONVENSIONAL PADA PROYEK CANOPY FOURCOURT SPBU SHELL GRAHA RAYA TANGERANG. S1 thesis, Universitas Mercu Buana Bekasi.

NURHAKIM, ARIE (2023) ANALISIS EFEKTIVITAS JEMBATAN PENYEBRANGAN ORANG (JPO) BERDASARKAN PERILAKU PENGGUNA JALAN KAKI DI RUAS JALAN M.H. THAMRIN KOTA TANGERANG (Studi Kasus : JPO Ruas Jl. M.H. Thamrin Kota Tangerang). S1 thesis, Universitas Mercu Buana.

NURHANANDA, BANGKIT (2023) ANALISIS PENILAIAN RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) DENGAN METODE HIRARC PROYEK PEMBANGUNAN APARTEMEN TOKYO RIVERSIDE. S1 thesis, Universitas Mercu Buana Jakarta.

NURHASNI, NURHASNI (2022) ANALISIS KINERJA SIMPANG EMPAT BERSINYAL MENGGUNAKAN BANTUAN PERANGKAT LUNAK PTV VISSIM STUDENT VERSION 9.0 (STUDI KASUS PERSIMPANGAN PEJATEN VILLAGE, PASAR MINGGU, JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

NURHAYATI, NOVITYA (2022) ANALISIS DAMPAK PEMBANGUNAN BENDUNGAN PIDEKSO TERHADAP PRODUKTIVITAS DAERAH IRIGASI DI KECAMATAN GIRIWOYO. S1 thesis, Universitas Mercu Buana Jakarta.

NURHIDAYAT, MUSTOFA (2021) ANALISIS PERBANDINGAN PEKERJAAN PELAT ANTARA METODE KONVENSIONAL DAN PRECAST DITINJAU DARI SEGI WAKTU DAN BIAYA PADA PROYEK STASIUN LIGHT RAIL TRANSIT (LRT) JABODEBEK. S1 thesis, Universitas Mercu Buana Jakarta.

NURLABIBAH, ZAHRA (2022) Analisis Faktor Penyebab Keterlambatan Proyek ABC Ditinjau Berdasarkan Produktivitas Kerja Pada Saat Pandemi Covid-19. S1 thesis, Universitas Mercu Buana Bekasi.

NURLATIFAH, WIDIA (2021) EVALUASI PERENCANAAN TEBAL LAPIS PERKERASAN LENTUR DENGAN METODE SNI 1732-1989-F (ANALISA KOMPONEN) DAN MANUAL DESAIN PERKERASAN JALAN (REVISI 2017) PADA RUAS JALAN RAYA PASAR KEMIS – KABUPATEN TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

NURLAYYINAH, (2023) PENGARUH KERUSAKAN JALAN ASPAL TERHADAP KECEPATAN KENDARAAN DI JALAN RAYA BEKASI – CAKUNG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

NUROHMAN, MOCHAMAD SOPYAN (2022) ANALISIS KINERJA SIMPANG TIGA LENGAN BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI 1997 (Studi Kasus Jalan Raya Diponegoro – Jalan Setia Mekar Kabupaten Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

NURPADILAH, SITI DELA (2023) ANALISIS PEMANFAATAN LIMBAH CANGKANG KERANG DARAH SEBAGAI BAHAN CAMPURAN PADA AGREGAT HALUS TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

NURPRASETIYO, RIFKI (2017) PROYEK ROSEVILLE SOHO & SUITE BSD-TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

NURRIZKY, FEBRIAN EKA (2019) PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA DKI JAKARTA TAHAP IB SEKSI A ZONA 1 JALAN BOULEVARD BARAT, KELAPA GADING, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

NURSALIM, AKHMAD (2020) TINJAUAN METODE PELAKSANAAN PELAT DAN BALOK STUKTUR ATAS TOWER 2 PADA PROYEK SYNTHESIS RESIDENCE, CILANDAK TIMUR - JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

NURSEPTIANI, TARI (2022) ANALISA PERILAKU STUKTUR GEDUNG BERTINGKAT YANG MENGGUNAKAN BASE-ISOLATION SYSTEMS. S2 thesis, Universitas Mercu Buana Jakarta.

NURSEPTIANI, TARI (2020) KAJIAN TINGGI EFEKTIF SHEARWALL PADA BANGUNAN HIGHRISE BUILDING 21 LANTAI DENGAN KETIDAKBERATURAN VERTIKAL. S1 thesis, Universitas Mercu Buana Jakarta.

NURSEPTIANI, TARI (2019) PELAKSANAAN PEKERJAAN BEKISTING (FORM WORK) STRUKTUR ATAS HORIZONTAL DAN VERTIKAL PADA PROYEK MENARA JAKARTA KEMAYORAN, JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

NURUL FIKRI, MUHAMMAD (2023) ANALISIS DAMPAK MUATAN LEBIH KENDARAAN ANGKUTAN BARANG TERHADAP PERKERASAN DAN MASA PELAYANAN JALAN (STUDI KASUS RUAS JALAN PANTURA SERANG – JAKARTA). S1 thesis, Universitas Mercu Buana Jakarta.

NURWANTO, FENDY (2019) PELAKSANAAN PEMBANGUNAN RUMAH SUSUN TOWER 4, 5, 6 PENGGILINGAN - PULO GEBANG - JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

NURYADI, BAYU (2019) KAJIAN FASAD BANGUNAN TERHADAP NILAI OTTV (Studi Kasus : Gereja Pouk Maranatha Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

NURYANTO, NURYANTO (2022) Analisis Pengendalian Limpasan Air Permukaan (Runoff) Dengan Metode Sumur Resapan Di Perumahan Bumi Citra Asri Tajurhalang – Bogor. S1 thesis, Universitas Mercu Buana Jakarta.

NURYANTO, WAHYU EKO (2018) METODE PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DENGAN ALAT PANCANG HYDRAULIC STATIC PILE DRIVER (HSPD) PROYEK CENGKARENG BUSINESS CITY LOT 01 - ONE MANSION APARTEMENT & THE 101 JAC. S1 thesis, Universitas Mercu Buana Jakarta.

NURZAMAN, FAHMI and SUPIAN, SUPIAN (2017) METODE PELAKSANAAN PEKERJAAN KOLOM LANTAI 18 PROYEK PEMBANGUNAN APARTEMEN MILLENNIUM VILLAGE KARAWACI – TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

NUSANTARA, BINTANG PUTRA (2018) ANALISIS WAKTU DAN BIAYA PELAKSANAAN KONSTRUKSI PEMASANGAN (ERECTION) MENGGUNAKAN MODEL U-SHAPE GIRDER PADA PROYEK LIGHT RAIL TRANSIT (LRT)-JABODEBEK LINTAS LAYANAN TAMAN MINI - CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

Nurhidayatulloh, . (2023) DESAIN ULANG JEMBATAN KW-VI DESA KARANGPAWITAN, KECAMATAN KARAWANG BARAT, KABUPATEN KARAWANG. S1 thesis, UNIVERSITAS MERCU BUANA.

OKAWARIZKY, MUHAMMAD FADLI (2023) ANALISIS PERBANDINGAN METODE BEKISTING RINGLOCK SCAFFOLDING DENGAN METODE BEKISTING ALUMUNIUM COMPOSITE (ALUCO) BERDASARKAN BIAYA DAN WAKTU (STUDI KASUS: PROYEK APARTEMEN KINGLAND AVENUE TAHAP II). S1 thesis, Universitas Mercu Buana Jakarta.

OKTAFIYANTO, ALDHY (2023) ANALISIS GETARAN PADA JEMBATAN AKIBAT BEBAN DINAMIK KERETA API (Studi Kasus : Jembatan Cikubang dan Jembatan Cisomang). S1 thesis, Universitas Mercu Buana Bekasi.

OKTAVIA, SANTI (2022) ANALISIS PENGARUH KUALITAS PELAYANAN TERHADAP KEPUASAN DAN LOYALITAS PENUMPANG ANGKUTAN UMUM “SIBENTENG” KOTA TANGERANG MENGGUNAKAN METODE STRUCTURAL EQUATION MODELLING ( SEM ). S2 thesis, Universitas Mercu Buana Jakarta.

OKTAVIA, TUTI (2023) ANALISIS TEKUK PROBABILISTIK PADA BATANG TEKAN DARI BAJA RINGAN. S2 thesis, Universitas Mercu Buana Jakarta.

OKTAVIANI, SANTI (2021) KORELASI PERBANDINGAN LEBAR DENGAN TINGGI PENAMPANG KOLOM EFEKTIF PADA STRUKTUR DENAH PERSEGI PANJANG. S1 thesis, Universitas Mercu Buana Jakarta.

OKTOPRIMA, RIANTINO (2020) PERENCANAAN SHEET PILE PADA PROYEK REHABILITASI JARINGAN IRIGASI PAMAYARAN BARAT. S1 thesis, Universitas Mercu Buana Bekasi.

OKTRIANTO, DIRGA (2020) ANALISIS PRODUKTIVITAS UNTUK PENGUKURAN KINERJA WAKTU DAN BIAYA DENGAN METODE (EARNED VALUE MANAGEMENT) EVM PADA PROYEK GEDUNG BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

OKVIANDY, VEBRIAN (2022) EVALUASI KONDISI PERKERASAN JALAN BERDASARKAN NILAI PAVEMENT CONDITION INDEX (PCI) DAN ROAD CONDITION INDEX (RCI) PADA RUAS JALAN KOMJEN M. JASIN, KELURAHAN KELAPA DUA, KOTA DEPOK KM 0+000 - KM 3+000 JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

OLDI, ISRAMI DAI and DZULFIKAR, MUHAMMAD (2017) PROYEK PEMBANGUNAN PRASARANA KERETA API RINGAN LIGHT RAIL TRANSIT (LRT) “METODE PELAKSANAAN PILE INTEGRITY TEST (PIT) UNTUK PONDASI BORE PILE”. S1 thesis, Universitas Mercu Buana Jakarta.

OLIVIA, VERNANDA (2020) LAPORAN PELAKSANAAN PEKERJAAN BALOK DAN PELAT PADA PROYEK PONDOK INDAH MALL 3 & OFFICE TOWER, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

OLIVIA, VERNANDA (2020) STUDI KOMPARASI PERENCANAAN STRUKTUR GEDUNG TAHAN GEMPA BERDASARKAN SNI 03-1726-2012 DENGAN SNI 03-1726-2019 DI DKI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

ORIZA, GISKA (2021) PENGARUH PERLINTASAN KERETA API TERHADAP KINERJA JALAN RAYA SERPONG TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

P, PANDE MADE RANGGAPRADITYA (2021) OPTIMALISASI HALTE KAWASAN STRATEGIS PARIWISATA NASIONAL PROV. BALI. S1 thesis, Universitas Mercu Buana Jakarta.

P S, HARRY WICAKSONO (2018) STUDY KASUS PERENCANAAN ULANG STRUKTUR ATAS APARTEMENT PRIMA ORCHARD DENGAN MENGGUNAKAN SISTEM FLAT SLAB. S1 thesis, Universitas Mercu Buana Bekasi.

PAHLEVI, REZA (2019) REDESAIN APRON PERKERASAN RIGID DI BANDARA HUSEIN SASTRANEGARA BANDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

PAKPAHAN, KRISTERIA (2023) EVALUASI KELONGSORAN GALIAN TANAH PADA PROYEK HOTEL FAIRFIELD BY MARRIOTT KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Bekasi.

PAMBUDI, LEONARDUS WISNU (2018) PERBANDINGAN STRUKTUR GEDUNG ANTARA SISTEM DROP PANEL DENGAN SISTEM BALOK KONVENSIONAL DITINJAU DARI SEGI VOLUME BETON, BERAT TULANGAN, DAN SIMPANGAN. S1 thesis, Universitas Mercu Buana Bekasi.

PAMBUDI, SINGGIH (2018) PERENCANAAN BETON MUTU TINGGI MENGGUNAKAN SUPERPLASTICIZER LIGNO P100 DAN ACCELERATOR LIGNO AC610. S1 thesis, Universitas Mercu Buana Jakarta.

PAMBUDI, SINGGIH (2018) PERENCANAAN BETON MUTU TINGGI MENGGUNAKAN SUPERPLASTICIZER LIGNO P100 DAN ACCELERATOR LIGNO AC610. S1 thesis, Universitas Mercu Buana Jakarta.

PAMUNGKAS, A. RISKI BANI (2018) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE EXTENDED HALF SLAB PROYEK TOL DEPOK - ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.

PAMUNGKAS, BASUKI ASTHA (2018) EVALUASI MANFAAT PEMBANGUNAN FLYOVER (STUDI KASUS FLYOVER HARAPAN INDAH BEKASI). S1 thesis, Universitas Mercu Buana Bekasi.

PAMUNGKAS, RWASTA FENDY (2019) EVALUASI SALURAN DRAINASE PADA JALAN SRENGSENG RAYA KELURAHAN SRENGSENG KECAMATAN KEMBANGAN JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, BONO (2023) ANALISIS KONDISI PERKERASAN LENTUR DAN PREDIKSI UMUR LAYAN RUAS JALAN BOULEVARD RAYA, KELAPA GADING, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, CANDRA (2023) ANALISIS KAPASITAS LINTAS DAN KUALITAS TRACK PADA JALAN REL DAOP 6 YOGYAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, EGY PUTRA (2021) PENGARUH KUAT TEKAN MORTAR RINGAN PADA USIA 14 HARI TERHADAP PENAMBAHAN CONSOL AER (AIR ENTRAINING CONCRETE ADMIXTURE) DENGAN PEMANFAATAN ABU AMPAS TEBU 12% DAN SERBUK KAYU DALAM PERENCANAAN MORTAR RINGAN. S1 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, MUHAMMAD KRISNA AJI (2023) ANALISIS FAKTOR MOTIVASI KERJA DAN PENGARUHNYA TERHADAP EFEKTIVITAS KERJA LEMBUR PADA PROYEK KONSTRUKSI (Study Kasus : Proyek Rumah Sakit Mitra Siaga Tegal). S1 thesis, Universitas Mercu Buana Bekasi.

PANGESTU, PUTRA ENGGAL (2018) METODE PELAKSANAAN PEKERJAAN CORE WALL PADA PROYEK SOCIAL SECURITY (SS) TOWER JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

PANGESTU, RIZKIAWAN (2023) PENINGKATAN COST PERFORMANCE BERBASIS BLOCKCHAIN-BUILDING INFORMATION MODELING (BIM) PADA GREEN RETROFITTING KAWASAN INDUSTRI. S2 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, RIZKY WAHYU (2018) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN SETELAH DITERAPKAN SISTEM SATU ARAH PADA JALAN DEWI SARTIKA DI DEPOK. S1 thesis, Universitas Mercu Buana Bekasi.

PANGESTU, VALENTINO ENGGAL (2022) ANALISIS PENGGUNAAN SHEARWALL PADA BANGUNAN 8 LANTAI (Studi Kasus : Proyek Hotel Domestik Terminal 3 Bandara Soekarno Hatta). S1 thesis, Universitas Mercu Buana Jakarta.

PANGGUA, ANUGERAH GERALDY (2021) ANALISIS PEMILIHAN MODA TRANSPORTASI UNTUK PERJALANAN KERJA MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS (AHP) (Studi Kasus: Pegawai Aparatur Sipil Negara Di Kementerian Koordinator Bidang Perekonomian Daerah Sawah Besar Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

PANJAITAN, HARTADI JIPHY SIMON (2017) ANALISIS MODERNISASI IRIGASI PADA INDIKATOR PENYEDIAAN AIR, PRASARANA JARINGAN IRIGASI DAN SISTEM PENGELOLAAN AIR DI DAERAH IRIGASI RAJAMANDALA KABUPATEN BANDUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PANJAITAN, RIFALDI (2021) PERBANDINGAN BENTUK DAN POSISI DINDING GESER TERHADAP SIMPANGAN LATERAL BANGUNAN BERTINGKAT TINGGI AKIBAT BEBAN GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

PANJAITAN, RIFALDI (2021) PERBANDINGAN BENTUK DAN POSISI DINDING GESER TERHADAP SIMPANGAN LATERAL BANGUNAN BERTINGKAT TINGGI AKIBAT BEBAN GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

PARADIBA, HAFISA (2022) ANALISIS PENGARUH KERJA LEMBUR TERHADAP PRODUKTIVITAS TENAGA KERJA KONSTRUKSI (Studi Kasus : Proyek Apartemen Sky House Alam Sutera, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

PARDOSI, IMELDA (2018) PEMANFAATAN LIMBAH SLAG NIKEL DENGAN TAMBAHAN SUPERPLASTICIZER MIGHTY 21N-1 DALAM PEMBUATAN BETON MUTU TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

PASARIBU, M WAHID HASAN (2023) EVALUASI KEPUASAN PENUMPANG TERHADAP KINERJA ANGKUTAN UMUM (ANGKUTAN KOTA D10 TRAYEK CIPUTAT - PONDOK AREN). S1 thesis, Universitas Mercu Buana.

PASJA, MUHAMAD KEMAL (2023) EVALUASI FASILITAS PEJALAN KAKI (STUDI KASUS JALAN PASAR SENEN KAWASAN PASAR SENEN). S1 thesis, Universitas Mercu Buana Bekasi.

PAWALLO, RIGEL (2020) Analisis Pemilihan Pemasok Alat Pada Proses Pengadaan Proyek Dengan Metode Analytical Hierarchy Process (AHP). S1 thesis, Universitas Mercu Buana Bekasi.

PELANGIE, KISSI ROSARI (2024) PENGARUH JUMLAH KENDARAAN TERHADAP KERUSAKAN JALAN ASPAL KELAS IIIA (STUDI KASUS: JALAN HAYAM WURUK, JAKARTA). S1 thesis, Universitas Mercu Buana - Buncit.

PELLENG, FRANS ROMI (2020) PEMODELAN FAKTOR KESEHATAN, KESELAMATAN DAN LINGKUNGAN KERJA TERHADAP MOTIVASI DAN PRODUKTIVITAS KERJA MENGGUNAKAN PARTIAL LEAST SQUARES PADA PROYEK BANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

PELULE, FEBRI ALDA (2023) ANALISA PEMANFAATAN SUBSTITUSI LIMBAH ABU BAN BEKAS DAN ABU JERAMI PADI PADA CAMPURAN BETON TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

PERDANA, GILANG BINA (2022) ANALISIS PERBANDINGAN SINGLE CELL DAN MULTIPLE CELL PADA CONCRETE BOX CULVERT (Studi Kasus : Jalan Tol Sigli-Banda Aceh Paket 4). S1 thesis, Universitas Mercu Buana Jakarta.

PERMADI, RIZKY WAHYU (2019) METODE PELAKSANAAN PEKERJAAN BEKISTING ALFORM (KUMKANG) PROYEK APARTEMEN SAUMATA SUITES ALAM SUTRA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

PERMADI, TEGAR (2022) PEMANFAATAN LIMBAH ASBES SEBAGAI BAHAN SUBTITUSI AGREGAT KASAR DAN ABU TERBANG (FLY ASH) SEBAGAI BAHAN SUBTITUSI SEMEN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

PERMATASARI, AKHMALIA YUYUN (2023) ANALISIS FAKTOR PENYEBAB TIMBULNYA RESIKO KETERLAMBATAN PROYEK KONSTRUKSI DENGAN METODE HOUSE OF RISK (Studi Kasus: Pembangunan Pabrik PT AHM). S1 thesis, Universitas Mercu Buana.

PERTAMI, REKINDRIAWATI DEWI (2018) ANALISIS WAKTU TUNDAAN DAN PANJANG ANTRIAN KENDARAAN AKIBAT PENGALIHAN JALAN STUDI KASUS (PERLINTASAN KERETA API TANJUNG BARAT JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Bekasi.

PERTIWIANI, ANGGRAENI (2019) KAJIAN PERILAKU STRUKTUR BANGUNAN TERHADAP BEBAN STATIK EKIVALEN DAN RESPON SPEKTRUM GEDUNG HOTEL MANOHARA YOGYAKARTA. S1 thesis, Universitas Mercu Buana.

PERWITA, AVIZAL LUGAS (2022) DESAIN ALTERNATIF STRUKTUR GEDUNG PERKANTORAN MENGGUNAKAN SISTEM ISOLASI DASAR (Studi Kasus : Gedung Perkantoran Dharmawangsa Tower, Jakarta Selatan, DKI Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

PRABANDARI, PAMELA META (2022) ANALISIS PEMILIHAN MODA PADA MASYARAKAT DI WILAYAH KECAMATAN KELAPA GADING JAKARTA UTARA MENGGUNAKAN METODE LOGIT BINER SELISIH. S1 thesis, Universitas Mercu Buana Jakarta.

PRABOWO, FAZRI DWI (2019) PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA DKI JAKARTA TAHAP IB SEKSI A ZONA 1 JALAN BOULEVARD BARAT, KELAPA GADING, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

PRABOWO, FIRNANDO AKBAR (2023) PEMODELAN DINAMIS GREEN TOLL ROAD BERBASIS VALUE ENGINEERING DAN LIFE CYCLE COST ANALYSIS UNTUK PENINGKATAN KINERJA BIAYA GREEN ROAD PADA JALAN TOL. S2 thesis, Universitas Mercu Buana Jakarta.

PRABOWO, IKHSYAN YUKHRI (2020) PELAKSANAAN PEMBUATAN PELAT LANTAI MENGGUNAKAN METAL DECK PADA TOWER PROYEK THAMRIN NINE. S1 thesis, Universitas Mercu Buana Jakarta.

PRABOWO, SANDHIYA RAHMAD (2019) ANALISA KINERJA WAKTU DAN BIAYA PELAKSANAAN PEKERJAAN PROYEK KONSTRUKSI ( Studi Pada : Proyek Apartement Centro City Tower West Point ). S1 thesis, Universitas Mercu Buana Jakarta.

PRADANA, FERI (2018) ANALISIS PELAYANAN SIMPANG EMPAT TAK BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI 1997 (Studi Kasus pada Jalan Raya Campaka – Subang, Simpang Empat Campaka, Purwakarta). S1 thesis, Universitas Mercu Buana Bekasi.

PRADANA, SENDY (2023) ANALISIS PENGARUH SILICAFUME DAN FLY ASH SEBAGAI BAHAN SUBSTITUSI SEMEN TERHADAP KUAT TEKAN BETON GEOPOLIMER SERTA PERMEABILITAS BETON DENGAN KUAT TEKAN FC’ 30 MPa UNTUK KAWASAN PANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

PRADANA, TAUFIK FAISAL SETIA (2019) ANALISIS EFEKTIFITAS ZONA SELAMAT SEKOLAH (ZoSS) (Studi Kasus SMPN 169 Jakarta dan SDN 11 Pegadungan,Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

PRADANA, TAUFIK FAISAL SETIA (2018) METODE PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DENGAN ALAT PANCANG HYDRAULIC STATIC PILE DRIVER (HSPD) PROYEK CENGKARENG BUSINESS CITY LOT 01 - ONE MANSION APARTEMENT & THE 101 JAC. S1 thesis, Universitas Mercu Buana Jakarta.

PRADESTA, FANNY ANDRE (2022) ANALISIS TINGKAT KESELAMATAN LALU LINTAS PADA PERSIMPANGAN DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (TCT) (Studi Kasus: Persimpangan Jalan Raya Pos Pengumben – Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

PRADYTIA, RIFALDO OLDIE (2022) ANALISIS FAKTOR KETERLAMBATAN, RENDAHNYA HASIL PEKERJAAN, DAN PEMBENGKAKAN BIAYA (TRIPLE CONSTRAINT) TERHADAP BERBAGAI BIDANG KONSTRUKSI. S1 thesis, Universitas Mercu Buana Jakarta.

PRAJWALITA, LALITYA PRADNYA (2022) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP KINERJA PELAYANAN DAN FASILITAS TERMINAL KAMPUNG RAMBUTAN. S1 thesis, Universitas Mercu Buana Bekasi.

PRAKASA, JONATHAN RANGGA (2020) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI, BALOK, DAN KOLOM PROYEK PEMBANGUNAN RUSUNAWA PULO GEBANG PENGGILINGAN TOWER TIMUR CAKUNG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

PRAKOSO, AGAM (2020) ANALISA RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PEKERJAAN DIAFRAGMA DI PROYEK JALAN TOL BECAKAYU (BEKASI, CAWANG, DAN KAMPUNG MELAYU) SEKSI II-A. S1 thesis, Universitas Mercu Buana Jakarta.

PRAKOSO, BUDI (2018) ANALISA KINERJA PELAYANAN JALAN TOL DALAM PROSES PENINGKATAN KAPASITAS (Studi Kasus jalan Tol Jakarta – Cikampek). S1 thesis, Universitas Mercu Buana Bekasi.

PRAKOSO, HENDRI (2020) METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT, KOLOM, DAN BALOK PROYEK BUITENZORG BASKET HALL - BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

PRAKOSO, HENDRI (2020) STUDI PERANCANGAN ULANG BANGUNAN HOTEL 10 LANTAI DENGAN STRUKTUR BAJA SISTEM RANGKA BERPENGAKU EKSENTRIK (SRBE) KONFIGURASI SPLIT-K. S1 thesis, Universitas Mercu Buana Jakarta.

PRAKOSO, SUGENG HADI (2022) ANALISIS PRODUKTIVITAS TERHADAP TENAGA KERJA PEKERJAAN STRUKTUR SHEAR WALL DENGAN METODE WORK SAMPLING ( Studi Kasus : Proyek Appartement Collins Boulevard Kota Tangerang ). S1 thesis, Universitas Mercu Buana Jakarta.

PRAMESTHI, ARTYA AURELIA (2023) PENGARUH KUALITAS PELAYANAN TERHADAP LOYALITAS DENGAN KEPERCAYAAN PENUMPANG SEBAGAI VARIABEL MEDIASI (STUDI KASUS BUS TAYO KORIDOR 4 CADAS-M1). S1 thesis, Universitas Mercu Buana Jakarta.

PRAMESWARI, ALYA AGIL (2021) ANALISIS PENINGKATAN BIAYA AKIBAT TERBITNYA CONTRACT CHANGE ORDER (CCO) (STUDI KASUS: PROYEK PEMBANGUNAN GEDUNG UTILITY RUMAH SAKIT JANTUNG HARAPAN KITA TAHAP II PALMERAH- JAKARTA BARAT ). S1 thesis, Universitas Mercu Buana Jakarta.

PRAMONO, AGUNG (2018) PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK GRAND KAMALA LAGOON BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

PRAMUDITO, HENDY (2019) PENGAMATAN PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN ASSESSMENT CENTER BSSN SAWANGAN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

PRAMUDJI, TRESNA INSAN (2023) ANALISIS PERBANDINGAN LOSS OF PRESTRESS PCI GIRDER DENGAN LINTASAN TENDON STRAIGHT PARABOLIC PARABOLIC DAN LINTASAN TENDON STRAIGHT STRIANGLE PARABOLIC PADA SISTEM POST-TENSIONED BERDASARKAN ULTIMATE STRENGTH DESIGN. (STUDI KASUS JEMBATAN PROYEK PEMBANGUNAN JALAN TOL CIBITUNGCILINCING SEKSI 4). S1 thesis, Universitas Mercu Buana Bekasi.

PRAMUDYA, ADLAN RAFLI (2022) STUDI EXPERIMENTAL PEMANFAATAN SERAT SERABUT KELAPA SEBAGAI BAHAN TAMBAH DAN SLAG SEBAGAI BAHAN SUBSTITUSI SEMEN TERHADAP KUAT TEKAN DAN KUAT TARIK BELAH BETON. S1 thesis, Universitas Mercu Buana Bekasi.

PRAMUDYKA, RIAN (2019) ANALISIS OPTIMALISASI AKSES DAN KINERJA TERMINAL PORIS PLAWAD (TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

PRANATA, DONY (2018) DAMPAK PELAKSANAAN METODE DEWATERING TERHADAP PEKERJAAN SEMI BASEMENT RUMAH SAKIT ABDI WALUYO. S1 thesis, Universitas Mercu Buana Jakarta.

PRANOTO, IMAM BUDI (2017) ANALISIS PENERAPAN MARKA JALAN YELLOW BOX JUNCTION MENGGUNAKAN MKJI 1997 (STUDI KASUS : SIMPANG JALAN LETJEND SOEPONO PERMATA HIJAU, JAKARTA) HIJAU, JAKARTA). S1 thesis, Universitas Mercu Buana Jakarta.

PRASASTI, MEGA DWI (2018) ANALISIS KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN (Studi Kasus : Jalan Sultan Agung – Wahab Affan, Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

PRASETIA, IRWAN (2021) ANALISIS PERBEDAAN WAKTU DAN BIAYA PEKERJAAN DRAINASE ANTARA MENGGUNAKAN METODE KONVENSIONAL DENGAN METODE PRACETAK DI JALAN KENANGA PONDOK RANGON. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETIA, KUSNAN (2023) ANALISIS KARAKTERISTIK KEBUTUHAN RUANG PARKIR PADA MASJID JAMI KAWASAN PERUMAHAN CLUSTER TERPADU (Studi Kasus: Masjid An-Ni’mah, CitraGran, Cibubur). S1 thesis, Universitas Mercu Buana Bekasi.

PRASETIO, EKO BEKTI (2021) ANALISIS PERBANDINGAN PENGENDALIAN WAKTU PADA PEKERJAAN KONSTRUKSI DENGAN METODE LINE OF BALANCE DAN MANUAL-PROGRAM EVALUATION AND REVIEW TECHNIQUE (Studi kasus : Apartemen Capital Square Surabaya). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETIO, IDO (2020) PERENCANAAN JALUR KERETA API GANDA ( DOUBLE-DOUBLE TRACK ) (Studi kasus Stasiun Bekasi km 26+652 – Stasiun Jatinegara km 12+050). S1 thesis, Universitas Mercu Buana Bekasi.

PRASETIYA, M. AGUNG BUDI (2020) ANALISIS STRUKTUR ATAS PADA SISTEM GANDA DENGAN RANGKA PEMIKUL MOMEN KHUSUS (Studi Kasus Apartemen Marcs Boulevard Di Batam). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETIYA, M. AGUNG BUDI (2019) METODE PELAKSANAAN PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI PADA PROYEK APARTEMEN LRT URBAN SIGNATURE CIRACAS JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETIYO, EKO (2022) ANALISIS PRODUKTIVITAS TENAGA KERJA MENGGUNAKAN METODE LUR (Labour Utilization Rate) PADA PEKERJAAN STRUKTUR ATAS (Studi Kasus: Pembangunan Perumahan Zahra Residence Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETIYO, RIFKI NUR (2018) EVALUASI DESAIN STRUKTUR BAWAH PADA PROYEK HOTEL ALOFT TB SIMATUPANG DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYA, ADI (2018) METODE PELAKSANAAN PEKERJAAN BALOK DAN PLAT LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYAMUKTI, WAHYUNING (2019) METODE PELAKSANAAN STRUKTUR STP (SEWAGE TREATMENT PLANT) PADA PROYEK PEMBANGUNAN APARTEMEN THE CONEXIO - CIKUNIR 1 BEKASI JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, ADHA DWI (2022) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP KINERJA PELAYANAN PADA ANGKUTAN UMUM SI BENTENG KOTA TANGERANG (STUDI KASUS : AP 1.G RUTE TERMINAL CIMONE – JALAN GALUH). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, AGUNG (2020) ANALISIS KARAKTERISTIK DAN KEBUTUHAN PARKIR MOBIL DAN MOTOR DI AEON MALL JGC – CAKUNG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, AGUNG (2019) METODE KERJA PELAKSANAAN BEKISTING PADA KOLOM DENGAN MENGGUNAKAN PERI SISTEM PROYEK ROSEVILLE SOHO & SUITE BSD-TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, ARUM NURDIN (2020) TINJAUAN METODE PELAKSANAAN PELAT DAN BALOK STUKTUR ATAS TOWER 2 PADA PROYEK SYNTHESIS RESIDENCE, CILANDAK TIMUR - JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, EKO PANJI (2022) ANALISIS PENGENDALIAN PRODUKSI PANEL GEOFORCE SEGMENTAL RETAINING WALL (GSRW) DENGAN METODE LEAN SIX SIGMA (Studi Kasus: Proyek GSRW PLTU Suralaya, Cilegon-Banten). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, HERMAWAN (2017) ANALISIS RISIKO KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT UNTUK MENINGKATKAN KINERJA WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, HERU (2018) ANALISIS KETERLAMBATAN SUPPLY CHAIN PADA PEKERJAAN KOLOM DAN BALOK STRUKTUR ATAS DALAM PROYEK PEMBANGUNAN APARTEMEN KALIANA METLAND CILEUNGSI. S1 thesis, Universitas Mercu Buana Bekasi.

PRASETYO, INDRA (2021) ANALISIS PEMILIHAN MODA TRANSPORTASI UMUM (STUDI KASUS: ANTARA BUS TRANSJAKARTA NON BRT DAN KERETA COMMUTER LINE RUTE KEBAYORAN LAMA-TANAH ABANG). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, KIKI ADHI (2020) ANALISA RISIKO KETERLAMBATAN TERHADAP PENYELESAIAN PROYEK PEMBANGUNAN GEDUNG LPPMP UNIVERSITAS TERBUKA Disusun Sebagai Salah Satu Syarat Memperoleh Gelar Sarjana Teknik Pada Program Studi Teknik Sipil Fakultas Teknik. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, PRAMUAJI SINGGIH DWI (2022) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK KONSTRUKSI (Studi Kasus : Proyek Office Poniman Pluit (POPP) – Jakarta Utara). S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, SEPTIAN BUDI (2020) PERBAIKAN KUALITAS PRODUK CONE DENGAN PENDEKATAN METODE DMAIC DAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) PADA INDUSTRI OTOMOTIF. S1 thesis, Universitas Mercu Buana Bekasi.

PRASETYO, WELLY MUDHI (2018) IDENTIFIKASI FAKTOR PENYEBAB CHANGE ORDER YANG MEMPENGARUHI KINERJA WAKTU PELAKSANAAN PROYEK (Studi Kasus : Proyek Infrastruktur Row 45 & Row 38 – Karawang New Industry City). S1 thesis, Universitas Mercu Buana Bekasi.

PRASETYO, YONDA EKO (2020) ALTERNATIF DESAIN STRUKTUR BANGUNAN 10 LANTAI (STUDI KASUS PROYEK URBANTOWN SERPONG). S1 thesis, Universitas Mercu Buana Jakarta.

PRASKOKO, ALDY DWI (2020) PENGARUH PERBANDINGAN LETAK SHEAR WALL PADA PERIMETER DAN PUSAT MASSA BANGUNAN GEDUNG 20 LANTAI DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRASTOWO, BAYU (2023) EVALUASI DESAIN FONDASI BORED PILE PADA PROYEK PEMBANGUNAN DOUBLE- DOUBLE TRACK MANGGARAI. S1 thesis, Universitas Mercu Buana Jakarta.

PRASTYA, ADI (2019) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN ( STUDI KASUS JALAN KH. HASYIM ASHARI - JALAN CIDENG BARAT ) DENGAN METODE MKJI 1997. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, ALFIAN ARDHI (2019) ANALISIS PRODUKTIVITAS PEKERJAAN ERECTION FULL SLAB PRECAST PADA KONSTRUKSI JEMBATAN PILE SLAB (Studi Kasus: Proyek Relokasi Jalan Tol Surabaya-Gempol Ruas Porong - Gempol Paket 1). S1 thesis, Universitas Mercu Buana.

PRATAMA, ANDHY (2023) DAMPAK PANDEMI COVID-19 TERHADAP PROGRES PEMBANGUNAN PROYEK JAKARTA INTERNATIONAL STADIUM. S1 thesis, Universitas Mercu Buana Bekasi.

PRATAMA, ANDREAS DWI (2020) ANALISIS DAN PERILAKU DINAMIK STRUKTUR PORTAL AKIBAT RECIPROCATING EQUIPMENT. S1 thesis, Universitas Mercu Buana Bekasi.

PRATAMA, AZZRA RAMADHAN (2023) PENGARUH BAHAN CAMPURAN KALSIUM KARBONAT TERHADAP KUAT TEKAN BETON DENGAN KOMBINASI KADAR ABU TERBANG. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, BANI (2017) PENGARUH PENGGUNAAN MATERIAL RECLAIMED ASPHALT PAVEMENT (RAP) SEBAGAI PENYUSUN TERHADAP KARAKTERISTIK CAMPURAN BERASPAL. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, BAYU DHIAN (2018) METODE PELAKSANAAN RAFT FOUNDATION PROYEK APARTEMEN SAUMATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana.

PRATAMA, EDO RIZKY (2019) PRESERVASI JALAN LINGKAR BARAT - BTS. KOTA SERANG - BTS. KOTA TANGERANG DITINJAU DARI SEGI KEAMANAN, KESEHATAN, DAN KESELAMATAN KERJA (K3) SERTA PENGENDALIAN MUTU PROYEK. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, ENIF ASFARIANTO (2020) ANALISA KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI 1997 (Studi Kasus Simpang Telkom Jatiasih, Jl. Raya Wibawa Mukti II – Jl. Benda Jatiwarna - Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

PRATAMA, FADHAN AMAR (2019) METODE PELAKSANAAN PEKERJAAN SHEARWALL PADA PROYEK ARANDRA RESIDENCE CEMPAKA PUTIH , JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, FADHYA FATHUR (2023) ANALISIS PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PADA PROYEK KONSTRUKSI GEDUNG. S1 thesis, Universitas Mercu Buana.

PRATAMA, FREZA HADI (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK DASWIN OFFICE TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, GANDY REZA (2023) ANALISIS TINGKAT KERUSAKAN JALAN PERKERASAN KAKU METODE PCI (Studi Kasus Jalan Widoro-Mojoreno Kecamatan Sidoharjo). S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, IKHSAN DIKA (2018) METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, IRFAN REZA (2023) IMPLEMENTASI METODE BIM DALAM PROSES QUANTITY TAKE OFF PEKERJAAN STRUKTUR PILE SLAB STA. 83+975 - STA. 84+821 PADA PROYEK JALAN TOL KAYU AGUNG - PALEMBANG - BETUNG PAKET II SEKSI 3. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, M. FAJAR ANGGA (2017) KAJIAN ADAPTASI FASADE BANGUNAN INDIS TERHADAP IKLIM TROPIS PADA BANGUNAN GEDUNG BIRAO SCS & KANTOR POS TEGAL DIKOTA TEGAL. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, MUHAMMAD AGIS and AMALIA, RIZKA (2017) METODE PELAKSANAAN PONDASI BORED PILE PROYEK M-TOWN OFFICE SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, MUHAMMAD DIAN (2021) ANALISA DAMPAK LALU LINTAS AKIBAT PEMBANGUNAN FLYOVER PURWOSARI PADA RUAS JALAN SLAMET RIYADI SOLO JAWA TENGAH. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, MUHAMMAD DIAN (2019) PONDASI KONSTRUKSI SARANG LABA - LABA PEMBANGUNAN GEDUNG BARU KAMPUS UNTIRTA SINDANG SARI – SERANG BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, PANJI BUANA (2020) ANALISIS PERBANDINGAN BIAYA DAN WAKTU METODE PELAKSANAAN PEKERJAAN DINDING CAST IN SITU DENGAN METODE DINDING PRECAST (Studi Kasus Proyek Pembangunan Gudang EPZ di Area Kawasan Industri Krakatau I Cilegon). S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, RANDY BASTIAN (2019) METODE PELAKSANAAN STRUKTUR ATAS LANTAI 6 - 8 PROYEK NEW FACTORY PHASE II ( Office ) PT. SANKEI DHARMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, SURYA ADI (2020) PELAKSANAAN PEMBUATAN PELAT LANTAI MENGGUNAKAN METAL DECK PADA TOWER PROYEK THAMRIN NINE. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, UNGGUL (2020) PENGARUH SERAT IJUK SEBAGAI BAHAN TAMBAH SERAT DAN SERBUK ARANG SEBAGAI SUBTITUSI SEMEN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

PRATAMA, YOGA ADITYA (2023) ANALISIS KEBUTUHAN PARKIR TRANSPARK JUANDA BEKASI DAN PENGARUHNYA TERHADAP KINERJA RUAS JALAN IR. H. JUANDA. S1 thesis, Universitas Mercu Buana Jakarta.

PRATIWI, LOLLA SURYANI (2020) ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE PERTUKARAN WAKTU DAN BIAYA (TIME COST TRADE OFF) (Studi Kasus proyek Showroom Honda IBRM Cimahi). S1 thesis, Universitas Mercu Buana.

PRATIWI, SAVITRI PERMATA BUNDA (2022) ANALISIS PENGGUNAAN METODE BIM PADA PERENCANAAN PEMBESIAN UNTUK PENINGKATAN EFISIENSI. S1 thesis, Universitas Mercu Buana Jakarta.

PRATIWI, SUCI GIAN (2024) METODE PERBANDINGAN KERUSAKAN JALAN DENGAN INTERNATIONAL ROUGHNESS INDEX (IRI) DAN PAVEMENT CONDITION INDEX (PCI) (STUDI KASUS: RUAS JALAN NASIONAL BTS. PROVINSI RIAU - BTS. KOTA PAYAKUMBUH STA 34+100 - 35+100 PROVINSI SUMATERA BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

PRATIWI, WIDYA YULIA (2022) ANALISIS HARGA SEMEN PCC DAN BESI BETON DI WILAYAH DKI JAKARTA PADA RENTANG WAKTU 2011 - 2021. S1 thesis, Universitas Mercu Buana Jakarta.

PRATOMO, WAHYU (2018) STUDI PENELITIAN MATERIAL RAMAH LINGKUNGAN ABU DAUN BAMBU APUS SEBAGAI SUBSTITUSI SEBAGIAN SEMEN PADA BETON NORMAL K-250. S1 thesis, Universitas Mercu Buana Bekasi.

PRATOMO, YOVINUS SURYO (2022) PENGARUH PENAMBAHAN ADDITIVE QUICK SETTING "MasterRoc SA 192" TERHADAP KUAT TEKAN BETON MUTU TINGGI DENGAN ADDITIVE "MasterGlenium ACE 8311". S1 thesis, Universitas Mercu Buana Jakarta.

PRAWINA, RIZA SEPTIA (2023) PENERAPAN KONSEP GREEN RETROFITTING PADA BANGUNAN HUNIAN BERTINGKAT TINGGI DENGAN MENGGUNAKAN SISTEM DINAMIK DAN M-PERT UNTUK MENGOPTIMALKAN KINERJA WAKTU. S2 thesis, Universitas Mercu Buana Jakarta.

PRAWIRA, ALDI (2022) DESAIN ALTERNATIF STRUKTUR ATAS APARTEMEN 5 LANTAI DENGAN RANGKA BAJA BERDASARKAN SNI 1729:2020 DAN SNI GEMPA 1726:2019. S1 thesis, Universitas Mercu Buana Jakarta.

PRAWIRA, RADEN ARIA (2018) FAKTOR RISIKO KETERLAMBATAN PEKERJAAN STRUKTUR ATAS BANGUNAN GEDUNG TINGGI TERHADAP MUTU. S1 thesis, Universitas Mercu Buana Bekasi.

PRAYOGA, ADI (2018) EVALUASI SALURAN DRAINASE DI KAWASAN PERUMAHAN JATI UNGGUL KECAMATAN BEKASI UTARA KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

PRAYOGA, ILHAM SURYA (2023) KAJIAN KEKUATAN STRUKTUR SHORING PERI SISTEM PADA BALOK DI BANGUNAN OFFICE MPP PROJECT (STUDI KASUS PROJECT MPP OFFICE BUILDING). S1 thesis, Universitas Mercu Buana Jakarta.

PRAYOGO, CATUR (2020) ANALISIS PERBANDINGAN DINDING BATA MERAH DENGAN DINDING M-CAST DITINJAU DARI KUAT TEKAN, WAKTU DAN BIAYA. S1 thesis, Universitas Mercu Buana Bekasi.

PRAYUDA, JONATHAN GALIH (2020) ANALISIS PENGARUH FAKTOR MANAJEMEN SUMBER DAYA MANUSIA TERHADAP KETERLAMBATAN PROYEK (Studi Kasus : Pelebaran Jalan Tol Tangerang – Merak & Simpang Susun Cikupa Paket 3). S1 thesis, Universitas Mercu Buana Jakarta.

PRIAMBOWO, AHMAD RUSDI (2022) ANALISIS BIAYA PELAKSANAAN KEGIATAN KESELAMATAN DAN KESEHATAN KERJA (K3)(Studi Kasus : Proyek Pemugaran Gedung Cagar Budaya A.A Maramis Kementerian Keuangan Republik Indonesia). S1 thesis, Universitas Mercu Buana Jakarta.

PRIANTORO, FAJAR TEGUH (2019) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRIHANTORO, AGUNG (2021) PENINGKATAN KINERJA PROYEK DERMAGA DENGAN SISTEM DINAMIK DAN LINE OF BALANCE (LOB). S2 thesis, Universitas Mercu Buana Jakarta.

PRIHATIN, ATIKA (2020) IDENTIFIKASI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK APARTEMEN KAWANA GOLF RESIDANCE JABABEKA DI CIKARANG. S1 thesis, Universitas Mercu Buana Jakarta.

PRIMANIYARTA, MUHAMMAD JODIE (2022) ANALISIS PENGARUH PERCEPATAN PEKERJAAN FINISHING TERHADAP WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (STUI KASUS PROYEK GOLD COAST OFFICE – PANTAI INDAH KAPUK). S1 thesis, Universitas Mercu Buana Jakarta.

PRIMAPUTRI, CYNTHIA AMELIA (2019) ANALISIS DAYA DUKUNG PERKERASAN RUNWAY DI BANDAR UDARA SULTAN MUHAMMAD SALAHUDDIN BIMA. S1 thesis, Universitas Mercu Buana Jakarta.

PRISTIWANTARA, DICKY (2021) REKAYASA LALU LINTAS UNTUK MENGURANGI POTENSI KECELAKAAN DI PERLINTASAN SEBIDANG KERETA API JPL - 181 JL.IR.H. DJUANDA KABUPATEN LEBAK BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

PRIYANTO, AGUS (2023) ANALISIS MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN SPBU REST AREA TOL TRANS SUMATERA KM. 172 B. S1 thesis, Universitas Mercu Buana Jakarta.

PRIYANTO, DANANG BAGAS (2023) ANALISIS KARAKTERISTIK RUANG PARKIR DI JALAN TOL (STUDI KASUS: REST AREA KM 43 JALAN TOL TANGERANG - MERAK). S1 thesis, Universitas Mercu Buana Jakarta.

PRIYANTO, DODIK (2018) OPTIMASI KEBUTUHAN TOWER CRANE BERBASIS LEAN CONSTRUCTION PADA BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

PRIYAWAN, PRIYAWAN (2023) PENINGKATAN COST PERFORMANCE BERBASIS BLOCKCHAIN-BIM DENGAN PENERAPAN BANGUNAN HIJAU PERMEN PUPR PADA GEDUNG PUSAT PERBELANJAAN MODERN. S2 thesis, Universitas Mercu Buana Jakarta.

PRIYONO, IRAWAN JOKO (2018) STABILISASI TANAH LEMPUNG MENGGUNAKAN PORTLAND POZZOLAN CEMENT (PPC) UNTUK MENINGKATKAN CBR PADA PERKERASAN JALAN KAWASAN MM2100. S1 thesis, Universitas Mercu Buana Bekasi.

PUJIANA, PUJIANA (2017) ANALISIS WAKTU DAN METODE PELAKSANAAN PENGGUNAAN PONDASI KONSTRUKSI SARANG LABA-LABA PADA PROYEK PEMBANGUNAN KANTOR PERWAKILAN PROVINSI KALIMANTAN UTARA DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PUJIANDI, AAN (2020) ANALISIS PENGARUH PERENCANAAN, PELAKSANAAN DAN PENGAWASAN TERHADAP TERJADINYA COST OVERRUNS PADA PELAKSANAAN PROYEK BANGUNAN GEDUNG BERTINGKAT DI JABODETABEK. S2 thesis, Universitas Mercu Buana Jakarta.

PUJIONO, TOMI (2018) STUDI EKSPERIMENTAL BETON GEOPOLIMER MENGGUNAKAN ABU SEKAM PADI SEBAGAI MATERIAL ALTERNATIF PADA PENGUJIAN KUAT LENTUR. S1 thesis, Universitas Mercu Buana Bekasi.

PUJIYANTO, PUJIYANTO (2017) STUDI PERBANDINGAN STRUKTUR ATAS 16 LANTAI DENGAN SHEAR WALL TERHADAP STRUKTUR TANPA SHEAR WALL (Studi Kasus: Apartemen Verde 1 Kuningan Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

PURBA, KRISTANTI APRIWANDA (2019) ANALISIS TINGKAT KINERJA PELAYANAN ANGKUTAN UMUM KERETA REL LISTRIK DITINJAU DARI SUDUT OPERASIONAL DAN KEPUASAN PENUMPANG (Studi kasus commuter line rute Jakarta Kota - Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

PURBA, MAJAVIER (2021) ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK PEMBANGUNAN SHOWROOM MOTOR PT. X CABANG DENPASAR. S1 thesis, Universitas Mercu Buana Jakarta.

PURBA, PESTA (2020) ANALISIS PENERAPAN SERTIFIKASI ISO 9001:2015 PADA KONTRAKTOR TERHADAP KINERJA MUTU (STUDI KASUS PT PULAUINTAN). S1 thesis, Universitas Mercu Buana Jakarta.

PURBA, PESTA (2019) PENGGUNAAN SAFETY SCREEN SEBAGAI IMPLEMENTASI K3L PROYEK APARTEMEN PERMATA HIJAU SUITES (PHS). S1 thesis, Universitas Mercu Buana Jakarta.

PURI PUSPITA, RAHAYU (2020) TINJAUAN STUDI POTENSI SUMBER DAYA AIR UNTUK PEMBANGKIT LISTRIK TENAGA MINIHIDRO DI SUNGAI CIKANDANG, GARUT. S1 thesis, Universitas Mercu Buana Jakarta.

PURMIANTI, FITRIA DWI (2018) ANALISIS PIHAK PEMANGKU KEPENTINGAN (STAKEHOLDER) PADA SIMPUL KPBU DI JAKARTA UNTUK MENINGKATKAN PELAYANAN INFRASTRUKTUR JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

PURNAMA, SABIT (2017) EFISIENSI DESAIN UKURAN PENAMPANG KOLOM DENGAN MEMPERHITUNGKAN EFEK KEKANGAN SENGKANG PADA BANGUNAN BETON BERTULANG BERLANTAI BANYAK. S1 thesis, Universitas Mercu Buana Jakarta.

PURNAYUDHA, GALANG (2019) PELAKSANAAN KONSTRUKSI PLAT, BALOK, DAN KOLOM PROYEK RUSUN PENGGILINGAN JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

PURNOMO, AGUS (2022) ANALISIS PERBANDINGAN PRODUKTIFITAS TENAGA KERJA SUKU J DAN SUKU S PADA PEMASANGAN PELAT LANTAI DASAR DENGAN METODE OPERATION PROCESS CHART (STUDI KASUS PROYEK WIND TUNNEL JAKARTA). S1 thesis, Universitas Mercu Buana Jakarta.

PURNOMO, ARIEF CAHYA (2022) ANALISIS WAKTU TEMPUH PERJALANAN DI RUAS JALAN TOL DALAM KOTA KELAPA GADING – PULO GEBANG DENGAN METODE MKJI DAN SPEED CHOICE ANALYSIS. S1 thesis, Universitas Mercu Buana Bekasi.

PURNOMO, ERWIN AJI (2017) IDENTIFIKASI NILAI KEKUATAN CAMPURAN BERASPAL DENGAN BAN BEKAS SERUT PADA CAMPURAN AGREGAT ASPHALT CONCRETE (AC-BC). S1 thesis, Universitas Mercu Buana.

PURNOMO, LINTANG (2021) ANALISA FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK EPC DITINJAU DARI PENGELOLAAN DETAIL ENGINEERING DESIGN (DED) STUDI KASUS PEMBANGUNAN INFRASTURKTUR PASCAPANEN MRMP BULOG. S1 thesis, Universitas Mercu Buana Jakarta.

PURWANING, MAMIEK (2020) ANALISIS POLA PENEMPATAN DAN KEBUTUHAN STASIUN HUJAN DENGAN METODE KAGAN-RODDA PADA DAS PROGO YOGYAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

PURWANTI, TRI INDRA (2021) ANALISIS KARAKTERISTIK PARKIR RSAB HARAPAN KITA JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PURWANTO, HERI (2023) EVALUASI KAPASITAS RUANG PARKIR BLOK M SQUARE TERHADAP DEMAND PENGGUNA MRT STASIUN BCA 2. S1 thesis, Universitas Mercu Buana Jakarta.

PURWANTO, HERI (2019) METODE PELAKSANAAN STRUKTUR PROYEK SOCIAL SECURITY TOWER Jl. Rasuna Said, Kav. 112 Blok B Setia Budi Jakarta. S1 thesis, Universitas Mercu Buana Jakarta.

PURWANTO, HERU (2021) EVALUASI KEKUATAN STRUKTUR GEDUNG BAJA DENGAN METODE LRFD AKIBAT PENAMBAHAN BEBAN TIAP LANTAI (STUDI KASUS: GEDUNG 4 LANTAI KAPUK BUSINESS PARK). S1 thesis, Universitas Mercu Buana Jakarta.

PURWATI, RITA (2023) ANALISIS AKURASI ESTIMASI BIAYA, EFEKTIVITAS TIM PROYEK DAN PRODUKTIVITAS TENAGA KERJA TERHADAP KINERJA BIAYA PADA PROYEK BANGUNAN GEDUNG BERTINGKAT. S2 thesis, Universitas Mercu Buana Jakarta.

PURWITASARI, VIDYA (2021) ANALISIS PERBAIKAN KERUSAKAN KONSTRUKSI JALAN REL PADA PERLINTASAN SEBIDANG (STUDI KASUS: LINTAS KARANGGANDUL – PURWOKERTO). S1 thesis, Universitas Mercu Buana Jakarta.

PURWONOTO, (2023) ANALISIS KINERJA RUAS JALAN RAYA BOGOR TERHADAP KINERJA SIMPANG BERSINYAL KEONG CIRACAS, JAKARTA TIMUR DENGAN METODE MKJI 1997 DAN VISSIM. S1 thesis, Universitas Mercu Buana Jakarta.

PUSPA, SANIA NUR WIDHIA (2021) ANALISIS PERBANDINGAN GAYA GESER DASAR SEISMIK BERDASARKAN SNI 1726-2012 DAN SNI 1726-2019 PADA GEDUNG BERTINGKAT. S1 thesis, Universitas Mercu Buana Jakarta.

PUSPITA, NOVIAWATI (2020) ANALISIS KINERJA BIAYA DAN WAKTU DENGAN KONSEP EARNED VALUE ANALYSIS PADA PROYEK JAKARTA-CIKAMPEK II ELEVATED. S1 thesis, Universitas Mercu Buana Bekasi.

PUSPITASARI, FEBRY (2018) ANALISIS STAKEHOLDER MANAGEMENT PADA PEMBANGUNAN PROYEK JAKARTA INTEGRATED TUNNEL DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU). S1 thesis, Universitas Mercu Buana Bekasi.

PUTRA, AGUNG PRIYONO (2021) ANALISA KARAKTERISTIK PARKIR PADA PARKIR TIMUR PLUIT VILLAGE MALL -JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, ANUGRAH TRIAN (2021) RESCHEDULE WAKTU PEKERJAAN ARSITEKTUR DENGAN MENGGUNAKAN METODE PERT ( Studi kasus proyek kost ekslusif benhil 6 lantai 1 basement ). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, ANUGRAH TRIAN (2021) RESCHEDULE WAKTU PEKERJAAN ARSITEKTUR DENGAN MENGGUNAKAN METODE PERT (Studi kasus proyek kost ekslusif benhil 6 lantai 1 basement). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, ANUGRAH TRIAN and DHAMMA, KETUT PARAMATTHA (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KERJA TOWER CRANE DENGAN KONVENSIONAL PADA BANGUNAN TINGKAT RENDAH (STUDI PADA : COASTA VILLA ANCOL TAHAP III). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, BAGUS ADI MAULANA (2023) ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DAN BEKISTING ALFORM (ALUMINIUM FORMWORK)TERHADAP BIAYA DAN WAKTU (Studi kasus : Pembangunan Proyek Apartemen Mahatta Serpong, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, DANANG ANDIKA (2017) PERILAKU PENGENDARA SEPEDA MOTOR TERHADAP PENINGKATAN JUMLAH KECELAKAAN DI JAKARTA (STUDI KASUS : RUAS JALAN CAKUNG CILINCING JAKARTA UTARA). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, DIMAS ADITYA (2020) PELAKSANAAN PEKERJAAN STRUKTUR BORE PILE PADA PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER – KUNCIRAN. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, FAKHRI JAUHAR AKBAR BIMA (2020) ANALISIS SUNGAI BEKASI TERHADAP BANJIR DI PERUMAHAN PONDOK GEDE PERMAI. S1 thesis, Universitas Mercu Buana Bekasi.

PUTRA, FARROSZY SAFANA (2021) ANALISA HIDROLOGI DAN PEMODELAN PENELUSURAN BANJIR STEADY FLOW DAN UNSTEADY FLOW PADA SUNGAI CILIWUNG. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, FAUZI PRADANA (2019) PELAKSANAAN PEKERJAAN KONSTRUKSI PLAT LANTAI DAN METODE PENGERJAANNYA PROYEK VIVERE COMMERCIAL BUILDING. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, FITRIANSYAH ADI (2018) PERBANDINGAN PRODUKTIVITAS BERDASARKAN HARGA SATUAN KONTRAKTOR PELAKSANA DAN SNI HARGA SATUAN 2016. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, IRFAN FADHILAH (2019) ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) MELALUI JOB SAFETY ANALYSIS DENGAN METODE HIRADC PADA PROYEK APARTEMEN CIMANGGIS CITY. S1 thesis, Universitas Mercu Buana.

PUTRA, LUTHFI UTAMA (2021) ANALISA PEMILIHAN MODA ANGKUTAN PENUMPANG ANTARA BUS TRANSJAKARTA DENGAN MRT JAKARTA DENGAN METODE BINOMIAL LOGIT SELISIH (STUDI KASUS: PERJALANAN LEBAK BULUS – DUKUH ATAS). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, MAHARDIKHA BAYU (2022) ANALISIS PENYIMPANGAN PADA PELAKSANAAN PENGADAAN BARANG DAN JASA UNTUK PEKERJAAN PROYEK KONSTRUKSI PEMERINTAH. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, MAHENDRA PRIMA (2022) EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) (Studi Kasus : Proyek Jembatan Penghubung Poins – MRT Lebak Bulus Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, MARTINDO GITA DWI (2022) EVALUASI PEMILIHAN MODA ANGKUTAN UMUM KORIDOR BLOK M – BUNDARAN HOTEL INDONESIA PADA ERA NEW NORMAL DENGAN STATED PREFERENCE. S1 thesis, Universitas Mercu Buana Bekasi.

PUTRA, MUHAMAD DEDEN SETIAWAN (2022) ALTERNATIF PENJADWALAN PADA PROYEK PEMBANGUNAN PERUMAHAN MENGGUNAKAN CRITICAL PATH METHOD DAN LINEAR SCHEDULING METHOD (Studi Kasus: Proyek Pembangunan Perumahan Golf Island PIK 2). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, PRIMA (2017) EFEKTIVITAS PENGGUNAAN BEKISTING DENGAN MENGGUNAKAN KOMBINASI C-TRUSS DIBANDINGKAN DENGAN BEKISTING KONVENSIONAL DARI SEGI BIAYA DAN METODA PELAKSANAAN UNTUK PEMBANGUNAN COOLING TOWER PADA LAHENDONG UNIT 5 & 6 GEOTHERMAL POWER PROJECT. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RAHADIAN NOVIANSYAH and DINI, VANY DIAN (2017) PEKERJAAN BEKISTING KOLOM DAN COREWALL PADA PROYEK RUMAH SUSUN POLRI PESING Alamat : Jalan Daan Mogot No. 47 Pesing Kedoya Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RAMA DARMAWAN (2019) PENGARUH FILLER SIKA FUME PADA PERKERASAN JALAN DENGAN UJI MARSHALL MENGGUNAKAN SISTEM WARM MIX PADA CAMPURAN AC-WC. S1 thesis, Universitas Mercu Buana.

PUTRA, RAMA DARMAWAN (2018) TINJAUAN METODE PELAKSANAAN SHEAR WALL UNTUK PROSES BANGUNAN BERTINGKAT TOWER 2 DI PROYEK SYNTHESIS RESIDENCE KEMANG, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RIFALDO DESKA (2022) ANALISIS EFEK INTERAKSI TANAH-STRUKTUR PADA MODEL BANGUNAN GEDUNG RENCANA KAWASAN PERKANTORAN PEMERINTAHAN IBU KOTA NUSANTARA (IKN). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RIYAN DIKA PRATAMA (2022) ANALISIS PERBANDINGAN LETAK SHEAR WALL PADA GEDUNG BERTINGKAT TINGGI BERLAYOUT H. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RIZKY PRAMANA (2018) PENGAMATAN PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN APARTEMEN DAAN MOGOT CITY JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, SEVREN BUANA (2020) ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN PEMBANGKIT LISTRIK (FIDIC Rainbow Contract 2017). S2 thesis, Universitas Mercu Buana Jakarta.

PUTRA, YOGA ADIROLA (2021) EVALUASI KINERJA PELAYANAN ANGKUTAN UMUM TERHADAP KEPUASAN PENUMPANG (ANGKUTAN KOTA G.03 TRAYEK KOTABUMI – TERMINAL KALIDERES). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, YUNIAR ANGGITA (2018) ANALISIS PERBANDINGAN PELAT LANTAI KONVENSIONALDAN HALF-SLAB PROYEK PEMBANGUNAN RUMAH DINAS ANGGOTA PUSLABFOR BARESKRIM POLRI UNTUK MENINGKATKAN KINERJA BIAYA PROYEK. S1 thesis, Universitas Mercu Buana Bekasi.

PUTRA, ZIK HANDOKO (2023) ANALISIS PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE KONSEP NILAI HASIIL (EARNED VALUE) (STUDI KASUS GEDUNG UNIVERSITAS MUHAMMADIYAH BANDUNG). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, AMILIA YUNHANDA (2022) ANALISIS FAKTOR – FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK PEMBANGUNAN JALAN TOL LAYANG DALAM KOTA JAKARTA SEKSI A ( KELAPA GADING – PULO GEBANG ). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, ANISHA TESSHUGAH (2022) STUDI PENJADWALAN ULANG (RESCHEDULE) PELAKSANAAN PERKERJAAN PROYEK PEMBANGUNAN PERUMAHAN TYPE ALAMANDA MENGGUNAKAN METODE CRITICAL PATH METHOD & PRECEDENCE DIAGRAM METHOD. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, ARINI CAHYANING (2021) ANALISIS PERAWATAN JALUR KERETA API DOUBLE – DOUBLE TRACK (ELEVATED TRACK MRI – JNG) STUDI KASUS : PETAK JALAN KM 0+000 S/D 1+400 ANTARA MANGGARAI - JATINEGARA. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, AURELLIA FIDELLA (2022) STUDI KENYAMANAN PEJALAN KAKI TERHADAP PEMANFAATAN JALUR PEDESTRIAN DI KOTA PONOROGO (Studi Kasus Jalan Hos Cokroaminoto). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, DITA AMANDA AMELIA (2018) ANALISIS KINERJA SIMPANG SEBIDANG JALAN DENGAN REL KERETA API AKIBAT WAKTU TUNDAAN DAN PANJANG ANTRIAN KENDARAAN (Studi Kasus di Jalan Raya Bojonggede). S1 thesis, Universitas Mercu Buana Bekasi.

PUTRI, ELISA (2019) EVALUASI NILAI KONDISI PERKERASAN JALAN TOL DENGAN METODE PAVEMENT CONDITION SURVEY (PCS) DAN METODE FALLING WEIGHT DEFLECTOMETER (FWD). S1 thesis, Universitas Mercu Buana Bekasi.

PUTRI, GISELA TRIANA (2020) Dampak Covid-19 terhadap Daerah Rawan Kecelakaan Lalu Lintas di Kota Depok (Studi Kasus Jalan Margonda Raya). S1 thesis, Universitas Mercu Buana Bekasi.

PUTRI, LARASINTABELA (2022) ANALISIS RISIKO TERHADAP MUTU PADA PEKERJAAN STRUKTUR BOX GIRDER DENGAN METODE CAST IN SITU (STUDI KASUS : PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A) (TAHAP II) “PEKERJAAN MAINLINE II”). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, NADIYADINI HAZRI (2023) ANALISIS PENERAPAN KONSEP EARNED VALUE UNTUK PENGENDALIAN KINERJA BIAYA DAN WAKTU PELAKSANAAN PROYEK (Studi Kasus : Proyek Pembangunan Pos Lintas Batas Negara Serasan, Kepulauan Riau). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, NUR SEPTIANI IKA (2023) ANALISIS KETERLAMBATAN PEKERJAAN TIMBUNAN PADA MAIN DAM MENGGUNAKAN CRITICAL PATH METHOD (CPM) (Studi Kasus : Proyek Pembangunan Bendungan Karian, Pasirtanjung, Rangkasbitung, Lebak, Banten). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, SEPTIANI HASANIATI (2022) ANALISIS PERILAKU STRUKTUR FLAT SLAB-DROP PANEL PADA GEDUNG BERTINGKAT 10 LANTAI DI ZONA GEMPA KUAT. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, VEGA ANGGINI (2023) ANALISIS PROBABILITAS PERPINDAHAN MODA DARI MOBIL PRIBADI KE TRANSPORTASI UMUM KERETA CEPAT (Studi kasus : Kereta Cepat Rute Jakarta - Bandung). S1 thesis, Universitas Mercu Buana.

PUTRI, VETRICYA (2023) ANALISIS PERCEPATAN PROYEK DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN FAKULTAS HUKUM UNIVERSITAS SRIWIJAYA. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, ZELIKHA SILVIANA RAHMA (2018) PROYEK PEMBANGUNAN SOUTHGATE-TANJUNG BARAT JALAN RAYA TANJUNG BARAT No.163 JAGAKARSA JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRIMINAJATI, AISYAH (2023) ANALISIS KINERJA JARINGAN IRIGASI DAERAH IRIGASI SINGAMPON KABUPATEN BOYOLALI. S1 thesis, Universitas Mercu Buana Jakarta.

Pamungkas, Galuh Yuri (2017) ANALISA PERFORMANCE KINERJA JALAN INSINYUR HAJI JUANDA, CIPUTAT, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

Pitoro, Raden Nugroho (2017) OPTIMASI DIMENSI KOLOM AKIBAT KONTRIBUSI DINDING PARTISI BATA RINGAN. S1 thesis, Universitas Mercu Buana Jakarta.

Prabowo, Ardi Agung (2024) PEMANFAATAN LIMBAH FLY ASH DAN SLAG NIKEL SEBAGAI BAHAN SUBSITUSI PADA BETON. S1 thesis, Universitas Mercu Buana - Buncit.

Prasetyo, Wahyu Adi (2022) ANALISIS KINERJA JALAN DAN SIMPANG EMPAT BERSINYAL DENGAN MKJI 1997 DALAM UPAYA MENGATASI KEMACETAN LALU LINTAS JL. PEMBANGUNAN 3 ? JL. BOURAQ, KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

Pratama, ADITIA (2017) PERENCANAAN TEBAL PERKERASAN RUNWAY 3 STUDI KASUS BANDARA SOEKARNO-HATTA DENGAN MEMBANDINGKAN NILAI ACN. S1 thesis, Universitas Mercu Buana Jakarta.

Pratiwi, Hesti (2022) ANALISIS PERBANDINGAN KETELITIAN PERHITUNGAN VOLUME PEKERJAAN SELECTED BORROW MATERIAL DENGAN METODE AVERAGE END SECTION DAN METODE PRISMOIDAL. S1 thesis, Universitas Mercu Buana Jakarta.

Primadianti, Eri (2023) ANALISIS PEMILIHAN METODE PELAKSANAAN ERECTION BOX GIRDER PRECAST BALANCE CANTILEVER DAN SPAN BY SPAN DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) (Studi Kasus Ruas A1 Rute Sunter-Pulogebang Proyek 6 Ruas Tol Dalam Kota Jakarta). S1 thesis, UNIVERSITAS MERCU BUANA.

QADRILLAH, MAYA ADHANI (2023) PERENCANAAN STRUKTUR BETON BERTULANG DENGAN MENGGUNAKAN BALOK KONVENSIONAL DAN BALOK PRATEGANG PADA STRUKTUR ATAS BANGUNAN GEDUNG DI JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

QYANGGA, ZENDIS (2021) KAJIAN PENGARUH REKONSTITUSI SAMPEL PASIR PADA UJI TRIAKSIAL UNTUK EVALUASI POTENSI LIKUIFAKSI (STUDI KASUS: DESA PETOBO, PALU). S1 thesis, Universitas Mercu Buana Jakarta.

RABIH, MUHAMMAD (2020) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS PROYEK APARTEMEN NINES PLAZA & RESIDENCE SUNBURST CBD BSD LOT I.9, KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RACHMADIANI, UTIA (2018) ANALISIS KINERJA STRUKTUR GEDUNG RUMAH SAKIT DENGAN METODE SISTEM GANDA MENGGUNAKAN SNI GEMPA 1726–2012 (STUDI KASUS : ROYAL DENTAL HOSPITAL SERPONG–BANTEN). S1 thesis, Universitas Mercu Buana Bekasi.

RACHMAN, RYANT (2018) FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN SUPERSTRUCTURE PADA PROYEK MASS RAPID TRANSIT CP103 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

RACHMAN, TRI HADIYANTO (2018) TINJAUAN METODE PELAKSANAAN SHEAR WALL UNTUK PROSES BANGUNAN BERTINGKAT TOWER 2 DI PROYEK SYNTHESIS RESIDENCE KEMANG, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RACHMAN, TRI HADIYANTO (2019) UJI KELAYAKAN LIMBAH KERAMIK SEBAGAI PENGGANTI AGREGAT HALUS UNTUK CAMPURAN ASPAL BETON LAPIS AC-WC DENGAN METODE HOT MIX DITINJAU DARI NILAI STABILITAS MARSHALL ( Studi Kasus : Limbah Keramik Wilayah Kecamatan Kabayoran Lama, DKI Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RAFSANJANI, IQBAL (2017) MODIFIKASI PERENCANAAN GEDUNG HOTEL IBIS PADANG MENGGUNAKAN FLAT SLAB BERDASARKAN SNI 03-2847-2013. S1 thesis, Universitas Mercu Buana Jakarta.

RAFSANJANI, TENGKU ALFIAN (2024) ANALISIS FAKTOR PENGARUH MANAJEMEN PLANNING, ORGANIZING, ACTUATING DAN CONTROLLING TERHADAP KINERJA WAKTU PELAKSANAAN PEMBANGUNAN MENARA TELEKOMUNIKASI. S2 thesis, Universitas Mercu Buana Jakarta.

RAHAYU, APRIA KRESNA (2019) ANALISIS TINGKAT KEPUASAN PELANGGAN TERHADAP PELAYANAN KERETA REL LISTRIK (KRL) SISTEM COMMUTERLINE RUTE ST. MANGGARAI – JAKARTA KOTA. S1 thesis, Universitas Mercu Buana.

RAHAYU, INDAH SUCI (2023) EVALUASI KINERJA MUTU DENGAN METODE LEAN SIX SIGMA PADA PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

RAHAYU, JAKA (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PROYEK GEDUNG PELAYANAN PERIZINAN MASYARAKAT KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAHAYU, KARTIKA SRI (2023) PENGARUH CHANGE ORDER DAN PRODUKTIVITAS TENAGA KERJA SERTA KOMPETENSI MANAJER PROYEK PADA KINERJA PROYEK JALAN. S2 thesis, Universitas Mercu Buana Jakarta.

RAHAYU, PUTRI (2022) ANALISA KAPASITAS PARKIR DAN KINERJA RUAS JALAN DI PASAR CILEUNGSI-BOGOR. S1 thesis, Universitas Mercu Buana Bekasi.

RAHDIKTYA PUTRA, ALFIAN (2022) PERENCANAAN LAPIS TAMBAH (OVERLAY) PERKERASAN LENTUR PADA RUAS JALAN YOS SUDARSO KABUPATEN CILACAP. S1 thesis, Universitas Mercu Buana Jakarta.

RAHIM, RIZKY FAUZAN (2023) ANALISIS KARAKTERISTIK PARKIR TIP TOP RAWAMANGUN DAN KINERJA RUAS JALAN BALAI PUSTAKA TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

RAHMA, ELFA (2022) ANALISIS DAERAH RAWAN KECELAKAAN LALU LINTAS PADA RUAS JALAN BYPASS DI WILAYAH KOTA PADANG, SUMATERA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

RAHMA, SUHARTANTI (2017) ANALISIS OPTIMASI WASTE BESI DENGAN APLIKASI 1D CUTTING OPTIMIZER PADA PEKERJAAN STRUKTUR BETON BERTULANG PROYEK HOTEL SWISSBEL-INN CIKANDE. S1 thesis, Universitas Mercu Buana Jakarta.

RAHMA DHIANTO, BOBBY (2018) ANALISIS PELAYANAN BUS PEMADU ANTAR MODA TERHADAP KEPUASAN PENUMPANG (Studi Kasus : Bus DAMRI Rute Karawang – Soekarno Hatta). S1 thesis, Universitas Mercu Buana Bekasi.

RAHMADANI, ADE and SAPUTRA, RAMA GANEZANUNGGAL (2017) METODE PELAKSANAAN COREWALL PADA PROYEK HOTEL AMARIS BY SANTIKA. S1 thesis, Universitas Mercu Buana Jakarta.

RAHMADHANI, AJENG WIDYANINGRUM (2024) ANALISIS PERSEPSI PENGGUNA TERHADAP LAYANAN ANGKUTAN UMUM KERETA REL LISTRIK COMMUTER LINE (Studi Kasus : Rute Depok - Jakarta Kota). S1 thesis, Universitas Mercu Buana - Buncit.

RAHMADI, ANDHI (2022) PENGARUH TINDAKAN TIDAK AMAN (UNSAFE ACTION) DAN KONDISI TIDAK AMAN (UNSAFE CONDITION) TERHADAP KECELAKAAN KERJA DI PEKERJAAN STRUKTUR BAWAH PROYEK PEGADAIAN TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

RAHMADYA, RANGGA (2022) ANALISIS TINGKAT AKURASI MANUAL PROGRAM EVALUATION AND REVIEW TECHNIQUE (M-PERT) DAN ACTIVITY BASED COSTING (ABC) TERHADAP OPTIMALISASI WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA UAP (PLTU). S2 thesis, Universitas Mercu Buana Jakarta.

RAHMAN, ANDIKA (2023) ANALISIS PENGAMBILAN KEPUTUSAN UNTUK PRIORITAS PERBAIKAN JALAN DI WILAYAH KOTA ADMINISTRASI JAKARTA BARAT. S1 thesis, Universitas Mercu Buana.

RAHMANSYAH, ARIF (2021) ANALISIS POTENSI DERAILMENT DI JALUR MRT JAKARTA DENGAN MENGGUNAKAN ANALISIS BOWTIE. S1 thesis, Universitas Mercu Buana Jakarta.

RAHMANSYAH, ARIF (2021) ANALISIS POTENSI DERAILMENT DI JALUR MRT JAKARTA DENGAN MENGGUNAKAN ANALISIS BOWTIE. S1 thesis, Universitas Mercu Buana Jakarta.

RAHMANUDIN, AGUS (2018) STUDI EKSPERIMENTAL PENGARUH PENGGUNAAN LIMBAH ABU ALUMINIUM (WASTE ALUMINIUM ASH) SEBAGAI SUBTITUSI SEBAGIAN SEMEN TERHADAP KUAT TEKAN, SLUMP DAN BERAT ISI BETON. S1 thesis, Universitas Mercu Buana Bekasi.

RAHMAWATI, IKA (2022) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PROYEK PEMBANGUNAN PABRIK E SPACE SFB (STANDARD FACTORY BUILDING) CIKARANG. S1 thesis, Universitas Mercu Buana Bekasi.

RAHMI, NURUL (2018) ANALISIS PENERAPAN AKTIVITAS VALUE ENGINEERING PADA PROSES KPBU BERDASARKAN PERMEN PPN/BAPPENAS NOMOR 4/2015 UNTUK MENINGKATKAN VALUE ADDED. S1 thesis, Universitas Mercu Buana Bekasi.

RAIHANA, PUSPARANI WINDIAR (2021) ANALISIS KARAKTERISTIK PARKIR DAN KEBUTUHAN RUANG PARKIR DI KAWASAN KULINER PASAR LAMA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RAIS, SYAMSUL RIZAL (2023) PENINJAUAN KOMPOSISI METODE KONSTRUKSI PADA PEKERJAAN PERANCAH STRUKTUR PLATFORM (STUDI KASUS PADA PROYEK STASIUN HALIM, KERETA CEPAT JAKARTA – BANDUNG). S1 thesis, Universitas Mercu Buana Bekasi.

RAMADAN, ARES RESTU (2019) METODE PELAKSANAAN GROUND ANCHOR PADA PROYEK MENARA BRI GATOT SUBROTO JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, ADRIAN HAFIZ FAJAR (2021) ANALISIS KOMBINASI ALAT BERAT UNTUK PEKERJAAN TIMBUNAN TANAH TERHADAP BIAYA DAN WAKTU (Studi Kasus Proyek Jalan Tol Serpong-Cinere). S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, AGHNIA IHSAN (2022) Evaluasi Kerusakan Perkerasan Lentur dan Perkerasan Kaku Menggunakan Metode Pavement Condition Index (PCI) dan Surface Distress Index (SDI) (Studi Kasus Ruas Jl. Raya Narogong – Cileungsi). S1 thesis, Universitas Mercu Buana Bekasi.

RAMADHAN, ALDY FAUZAN (2019) ANALISA PENGGUNAAN DAN METODE PELAKSANAAN PEKERJAAN DINDING DENGAN CLAY BRICK PADA PROYEK ORICC. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, BIMA ARIFIAN TEGUH (2020) PENGARUH RENDAMAN ASAM SULFAT TERHADAP KUAT TEKAN BETON YANG MENGANDUNG KAPUR SEBAGAI SUBSTITUSI SEMEN DAN KACA SEBAGAI SUBSTITUSI AGREGAT KASAR. S1 thesis, Universitas Mercu Buana Bekasi.

RAMADHAN, DAFFA (2020) EVALUASI KINERJA STASIUN PASAR MINGGU JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, DAFFA (2019) PENCEGAHAN PENGGEMBUNGAN PADA KOLOM PROYEK SUSHI MASA TOWER (Gading Serpong - Kota Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, EDWIN (2019) EVALUASI PERLINTASAN SEBIDANG JALAN KERETA API DI JL. PROF. DR. LATUMETEN, GROGOL - JAKARTA BARAT (DITINJAU DARI SEGI KEKUATAN DAN KEAWETAN). S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, HAEKAL (2018) ANALISIS AKSES DAN KARAKTERISTIK PARKIR KENDARAAN PADA AREA PARKIR PUSAT PERBELANJAAN CARREFOUR LEBAK BULUS – JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, LUTFI (2020) PENGARUH PASAR PALMERAH TERHADAP KINERJA RUAS JALAN PALMERAH BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, MIKAIL (2019) PEKERJAAN KOLOM DAN PLAT LANTAI PADA PROYEK SMALL OFFICE HOME OFFICE - ANCOL. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, MUHAMMAD (2022) ANALISA PEMILIHAN MODA TRANSPORTASI DIKAWASAN INDUSTRI DENGAN METODE STATED PREFERENCE (STUDI KASUS KAWASAN INDUSTRI MM2100). S1 thesis, Universitas Mercu Buana Bekasi.

RAMADHAN, MUHAMMAD IKHSAN (2022) ANALISIS PANJANG ANTRIAN AKIBAT PALANG PINTU KERETA API (Studi Kasus Jalan Taman Makam Pahlawan Taruna, Kota Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, RAFLY (2021) ANALISIS PENGARUH KESELAMATAN, KESEHATAN DAN LINGKUNGAN KERJA TERHADAP KINERJA WAKTU (Studi Kasus : Proyek Apartemen Perkantoran Lot Bidex BSD Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHANI, ANUGRAH RIZKI (2023) ANALISA KEBUTUHAN PERAWATAN PERKERASAN RUNWAY SELATAN BANDAR UDARA INTERNATIONAL SOEKARNO - HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHANI, RIZKY (2019) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMBESIAN PLAT LANTAI PROYEK SOUTHGATE TANJUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHANI, SANDY MULYA (2018) PENGAMATAN STRUKTUR ATAS PADA PROYEK APARTEMEN MILLENIUM VILLAGE LIPPO KARAWACI. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHITA, WILDA CAHYA (2021) PREDIKSI RIWAYAT WAKTU PERCEPATAN GEMPA DI PERMUKAAN PETOBO BERDASARKAN REKAMAN DATA ACCELERATION WAVEFORM DI BALAROA. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHON, AKBAR (2021) ANALISIS RISIKO PADA TAHAP PRA KONSTRUKSI PADA PROYEK PEMBANGUNAN TRANSMISI SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 KV GAJAH TUNGGAL DI PROVINSI BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMDANI, DANI and CAHYADI, MUH. DWIKI (2017) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN GREEN OFFICE PARK 1, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RAMDANI, IMAN (2024) ANALISIS STABILITAS DINAMIS PADA CAMPURAN BERASPAL AC-WC DENGAN MENGGUNAKAN METODE WARM MIX. S1 thesis, Universitas Mercu Buana Jakarta.

RANI, RESTY ARIESTYA (2021) ANALISIS PENERAPAN KONSEP NILAI HASIL PADA PEMBANGUNAN SEWAGE TREATMENT PLANT GUNA PENINGKATAN PENGENDALIAN BIAYA DAN WAKTU PELAKSANAAN PROYEK (Studi Kasus: Proyek Apartment Sky House Alam Sutera). S1 thesis, Universitas Mercu Buana Jakarta.

RASYID, FARIS AL (2019) ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG STRUKTUR JEMBATAN PADA TANAH LEMPUNG (Studi Kasus : Proyek Jalan Tol Cibitung – Cilincing Seksi 3). S1 thesis, Universitas Mercu Buana Bekasi.

RASYIDI, FAUZI ADAM (2023) ANALISA KINERJA RUAS JL. LETJEN SUPRAPTO DAN SIMPANG BERSINYAL SENEN PASCA PEMBANGUNAN UNDERPASS SENEN EXTENTION. S1 thesis, Universitas Mercu Buana Jakarta.

RATNADEWI, WULAN (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN ASSESSMENT CENTER BSSN SAWANGAN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

RATNASARI, DEWI (2019) PROYEK PEMBANGUNAN GEDUNG OFFICE DAN PABRIK PT. VICTORY INDAH PELANGI, JATAKE, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RAYMOND, JOHANES (2023) ANALISIS KINERJA OPRASIONAL TERHADAP KAWASAN STASIUN MRT JAKARTA STUDI KASUS : KAWASAN STASIUN LEBAK BULUS, KAWASAN STASIUN DUKUH ATAS, KAWASAN STASIUN SENAYAN ISTORA. S1 thesis, Universitas Mercu Buana Bekasi.

REFAN, REFAN (2020) ANALISIS PENYEBAB TERJADINYA PEKERJAAN REWORK PADA STRUKTUR GEDUNG (Studi Kasus : Indonesia 1 Project). S1 thesis, Universitas Mercu Buana Jakarta.

REHMAWAN, MAHMUT IBNU (2019) PELAKSANAAN PEKERJAAN KONSTRUKSI BORE PILE DAN METODE PENGUJIANNYA PROYEK APARTEMEN EMERALD BINTARO JAYA. S1 thesis, Universitas Mercu Buana Jakarta.

REMUTA, DANIS CAUSA (2021) ANALISIS EFEKTIVITAS LAYANAN BUS TRANS TANGERANG AYO (TAYO) PADA KORIDOR III RUTE CBD CILEDUG - TANGCITY. S1 thesis, Universitas Mercu Buana Jakarta.

RENGGAH, RAHMAT HIDAYAT (2017) PEMILIHAN PEMBANGUNAN JALAN KABUPATEN METODE ANALYTICAL HIERARCHY PROCESS DAN SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE. S2 thesis, Universitas Mercu Buana Jakarta.

RESTITA, RIZKY SENDILA (2021) OPTIMALISASI PENGATURAN LINE POSSESSION PERMIT (LPP) DI MRT JAKARTA DENGAN METODE LEAN SIX SIGMA DMAIC FRAMEWORK. S1 thesis, Universitas Mercu Buana Jakarta.

RETNANINGTYAS, PRADESTIA (2020) ANALISIS DAMPAK LALU LINTAS PEMBANGUNAN APARTEMEN. S1 thesis, Universitas Mercu Buana Bekasi.

REVANZA, REVO (2023) ANALISIS PENGENDALIAN RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) STUDI KASUS PROYEK PEMBANGUNAN HOTEL TENTREM JAKARTA. S1 thesis, Universitas Mercu Buana.

REVIAWAN, FENDRA (2018) PENGARUH LIKUIFAKSI AKIBAT GEMPA TERHADAP DESAIN PONDASI BORED PILE Studi Kasus : PROYEK APARTEMEN LAVANYA GARDEN RESIDENCE CINERE DEPOK JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

REYNALDI, KEVIN NUR (2020) PENGARUH PENETRASI ASAM SULFAT TERHADAP KUAT TEKAN BETON MUTU TINGGI YANG MENGGUNAKAN NIKEL SLAG SEBAGAI SUBSTITUSI MATERIAL SEMEN. S1 thesis, Universitas Mercu Buana Bekasi.

REZA, MOCHAMMAD (2023) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PEKERJAAN DINDING PADA PROYEK PEMBANGUNAN GEDUNG KANTOR CABANG BRI SETIABUDI. S1 thesis, Universitas Mercu Buana Bekasi.

RIANTO, LANGGENG (2020) ANALISIS PERBANDINGAN BIAYA DAN WAKTU METODE MOBILE CRANE DAN METODE CRAWLER CRANE PADA PROYEK STASIUN LIGHT RAIL TRANSIT (LRT) JABODEBEK. S1 thesis, Universitas Mercu Buana.

RIANTO, LANGGENG (2019) METODE PELAKSANAAN ERECTION BAJA PADA PROYEK PEMBANGUNAN STASIUN LRT JABODEBEK LINTAS PELAYANAN CAWANG-CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

RIANTO, MUHAMMAD RIZQI (2018) PEMANFAATAN ABU ECENG GONDOK SEBAGAI FILLER PADA CAMPURAN ASPAL LASTON LAPISAN PERMUKAAN AUS (AC-WC) DENGAN SISTEM HOT MIX MELALUI PENGUJIAN MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

RIDHO, MUHAMAD (2023) ANALISIS PERBANDINGAN EFISIENSI PEKERJAAN DINDING KONVENSIONAL DENGAN DINDING PRECAST DARI SEGI BIAYA DAN WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

RIDWAN, DERI MUHAMMAD (2022) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN DINDING FACADE(Studi Kasus Pada Proyek Pembangunan Ruang Makan Perwira Kowal - Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RIFAI, MUHAMMAD FAJAR YUSUF (2021) ANALISIS PEMILIHAN MODA TRANSPORTASI UMUM KERETA API DAN BUS (STUDI KASUS : RUTE YOGYAKARTA-PURWOKERTO). S1 thesis, Universitas Mercu Buana Jakarta.

RIFALDY, INDRA (2023) ANALISIS DINAMIS STRUKTUR PENYANGGA TURBIN DAN GENERATOR PADA PEMBANGKIT LISTRIK TENAGA UAP(STUDI KASUS : PLTU MAMUJU). S2 thesis, Universitas Mercu Buana Jakarta.

RIFANDITYO, ABIMANYU (2020) ANALISA KECELAKAAN LALU LINTAS DENGAN METODE AEK DAN BKA (STUDI KASUS JALAN RAYA JONGGOL - CILEUNGSI). S1 thesis, Universitas Mercu Buana Bekasi.

RIFQI, MUHAMAD (2018) PEMANFAAATAN PENGUNAAN SERBUK BATA MERAH SEBAGAI FILLER PENGGANTI PADA CAMPURAN ASPHALT (AC-WC) DENGAN MENGGUNAKAN METODE UJI MARSHALL DAN WHEEL TRACKING. S1 thesis, Universitas Mercu Buana Jakarta.

RIJAL, SYAMSUL (2019) ANALISIS KEBIJAKAN GANJIL GENAP TERHADAP KINERJA RUAS JALAN RS FATMAWATI RAYA. S1 thesis, Universitas Mercu Buana Jakarta.

RIKAZ, ILHAM (2023) ANALISIS KINERJA SIMPANG TIGA LENGAN TAK BERSINYAL MENGGUNAKAN PERANGKAT LUNAK KAJI(STUDI KASUS JALAN KAPUK RAYA - JALAN POS POLISI JAKARTA BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

RIKKI, MUHAMMAD (2021) EVALUASI PENGENDALIAN BIAYA DAN WAKTU DENGAN KONSEP NILAI HASIL PADA PROYEK KONSTRUKSI (Studi Kasus Pada Proyek RS Dewi Sri Karawang. S1 thesis, Universitas Mercu Buana Jakarta.

RIMAWAN, FAHMIZAN (2019) ANALISIS BIAYA DAN WAKTU PERCEPATAN PEKERJAAN TANAH DENGAN METODE PENAMBAHAN JUMLAH ALAT BERAT PADA PROYEK JALAN TOL DEPOK – ANTASARI. S1 thesis, Universitas Mercu Buana Bekasi.

RINALDHI, LUTHFI (2019) PEKERJAAN BANGUNAN PARKIR PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT BPRS HIK CILEDUG. S1 thesis, Universitas Mercu Buana Jakarta.

RINALDY, NOVARIA (2019) ANALISIS KINERJA RUAS JALAN DAN SIMPANG TAK BERSINYAL DI PAMULANG TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RINJANI, DELVIANA (2022) ANALISIS PERBANDINGAN PERILAKU DINAMIK DAN GAYA PADA KOLOM ANTARA SISTEM STRUKTUR DENGAN DINDING GESER DAN BRESING BAJA. S1 thesis, Universitas Mercu Buana Jakarta.

RISA, MUHAMMAD (2022) PENGARUH PENAMBAHAN FLY ASH DAN SERBUK KACA TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

RISDIYANTO, OTTO DWI (2019) IDENTIFIKASI FAKTOR-FAKTOR DAN DAMPAK KETERLAMBATAN TERHADAP BIAYA DAN WAKTU KONTRAK PADA PEMBANGUNAN PROYEK KONSTRUKSI(Studi Kasus : Hotel & Apartemen Tentrem- Semarang ). S1 thesis, Universitas Mercu Buana Jakarta.

RISKIA, TASYA (2023) ANALISIS RISIKO SECARA TEKNIKAL PADA PROYEK PEMBANGUNAN HOTEL (STUDI KASUS : HOTEL SOLL MARINA ALAM SUTERA). S1 thesis, Universitas Mercu Buana Jakarta.

RISNANTO, MUHAMAD (2022) ANALISIS PRODUKTIVITAS PEKERJAAN ALUMINIUM COMPOSITE PANEL SISTEM KONVESIONAL DAN SISTEM OPEN JOINT DENGAN SIMULASI STROBOSCOPE (Studi Kasus Proyek Harco Glodok Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RISTIYAWATI, LYSA (2018) ANALISIS FAKTOR KETERLAMBATAN METODE PEMASANGAN DINDING PARAMETER LUAR (FASADE) DITINJAU DARI SEGI WAKTU PELAKSANAAN (Studi Kasus : Proyek Wisma Kartika – Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RISWANTO, FERY (2018) PROYEK PEMBANGUNAN “HIGH RISE BUILDING” THAMRIN NINE JAKARTA PUSAT (Metode Pemasangan ATR Self – Climbing Formwork system (Auto Jump Formwork) Akibat Bertemu Dengan Balok Baja Tanam di Lantai 35). S1 thesis, Universitas Mercu Buana Jakarta.

RIVALDI, SLAMET (2022) ANALISIS PELAKSANAAN SERTIFIKAT LAIK FUNGSI (SLF) BANGUNAN GEDUNG NON RUMAH TINGGAL DI WILAYAH KOTA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

RIYADI, RIZKI (2020) PENGARUH PENERAPAN TQM (TOTAL QUALITY MANAGEMENT) TERHADAP KINERJA PROYEK (STUDI PADA : PROYEK HOTEL&RESORT - PUNCAK). S1 thesis, Universitas Mercu Buana Jakarta.

RIYADI, SUGENG (2019) PROYEK JALAN TOL DEPOK ANTASARI PAKET 1 SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RIYADIN, RIYADIN (2020) ANALISIS PRODUKTIVITAS TENAGA KERJA PEMBESIAN WIREMESH PLAT LANTAI DENGAN METODE WORKSAMPLING (pada proyek Apartement Urban Sky Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

RIYADIN, RIYADIN (2020) METODE PERBAIKAN STRUKTUR DINDING BASEMENT PADA PROYEK PEMBANGUNAN RUMAH SAKIT MANDAYA. S1 thesis, Universitas Mercu Buana Jakarta.

RIYANTO, MUKTI FAJAR (2022) ANALISIS PENGGUNAAN METODE PRECAST UNTUK PERCEPATAN PELAKSANAAN STRUKTUR GEDUNG (STUDI KASUS : PROYEK PEMBANGUNAN TOKYO RIVERSIDE APARTEMENT PIK 2). S1 thesis, Universitas Mercu Buana Jakarta.

RIYANTO, PUNGKI (2022) ANALISIS FAKTOR – FAKTOR PENYEBAB TERJADINYA PERUBAHAN KONTRAK PROYEK JALAN TOL DEPOK – ANTASARI PAKET 1 SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RIZAL, FATKHUL (2020) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PROYEK RSIA BRAWIJAYA SAHARJO TEBET JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RIZAL, NAUFAL ALHAFIDZ (2020) IMPLEMENTASI BUILDING INFORMATION MODELLING (BIM) UNTUK PENGENDALIAN WAKTU PADA PELAKSANAAN PROYEK PEMBANGUNAN INFRASTRUKTUR GEDUNG DAN LABORATORIUM LIPI CIBINONG. S1 thesis, Universitas Mercu Buana Jakarta.

RIZALIANO, MOCHAMAD ARSYA (2020) ANALISA PENGARUH LIMBAH PLASTIK PET DAN HDPE DAN PENAMBAHAN SERAT BAMBU TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

RIZKI, ARIF (2023) PENGARUH PEMANFAATAN LIMBAH GENTENG DAN LIMBAH BETON SEBAGAI SUBSTITUSI SEBAGIAN AGREGAT KASAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

RIZKI, FADLY (2023) PENGARUH PENGGUNAAN LIMBAH KACA SEBAGAI SUBSTITUSI AGREGAT HALUS DAN AIR LAUT SEBAGAI PENGGANTI AIR TAWAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

RIZKI, MAFTUH (2022) TUGAS AKHIR ANALISIS PERBANDINGAN STICK ON WALL SEBAGAI METODE SUBSITUSI FINISHING PASANGAN DINDING KONVENSIONAL DENGAN PLESTER ACIAN DITINJAU TERHADAP BIAYA, WAKTU, DAN MUTU PEKERJAAN.(Studi Kasus Pembangunan Gedung Proyek Apartemen Yukata). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKI, MUHAMMAD (2023) PENINGKATAN KINERJA BIAYA OPERASIONAL BERBASIS LIFE CYLE COST PADA BANGUNAN PENDIDIKAN PEDULI LINGKUNGAN (GREEN SCHOOL). S2 thesis, Universitas Mercu Buana Jakarta.

RIZKI, PUTRI WALMINA AMALIA (2021) ANALISIS PENGENDALIAN BIAYA DAN WAKTU DENGAN MENGGUNAKAN METODE EARNED VALUE (Studi Kasus : Proyek Pembangunan Rumah Sakit Altha Medika). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKI, PUTRI WALMINA AMALIA (2020) MENARA BRI GATOT SUBROTO (Metode Pelaksanaan Raft Foundation). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKI FAUZIA, AYU (2016) DAMPAK VARIATION ORDER TERHADAP WAKTU PELAKSANAAN DAN BIAYA OPERASIONAL PROYEK (Studi Kasus : Proyek One Belpark - Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKIANTO S., RADEN IMRAN (2018) EVALUASI EFEKTIFITAS JEMBATAN PENYEBEREANGAN ORANG (JPO) PADA JALAN JEND. A. YANI DI DEPAN MAL MEGABEKASI KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

RIZKIYAH, DINDA (2021) ANALISIS BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN BEKISTING SISTEM FLYING TABLE FORMWORK PADA PROYEK THE STATURE JAKARTA DENGAN MENGGUNAKAN ZONATING AREA (Studi Kasus : The Stature Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKIYANTO, BAYU (2018) IDENTIFIKASI RISIKO KETERLAMBATAN PEKERJAAN PONDASI BORE PILE DIAMETER 1000 MM PADA PROYEK GEDUNG NINES PLAZA & RESIDENCE AT CBD SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

RIZKY, FAJAR DWI (2022) PENGARUH PENGGUNAAN ABU ARANG TEMPURUNG KELAPA DAN LIMBAH KERAMIK SEBAGAI SUBSTITUSI SEMEN DAN AGREGAT KASAR TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

RIZQULLAH, FAISHAL ZAID (2020) ANALISIS OPTIMASI PENGGUNAAN SHEAR WALL TERHADAP SIMPANG STRUKTUR GEDUNG AKIBAT GEMPA (STUDI KASUS: RAFA TOWER LIFE STYLE & OFFICE TANAH ABANG - JAKARTA). S1 thesis, Universitas Mercu Buana Bekasi.

RIZQYANTO, DWI ADI NUR (2022) PERENCANAAN ULANG WAREHOUSE AKIBAT PERLUASAN MENGGUNAKAN SISTEM CASTELLATED BEAM. S1 thesis, Universitas Mercu Buana Jakarta.

RODANI, AYU ANDHIRA (2022) ANALISIS FAKTOR DOMINAN YANG MEMPENGARUHI KINERJA PROYEK DENGAN METODE AHP (ANALYTIC HIERARCHY PROCESS) (Studi kasus : Proyek Perencanaan Pengembangan Sistem Irigasi di Sulawesi Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

RODIANA, FAJAR (2019) ANALISIS SISTEM DRAINASE PERUMAHAN BINTANG ALAM KABUPATEN KARAWANG. S1 thesis, Universitas Mercu Buana Jakarta.

RODIYATNO, RIZAL (2019) IDENTIFIKASI RISIKO PELAKSANAAN PEKERJAAN KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT (STUDI KASUS PROYEK PEMBANGUNAN APARTEMEN GREEN CLEOSA). S1 thesis, Universitas Mercu Buana Jakarta.

ROFIQOH, ROFIQOH (2021) ANALISA DAERAH RAWAN KECELAKAAN LALU LINTAS DI RUAS JALAN WILAYAH KOTA JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

ROHMAH, IKE MARBUN NUR (2023) ANALISIS PERBANDINGAN PERHITUNGAN VOLUME STRUKTUR ANTARA BUILDING INFORMATION MODELLING DENGAN METODE KONVENSIONAL PADA PROYEK DESIGN & BUILD PENATAAN KAWASAN PURA BESAKIH. S1 thesis, Universitas Mercu Buana Jakarta.

ROHMAN, NUR (2022) “PENGARUH PENGGUNAN SERBUK KAYU SEBAGAI SUBSTITUSI AGREGAT HALUS DAN STEEL SLAG SEBAGAI SUBSTITUSI AGREGAT KASAR TERHADAP KUAT TEKAN BETON”. S1 thesis, Universitas Mercu Buana Bekasi.

ROKHIM, DUL (2020) ANALISIS PENGARUH PENERAPAN GREEN MATERIAL TERHADAP BIAYA PADA PROYEK PEMBANGUNAN GEDUNG BERTINGKAT (Studi Kasus : Proyek Kantor PT. Dusaspun Gunung Putri, Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

ROKHIM, DUL (2019) PEMBANGUNAN KANTOR UNIT PENGELOLA PENGEMBANGAN TANAMAN PERKOTAAN DINAS KEHUTANAN. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADHON, AAN GILANG (2022) ANALISIS JENIS RISIKO K3 DI PROYEK PEMBANGUNAN GEDUNG BANK TABUNGAN NEGARA KCP KARAWANG. S1 thesis, Universitas Mercu Buana Bekasi.

ROMADHON, AGUS SUPRIYANTO (2022) ANALISIS SAMBUNGAN TIPE JEPIT ANTARA BASEPLATE ANGKUR DAN PEDESTAL UNTUK BANGUNAN INDUSTRI (STUDI KASUS: BUILDING 45 PT. PRATAMA ABADI INDUSTRI, TANGERANG, BANTEN). S1 thesis, Universitas Mercu Buana Bekasi.

ROMADHON, DWI FAJAR (2019) METODE ERECTION GIRDER BENTANG 40,8 M PADA PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGGANG ZONA VGF CISUMDAWU JALAN TOL TRANS SUMATRA TERBANGGI BESAR-PEMATANG PANGGANG, LAMPUNG. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADLAN, ARIF (2019) PROSES PEMBUATAN PANEL LVMDP PROYEK HOTEL IBIS PALEMBANG DI PT. MAHKOTA PRIMA. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADON, MUHAMMAD (2019) PENGAMATAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK PEMBANGUNAN RUSUN POLRI PESING Jl. Daan Mogot, Pesing, Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

ROSADI, MUHAMAD ROBY (2022) IMPLEMENTASI KEY PERFORMANCE INDICATOR (KPI) DALAM EVALUASI PENCAPAIAN PRODUKTIFITAS PRODUKSI TOBACO. S1 thesis, Universitas Mercu Buana Jakarta.

ROSANTI, RIKA ROSI (2019) ANALISIS TINGKAT KERAWANAN BANJIR BERBASIS SISTEM INFORMASI GEOGRAFIS (SIG) PADA DAS CISADANE. S1 thesis, Universitas Mercu Buana Jakarta.

ROSDIAWATI, FIRDA (2019) PERANCANGAN HOTEL DAN RESORT BANDUNG JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

ROSIDAH, CHOIROLIS (2019) EFEKTIVITAS PENGGUNAAN PELICAN CROSSING BAGI PENYEBERANG JALAN DAN PENGARUHNYA TERHADAP PANJANG ANTRIAN KENDARAAN DI TOSARI. S1 thesis, Universitas Mercu Buana Bekasi.

ROSIDAH, IDA (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK CONTROL BUILDING PROJECT @SCBD. S1 thesis, Universitas Mercu Buana Jakarta.

ROSIDAH, IDA (2020) PERENCANAAN STRUKTUR BETON BERTULANG DENGAN DISKONTINUITAS KOLOM. S1 thesis, Universitas Mercu Buana.

ROSIDIN, ROSIDIN (2017) EVALUASI DAN PENINGKATAN KINERJA PERSIMPANGAN SEBIDANG PURI KEMBANGAN. S1 thesis, Universitas Mercu Buana Jakarta.

ROZIHAH, AINUN (2023) ANALISIS DAERAH RAWAN KECELAKAAN DENGAN PENDEKATAN THE GROSS OUTPUT (HUMAN CAPITAL) Di KOTA TANGERANG SELATAN (STUDI KASUS: JALAN IR. JUANDA, DEWI SARTIKA DAN RE MARTADINATA). S1 thesis, Universitas Mercu Buana Jakarta.

ROZIKIN, ZANETI FERI CHOIRUL (2022) ANALISIS SISTEM SALURAN DRAINASE UNTUK PENANGANAN GENANGAN BANJIR DI GERBANG TOL MERAK KM 97+000 – KM 98+000. S1 thesis, Universitas Mercu Buana Jakarta.

RUDIYANTO, RAHMAD (2020) ANALISIS PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (Critical Path Method) dan PERT (Project Evaluation and Review Technique) Studi Kasus Proyek Cluster Alloggio Ext 4 Gading Serpong. S1 thesis, Universitas Mercu Buana Jakarta.

RUDIYANTO, RAHMAD (2021) ANALISIS PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (Critical Path Method) dan PERT (Project Evaluation and Review Technique) Studi Kasus Proyek Cluster Alloggio Ext 4 Gading Serpong. S1 thesis, Universitas Mercu Buana Jakarta.

RUKMANA, MEITRA AYU CANDRA (2018) ANALISIS KINERJA SIMPANG BERSINYAL (Studi Kasus Simpang Tiga Tol Barat Jl. Jend. Ahmad Yani, Kota Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

RUMINAR, RACHMANITA (2020) ANALISIS PERBANDINGAN SALURAN DRAINASE MENGGUNAKAN METODE KONVENSIONAL DENGAN METODE PRACETAK DARI SEGI WAKTU (Studi Kasus Saluran Drainase Kota Administrasi Jakarta Timur). S1 thesis, Universitas Mercu Buana Jakarta.

RUSMALINA, ENDAH (2019) ANALISA DUAL SISTEM PADA STRUKTUR ATAS BANGUNAN EMBARCADERO PARK. S1 thesis, Universitas Mercu Buana.

RUSTIYANTI, RIRIN (2023) ANALISIS TINGKAT KEPUASAN PEJALAN KAKI TERHADAP TINGKAT PELAYANAN JALUR PEJALAN KAKI DI JALAN RAYA BOGOR KOTA JAKARTA TIMUR (STUDI KASUS DEPAN KAWASAN PASAR INDUK KRAMATJATI). S1 thesis, Universitas Mercu Buana Bekasi.

RUSYDIE, MUHAMMAD AHDY FAKHRU (2017) ANALISIS KAPASITAS KEBUTUHAN RUANG PARKIR PADA GEDUNG PLAZA SENAYAN , JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

S, FRANSISKA APRILIA TINARA (2023) PENGGUNAAN ANALISIS METODE HASIL (EARNED VALUE ANALYSIS) TERHADAP BIAYA DAN WAKTU Studi Kasus Proyek Pembangunan Reservoir Untuk Penyediaan Air Baku di Kawasan Industri Terpadu Batang. S1 thesis, Universitas Mercu Buana Jakarta.

S, RADEN SONY TRIAIR (2022) ANALISIS SAMBUNGAN PELAT BUHUL (GUSSET PLATE) PADA STUDI KASUS JEMBATAN BINA MARGA TIPE WARREN. S1 thesis, Universitas Mercu Buana Jakarta.

SADEWO, DAMAR (2023) ANALISIS KAPASITAS RUANG PARKIR OFF STREET SEPEDA MOTOR DAN MOBIL PENUMPANG CINERE MALL SERTA TINGKAT PELAYANAN JALAN CINERE RAYA. S1 thesis, Universitas Mercu Buana Jakarta.

SAFIRA, NARIAH (2023) PEMANFAATAN LIMBAH SERBUK KOPI SEBAGAI MATERIAL POZZOLAN DAN SERBUK KACA SEBAGAI SUBSTITUSI AGREGAT HALUS PADA CAMPURAN BETON DITINJAU DARI KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

SAFITRI, RIZKA (2019) ANALISIS PENGENDALIAN MUTU PADA PELAKSANAAN PEKERJAAN TIMBUNAN ZONA 1 COFFERDAM PROYEK BENDUNGAN KARIAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAFITRI, WIDI (2020) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PADA PROYEK KONSTRUKSI AEON MALL SENTUL CITY (Studi Kasus Proyek Pembangunan Aeon Mall Sentul City, Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

SAFRUDIN, DEDEN (2017) ANALISIS PERBEDAAN WAKTU DAN BIAYA AKIBAT PERUBAHAN DARI DESAIN SHEET PILE BAJA MENJADI SHEET PILE BETON PADA PEMBANGUNAN PUMP STATION KAPUK NAGA INDAH PANTAI INDAH KAPUK - JAKARTA UTARA. S1 thesis, Universitas Mercu Buana.

SAGALA, RAY SALOMO (2024) ANALISIS PERBANDINGAN BIAYA MUTU DAN WAKTU ANTARA PRECAST DAN CAST IN SITU PADA PEKERJAAN SALURAN (STUDI KASUS : PROYEK PABRIK DIAPERS PT. XYZ). S1 thesis, Universitas Mercu Buana - Buncit.

SAHARA, DWIKI ALI (2023) “EVALUASI KINERJA RUAS JALAN AKIBAT PARKIR PADA BADAN JALAN (STUDI KASUS : JALAN JEND. AHMAD YANI KABUPATEN PANDEGLANG)”. S1 thesis, UNIVERSITAS MERCU BUANA.

SAHIB, NABILA (2022) ANALISIS PERBANDINGAN VOLUME PEKERJAAN ANTARA QUANTITY TAKE OFF BIM DAN KONVENSIONAL (Studi Kasus : Relokasi Kantor Kelurahan Cilenggang). S1 thesis, Universitas Mercu Buana Jakarta.

SAIFULLAH, RICO FATEH (2022) ANALISIS KEPUASAN PEJALAN KAKI TERHADAP KINERJA TROTOAR (STUDI KASUS: JALAN TEBET RAYA – JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Bekasi.

SALIM, DAMAR FARHADIVA (2021) PERBANDINGAN KEKUATAN ELEMEN STRUKTUR MENGGUNAKAN BETON BERTULANG DENGAN BETON PRATEGANG (Studi Proyek Gedung Data Center). S1 thesis, Universitas Mercu Buana Jakarta.

SALSABIEL, AZ-ZAHRA TASYA (2022) ANALISIS TINGKAT KEBERHASILAN IMPLEMENTASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) BERDASARKAN PERATURAN PEMERINTAH NOMOR 50 TAHUN 2012 MENGGUNAKAN METODE SEVERITY INDEX (SI). S1 thesis, Universitas Mercu Buana Jakarta.

SALSABILA, PRINCESS AUDREY (2022) ANALISIS TUNDAAN PADA PERLINTASAN SEBIDANG DENGAN METODE SHOCKWAVE UNTUK MENGETAHUI KINERJA LALU LINTAS (Studi Kasus Perlintasan Kereta Api Jalan Perjuangan, Kota Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

SAMUDRA, GATOT (2019) ANALISIS STABILITAS LUBANG BOR PADA PEKERJAAN BOREDPILE ( Studi Kasus : Proyek Pembangunan Jalan Tol Jakarta Cikampek II – Elevated ). S1 thesis, Universitas Mercu Buana Bekasi.

SANDI, BAGUS KURNIA (2019) ANALISIS PERBANDINGAN PENERAPAN TQM (Total Quality Management) DAN NON TQM TERHADAP PENINGKATAN KINERJA KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONSTRUKSI GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

SANDI, BAGUS KURNIA (2018) METODE PELAKSANAAN STRUKTUR BALOK, KOLOM, PELAT LANTAI DAN SHEAR WALL PROYEK PEMBANGUNAN GEDUNG ABADI KLENDER PT. PRAJA VITA MULIA KLENDER - JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SANDI, YISRAEL (2019) STUDI PENGAMATAN KELAYAKAN FASILITAS UNTUK DISABILITAS PADA RUANG BANGUNAN BERSEJARAH DITINJAU DARI STANDAR BANGUNAN (Museum Wayang Kota Tua). S1 thesis, Universitas Mercu Buana Jakarta.

SANDROTO, IMAN ANETELI (2017) IDENTIFIKASI NILAI KEKUATAN ASPAL DENGAN MODIFIKASI CAMPURAN ADDITIVE BOTOL PLASTIK PADA CAMPURAN GRADE AC-BC. S1 thesis, Universitas Mercu Buana Jakarta.

SANDY, KURNIA (2021) ANALISIS NILAI HASIL PROYEK RENOVASI INTERIOR APARTEMEN UNTUK MENINGKATKAN KINERJA BIAYA DAN WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

SANI, NABILA OKTIVANA (2024) ANALISIS KINERJA DAN TINGKAT KEPUASAN PENGGUNA BISKITA TRANS PAKUAN KOTA BOGOR KORIDOR 2 TERMINAL BUBULAK (VIA CIDANGIANG) - CIAWI. S1 thesis, Universitas Mercu Buana Jakarta.

SANJAYA, ARIF (2020) ANALISA DAYA DUKUNG PONDASI BORED PILE PADA PROYEK TRANSPARK CIBUBUR. S1 thesis, Universitas Mercu Buana Bekasi.

SANTOSA, ANDHIKA PRAWIRA YUDHA (2023) ANALISIS PERBANDINGAN KOEFISIEN PRODUKTIVITAS TENAGA KERJA METODE AHSP PUPR 2022 DAN KONDISI AKTUAL PADA STRUKTUR BALOK, PELAT DAN KOLOM (Studi Kasus Proyek Cibinong City Mall Extention). S1 thesis, Universitas Mercu Buana Bekasi.

SANTOSO, AGUS (2018) EFISIENSI SUBCON DALAM PELAKSANAAN PENGECORAN PLAT LANTAI (PROYEK APARTEMEN PROSPERITY RESIDENCE THE LOTUS) JL. Kembangan Raya No. 12A. S1 thesis, Universitas Mercu Buana.

SANTOSO, BAGAS ERVAN (2024) ANALISIS PENERAPAN COMMON DATA ENVIRONMENT (CDE) PADA PROYEK KONTRUKSI. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, BAYU AJI (2023) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP PELAYANAN TERMINAL PULO GEBANG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, DANANG (2023) EVALUASI DESAIN STRUKTUR GEDUNG TIPIKAL DARI LOKASI RESIKO GEMPA RENDAH KE LOKASI RESIKO GEMPA TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, DANIS EKO (2019) ANALISIS PERBANDINGAN SISTEM STRUKTUR FLATE SLAB (DROP PANEL), FLATE PLATE DAN PELAT KONVENSIONAL. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, DANIS EKO (2018) STRUKTUR PROYEK GEDUNG MABES POLRI SISI BARAT KEBAYORAN BARU-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, ERIK (2018) PROYEK PEMBANGUNAN GEDUNG SARANA PARKIR BASEMENT LAPANGAN BHAYANGKARA MABES POLRI, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, NUGROHO DWI (2024) ANALISIS PERBANDINGAN BIAYA PENGGUNAAN BEKISTING KONVENSIONAL DAN BEKISTING SISTEM PADA PEKERJAAN STRUKTUR MERCU BENDUNG. S1 thesis, Universitas Mercu Buana - Buncit.

SANTOSO, PRIYO (2017) ANALISIS PERBANDINGAN METODE PEKERJAAN TANGGA BETON PRECAST DAN TANGGA BETON KONVENSIONAL DARI SEGI BIAYA DAN WAKTU (Studi Kasus Proyek Apartemen Grand Kamala Lagoon Tower Emerald Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ADJI RAKA (2021) PERENCANAAN ULANG BANGUNAN APARTEMEN DI DEPOK MENGGUNAKAN PERATURAN SNI 2847-2019 DAN SNI 1726-2019. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ANDIKA (2018) STABILISASI TANAH LEMPUNG MENGGUNAKAN KAPUR UNTUK MENINGKATKAN CBR TANAH PADA PERKERASAN JALAN KAWASAN MM2100. S1 thesis, Universitas Mercu Buana Bekasi.

SAPUTRA, ANGGI (2020) ANALISIS PERBANDINGAN ESTIMASI BIAYA DAN WAKTU PELAKSANAAN DINDING KONVENSIONAL DENGAN DINDING PRECAST ( STUDI KASUS PEMBANGUNAN RUMAH SUSUN PORLI KEDAUNG ). S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ANGGI (2019) PEMBANGUNAN RUSUN POLRI MENGGUNAKAN STRUKTUR PRECAST DENGAN SISTEM PSA BINTARO - TANGERANG SELATANKP/SIP. 19 119. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ARDI WAHID (2019) PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING Proyek Apartemen Sedayu City at Kelapa Gading, Jakarta Utara. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ARIS ROHMAN (2021) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PADA PROYEK PENYEDIAAN PIPA AIR CURAH KOTA TANGERANG (Studi Kasus : Proyek Pemasangan Pipa Penjenuhan di Kecamatan Cipondoh, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, BAYU EKA (2023) ANALISIS KINERJA PROYEK PEMBANGUNAN GEDUNG FIA UNIVERSITAS INDONESIA DITINJAU DARI BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE DAN EARNED SCHEDULE. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, BEMBY ARIF (2022) ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GERBANG TOL KRAMASAN PALEMBANG. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, BRAM PERMADI LINTAR (2017) ANALISIS EFISIENSI DAN KEHILANGAN AIR DI JARINGAN IRIGASI DAERAH IRIGASI SUBAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, FAJARINTA ANUNG (2013) PROYEK PEMBANGUNAN APARTEMEN SCIENTIA RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, FANDI AHMAD (2020) PEKERJAAN STRUKTUR KOLOM ZONA I PADA PROYEK PEMBANGUNAN APARTEMEN URBAN SIGNATURE - CIRACAS JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, FIKRIANSYAH INDRA (2024) PERANCANGAN ULANG STRUKTUR RANGKA ATAP TERHADAP PERBEDAAN MODEL PORTAL FRAME BAJA IWF DAN MODEL PORTAL TRUSS PADA STUDI KASUS PROYEK PEMBANGUNAN PABRIK PT YIH QUAN FOOTWARE INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, JAKA (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK KEBAYORAN APARTEMENT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, M. FADLI ADITYA (2022) OPTIMALISASI KINERJA SIMPANG TAK BERSINYAL DENGAN METODE MKJI 1997 (Studi Kasus : Jalan Dr. Ratna, Kecamatan Jatiasih, Kota Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

SAPUTRA, MUHAMMAD TRIDAYA NUGRAHA (2023) ANALISIS FAKTOR - FAKTOR DOMINAN YANG MEMPENGARUHI KETERLAMBATAN PADA PROYEK APARTMENT TOD PONDOK CINA. S1 thesis, Universitas Mercu Buana.

SAPUTRA, MUKHAMMAD HARIS (2022) ANALISIS PRODUKTIFITAS PEKERJA PADA PEKERJAAN STRUKTUR ATAS DARI BETON BERTULANG (Studi Kasus : Proyek Pembangunan Apartement Collins Boulevard). S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, NANDA DAVID (2022) PERENCANAAN TEBAL DAN GEOMETRIK RUNWAY STUDI KASUS BANDAR UDARA AJI PANGERAN TUMENGGUNG PRANOTO KOTA SAMARINDA DENGAN PENAMBAHAN DAYA DUKUNG PERKERASAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, RAHMAD HIDAYAT (2020) PENGARUH WASTE MATERIAL BERBASIS LEAN CONSTRUCTION TERHADAP KINERJA PROYEK KONSTRUKSI GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, TEGUH (2022) STUDI PERENCANAAN JEMBATAN GELAGAR BOX BAJA BENTANG 100 METER MENGGUNAKAN AASHTO LRFD DAN SNI 1725-2016. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, VALENTINO EKO (2020) PENGARUH PENGGUNAAN ALWA DAN KAPUR SEBAGAI SUBTITUSI AGGREGAT HALUS DAN SEMEN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

SAPUTRA, YUSUF (2019) ANALISIS RUAS DAN SIMPANG BERSINYAL PADA JALAN KYAI MAJA – TRUNOJOYO JAKARTA (PLN BULUNGAN). S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, AFIONITA IMAM (2020) PENGARUH PENERAPAN METODE VALUE ENGINEERING DAN CRITICAL PATH METHOD PADA PEKERJAAN ELEVATED RAILWAY PROYEK LIGHT RAIL TRANSIT (LRT). S2 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, ARISKA (2019) METODE PELAKSANAAN PENGUJIAN PILE DRIVING ANALYZER (PDA TEST) PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS MUHAMMADIYAH PROF. DR. HAMKA. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, MARLIANA EKA (2019) KAJIAN WAKTU PELAKSANAAN PEKERJAAN BASEMENT MENGGUNAKAN METODE TOP DOWN SEBAGAI PENGGANTI METODE BOTTOM UP PADA PROYEK THE PAKUBUWONO MENTENG. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, MARLIANA EKA (2018) PEMBANGUNAN PROYEK GEDUNG INDONESIA – 1 JALAN MH. THAMRIN NO. 13, JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, MASITHOH WAHYU (2019) METODE PELAKSANAAN PENGUJIAN PILE DRIVING ANALYZER (PDA TEST) PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS MUHAMMADIYAH PROF. DR. HAMKA. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, NATOE IGA (2021) ANALISA PERBANDINGAN BEAM BRACING DAN SHEARWALL SEBAGAI SISTEM GANDA PADA STRUKTUR BANGUNAN BERTINGKAT. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, ARIF (2018) EVALUASI KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN SETIA DARMA II TAMBUN SELATAN KABUPATEN BEKASI JAWA BARAT DENGAN METODE MANUAL KAPASITAS JALAN INDONESIA (MKJI) 1997. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, FIRMAN (2020) ANALISIS ZONA SELAMAT SEKOLAH (ZoSS) JALAN RAYA TINGGARJAYA PURWOKERTO STUDI KASUS (SDN 1 TINGGARJAYA). S1 thesis, Universitas Mercu Buana.

SAPUTRO, ILYAS WIJI (2020) METODE PELAKSANAAN PEKERJAAN SAMBUNGAN PELAT PADA PROYEK PEMBANGUNAN REHABILITASI GEDUNG AULA BALAI TEKNOLOGI KESELAMATAN PELAYARAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, RAHMAN YULI (2019) ANALISA KARAKTERISTIK KECELAKAAN LALU LINTAS DENGAN METODE AEK (Studi kasus : Jalan Raya Kalimalang Cibitung Kabupaten Bekasi Sta 0+200 - 7+200). S1 thesis, Universitas Mercu Buana Bekasi.

SAPUTRO, RIAN ADI (2023) STUDI EKSPERIMENTAL SUBTITUSI SEBAGIAN SEMEN DENGAN FLY ASH DAN PECAHAN GENTENG BETON SEBAGAI AGREGAT KASAR PADA CAMPURAN BETON YANG DITINJAU BERDASARKAN KUAT TEKAN, HARGA SATUAN, DAN INITIAL SETTING TIME. S1 thesis, Universitas Mercu Buana Bekasi.

SAPUTRO, TOFANI WAHYU (2018) PERENCANAAN PEMBANGUNAN RUMAH SUSUN PULO GEBANG, KEL. PENGGILINGAN KEC. CAKUNG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, WAHYU (2019) PEKERJAAN STRUKTUR BALOK KANTILEVER TERTINGGAL PEMBANGUNAN GEDUNG D BADAN POM JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, WINDI AGUNG (2017) FAKTOR - FAKTOR PENYEBAB KEMIRINGAN STRUKTUR KINGPOST PADA PEKERJAAN STRUKTUR KOLOM BASEMENT (Study Kasus INDONESIA 1). S1 thesis, Universitas Mercu Buana Jakarta.

SARI, ANISYA INTAN (2021) ANALISIS PERBANDINGAN ESTIMASI BIAYA, WAKTU DAN MUTU PENGGUNAAN METODE BEKISTING KONVENSIONAL DAN METODE BEKISTING ALUMINIUM FORMWORK PADA STRUKTUR KOLOM PROYEK APPARTEMENT SKY HOUSE ALAM SUTERA. S1 thesis, Universitas Mercu Buana Jakarta.

SARI, ANITA RAHMA (2021) ANALISIS RISIKO KESELAMATAN PADA PELAKSANAAN PEKERJAAN STRUKTUR ATAS PEMBANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

SARI, DAHLIA PUSPITA (2021) PENERAPAN KONSEP EARNED VALUE METHOD SEBAGAI ALAT UKUR KINERJA BIAYA DAN JADWAL PADA PEKERJAAN BEKISTING (Studi Kasus : Proyek Gedung Graha Paramitha 2 Bintaro). S1 thesis, Universitas Mercu Buana Jakarta.

SARI, DWY YUSTIKA (2023) ANALISIS PENILAIAN RISIKO TERHADAP KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONTRUKSI PEMBANGUNAN JEMBATAN TIMBANG (STUDI KASUS: PROYEK JEMBATAN TIMBANG KAPASITAS 70 TON CK-MIFA BERSAUDARA). S1 thesis, Universitas Mercu Buana Jakarta.

SARI, ENDAH TRIANA (2019) PERBANDINGAN PENGGUNAAN BEKISTING SYSTEM PERI DENGAN BEKISTING STEEL DECK PADA PENAMBAHAN STRUKTUR PLAT LANTAI DARI SEGI EFISIENSI BIAYA DAN WAKTU (Studi Kasus Proyek Grand Classic Hotel Cikarang). S1 thesis, Universitas Mercu Buana.

SARI, INTAN PURNAMA (2022) ANALISIS RISIKO PROYEK PEMBANGUNAN JALUR KERETA CEPAT JAKARTA - BANDUNG SEKSI II. S1 thesis, Universitas Mercu Buana Jakarta.

SARI, RESKA MORULITA (2019) PENGAMATAN STRUKTUR PROYEK APARTEMEN THE LOTUS JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SARI, RIZKY MAYA (2020) PERENCANAAN SHEET PILE DENGAN MENGGUNAKAN PROGRAM PLAXIS (STUDI KASUS : PROYEK PEMBANGUNAN JALUR GANDA KERETA API LINTAS BOGOR - SUKABUMI). S1 thesis, Universitas Mercu Buana Bekasi.

SARIFFUDIN, SAIFUL IKSAN (2019) PERKUATAN TOWER SST 4 LEG 62 M AKIBAT PENAMBAHAN BEBAN ANTENNA (STUDI KASUS SITE YON ZIPUR PROBOLINGGO). S1 thesis, Universitas Mercu Buana Jakarta.

SASMITO, PUJO (2018) STUDI EKSPERIMENTAL SIFAT MEKANIK BALOK LAMINASI SENGON LAUT (ALBAZIA FALCATARIA) DENGAN PERKUATAN BAMBU PETUNG (DENDROCALAMUS ASPER) SEBAGAI BAHAN KONTRUKSI. S1 thesis, Universitas Mercu Buana Bekasi.

SASMITO, SUGENG (2021) ANALISIS PERBANDINGAN MATERIAL PRECAST CONCRETE SLAB DAN STEEL DECK SEBAGAI DUDUKAN LANTAI JEMBATAN TERHADAP KINERJA WAKTU DAN BIAYA (Studi Kasus Proyek Jalan Tol Terbanggi Besar – Pematang Panggang – Kayu Agung). S1 thesis, Universitas Mercu Buana Jakarta.

SATRIYANTO, SURYA HARI (2018) PENGAMATAN PEKERJAAN SISTIM MEP PROYEK RUMAH SAKIT PENDIDIKAN UKRIDA JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SAUGANI, AHMAD (2020) TINJAUAN PELAKSANAAN PELAT DAN BALOK MENGGUNAKAN BEKISTING (FORMWORK) ALUMINIUM DI PROYEK APARTEMENT SAUMATA SUITES TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

SAUQI, DIMAS (2021) IDENTIFIKASI FAKTOR-FAKTOR PENGARUH CONTRACT CHANGE ORDER TERHADAP WAKTU PELAKSANAAN PROYEK KONSTRUKSI (Studi Kasus : Proyek Pembangunan Kantor Unit pengelola Pengembangan Tanaman Perkotaan Dinas Kehutanan). S1 thesis, Universitas Mercu Buana Jakarta.

SAUQI, DIMAS (2019) PEMBANGUNAN KANTOR UNIT PENGELOLA PENGEMBANGAN TANAMAN PERKOTAAN DINAS KEHUTANAN. S1 thesis, Universitas Mercu Buana Jakarta.

SEFIANITA, PETRICIA AYU (2018) PERBANDINGAN PELAKSANAAN STRUKTUR PELAT LANTAI ANTARA METODE KONVENSIONAL DENGAN PRECAST HOLLOW CORE SLAB TERHADAP WAKTU PELAKSANAAN DENGAN PROGRAM EVALUATION REVIEW TECHNIQUE (Studi Kasus : Proyek Sint Carolus Borromeus – Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

SEGORO, FAHRU ARI (2022) ANALISIS FAKTOR – FAKTOR YANG MEMPENGARUHI TINGKAT MINAT MASYARAKAT TERHADAP KUALITAS PELAYANAN BUS RAPID TRANSIT KOTA TANGERANG PADA KORIDOR 3 (STUDI KASUS BUS TAYO KORIDOR 3 CBD CILEDUG – TANGERANG CITY). S1 thesis, Universitas Mercu Buana Jakarta.

SELARAS, ERA RIZKI DWI (2019) ANALISIS KEBUTUHAN RUANG PARKIR MALL KOTA KASABLANKA, JAKARTA. S1 thesis, Universitas Mercu Buana.

SENNIA, DYANITA INDRIA (2023) ANALISIS KEPUASAN PENUMPANG TERHADAP PELAYANAN KERETA API LOKAL BANDUNG RAYA. S1 thesis, Universitas Mercu Buana.

SEPTIAN, RENDI (2018) STUDI PENGARUH VOLUME LALU LINTAS TERHADAP TINGKAT KECELAKAAN LALU LINTAS DI KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

SEPTIANA, ALWANABILA AYU (2023) ANALISIS TINGKAT KINERJA PELAYANAN TERHADAP KEPUASAN PENUMPANG PADA TERMINAL KAMPUNG RAMBUTAN. S1 thesis, Universitas Mercu Buana Bekasi.

SEPTIANADRAH, REGINA EKA (2022) LAPORAN TUGAS AKHIR PERENCANAAN ULANG HOTEL SEPULUH LANTAI DENGAN MENGGUNAKAN STRUKTUR BAJA SESUAI SNI BAJA 1729:2020 DAN SNI GEMPA 1726:2019. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTIANDINI, WIDYA TRISNA (2021) EVALUASI PELAYANAN DAN KINERJA STASIUN KERETA API JAKARTA KOTA BERDASAKAN STANDAR PELAYANAN MINIMUM DENGAN METODE IMPORTANCE PERFOMANCE ANALYSIS (IPA. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTIANI, RITA (2023) ANALISIS KONDISI PERKERASAN JALAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) DAN SURFACE DISTRESS INDEX (SDI) PADA JALAN LINTAS SELATAN JAWA BARAT (STUDI KASUS: RUAS JALAN RAYA CIJULANG - PANGANDARAN). S1 thesis, Universitas Mercu Buana Bekasi.

SEPTIASARI, DEPITA (2019) IDENTIFIKASI FAKTOR-FAKTOR PENYEBAB KECELAKAAN KERJA PADA PROYEK KONSTRUKSI. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTININGRUM, DHINA PUSPITA (2018) PEKERJAAN STRUKTUR LIFT PANORAMIC PROYEK GALERIA MALL VIVO SENTUL-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTIONO, ANGGA (2018) METODE PEKERJAAN BEKISTING BONDEK PADA PELAT LANTAI PROYEK PEMBANGUNAN MENARA BNI PEJOMPONGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SESTIANTO, RIAN (2020) PENINGKATAN AKSESSIBILITAS DALAM MENDUKUNG KONEKTIVITAS BANDAR UDARA SOEKARNO HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

SETIADI, ERA (2022) ANALISIS PEMILIHAN MODA TRANSPORTASI UMUM MENUJU BANDARA SOEKARNO HATTA DENGAN METODE STATED PREFERENCE ( STUDI KASUS KOTA BEKASI – SOEKARNO HATTA ). S1 thesis, Universitas Mercu Buana Bekasi.

SETIAJI, SETIAJI (2018) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PADA PROYEK APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, ANDRIAS (2019) METODE ERECTION GIRDER BENTANG 40,8 M PADA PROYEK JALAN TOL TERBANGGI BESAR PEMATANG PANGGANG ZONA VGF CISUMDAWU JALAN TOL TRANS SUMATRA TERBANGGI BESAR-PEMATANG PANGGANG, LAMPUNG. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, ARI DWI (2022) ANALISIS KINERJA DAN KEPUASAN PENUMPANG BUS RANSJAKARTA BERBASIS STANDAR PELAYANAN MINIMAL (SPM) RUTE KALIDERES – PASAR BARU. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, BAMBANG ADI (2020) ANALISA TINGKAT PELAYANAN BUS AGRA MAS BANDARA RUTE (PGC JAKARTA TIMUR-BANDARA SOEKARNO HATTA). S1 thesis, Universitas Mercu Buana Bekasi.

SETIAWAN, CHANDRA (2022) ANALISIS PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP KINERJA BIAYA PELAKSANAAN PADA PROYEK HOTEL PONDOK INDAH INTERCONTINENTAL JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, DANIEL (2019) DESAIN ALTERNATIF GEDUNG 30 LANTAI MENGGUNAKAN TINGGI EFEKTIF DINDING GESER. S1 thesis, Universitas Mercu Buana.

SETIAWAN, DANIEL (2018) PELAKSANAAN KONSTRUKSI PROYEK PEMBANGUNAN PRASARANA KERETA API LIGHT RAIL TRANSIT LINTAS TAMAN MINI - CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, DENI TRI (2021) DESAIN BANGUNAN BETON BERTULANG BERTINGKAT BANYAK DENGAN KOLOM BERBENTUK PIPIH. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, DONI (2024) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE FAST TRACK PADA PEKERJAAN PONDASI BORE PILE (STUDI KASUS: PROYEK PENGEMBANGAN RSUD KEMBANGAN JAKARTA BARAT). S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, IMAM (2020) ANALISIS FAKTOR-FAKTOR PENGHAMBAT PADA TEKNOLOGI BIM TERHADAP KINERJA WAKTU (STUDI PADA PROYEK SULSEL BARRU2 PEMBANGUNAN BOILER HOUSE STRUCTURE). S1 thesis, Universitas Mercu Buana.

SETIAWAN, IMAM Q (2019) METODE PELAKSANAAN PEKERJAAN PONDASI DAN ABUTMENT PROYEK JEMBATAN CIBEREUM. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, OKTA AVIANTO (2019) ANALISIS PENGARUH AKTIVITAS DI PASAR PESING TERHADAP KINERJA LALU LINTAS DI JALAN KEDOYA RAYA JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, R. LIVIA WULANDARI (2022) KAJIAN TEKNIS PERENCANAAN PERKERASAN KAKU DENGAN METODE BINA MARGA 2017 DAN AASHTO 1993 (STUDI KASUS JALAN TOL PEMALANG-BATANG). S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, RACHMAT (2022) ANALISIS EFEKTIFITAS ZONA SELAMAT SEKOLAH (ZoSS) TERHADAP KESELAMATAN PENYEBERANG JALAN (Studi Kasus SD Islam Terpadu Almaka Kalideres Dan SDN Duri Kosambi 05 PagiJakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, RACHMAT (2018) EFISIENSI SUBCON DALAM PELAKSANAAN PENGECORAN PLAT LANTAI (PROYEK APARTEMEN PROSPERITY RESIDENCE THE LOTUS) JL. Kembangan Raya No. 12A. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, ROJAK (2022) ANALISIS PENILAIAN RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG (STUDI KASUS PROYEK RUMAH SAKIT JANTUNG DAN PEMBULUH DARAH HARAPAN KITA). S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, YUDHI (2019) METODE PELAKSANAAN PEKERJAAN GROUND ANCHOR SEBAGAI ELEMEN PENDUKUNG STRUKTUR PENAHAN TANAH. S1 thesis, Universitas Mercu Buana Jakarta.

SETIYADI, SYUKUR (2023) PENGARUH BATU KUARSIT DAN GAMPING KORAL SEBAGAI ALTERNATIF AGGREGAT KASAR BETON TERHADAP KARAKTERISTIK BETON. S2 thesis, Universitas Mercu Buana Jakarta.

SETIYAWAN, ANDRI (2018) Penerapan Value Engineering Dalam Pekerjaan Perbaikan Balok Tangga Kantor Kecamatan Sawah Besar. S1 thesis, Universitas Mercu Buana Bekasi.

SETYABUDI, PRAYOGO WISNU (2023) ANALISIS KINERJA BIAYA DAN WAKTU DENGAN KONSEP EARNED VALUE ANALYSIS PADA MASA PANDEMI COVID-19 (Studi Kasus Proyek Pabrik Manufacture Automotive Di Kawasan Industri Mitra Karawang Timur). S1 thesis, Universitas Mercu Buana Jakarta.

SETYAJI, ANDREAS AGUNG (2021) PERENCANAAN TEBAL PERKERASAN LENTUR MENGGUNAKAN METODE MDP 2017 UNTUK PELEBARAN JALAN DAN OVERLAY PADA JALAN PALUR ? SRAGEN JAWA TENGAH. S1 thesis, Universitas Mercu Buana Jakarta.

SETYANEGARA, PUTRA ADI (2019) PELAKSANAAN PEMBANGUNAN RUMAH SUSUN TOWER 4, 5, 6 PENGGILINGAN-PULO GEBANG-JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SETYAWAN, ROBBY (2019) METODE PELAKSANAAN PEKERJAAN BEKISTING ALUMINIUM PADA PEMBAGUNAN THE AYOMA APARTMENT JL. CIATER BARAT, RW. BUNTU - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SETYAWAN, TRI LEKSANA (2019) PENERAPAN BIM BERBASIS QUANTITY TAKE-OFF PADA PEKERJAAN FIT-OUT BANGUNAN KANTOR. S2 thesis, Universitas Mercu Buana Jakarta.

SETYAWATI, RENNY (2018) PERENCANAAN DAN PENGENDALIAN MATERIAL PEMBANGUNAN GEDUNG OFFICE DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT.NUSA KONSTRUKSI ENJINIRING, Tbk. S1 thesis, Universitas Mercu Buana Jakarta.

SETYONUGROHO, PRADANA BAYU (2020) DESAIN PONDASI BORED PILE SERTA PERBANDINGAN DENGAN HASIL UJI PILE DRIVING ANALYZER (PDA) DAN REACTION PILE “PROYEK GEDUNG TIGER MANDIRI HEAD OFFICE – JAKARTA”. S1 thesis, Universitas Mercu Buana.

SHABRI, IZA RAHMANI (2021) ANALISIS JADWAL PELAKSANAAN PEKERJAAN MENGGUNAKAN METODE FUZZY PERT (Studi Kasus Proyek Pembangunan Masjid “The Mosque of Light” Islamic Boarding School Cahaya Rancamaya Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

SHANDRA, JOANITO JOSSE (2023) ANALISIS FAKTOR RISIKO DAN RENCANA MITIGASI RISIKO TERHADAP BIAYA DAN WAKTU PADA PROYEK SPAM TANAH MERAH CIKARANG JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SHANTY, SHANTY (2023) ANALISIS PERBANDINGAN KINERJA STRUKTUR PORTAL SLAB-BEAM DENGAN PORTAL FLAT SLAB-DROP PANEL PADA GEDUNG PARKIR BERTINGKAT MENGGUNAKAN METODE PUSHOVER. S1 thesis, Universitas Mercu Buana Jakarta.

SHAPUTRA, AGUNG WAHANA (2018) ANALISIS KOMPARASI AIR LIMBAH PRODUKSI BETON READY-MIX DENGAN AIR BERSIH SEBAGAI CAMPURAN BETON TERHADAP KUAT TEKAN BETON (Studi Kasus: PT. Wika Beton-SIS Cimanggis). S1 thesis, Universitas Mercu Buana Bekasi.

SHOFARUDDIN, MUHAMMAD (2022) ANALISIS PENYEBAB-PENYEBAB CONTRACT CHANGE ORDER PADA PROYEK PENINGKATAN JALAN JOHAR-GEMPOL. S1 thesis, Universitas Mercu Buana Jakarta.

SHOLAHUDDIN, MOH. (2018) ANALISIS PERBANDINGAN WAKTU PRODUKTIVITAS CLIMBING TOWER CRANE DAN TIED IN CRANE PADA BANGUNAN GEDUNG TINGKAT TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

SIADARI, FIKRI MARSANGAP TUA (2021) ANALISIS TINGKAT KEPUASAN PENUMPANG TERHADAP PELAYANAN PT ASDP INDONESIA FERRY (KMP. IHAN BATAK) DIKAWASAN DANAU TOBA. S1 thesis, Universitas Mercu Buana Jakarta.

SIANIPAR, CAROLINE TIURMA (2018) ANALISA PERBANDINGAN BIAYA BEKISTING LANTAI JEMBATAN MENGGUNAKAN GIRDER TIPE I PADA PROYEK JALAN TOL BOGOR – CIAWI – SUKABUMI. S1 thesis, Universitas Mercu Buana Bekasi.

SIANIPAR, JONATHAN HARRIS (2020) ANALISA PERBANDINGAN BIAYA BEKISTING PLAT LANTAI JEMBATAN PADA PROYEK JALAN TOL. S1 thesis, Universitas Mercu Buana Bekasi.

SIBORO, RANI NOVITA (2022) ANALISIS PENYEBAB TERJADINYA CONTRACT CHANGE ORDER DAN DAMPAKNYA TERHADAP WAKTU DAN BIAYA PEMBANGUNAN (Studi Kasus: Proyek Pembangunan Infrastruktur Jalan dan Drainase Perumahan Modernland Cilejit-Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

SIDABUTAR, TOMOK SUTRISNO (2018) DAMPAK PELAKSANAAN METODE DEWATERING TERHADAP PEKERJAAN SEMI BASEMENT RUMAH SAKIT ABDI WALUYO. S1 thesis, Universitas Mercu Buana Jakarta.

SIDIS, ABDUL ROHMAN (2019) PELAKSANAAN PEKERJAAN PILE CAP DI PROYEK URBAN SKY APARTEMENT BEKASI - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SIHAB, FAJAR NUR (2021) ANALISIS ASPEK BIAYA DAN WAKTU AKIBAT COVID-19 DENGAN METODE EARNED VALUE PADA PROYEK REVITALISASI RUSUNAWA. S1 thesis, Universitas Mercu Buana Jakarta.

SIMANGUNSONG, GELORA (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN BEKISTING KAYU DENGAN BEKISTING ALUMUNIUM (Studi Kasus Proyek Pembangunan Rusun Stasiun Rawabuntu Mahata Serpong Tower B2). S1 thesis, Universitas Mercu Buana Jakarta.

SIMANJUNTAK, INDRA JADI (2024) ANALISIS PENYEBAB KLAIM YANG MENYEBABKAN SENGKETA PADA PROYEK PENGERUKAN DAN REKLAMASI BERDASARKAN FIDIC FORM OF CONTRACT FOR DREDGING AND RECLAMATION EDITION 2016 (BLUE BOOK). S2 thesis, Universitas Mercu Buana Jakarta.

SIMANULLANG, BOY FERNANDES RSP (2023) ANALISIS KINERJA BIAYA DAN WAKTU DENGAN KONSEP EARNED VALUE ANALYSIS (EVA) PADA PROYEK TUNNEL UNDERPASS AKSES MALL BXC 2- STASIUN JURANG MANGU. S1 thesis, Universitas Mercu Buana Jakarta.

SIMANULLANG, KRISNO ARIF (2018) ANALISIS PERBANDINGAN ZONING DAN SIKLUS PADA PELAKSANAAN PEKERJAAN BEKISTING LANTAI DAN BALOK MENGGUNAKAN ALUMA SYSTEM (Studi Kasus : Proyek South Hills Apartemen Kuningan, Jakarta Selatan ). S1 thesis, Universitas Mercu Buana Jakarta.

SIMANUNGKALIT, TIDES OLOAN (2018) METODE PELAKSANAAN SHEAR WALL PROYEK RUSUNAMI URBANTOWN@SERPONG Jl. Bukit Serua Ciputat – Tangerang selatan. S1 thesis, Universitas Mercu Buana Jakarta.

SIMARMATA, ELDA ADRIANI (2019) ANALISIS SIMPANG BERSINYAL PADA JL. LETJEN SUPRAPTO – JL. KRAMAT KWITANG DAN JL. ST. SENEN, JAKARTA PUSAT, DKI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SIMARMATA, NINDI SERE OCTAVIA (2022) ANALISA PENGARUH FASILITAS PELAYANAN TERHADAP JUMLAH PENUMPANG PADA ANGKUTAN KERETA COMMUTER LINE RUTE STASIUN KEBAYORAN LAMA – STASIUN RAWA BUNTU SELAMA PPKM LEVEL 1. S1 thesis, Universitas Mercu Buana Jakarta.

SIMBOLON, RUI RAPHAEL (2022) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK PEMBANGUNAN RUMAH SUSUN CAKUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SIMORANGKIR, ASIMA MARSAOR ULI ROHANA (2017) PEKERJAAN STRUKTUR ATAS GEDUNG PERKANTORAN DAN FASILITASNYA. S1 thesis, Universitas Mercu Buana Jakarta.

SINAGA, GAMALIEL GEOVANI (2023) PEMANFAATAN LIMBAH BOTOL KACA DAN LIMBAH KERAMIK SEBAGAI SUBSTITUSI AGREGAT KASAR PADA KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

SINAGA, TRUMAN (2021) PENINGKATAN KINERJA WAKTU DENGAN METODE CCPM DAN BIM 4D PADA PEKERJAAN BASEMENT BANGUNAN HUNIAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

SINAMBELA, AMYUSNI FIETSER (2016) TINJAUAN KHUSUS PEKERJAAN STRUKTUR INVESTIGASI PONDASI RAKIT (RAFT) PROYEK GOLD COAST PIK APARTEMENT. S1 thesis, Universitas Mercu Buana Jakarta.

SINGGIH, RESTU (2019) DESAIN PERBANDINGAN STRUKTUR ATAS GEDUNG 12 LANTAI DENGAN SHEAR WALL TERHADAP STRUKTUR TANPA SHEAR WALL. S1 thesis, Universitas Mercu Buana Jakarta.

SIREGAR, AFRIANA (2019) ANALISIS POTENSI LIKUIFAKSI WILAYAH DKI JAKARTA MENGGUNAKAN DATA STANDARD PENETRATION TEST (SPT) (Studi Kasus: Prapatan No.20-22, Kwitang Jakarta Pusat - Jl. Kebon Jati, Jakarta Pusat - Jl. Borobudur No. 10, Jakarta Pusat - Jl. Kyai Caringin, Jakarta Pusat - Jl. Kelapa Gading, Jakarta Utara - Jl. Cipinang Utara, Jatinegara, Jakarta Timur - Jl. Yos. Sudarso, Jakarta Utara.). S1 thesis, Universitas Mercu Buana.

SIREGAR, MUHAMMAD SURYA SAKTI (2023) PENGARUH PENGGUNAAN ABU BOILER CANGKANG KELAPA SAWIT SEBAGAI SUBTITUSI SEMEN PADA BETON DENGAN PENAMBAHAN SILICA FUME. S1 thesis, Universitas Mercu Buana.

SISWANTO, EKO (2018) HUBUNGAN INTENSITAS KEBISINGAN TERHADAP NILAI AMBANG DENGAR PADA PEKERJA DI BAGIAN PRODUKSI PUTAR (CONCRETE SPUN PILE) PT ADHI PERSADA BETON PABRIK SADANG PURWAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

SISWANTORO, SISWANTORO (2017) EVALUASI SIMPANG BERSINYAL RAGUNAN JAKARTA SELATAN PADA RUAS JALAN TB. SIMATUPANG-JALAN RM. HARYONO DENGAN MENGGUNAKAN MANUAL KAPASITAS JALAN INDONESIA (MKJI) 1997. S1 thesis, Universitas Mercu Buana Jakarta.

SITANGGANG, ANASTASIUS JACKSON M. (2018) PENGARUH PENERAPAN INTEGRASI METODE PERT DAN METODE SIX SIGMA PADA PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

SITINJAK, RUTH NOVITA (2018) PENGARUH AKSES GERBANG TOL BEKASI TIMUR 1 TERHADAP KINERJA SIMPANG TAK BERSINYAL. S1 thesis, Universitas Mercu Buana Bekasi.

SITOMPUL, PARIS WANTO DOLORES (2021) PENERAPAN KONSEP NILAI HASIL DAN PERCEPATAN PADA KETERLAMBATAN PROYEK KONTRUKSI PERUMAHAN. ( Studi Kasus :Proyek Perumahan Samanea Hill – Cluster Acacia Parung Panjang ). S1 thesis, Universitas Mercu Buana Jakarta.

SITOMPUL, SANG TOGA (2022) RELIABILITAS STRUKTUR MENARA JARINGAN TRANSMISI TERHADAP PROBABILITAS BEBAN AKIBAT ARUS. S2 thesis, Universitas Mercu Buana Jakarta.

SITULAK, ELIASER SOFYAN (2024) PERENCANAAN STRUKTUR ATAS KANTOR 25 LANTAI MENGUNAKAN SISTEM GANDA (SRPMK DAN DINDING GESER) DI KOTA MANADO. S1 thesis, Universitas Mercu Buana Jakarta.

SITUMEANG, ANDALA PRATAMA (2021) ANALISIS DAYA DUKUNG DAN PENURUNAN TANAH MENGGUNAKAN DATA SPT DAN PDA TEST (PILE DRIVING ANALYZER) PADA PROYEK GEDUNG USULLUDIN DAN DAKWAH KAMPUS-2 UIN “PROJEK 6 IN 1” SERANG, BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

SIWI, SIMON PRABANCONO (2019) ANALISIS PERBANDINGAN BIAYA, WAKTU & MUTU PEMASANGAN BATA MERAH MENGGUNAKAN ALAT BRICO DENGAN METODE KONVENSIONAL (Studi Kasus : Proyek Rainbow Springs Condovillas). S1 thesis, Universitas Mercu Buana.

SLAMET, EKO MARJONO (2021) PERENCANAAN STRUKTUR TEMPAT EVAKUASI SEMENTARA (TES) UNTUK GEMPA BUMI DAN TSUNAMI DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SM, RIMA RIVA ATUL MUNAWAROH (2017) PERENCANAAN DIMENSI SISTEM DRAINASE APARTEMEN PONDOK INDAH RESIDENCES JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SONIA, SONIA (2018) PERENCANAAN PEMANFAATAN RAINWATER HARVESTING (RWH) SEBAGAI ALTERNATIF SUMBER AIR BERSIH (STUDI KASUS : UNIVERSITAS MERCU BUANA). S1 thesis, Universitas Mercu Buana Jakarta.

SONY, YOHANES GERATAMA (2017) ANALISIS KINERJA ANGKUTAN UMUM DALAM KOTA METROMINI 92 JURUSAN GROGOL CILEDUG PP. S1 thesis, Universitas Mercu Buana Jakarta.

SOPIAN, MUHAMAD (2022) “PENGARUH PEMANFAATAN LIMBAH BATA RINGAN SEBAGAI SUBTITUSI PASIR DAN RESIN EPOXY SEBAGAI BINDER TERHADAP KUAT TEKAN BETON POLIMER’’. S1 thesis, Universitas Mercu Buana Bekasi.

SOPIYAN, YOPI (2020) ANALISA KARAKTERISTIK KECELAKAAN LALU LINTASDENGAN METODE AEK (ANGKA EKUIVALEN KECELAKAAN) STUDI KASUS JALAN RAYA NAROGONG KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

SOSENA, SOFYAN DIMAS (2019) METODE PELAKSANAAN MASS CONCRETE PADA RAFT FOUNDATION DI PROYEK GREEN CLEOSA APARTMENT DAN CONDOTEL Jl. Raden Fatah No.62 Sudimara Barat, Ciledug, Tangerang. S1 thesis, Universitas Mercu Buana Jakarta.

SRIWAHYUNINGSIH, AULIA (2019) ANALISIS KEBUTUHAN LAHAN PARKIR PADA PASAR SWALAYAN (STUDI KASUS : TIP TOP RAWAMANGUN). S1 thesis, Universitas Mercu Buana.

STEFANNIE, CATHERINE (2022) ANALISIS ANTRIAN SIMPANG BERSINYAL JALAN JOGLO RAYA – JALAN RAYA POS PENGUMBEN dan JALAN SRENGSENG RAYA dengan METODE GELOMBANG KEJUT (SHOCK WAVE) dan MANUAL KAPASITAS JALAN INDONESIA (MKJI) 1997. S1 thesis, Universitas Mercu Buana Jakarta.

STEFANO, YOSCA ALEXANDER (2019) TINJAUAN PERBANDINGAN PENJADWALAN PROYEK VERDE II CONDOMINIUM DENGAN MENGGUNAKAN RANKED POSITIONAL WEIGHT METHOD. S1 thesis, Universitas Mercu Buana Jakarta.

SUBAGJA, INDRA (2022) PENGEMBANGAN METODE PEMILIHAN RUTE UNTUK PENGIIRMAN BETON PRACETAK BERUKURAN BESAR TERHADAP KLASIFIKASI JALAN, DAN JENIS PRECAST (STUDI KASUS : PABRIK PRECAST SENTUL). S1 thesis, Universitas Mercu Buana Jakarta.

SUBEKTI, HERU (2017) PENERAPAN METODE CHEMICAL ANCHORING SYSTEM PADA PEKERJAAN KOLOM PRAKTIS PROYEK APARTEMEN BRANZ BSD. S1 thesis, Universitas Mercu Buana Jakarta.

SUBHAKTI, MOH ILHAM (2023) ANALISIS KUALITAS PENGGUNAAN BEKISTING KONVENSIONAL PADA PELAKSANAAN PEMBANGUNAN GEDUNG BERTINGKAT TINGGI DENGAN METODE SIX SIGMA (studi kasus: pembangunan apartemen Sky House Alam Sutera). S1 thesis, Universitas Mercu Buana.

SUBHAN, REZA (2019) PELAKSANAAN PEKERJAAN PONDASI KONSTRUKSI SARANG LABA - LABA PEMBANGUNAN GEDUNG BARU KAMPUS UNITIRTA SINDANG SARI - SERANG BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

SUBHANA, ALI (2020) ANALISIS PERKERASAN JALAN MENGGUNAKAN METODE PCI (Studi Kasus Jalan M.H.Thamrin). S1 thesis, Universitas Mercu Buana Bekasi.

SUBIASTUTI, EVIANI (2020) ANALISA LALU LINTAS AKIBAT PEMBANGUNAN ON OFF RAMP TOL BECAKAYU. S1 thesis, Universitas Mercu Buana Bekasi.

SUBKHAN, FAJAR (2018) ANALISIS RISIKO PEMBANGUNAN RUMAH SUSUN BERBASIS TRANSIT ORIENTED DEVELOPMENT YANG BERPENGARUH TERHADAP KINERJA WAKTU ( Studi Kasus : Pekerjaan Struktur Bawah Pembangunan Rumah Susun Tanjung Barat ). S1 thesis, Universitas Mercu Buana Bekasi.

SUBKHAN, FAJAR (2018) ANALISIS RISIKO PEMBANGUNAN RUMAH SUSUN BERBASIS TRANSIT ORIENTED DEVELOPMENT YANG BERPENGARUH TERHADAP KINERJA WAKTU ( Studi Kasus : Pekerjaan Struktur Bawah Pembangunan Rumah Susun Tanjung Barat ). S1 thesis, Universitas Mercu Buana Bekasi.

SUDARSONO, WAHYU (2020) ANALISIS TATA LETAK FASILITAS PROYEK MENGGUNAKAN ACTIVITY RELATIONSHIP CHART DAN MULTI-OBJECTIVES FUNCTION PADA PROYEK PEMBANGUNAN APARTEMEN EMERALD. S1 thesis, Universitas Mercu Buana.

SUDARSONO, WAHYU (2018) PELAKSANAAN PEKERJAAN TIANG PANCANG PROYEK RUSUN STASIUN TANJUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SUDRAJAT, ASEP (2018) ANALISIS KERUSAKAN JALAN PADA PERKERASAN KAKU DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN BIAYA PENANGANANNYA (Studi kasus : Ruas Jalan Bogasari Citeureup Sta 0+900 - 2+300). S1 thesis, Universitas Mercu Buana Bekasi.

SUFTANDI, MAHFUDZ (2019) IDENTIFIKASI FAKTOR PENYEBAB KETERLAMBATAN WAKTU PADA PEKERJAAN STRUKTUR ATAS PADA PROYEK EVENCIIO MARGONDA APARTEMENT. S1 thesis, Universitas Mercu Buana.

SUGIANTO, BAYU (2020) ANALISIS DAERAH RAWAN KECELAKAAN DI JAKARTA TIMUR (STUDI KASUS: JALAN INSPEKSI KALIMALANG). S1 thesis, Universitas Mercu Buana Bekasi.

SUGIANTO, EGAR ALBERT (2020) ANALISIS PERBANDINGAN BIAYA DAN MUTU PAGAR PROYEK DAUR ULANG (PPDU) DENGAN PAGAR PROYEK ZINCALUME (STUDI KASUS PROYEK X DI JAKARTA). S1 thesis, Universitas Mercu Buana Bekasi.

SUGIANTORO, ADHIE FAJAR (2022) PERANCANGAN ULANG GEDUNG BERTINGKAT TINGGI DENGAN MENGGUNAKAN SISTEM OUTRIGGER Studi kasus: Apartemen Bekasi 50 Lantai. S1 thesis, Universitas Mercu Buana Jakarta.

SUGIHARTO, AFIF (2022) ANALISIS PENGARUH INTEGRASI PRECEDENCE DIAGRAM METHOD (PDM), LINE OF BALANCE (LOB), & SIX SIGMA UNTUK IMPROVMENT KINERJA WAKTU & MUTU PADA PROYEK JALAN LAYANG (KAPTEN TANDEAN - BLOK M - CILEDUG). S2 thesis, Universitas Mercu Buana Jakarta.

SUGITO, SEPTIYAN CAHYO HIDAYAT (2018) PENGARUH FILLER SERBUK KAYU TERHADAP KINERJA CAMPURAN ASPAL AC WC MENGGUNAKAN METODE WARM MIX. S1 thesis, Universitas Mercu Buana Jakarta.

SUHADI, SUHADI (2021) ANALISA DAYA DUKUNG TIANG PONDASI BOREDFILE METODE PILE DRIVING ANALISYS. S1 thesis, Universitas Mercu Buana Jakarta.

SUHANDA, (2018) ANALISIS INVESTASI UNTUK PEMBANGUNAN PASAR SEHAT SABILULUNGAN MAJALAYA KABUPATEN BANDUNG DALAM STUDI KASUS PT. SIDO SEMESTA. S1 thesis, Universitas Mercu Buana Bekasi.

SUHARTINI, SUHARTINI (2013) Proyek Pembangunan Apartement Scientia Residences. S1 thesis, Universitas Mercu Buana Jakarta.

SUHARTONO, SUHARTONO (2023) PERBANDINGAN EFEK PENAMBAHAN BAHAN PENGHAMBAT KOROSI ALAMI DENGAN BAHAN PENGHAMBAT KOROSI KIMIA PADA BETON BERTULANG YANG MENGGUNAKAN AIR LAUT TERHADAP LAJU KOROSI TULANGAN DAN KUAT TEKAN BETON. S2 thesis, Universitas Mercu Buana Jakarta.

SUHENDRI, (2018) PENGARUH KADAR LUMPUR DAN ORGANIK PADA PASIR SILIKA BELITUNG TERHADAP PENGGUNAAN POLYCARBOXYLATE ETHER ADMIXTURE PADA BETON MUTU TINGGI. S1 thesis, Universitas Mercu Buana Bekasi.

SUJADMIKO, ADE (2018) PROYEK APARTEMENT T PLAZA JL. PENJERNIHAN 1 PEJOMPONGAN JAKARTA PUSAT (Metode Pelaksanaan Dinding Shear Wall). S1 thesis, Universitas Mercu Buana Jakarta.

SUJOHAN, SUJOHAN (2017) DESAIN PERKUATAN TOWER TELEKOMUNIKASI 70 METER AKIBAT PENAMBAHAN BEBAN ANTENA: (STUDI KASUS TOWER TELEKOMUNIKASI DI KOTA SUMEDANG). S1 thesis, Universitas Mercu Buana Jakarta.

SUKAMTO, RENDY (2019) METODE PELAKSANAAN STRUKTUR STP (SEWAGE TREATMENT PLANT) PADA PROYEK PEMBANGUNAN APARTEMEN THE CONEXIO - CIKUNIR 1 BEKASI JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SUKARMAN, SUKARMAN (2017) ANALISIS BIAYA KONSTRUKSI PEKERJAAN VERTICAL DENGAN METODE BEKISTING PLAT BAJA DAN BEKISTING PANEL RESIN PADA BANGUNAN GEDUNG BERTINGKAT (STUDI KASUS : PROYEK PEMBANGUNAN APARTEMENT GOLD COAST RESIDENCE PANTAI INDAH KAPUK - JAKARTA UTARA). S1 thesis, Universitas Mercu Buana Jakarta.

SUKMANA, MUHAMMAD FADHIIL DWI (2020) ANALISIS PERBANDINGAN PELAT LANTAI METODE KONVENSIONAL DENGAN METODE HALF SLAB TERHADAP BIAYA DAN WAKTU PROYEK XYZ. S1 thesis, Universitas Mercu Buana Bekasi.

SULAIMAN, AHMAD (2020) KAJIAN DEBIT RANCANGAN BANJIR DAN KAPASITAS PENAMPANG SUNGAI PEMALI BREBES-JAWA TENGAH. S1 thesis, Universitas Mercu Buana Jakarta.

SULAIMAN, AHMAD (2019) PEKERJAAN KOLOM DENGAN METODE COUPLER PROYEK APARTEMEN SAMARA SUITES (PANCORAN - JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana.

SULASTRI, SRI (2021) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PADA PELAKSANAAN PROYEK MENARA JAKARTA KEMAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

SULFATA, ROIS (2021) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN (STUDI KASUS JALAN PANJANG - JALAN POS PEMGUMBEN). S1 thesis, Universitas Mercu Buana Jakarta.

SULISTIANI, AMELIA (2019) EVALUASI SISTEM DRAINASE PEMUKIMAN PERUMAHAN THE RIVIERA MET LAND PURI CIPONDOH, KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

SULISTYAWAN, LATIF (2020) PENGARUH PENGGUNAAN ABU AMPAS TEBU SEBAGAI SUBTITUSI SEMEN DAN SERBUK KACA SEBAGAI SUBTITUSI PASIR PADA CAMPURAN BETON TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

SULISTYAWAN, LATIF (2020) PENGARUH PENGGUNAAN ABU AMPAS TEBU SEBAGAI SUBTITUSI SEMEN DAN SERBUK KACA SEBAGAI SUBTITUSI PASIR PADA CAMPURAN BETON TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

SULISTYO, BAGOES YUDHA (2022) DESAIN ALTERNATIF GEDUNG PARKIR 6 LANTAI KONSTRUKSI BAJA SESUAI DENGAN SNI 1729 : 2020 DAN SNI 1726 : 2019. S1 thesis, Universitas Mercu Buana Jakarta.

SUMINTO, MIRA WIDYANINGSIH (2020) ANALISA PENERAPAN BUILDING INFORMATION MODELLING (BIM) TERHADAP PENINGKATAN CONSTRUCTABILITY PADA PROYEK KONSTRUKSI DENGAN METODE SISTEM DINAMIK. S2 thesis, Universitas Mercu Buana Jakarta.

SUNARDI, BAMBANG (2019) PELAKSANAAN PEKERJAAN BEKISTING BALOK PROYEK RSUD CENGKARENG. S1 thesis, Universitas Mercu Buana Jakarta.

SUNARTI, TUTUT (2022) ANALISA KEBUTUHAN RUANG PARKIR OFF STREET PADA CIPUTRA MALL JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SUNARYO, NANO (2021) PERANCANGAN STRUKTUR ATAS GEDUNG SISTEM GANDA 20 TINGKAT DENGAN OPTIMASI VARIASI BENTUK, LETAK, DAN KETINGGIAN EFEKTIF DINDING GESER STUDI KASUS BANGUNAN BERTAPAK PERSEGI PANJANG TIPIS. S1 thesis, Universitas Mercu Buana Jakarta.

SUNDANI, YUDHISTIRA SAPTAPRINGGA RIEZKY (2020) PENGARUH RENDAMAN ASAM SULFAT PASCA CURRING TERHADAP KUAT TEKAN BETON YANG BERASAL DARI TIGA QUARRY PASIR YANG BERBEDA. S1 thesis, Universitas Mercu Buana Bekasi.

SUNOTO, EDI (2021) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN MENGGUNAKAN METODE MKJI 1997 (Studi Kasus : Simpang Swadharma, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

SUPIAN, SUPIAN (2018) FAKTOR - FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN STRUKTUR BAWAH PADA PROYEK GEDUNG TINGGI MITRA PANCA PERSADA (MPP). S1 thesis, Universitas Mercu Buana.

SUPRIADI, IYAN (2019) METODE PELAKSANAAN SHEAR WALL DAN CORE WALL PROYEK PEMBANGUNAN MALL, RUKO DAN APARTEMENT CHADSTONE CIKARANG KABUPATEN BEKASI - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIADI, IYAN (2021) PERENCANAAN SUMUR RESAPAN DALAM UPAYA MEREDUKSI LIMPASAN AIR HUJAN (STUDI KASUS JL. H. A WAHID, JATI PADANG, PASAR MINGGU). S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIADI, WANDI (2022) PENERAPAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) PADA PENJADWALAN PROYEK RENOVASI MUSHOLLA DAN PENDOPO BROMO-MALANG. S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIADIN, ANDI (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PROYEK GEDUNG PELAYANAN PERIZINAN MASYARAKAT KOTA TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIANTO, DHODI (2019) ANALISIS KINERJA RUAS DAN SIMPANG TAK BERSINYAL JALAN GANJIL GENAP, JALAN SISINGAMANGARAJA KEBAYORAN BARU JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIANTO, DHODI (2018) METODE PEKERJAAN PILE CAP PROYEK TWO SENOPATI. S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIYADI, SUPRIYADI (2021) STUDI PERBANDINGAN ANTARA CONVENTIONAL FORMWORK DAN ALUMINIUM FORMWORK DITINJAU DARI SEGI BIAYA DAN WAKTU (Studi Kasus : Proyek Apartemen Cisauk Point, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIYATNA, ADI SIFA (2019) METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK GRAHA PARAMITA BINTARO TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SUPRIYATNA, NANA (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK FAKULTAS KEDOKTERAN UHAMKA. S1 thesis, Universitas Mercu Buana Jakarta.

SURAHMAN, ARIS (2020) ANALISIS PERBANDINGAN METODE FORMWORK KONVENSIONAL DAN FORMWORK PANEL TIPE ALUMUNIUM TERHADAP BIAYA DAN WAKTU ( Studi Kasus : Proyek Satoria Office Surabaya ). S1 thesis, Universitas Mercu Buana Jakarta.

SURAHMAN, ARIS (2020) PEKERJAAN PELAT LANTAI DAN KOLOM PADA PROYEK APARTEMEN URBAN SKY - BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

SURAJI, IMAM (2019) ANALISIS KEBUTUHAN AIR IRIGASI PADA WILAYAH KECAMATAN CARENANG KABUPATEN SERANG BANTEN. S1 thesis, Universitas Mercu Buana.

SURENTU, SANDI ARUNG (2022) ANALISIS PEMILIHAN MODA TRANSPORTASI UNTUK PERJALANAN KERJA MENUJU PT AJ CENTRAL ASIA RAYA TOMANG JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SURIYANINGSIH, NI MADE (2018) ANALISIS ALOKASI RISIKO PADA PEMBANGUNAN INTEGRATED TUNNEL JAKARTA DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU). S1 thesis, Universitas Mercu Buana Bekasi.

SURYADI, WIWIT (2019) ANALISA KESELAMATAN DAN KINERJA LALU LINTAS AKIBAT PEKERJAAN PADA RUAS JALAN TOL TANGERANG - MERAK (Studi Kasus : Proyek Penambahan lajur ke-3 pada Jalan Tol Tangerang-Merak, KM 47+700 s/d KM 51+700). S1 thesis, Universitas Mercu Buana Jakarta.

SURYANA, ADE (2022) ANALISIS PERBANDINGAN METODE TIANG PANCANG HYDRAULIC DAN METODE TIANG PANCANG DIESEL HAMMER TERHADAP BIAYA DAN LOKASI PELAKSANAAN (STUDI KASUS PROYEK PEMBANGUNAN MALL LIVING WORLD KOTA WISATA CIBUBUR). S1 thesis, Universitas Mercu Buana Bekasi.

SURYANA, AGUS (2023) ANALISIS KARAKTERISTIK RUANG PARKIR DAN KINERJA RUAS JALAN MASJID AL –HAWI JALAN RAYA CONDET (STUDI KASUS : MASJID AL – HAWI JALAN RAYA CONDET). S1 thesis, Universitas Mercu Buana Bekasi.

SURYATI, ETI (2023) ANALISIS PENANGANAN GENANGAN DI KAWASAN JALAN LOKASI SEKOLAH BPK PENABUR DI PERUMAHAN CIPINANG INDAH I JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SUSANTI, APRILIA (2023) ANALISIS PERCEPATAN WAKTU (CRASHING) MENGGUNAKAN SISTEM PENAMBAHAN JAM KERJA PADA PEKERJAAN FINISHING LANTAI DASAR DENGAN METODE PDM (PRECENDENCE DIAGRAMMING METHOD) (Studi kasus : Proyek Pembangunan Aula GKP Paroki Rawamangun). S1 thesis, Universitas Mercu Buana Bekasi.

SUSANTI, AYU CITRA RIZKI SOFIYAN (2020) PERANCANGAN HOTEL DAN M.I.C.E YANG MENDUKUNG TRANSPORT HUB PADA KAWASAN YANG BERORIENTASI TRANSIT DI CIBUBUR. S1 thesis, Universitas Mercu Buana Bekasi.

SUSANTI, ELI (2019) ANALISIS PERENCANAAN SISTEM PERPIPAAN AIR GAMBUT MENJADI AIR BERSIH, DENGAN SISTEM BRACKISH WATER REVERSE OSMOSIS (BWRO) PADA DISTRIK NURSERY AIR SUGIHAN, PALEMBANG-SUMATERA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SUSANTO, ERICK (2023) PERBANDINGAN ANALISIS GEMPA GEDUNG 11 LANTAI DENGAN PENDEKATAN PERLETAKAN JEPIT DAN SOIL-STRUCTURE INTERACTION PADA SITUS TANAH LUNAK DI KAWASAN PANTAI INDAH KAPUK 2. S1 thesis, Universitas Mercu Buana Jakarta.

SUSANTO, FATHURROZI BAGAS (2020) ANALISIS PERBANDINGAN KOLOM PADA STRUKTUR SISTEM OPEN FRAME DENGAN DUAL SYSTEM STUDI KASUS PROYEK URBAN SIGNATURE OF LRT CITY CIRACAS, JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SUSANTO, JOKO ADI (2022) ANALISIS PENJADWALAN PROYEK PEMBANGUNAN GEDUNG SEKOLAH OLAHRAGA 9 LANTAI FAMBAM ACADEMY MENGGUNAKAN METODE CPM DAN PERT. S1 thesis, Universitas Mercu Buana Jakarta.

SUSANTO, KEANE ANDREEJAN (2023) IMPLEMENTASI BUILDING INFORMATION MODELLING (BIM) PADA PROYEK PEMBANGUNAN JALAN TELUK TAPANG (STA 35+700 - STA 42+800). S1 thesis, Universitas Mercu Buana.

SUSIANTI, ANTI (2023) PENINGKATAN KINERJA BIAYA DAN WAKTU BERBASIS LEAN SIX SIGMA DAN LAST PLANNER SYSTEM PADA PEKERJAAN BENDUNGAN. S2 thesis, Universitas Mercu Buana.

SUSILO, BUDI (2023) STABILISASI TANAH LEMPUNG DENGAN CAMPURAN SEMEN PADA PROYEK JALAN TOL CIAWI – SUKABUMI SEKSI 2 RUAS CIGOMBONG – CIBADAK STA 13+650 – 26+500. S1 thesis, Universitas Mercu Buana Bekasi.

SUSILO, MUHAMAD TOMMY (2019) ANALISIS KARAKTERISTIK KEBUTUHAN RUANG PARKIR (STUDI KASUS DI RS SENTRA MEDIKA CIBINONG). S1 thesis, Universitas Mercu Buana.

SUWANTO, DANIEL (2020) ANALISIS PERBANDINGAN PEKERJAAN DINDING MENGGUNAKAN PRECAST ACOUTEC DAN BATA RINGAN DILIHAT DARI SISI WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN GUDANG DI DELTA SILICON 8 LIPPO CIKARANG. S1 thesis, Universitas Mercu Buana Bekasi.

SUWARDI, SUWARDI (2017) PENGAMATAN METODE PELAKSANAAN BEKISTING SYSTEM PADA PROYEK OFFICE BLOCK THE AIRPORT CITY. S1 thesis, Universitas Mercu Buana Jakarta.

SUYUDI, ACHMAD ROFIANTO (2018) ANALISIS ARUS LALU LINTAS DAN RUAS JALAN DI SIMPANG TAK BERSINYAL TIGA LENGAN MENGGUNAKAN METODE MANUAL KAPASITAS JALAN INDONESIA (MKJI) 1997 (STUDI KASUS SIMPANG SUMBER ARTHA JL. KH NOER ALI). S1 thesis, Universitas Mercu Buana Bekasi.

SWANDANU, NDARU (2018) ANALISIS FAKTOR KETERLAMBATAN PADA PEKERJAAN FINISHING DI PROYEK APARTEMENT M-TOWN RESIDENCE. S1 thesis, Universitas Mercu Buana Bekasi.

SWASTI, SANI SONA (2020) ANALISIS PEGUNAAN WELDED ANGLE & DROP HOLLOW SEBAGAI REUSABLE TEMPORARY SUPPORTING PADA SLAB METALDECK DITINJAU DARI KINERJA BIAYA DAN WAKTU ( Studi kasus : Proyek Indonesia 1 Jakarta ). S1 thesis, Universitas Mercu Buana Bekasi.

SYACH, NOER ADJI ISKANDAR (2022) ANALISA KECELAKAAN LALU LINTAS DAN ALTERNATIF PENANGGULANGANNYA PADA JALAN RAYA TLAJUNG UDIK, GUNUNG PUTRI, KAB.BOGOR. S1 thesis, Universitas Mercu Buana Bekasi.

SYAFEI, MUHAMMAD RIANTO (2020) KAJIAN RASIO LUAS PENAMPANG DAN POSISI DINDING GESER TERHADAP DAYA SERAP GAYA LATERAL BANGUNAN STUKTUR GANDA. S1 thesis, Universitas Mercu Buana.

SYAFI''I, LEVIN MUHAMAD (2017) METODE PEKERJAAN PELAT LANTAI DENGAN MENGGUNAKAN BEKISTING BONDEK PADA PROYEK PEMBANGUNAN GEDUNG TELKOM LANDMARK TOWER - JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SYAFI'I, AHMAD (2022) PERBANDINGAN VARIASI BENTUK PENAMPANG KOLOM TERHADAP PERILAKU STRUKTUR DALAM MENAHAN GAYA GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

SYAFITRI, RIMA DEAMAS (2023) ANALISIS PUSHOVER STRUKTUR GEDUNG BETON BERTULANG BERDASARKAN ATC-40 DAN FEMA 440 (Studi Kasus : Gedung Apartemen 26 Lantai). S1 thesis, Universitas Mercu Buana Jakarta.

SYAH, IRVAN (2018) PELAKSANAAN PEKERJAAN FOUNDATION STEAM TURBINE BUILDING PROYEK PLTU CIREBON 2 - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHBIRIN, SAYUDHA PATRIA (2023) PENGARUH PENERAPAN KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA PADA PEMBANGUNAN GEDUNG BINAMARGA DAN SUMBER DAYA AIR TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHDEINI, RAYHAN (2020) PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DAN PILE CAP PADA PROYEK KLAPA VILLAGE Pondok Kelapa - Jakarta Timur. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHDEINI, RAYHAN (2021) PENGARUH BAHAN TAMBAH TALC DAN CELLULOSA RICE FIBER PADA CAMPURAN ASPHALT CONCRETE-WEARING COURSE (AC-WC) TERHADAP NILAI PROPERTIES MARSHALL DAN DURABILITAS. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHPUTRA, RIDHO (2019) ANALISIS PENYEBAB TERJADINYA PEKERJAAN REPAIR PADA HIGH RISE BUILDING (Studi Kasus : Thamrin Nine Project, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

SYAHRI, BILAL BANI (2021) ANALISIS DAMPAK LALU LINTAS AKIBAT ADANYA AKTIFITAS PASAR PALMERAH JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHRI, BILAL BANI (2019) METODE PELAKSANAAN GEOFORCE SEGMENTAL RETAINING WALL PADA PROYEK PEMBANGUNAN JALAN TOL CENGKARENG - BATU CEPER - KUNCIRAN. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHRUL, M (2019) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP OPERATION & MAINTENANCE PADA STADION SEPAK BOLA DI INDONESIA. S1 thesis, Universitas Mercu Buana Bekasi.

SYAIFULLAH, MUHAMAD NURRAHMAN (2018) EVALUASI PELAKSANAAN SISTEM KESELAMATAN KERJA PADA PROYEK PLTU BATANG STUDI KASUS PT. X SUBKON DARI MITSUI ENGINEERING & SHIPBUILDING CO.,LTD. S1 thesis, Universitas Mercu Buana Bekasi.

SYIFA, SAVITRI NURUL (2021) ANALISIS PERENCANAAN PERBAIKAN TANAH LUNAK DENGAN MENGGUNAKAN STONE COLUMN (Studi Kasus: Perencanaan Proyek Pembangunan Simpang Susun Jalan Tol Serang-Panimbang Sta. 1+825 – Sta. 2+200). S1 thesis, Universitas Mercu Buana Jakarta.

SYUKRA, AHMADI (2019) EVALUASI PERUBAHAN DESAIN AKIBAT PENAMBAHAN KOLAM RENANG PADA GEDUNG HOTEL IBIS TRANSPARK BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

Saphira, Dara Syifa (2023) ANALISIS PERBANDINGAN ESTIMASI BIAYA PELAKSANAAN PEKERJAAN KOLOM DENGAN DIMENSI YANG BERVARIASI BERDASARKAN PERATURAN MENTERI PUPR 2016, SNI 2008 DAN AHSP 2021 PADA KONSTRUKSI GEDUNG (Studi Kasus: Proyek Pembangunan Hotel JHL Gallery Gading Serpong, Tangerang). S1 thesis, UNIVERSITAS MERCU BUANA.

Saphira, Dara Syifa (2023) ANALISIS PERBANDINGAN ESTIMASI BIAYA PELAKSANAAN PEKERJAAN KOLOM DENGAN DIMENSI YANG BERVARIASI BERDASARKAN PERATURAN MENTERI PUPR 2016, SNI 2008 DAN AHSP 2021 PADA KONSTRUKSI GEDUNG (Studi Kasus: Proyek Pembangunan Hotel JHL Gallery Gading Serpong, Tangerang). S1 thesis, UNIVERSITAS MERCU BUANA.

Sidik, Fajar (2017) IDENTIFIKASI NILAI KARAKTERISTIK CAMPURAN ASPAL BETON LAPIS AUS ( AC WC ) DENGAN ADDITIVE KARET ALAM. S1 thesis, Universitas Mercu Buana Jakarta.

Suganda, Said (2023) ANALISIS PRODUKTIVITAS DAN KOMBINASI ALAT BERAT TERHADAP WAKTU DAN BIAYA PADA PEKERJAAN TANAH (STUDI KASUS: PROYEK JALAN SUMMARECON BOGOR). S1 thesis, Universitas Mercu Buana - Buncit.

Suharno, Suharno (2013) TINJAUAN KHUSUS PEKERJAAN PLATFORM DI PROYEK SATRIO SQUARE OFFICE TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

Suhendri, (2018) PENGARUH KADAR LUMPUR DAN ORGANIK PADA PASIR SILIKA BELITUNG TERHADAP PENGGUNAAN POLYCARBOXYLATE ETHER ADMIXTURE PADA BETON MUTU TINGGI. S1 thesis, Universitas Mercu Buana Bekasi.

Suseno, Rezky Satrio (2017) STUDI PARAMETRIK KOEFISIEN PENENTU DIMENSI KOLOM STRUKTUR BERATURAN PADA KATEGORI DESAIN SEISMIK C. S1 thesis, Universitas Mercu Buana Jakarta.

Susilo, Bhekti (2022) ANALISA KINERJA U-TURN / MANUVER BERBALIK ARAH DEPAN ITC PERMATA HIJAU-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

Swandanu, Ndaru (2018) ANALISIS FAKTOR KETERLAMBATAN PADA PEKERJAAN FINISHING DI PROYEK APARTEMENT M-TOWN RESIDENCE. S1 thesis, Universitas Mercu Buana Bekasi.

Syahbimataka, Ghea Sanyanan (2023) EVALUASI ANTRIAN AREA PARKIR SIAP MUAT DERMAGA EKSEKUTIF PELABUHAN PENYEBERANGAN BAKAUHENI. S1 thesis, Universitas Mercu Buana - Buncit.

TAHANI, SYERIN NISRINA (2021) PENGARUH JALUR GANDA TERHADAP PERJALANAN KERETA API DI DAERAH OPERASI 1 JAKARTA (Studi Kasus: Lintas Rangkasbitung-Merak). S1 thesis, Universitas Mercu Buana Jakarta.

TAMA, HAIKAL PUTRA (2019) ANALISIS KINERJA RUAS JALAN DAN SIMPANG TAK BERSINYAL DENGAN METODE MKJI 1997 (STUDI KASUS SIMPANG TIGA LENGAN JALAN JAGAKARSA RAYA-JALAN JERUK RAYA). S1 thesis, Universitas Mercu Buana Bekasi.

TAMBUNAN, DANIEL RIZKY (2020) PENGARUH PEMANFAATAN SERAT BAMBU DAN SUBSTITUSI GYPSUM DENGAN SEMEN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

TAMPUBOLON, LUHUT MANAHAN (2020) ANALISA PERBANDINGAN METODE CHEMICAL ANCHOR SYSTEM DAN KONVENSIONAL PADA BALOK SEPARATOR DITINJAU TERHADAP BIAYA DAN WAKTU (Studi Kasus : Proyek Apartemen Arandra Residence, Cempaka Putih). S1 thesis, Universitas Mercu Buana Jakarta.

TANJUNG, GALEN (2019) ANALISIS PERBANDINGAN BIAYA PEKERJAAN UPPER STRUCTURE LANTAI TIPIKAL DENGAN MENGGUNAKAN BALOK BETON DAN BALOK BAJA (STUDI KASUS: PERENCANAAN SINARMAS TOWER JAKARTA). S1 thesis, Universitas Mercu Buana Bekasi.

TANTOWI, TANTOWI (2019) EVALUASI RENCANA PELEBARAN JALAN DI JEMBATAN BARU KAPUK RAYA DI TINJAU DARI ASPEK LALU LINTAS JALAN RAYA (Studi Kasus : Pada Jembatan Baru Kapuk Raya, Jakarta Barat). S1 thesis, Universitas Mercu Buana.

TARIGAN, YANSEN IMANUEL (2019) ANALISA KERUSAKAN DAN PERBAIKAN PERKERASAN FLEXIBLE PADA JALAN PERKOTAAN Studi Kasus : Jalan I Gusti Ngurah Rai Ruas Stasiun Cakung – Bekasi. S1 thesis, Universitas Mercu Buana Bekasi.

TAUFIK, BAYU MUHAMAD (2017) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN JEMBATAN BAJA SEBAGAI ALTERNATIF PENGGANTI JEMBATAN BETON PADA PERKEBUNAN SINARMAS DI REGION RIAU. S1 thesis, Universitas Mercu Buana Jakarta.

TAUFIK, REZA IRFAN (2019) METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK APARTEMENT OSAKA RIVERSIDE TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

TELAUMBANUA, REINHARD PUTRA BABTISTA (2019) PENGAMATAN STRUKTUR ATAS PADA PROYEK APARTEMEN SEDAYU CITY @KELAPAGADING. S1 thesis, Universitas Mercu Buana Jakarta.

TETUKO, DANANG WISNHU (2019) PENGARUH BAHAN RAMAH LINGKUNGAN ABU TEMPURUNG KELAPA SEBAGAI BAHAN SUBTITUSI SEMEN TERHADAP MUTU BETON. S1 thesis, Universitas Mercu Buana.

TOHARI, ASEP (2017) PERENCANAAN SISTEM DRAINASE BERWAWASAN LINGKUNGAN (ECO-DRAIN) PADA GEDUNG BERTINGKAT (STUDI KASUS : KOMPLEK SAMPOERNA STRATEGIC SQUARE). S1 thesis, Universitas Mercu Buana Jakarta.

TONDANG, RIO MANCONUARI (2018) METODE PELAKSANAAN PEKERJAAN BALOK DAN PLAT LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

TRIANING, CITRA and LAOLI, ALNIS GUSTIN (2017) ANCHORAGE OF BEAM AND SHEARWALL ( PENJANGKARAN PADA BALOK DAN DINDING GESER ). S1 thesis, Universitas Mercu Buana Jakarta.

TRIATMIKO, BAGAS AGUNG (2018) KETERKAITAN MUTU DAN WAKTU TERHADAP MASS CONCRETE RAFT FOUNDATION PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

TRIONO, PANGKI ARIF (2018) ALTERNATIVE DESAIN STRUKTUR BETON BERTULANG PADA PROYEK RUMAH SAKIT ROYAL DENTAL. S1 thesis, Universitas Mercu Buana.

TRIONO, WAHYU JOKO (2019) ANALISIS KINERJA RUAS JALAN DAN SIMPANG TAK BERSINYAL TIGA LENGAN DENGAN METODE MANUAL KAPASITAS JALAN INDONESIA 1997 (STUDI KASUS SIMPANG JL. RAYA SERANG JL. RAYA BITUNG, TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.

TRIYADANA, NURHADI (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

TRIYANTO, OKY (2017) PENGAMATAN METODE PELAKSANAAN BEKISTING SYSTEM PADA PROYEK OFFICE BLOCK THE AIRPORT CITY. S1 thesis, Universitas Mercu Buana Jakarta.

TRIYONO, (2018) ANALISIS PEKERJAAN SHEAR WALL DENGAN METODE PENGECORAN PER LANTAI DAN METODE RAIL CLIMBING SYSTEM DARI SEGI WAKTU. S1 thesis, Universitas Mercu Buana Bekasi.

TRIYONO, (2018) ANALISIS PEKERJAAN SHEAR WALL DENGAN METODE PENGECORAN PER LANTAI DAN METODE RAIL CLIMBING SYSTEM DARI SEGI WAKTU. S1 thesis, Universitas Mercu Buana Bekasi.

TRIYUNIARWARDANA, DANIEL SONIARDI (2022) ANALISIS TINGKAT KEPUASAN TERHADAP PELAYANAN TERMINAL PENUMPANG PELABUHAN TANJUNG PRIOK BERDASARKAN STANDAR PELAYANAN MINIMAL. S1 thesis, Universitas Mercu Buana Jakarta.

TUGOR, MUHAMMAD TAMBUN (2016) STRUKTUR BAWAH BASEMENT PROYEK ROSEVILLE & SUITE BSD CITY - RANGGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

TUMIN, (2022) STUDI EKSPERIMENTAL PEMANFAATAN LIMBAH BOTTOM ASH SEBAGAI SUBTITUSI MATERIAL AGREGAT HALUS PADA PEMBUATAN MORTAR GEOPOLIMER. S1 thesis, Universitas Mercu Buana Bekasi.

TUNNUR, ZAHARA (2021) ANALISIS KINERJA DAN TINGKAT PELAYANAN FASILITAS PEJALAN KAKI DI KAWASAN STASIUN PASAR MINGGU. S1 thesis, Universitas Mercu Buana Jakarta.

TURFERIS, ANDRI (2019) DESAIN ULANG STRUKTUR GEDUNG BERTINGKAT DENGAN EFEKTIVITAS LETAK DAN TINGGI CORE WALL. S1 thesis, Universitas Mercu Buana Jakarta.

TYASTANTRI, HERNA SUKMANING (2023) ANALISIS BEBAN KENDARAAN TERHADAP KERUSAKAN PERKERASAN LENTUR DI JALAN RAYA NAROGONG KOTA BEKASI. S1 thesis, Universitas Mercu Buana Bekasi.

UMAM, KOMARUL (2020) ANALISIS PERBANDINGAN BIAYA PEKERJAAN BEKISTING PLAT MENGGUNAKAN METODE SISTEM (TABLE FORM) DAN SEMI SISTEM PADA PROYEK APARTEMEN MEIKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

UMAM, SIRAJUL (2021) ANALISIS PERAN DAN KINERJA OWNER SEBAGAI PENGAWAS DALAM PROYEK MULTI KONTRAKTOR DENGAN MENGGUNAKAN METODE BALANCED SCORECARD (Studi Kasus : Proyek Pembangunan dan Pengembangan pada Area Taman Impian Jaya Ancol). S1 thesis, Universitas Mercu Buana Jakarta.

UMAMI, IBNU (2020) ANALISIS STRUKTUR GUDANG AKIBAT PENAMBAHAN BEBAN HOIST CRANE 10 TON. S1 thesis, Universitas Mercu Buana Jakarta.

UMAMI, IBNU (2019) “PERBAIKAN TANAH MENGGUNAKAN METODE PVD PADA PROYEK RUNWAY 3” (STUDI KASUS : BANDAR UDARA SOEKARNO-HATTA). S1 thesis, Universitas Mercu Buana Jakarta.

USTIARTI, FIEKA RARA (2019) TINGKAT PERUBAHAN TAMPAK BANGUNAN DAN DAMPAK VISUAL PADA PERUMAHAN TAMAN WISMA ASRI, BEKASI UTARA Studi Kasus: Jl. Taman Wisma Asri, Teluk Pucung, Bekasi Utara. S1 thesis, Universitas Mercu Buana Jakarta.

UTAMI, GHINA (2018) ANALISIS FAKTOR - FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK GRAND CLASSIC CIKARANG. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, DWI ARIYADI (2018) STUDI EKSPERIMENTAL KUAT TEKAN BETON RIGID PAVEMENT DENGAN MENGGUNAKAN ACCELERATOR PAC (POLY ALUMUNIUM CHLORIDE) DAN GULA TEBU (SUCROSE). S1 thesis, Universitas Mercu Buana Bekasi.

UTOMO, PRASTYO (2018) PERENCANAAN ROYAL ORCHARD YOGYAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, PUJI (2020) ANALISIS PERCEPATAN DURASI PROYEK DENGAN METODE PERTUKARAN WAKTU DAN BIAYA (TIME COST TRADE OFF METHOD) DENGAN ALTERNATIF PENAMBAHAN JAM KERJA DAN PENAMBAHAN JUMLAH TENAGA KERJA. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, SRI PUJI (2023) EVALUASI PENJADWALAN PROYEK SHOWROOM DAN KANTOR ALTO LINK DENGAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM). S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, WAWAN SETIO BUDI (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK APARTMENT T PLAZA PEJOMPONGAN JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, YUDHI (2022) ANALISIS DAERAH RAWAN KECELAKAAN DI RUAS JALAN ALTERNATIF CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

UZMA, SYAFAATUL (2022) ANALISIS MANAJEMEN RISIKO TERHADAP PELAKSANAAN PROYEK RUMAH SUSUN PADAT KARYA. S1 thesis, Universitas Mercu Buana Jakarta.

VAHIRA, RANA REZA (2020) Perencanaan Gedung Park and Ride Di Alun Alun Kota Bekasi. S1 thesis, Universitas Mercu Buana Bekasi.

VANANDA, DWI FITRA (2020) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI PADA PROYEK APARTEMEN TAMAN SARI BINTARO MANSION. S1 thesis, Universitas Mercu Buana Jakarta.

VANESA, YUZA GIRA (2022) ANALISIS PERBANDINGAN WAKTU PADA METODE PEKERJAAN SLAB PRECAST DENGAN KOMBINASI SLAB IN SITU PADA PROYEK JALAN TOL CIBITUNG - CILINCING SEKSI IV. S1 thesis, Universitas Mercu Buana Jakarta.

VEBRUARA, RINGGO (2020) ANALISIS NERACA AIR DANAU KONSERVASI CITRA RAYA UNTUK OPTIMALISASI KEBUTUHAN AIR BERSIH DI KAWASAN CITRA RAYA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

VIRGIANTO, AFIF PUDJI (2019) ANALISIS SISTEM SALURAN DRAINASE PERUMAHAN THE GREEN VIEW BEKASI. S1 thesis, Universitas Mercu Buana.

W, M. ARIEF PRASETYO. (2023) PENINGKATAN JALAN MENGGUNAKAN RIGID PAVEMENT DENGAN METODE BINA MARGA 2003, AASHTO 1993 DAN PCA DI KABUPATEN ASAHAN. S1 thesis, Universitas Mercu Buana Jakarta.

WAHAB, RIZKA AZIZ (2022) PEMODELAN GENANGAN BANJIR MENGGUNAKAN SOFTWARE ArcGIS dan HEC-geoRAS Studi Kasus : Bendungan Pidekso, Kabupaten Wonogiri. S1 thesis, Universitas Mercu Buana Jakarta.

WAHONO, NANANG ASEP (2018) LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

WAHONO, WAHONO (2022) FAKTOR-FAKTOR KETERLAMBATAN PROYEK RUMAH MEWAH (Study Kasus Proyek Rumah Mewah Yang Dikerjakan Oleh PT. APS ). S1 thesis, Universitas Mercu Buana Jakarta.

WAHYU LESTARI, DIAS (2022) EVALUASI KINERJA STRUKTUR GEDUNG PERKANTORAN 12 LANTAI DENGAN METODE PUSHOVER ANALYSIS BERDASARKAN SNI 1726:2019. S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUDI, DIKI (2020) ANALISA TINGKAT KEPUASAN PARKIR PADA PASAR IKAN MODERN MUARA BARU TERHADAP PENGUNJUNG PASAR IKAN MODERN MUARA BARU JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUDI, DIKI (2018) PROYEK PEKERJAAN KONSTRUKSI PEMBANGUNAN GEDUNG ASEAN SECRETARIAT (ASEC). S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUDI, INDRA (2023) ANALISIS SUMBER RISIKO K3 PADA PEKERJAAN BEKISTING BALOK DAN PELAT (Studi Kasus : Proyek Warehouse DLP (Depok Logistic Property) Depok). S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUDI, M. ANDI (2020) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN TENAGA KERJA DAN JAM KERJA (LEMBUR) MENGGUNAKAN METODE TIME COST TRADE OFF (Studi kasus: Pembangunan Proyek Apartment The Conexio). S1 thesis, Universitas Mercu Buana Bekasi.

WAHYUDI, MUHAMMAD (2021) ANALISIS PENGARUH JUMLAH KENDARAAN TERHADAP KERUSAKAN PADA JALAN RAYA STUDI KASUS : (Jalan Raya Parung Panjang – Jalan Mohammad Toha). S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUNI, DWI (2023) PENERAPAN VALUE ENGINEERING DALAM PEMILIHAN JENIS BEKISTING BALOK DAN PLAT LANTAI PADA PROYEK RUMAH SUSUN PULO JAHE. S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUNI, INDAH DWI (2019) Metode Pelaksanaan Pekerjaan Bekisting Aluminium Pada Pembagunan The Ayoma Apartment JL. Ciater Barat, Rw. Buntu - Tangerang Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUNINGSIH, DIAN (2019) PENGGUNAAN SAFETY SCREEN SEBAGAI IMPLEMENTASI K3L PROYEK APARTEMEN PERMATA HIJAU SUITES (PHS). S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUNINGTYAS, ALIFFA (2022) PENGARUH PENGGUNAAN ABU SEKAM PADI SEBAGAI FILLER AGREGAT HALUS PADA SELF-COMPACTING CONCRETE (SCC) TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

WALDHANI, TIA RAHMA (2020) ANALISIS INFRASTURKTUR JALUR SEPEDA DI JAKARTA UNTUK MENINGKATKAN KENYAMANAN PESEPEDA. S1 thesis, Universitas Mercu Buana Bekasi.

WALUYO, AGUS (2019) PENGARUH SUBTITUSI MATERIAL SEMEN DENGAN NIKEL SLAG PADA CAMPURAN BETON K 600 TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

WARDANA, AGUNG KUSUMA (2022) EVALUASI WAKTU DAN BIAYA PEKERJAAN GAS IN PELANGGAN PADA PROYEK PEMBANGUNAN JARINGAN (PIPA) GAS RUMAH TANGGA (JARGAS) (Studi Kasus Pembangunan Jargas APBN Kota Bandar Lampung Tahun 2020). S1 thesis, Universitas Mercu Buana Jakarta.

WARDANI, KUSUMAH ANGGA (2020) ANALISIS PERBANDINGAN BALOK PADA STRUKTUR SISTEM OPEN FRAME DENGAN DUAL SYSTEM STUDI KASUS GEDUNG ORANGE COUNTY TOWER C-D LIPPO CIKARANG. S1 thesis, Universitas Mercu Buana Jakarta.

WARIH, SASMITA TRI HIDAYAH (2020) ANALISIS PRODUKTIVITAS TENAGA KERJA TERHADAP PENYELESAIAN DEFECT DAN PENGGUNAAN CHECKLIST DIGITAL PADA PROYEK APARTEMEN EMBARCADERO. S1 thesis, Universitas Mercu Buana Jakarta.

WARYANTO, HERU (2019) ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK KONSTRUKSI LIPPO THAMRIN OFFICE TOWER JAKARTA PUSAT MENURUT PERSEPSI KONTRAKTOR. S1 thesis, Universitas Mercu Buana Jakarta.

WASKITO, ARIO (2021) ANALISIS GEOMETRI JALAN REL MRT JAKARTA PETAK CIPETE RAYA – HAJI NAWI UNTUK REKOMENDASI PERAWATAN PERIODIK (Studi Kasus : Rel Meliuk Pada Track). S1 thesis, Universitas Mercu Buana Jakarta.

WIBAWA, JULIANDRO AKHMAD (2020) PENGARUH KUALITAS PELAYANAN DAN FASILITAS TERHADAP KEPUASAN PENUMPANG LRT JAKARTA RUTE VELODROME – PEGANGSAAN DUA. S1 thesis, Universitas Mercu Buana Jakarta.

WIBAWA, RICKY SATRIA (2019) PERANCANGAN BANGUNAN HOTEL DAN RESORT. S1 thesis, Universitas Mercu Buana Jakarta.

WIBISONO, ANOM (2018) ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN DERMAGA (FIDIC Rainbow Contract 2017). S2 thesis, Universitas Mercu Buana Jakarta.

WIBISONO, ASTRIO (2020) PEKERJAAN PONDASI BORED PILE PADA PROYEK PASAR SAMBOJA JATINEGARA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, AGUSTINUS SETYO (2018) KAJIAN EKSPERIMENTAL PENGARUH PENAMBAHAN LIMBAH TETES TEBU (MOLASSES) TERHADAP KUAT TEKAN CAMPURAN BETON BERBASIS FLY ASH. S1 thesis, Universitas Mercu Buana Bekasi.

WIBOWO, ANDRIE (2018) PEKERJAAN BEKISTING KONVENSIONAL PADA PLAT LANTAI APARTEMENT BELLEVUE PLACE - JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, CORNELIA ARIE (2019) PERANCANGAN RUMAH SAKIT IBU DAN ANAK JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, DAMAR PRAWITA (2023) ANALISIS PEMANFAATAN LIMBAH CANGKANG TELUR SEBAGAI BAHAN CAMPURAN SEMEN PADA PEMBUATAN BETON RAMAH LINGKUNGAN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

WIBOWO, DIAN HARIYADI (2019) KAJIAN TINGGI SHEARWALL EFEKTIF PADA STRUKTUR DUAL SYSTEM BERTAPAK L. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, DODI TRI (2018) EFISIENSI PEMBERIAN AIR IRIGASI DI SALURAN SEKUNDER SOKAWANGI, KECAMATAN TAMAN, KABUPATEN PEMALANG, JAWA TENGAH. S1 thesis, Universitas Mercu Buana.

WIBOWO, FAJAR ADI (2019) PELAKSANAAN PEKERJAAN ALUMUNIUM FORM PROYEK APARTEMEN SYNTHESIS JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, FEBRY SRI (2021) EVALUASI PERENCANAAN FONDASI BORED PILE PADA PROYEK PEMBANGUNAN GEDUNG PELAYANAN RUMAH SAKIT JANTUNG HARAPAN KITA JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, JANUARKO ADI (2023) ANALISIS EFISIENSI KINERJA WAKTU MELALUI PENERAPAN BUILDING INFORMATION MODELING (BIM) 4D PADA PROYEK HALTE BUS RAPID TRANSIT (BRT). S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, REZA ARYANTO (2019) METODE PELAKSANAAN BORE PILE PADA PROYEK DHARMAWANGSA TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, SATRIA ANGGAYUH (2023) EFEKTIVITAS PENEMPATAN SHEARWALL PADA BANGUNAN RUMAH SAKIT. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, SYAEFUDIN (2018) PENGAMATAN PEKERJAAN TIANG PANCANG PROYEK MAZDA SHOWROOM SIMPRUG Jl. Teuku Nyak Areif, Jakarta Selatan Depan Halte Busway Simprug. S1 thesis, Universitas Mercu Buana Jakarta.

WICAKSANA, ARDI NOOR (2024) PENGARUH SUBTITUSI SEBAGIAN AGREGAT KASAR DENGAN CANGKANG KERANG TERHADAP KUAT TEKAN BETON DENGAN BAHAN ADITIF ABU TERBANG. S1 thesis, Universitas Mercu Buana Jakarta.

WICAKSONO, BILIATER BAGUS (2022) ANALISIS PENGENDALIAN BANJIR DI SALURAN PRIMER KAMAL JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

WICAKSONO, SATRIA ADE (2022) IMPLEMENTASI BIM PADA PROSES QUANTITY TAKE-OFF PEKERJAAN STRUKTUR ELEVATED ROAD TRANSYOGI STA 27+070-STA 28+812 PROYEK JALAN TOL CIMANGGIS-CIBITUNG SEKSI 2. S1 thesis, Universitas Mercu Buana Bekasi.

WICAKSONO P S, HARRY (2018) STUDY KASUS PERENCANAAN ULANG STRUKTUR ATAS APARTEMENT PRIMA ORCHARD DENGAN MENGGUNAKAN SISTEM FLAT SLAB. S1 thesis, Universitas Mercu Buana Bekasi.

WIDHYASTARI, ARSITA NURANNISA (2019) PENGAMATAN PROYEK APARTMENT MANGKULUHUR CITY Jalan Jenderal Gatot Subroto kav. 1-3, Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANI, DINI (2019) ANALISA KONSEP NILAI HASIL PADA PROYEK KONSTRUKSI GUNA MENINGKATKAN EFISIENSI WAKTU DAN BIAYA (Studi Kasus Proyek Penataan Taman Masjid Agung Baiturahman Kabupaten Tasikmalaya). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) EFISIENSI SISTEM PONDASI (GABUNGAN TIANG PANCANG DAN RAFT FOUNDATION) STRUKTUR GEDUNG DI ATAS TANAH LUNAK (STUDI KASUS PROYEK PEMBANGUNAN APARTEMEN ACACIA TOWER 30 LANTAI DI CIKARANG). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK BOXIES 123 BOGOR - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANTO, BAGAS LEGO (2020) PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA DKI JAKARTA TAHAP IB SEKSI A ZONA 5 JALAN RAYA BEKASI, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANTORO, RIZAL (2022) PEMODELAN PROBABILISTIK UNTUK MEMPREDIKSI PENYEBAB KETERLAMBATAN PADA TAHAP PEKERJAAN STRUKTUR ATAS (Studi Kasus: Pembangunan Proyek CWP02 UPI Bandung, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIASTUTI, `INDRIANI EKA (2023) PENINGKATAN KINERJA WAKTU DAN MUTU MENGGUNAKAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) DAN LEAN SIX SIGMA PADA STRUKTUR ATAS BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

WIDIYASTANTO, SARJI (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE) PADA PROYEK PEMBANGUNAN CIPUTRA INTERNATIONAL PROPAN TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

WIDYANTO, ROBERTUS ALFIAN (2017) PENGKAJIAN EFISIENSI MANAJEMEN KLAIM PENAMBAHAN BIAYA DAN WAKTU BERDASARKAN KAIDAH FIDIC CONDITION OF CONTRACT FOR CONSTRUCTION DAN LUMP SUM FIX PRICE PADA PROYEK HIGH RISE BUILDING. S1 thesis, Universitas Mercu Buana Jakarta.

WIGUNA, DICKY SYAN PUTRA (2021) ANALISIS WAKTU PENYELESAIAN PEMASANGAN BOX GIRDER DENGAN FULL SPAN LAUNCHER METHOD (FSLM) (Studi Kasus : Proyek Kereta Cepat Jakarta - Bandung Section 1). S1 thesis, Universitas Mercu Buana Jakarta.

WIJATMOKO, (2022) PENGARUH KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA PADA PEKERJAAN STRUKTUR ATAS LANTAI 40 – 60 DIMASA PANDEMI COVID-19 STUDI KASUS PROYEK GEDUNG THAMRIN NINE TOWER 2 – JAKARTA (PERIODE OKTOBER 2020 S/D NOVEMBER 2021). S1 thesis, Universitas Mercu Buana Bekasi.

WIJAYA, ABIDARDA ALWI (2023) ANALISIS RISIKO DARI FAKTOR OWNER, TIM PELAKSANA, DAN EKSTERNAL TERHADAP KINERJA WAKTU PADA PROYEK DESIGN AND BUILD JEMBATAN. S2 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, ABIDARDA ALWI (2020) PEMANFAATAN LIMBAH KERAMIK DAN ABU AMPAS TEBU DALAM PERENCANAAN BETON RINGAN. S1 thesis, Universitas Mercu Buana.

WIJAYA, AL VIAN RIZKI (2021) STUDI KELAYAKAN RENCANA PEMBANGUNAN PERUMAHAN DI JALAN NAGRAK CIANGSANA, CIBUBUR, KABUPATEN BOGOR,JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, ANDRI (2020) ANALISIS PENGARUH BANGKITAN PERGERAKAN PERMUKIMAN TERHADAP KINERJA RUAS JALAN (STUDI KASUS PERUMAHAN COCO GARDEN RESIDENCE KELAPA NUNGGAL-KABUPATEN BOGOR ). S1 thesis, Universitas Mercu Buana Bekasi.

WIJAYA, DENY SAPUTRA (2023) ANALISIS PEMILIHAN MODA TRANSPORTASI ONLINE DAN KONVENSIONAL DI TERMINAL JATIJAJAR KOTA DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, DINNA DEWINDA (2017) IDENTIFIKASI RISIKO BAHAYA KERJA DI DAERAH BERTEGANGAN TINGGI PADA SWITCHYARD GARDU INDUK (GI) 150 KV SUNYARAGI - CIREBON. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, HADI (2019) ANALISIS KINERJA RUAS JALAN DAN SIMPANG TIGA LENGAN TAK BERSINYAL JALAN CIPAYUNG RAYA DAN JALAN BINA MARGA JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana.

WIJAYA, IKHSAN ANANTO (2024) ANALISIS BIAYA PELAKSANAAN PEKERJAAN PONDASI METODE TIANG PANCANG BAJA SEBAGAI ALTERNATIF PENGGANTI METODE TIANG PANCANG BETON PADA JEMBATAN BENTANG PANJANG (Studi Kasus : Proyek Pembangunan Jalan Tol Ruas Binjai – Langsa Seksi Binjai – Pangkalan Brandan, Medan). S1 thesis, Universitas Mercu Buana - Buncit.

WIJAYA, REZKY (2021) ANALISIS FAKTOR-FAKTOR PENYEBAB REWORK PADA PROYEK KONSTRUKSI THE PAKUBUWONO MENTENG (STUDI KASUS: APARTEMEN THE PAKUBUWONO MENTENG). S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, ROY CAHYA (2024) ANALISIS PENJADWALAN PROYEK PEMBANGUNAN GEDUNG SUMBER DAYA AIR 6 LANTAI MENGGUNAKAN METODE CPM DAN PDM. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, SETYO ADI (2020) METODE PERBAIKAN STRUKTUR DINDING BASEMENT PADA PROYEK PEMBANGUNAN RUMAH SAKIT MANDAYA. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYANTO, IMAM AZIZ (2023) ANALISIS FAKTOR PELAKSANAAN TERHADAP KINERJA BIAYA DANWAKTU SELAMA PANDEMI COVID-19 PADA PROYEK PEMBANGUNAN INFRASTRUKTUR TRANSPORTASI. S2 thesis, Universitas Mercu Buana Jakarta.

WIJAYANTO, RICKY (2019) ANALISA PERBANDINGAN DINDING BATA MERAH DENGAN DINDING M-SYSTEM DITINJAU DARI KUAT TEKAN, WAKTU DAN BIAYA. S1 thesis, Universitas Mercu Buana Bekasi.

WIJDAN, WIJDAN (2016) PEMBANGUNAN RUMAH SUSUN KS. TUBUN JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

WIJIANTY, PIPIT (2018) ANALISIS WAKTU PEKERJAAN STRUKTUR DENGAN METODE CRITICAL PATH METHOD (CPM) (Studi Kasus Proyek Pembangunan Rumah Dinas Anggota Puslabfor Polri Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

WILDAN, DANDI (2018) INSTALASI DAN MAINTENANCE GPS TRACKING PADA KENDARAAN RODA EMPAT DI PT. PRIMANUSA GLOBALINDO. S1 thesis, Universitas Mercu Buana Jakarta.

WINATA, CHRISTHOPER ANDELUS (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA PRODUKSI BOX GIRDER CAST IN SITE (Studi Kasus : Kereta Cepat Jakarta – Bandung). S1 thesis, Universitas Mercu Buana Jakarta.

WINDA, M. JAKA (2021) ANALISA PENGARUH BUKAAN DINDING GESER PADA BANGUNAN GEDUNG ARSIP DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

WINDYANTO, ACHMAD (2022) ANALISIS BIAYA DAN WAKTU AKIBAT PERUBAHAN DESAIN PADA STRUKTUR BAWAH PONDASI MESIN DALAM RANGKA PENURUNAN BIAYA KONSTRUKSI (Studi Kasus: Project Pembangkit Listrik Tenaga Mesin Gas (PLTMG) Nunukan 2 – 10MW Fixed Type Gas Engine Power Plant Package II, Nunukan, Kaltara). S1 thesis, Universitas Mercu Buana Jakarta.

WIRATAMA, ADHITYA (2020) EVALUASI KINERJA HALTE PURIBETA 2 BUS TRANSJAKARTA DAN KINERJA TRANSJAKARTA KORIDOR 13A. S1 thesis, Universitas Mercu Buana Jakarta.

WULANDARI, CITRA ASTRI (2018) PERENCANAAN GEDUNG KANTOR DIREKTORAT JENDERAL PAJAK YOGYAKARTA DENGAN MENGGUNAKAN STRUKTUR KOMPOSIT. S1 thesis, Universitas Mercu Buana Jakarta.

WULANDARI, POPPY (2018) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO METODE PELAKSANAAN SHEAR WALL (Jalan Raya Jombang No. 42, Parigi, Pondok Aren, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

WULANDARI, YOSI (2022) PENGARUH TILANG ELEKTRONIK TERHADAP KINERJA LALU LINTAS (STUDI KASUS: SIMPANG PANCORAN JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

Wahyuningsih, Ita (2017) TINJAUAN PERENCANAAN DRAINASE PEMUKIMAN PADA KOMPLEK PERUMAHAN SUMMARECON BEKASI DEVELOPMENT (LOT II). S1 thesis, Universitas Mercu Buana Jakarta.

Widarta, Indra Wangsa (2017) EVALUASI KINERJA RUAS DAN SIMPANG JALAN RAYA PAMULANG II. S1 thesis, Universitas Mercu Buana Jakarta.

YAHYA, MUHAMMAD AMMAR HILMI (2022) ANALISIS KECELAKAAN LALU LINTAS MENGGUNAKAN METODE UPPER CONTROL LIMIT (UCL) (STUDI KASUS: JALAN PERCETAKAN NEGARA, JAKARTA PUSAT). S1 thesis, Universitas Mercu Buana Jakarta.

YANDA, GEFRI (2020) ANALISIS INVESTASI, RETURNS DAN RISIKO TERHADAP IMPLEMENTASI BUILDING INFORMATION MODELING PADA PROYEK KONSTRUKSI DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

YANTI, RISMA DEVI (2018) PELAKSANAAN PEKERJAAN BORE PILE PROYEK APARTEMEN EMERALD BINTARO TOWER B. S1 thesis, Universitas Mercu Buana Jakarta.

YANTO, HARI (2024) ANALISIS PERBAIKAN TANAH LUNAK MEGGUNAKAN METODE VACUUM PRELOADING & PREFABRICATED VERTICAL DRAIN (PVD) PADA AREA ALUMINA PLANT. S1 thesis, Universitas Mercu Buana Jakarta.

YANTO, HERI (2023) ANALISIS RISK MATURITY LEVEL PADA BUMN KARYA DI INDONESIA BERBASIS ISO 31000:2018 DENGAN METODE FORUM GROUP DISCUSSION (FGD). S2 thesis, Universitas Mercu Buana Jakarta.

YANTO, HERI (2020) EVALUASI SISTEM MANAJEMEN MUTU ISO 9001 : 2015 PADA PROYEK RANCANG BANGUN RUSUNAMI TRANSIT ORIENTED DEVELOPMENT TANJUNG BARAT (Studi Kasus : Proyek Pembangunan Rancang Bangun Rusunami Transit Oriented Development Tanjung Barat, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

YANUAR, DIKA (2021) “KAJIAN PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA DI PROYEK TERHADAP PEKERJAAN BERISIKO TINGGI” (Studi Kasus : Proyek UIN STS Jambi). S1 thesis, Universitas Mercu Buana Jakarta.

YASA, MOHAMMAD ADY (2019) PERENCANAAN SISTEM PENYEDIAN AIR BERSIH PADA GEDUNG RAINBOW SPRINGS CONDOVILLAS TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

YASIN, M.NUR (2020) EARNED VALUE ANALYSIS TERHADAP WAKTU PADA PROYEK PEMBANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Bekasi.

YESIKA, YESIKA (2021) PERBANDINGAN ANALISA HARGA SATUAN METODE BOW, SNI DAN MODERN (Pekerjaan Bored Pile Pada Proyek Mall dan Apartemen Lampung City). S1 thesis, Universitas Mercu Buana Jakarta.

YHANTY, REBECCA CHRISTINA (2023) ANALISIS PRODUKTIVITAS HYDRAULIC STATIC PILE DRIVER PADA PEKERJAAN PONDASI TIANG PANCANG Studi Kasus : Bangunan Hydrofil IPA Bekasi Proyek Sistem Penyediaan Air Minum Regional Jatiluhur 1. S1 thesis, Universitas Mercu Buana Jakarta.

YOCIENT, NOVIE (2021) ANALISIS RISIKO PERIZINAN DAN PEMBEBASAN LAHAN YANG BERPENGARUH PADA KINERJA PROYEK PEMBANGUNAN TRANSIT ORIENTED DEVELOPMENT/ TOD TANJUNG BARAT. S2 thesis, Universitas Mercu Buana Jakarta.

YOGA, HERI DIO PRIMA (2020) EVALUASI KONDISI JALAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) PADA RUAS JALAN R.E MARTADINATA, TANJUNG PRIOK. S1 thesis, Universitas Mercu Buana Jakarta.

YOGAPURNO, CAHYO (2022) STUDI GELOMBANG KEJUT DAN ANALISIS ANTRIAN PADA PERSIMPANGAN JALAN DAN JALAN REL (Studi Kasus: Persimpangan Jalan Rel Sebidang Stasiun Sudimara). S1 thesis, Universitas Mercu Buana Jakarta.

YOGATAMA, ARIF (2019) METODE PELAKSANAAN BORE PILE PADA PROYEK DHARMAWANGSA TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

YOHANDRA, YOGI (2017) ANALISIS DAN PERENCANAAN SISTEM DRAINASE PERKOTAAN MENGGUNAKAN PROGRAM EPA SWMM 5.1 PADA KELURAHAN LUBUK BEGALUNG KECAMATAN LUBUK BEGALUNG KOTA PADANG SUMATERA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

YUDIANTO, FALLDY (2022) ANALISIS MODIFIKASI STRUKTUR GALLERY & LEG EKSISTING CONVEYOR AKIBAT PENAMBAHAN KAPASITAS PRODUKSI BATUBARA (Studi Kasus Proyek BLC Upgrade 2000 TPH Kalimantan Timur). S1 thesis, Universitas Mercu Buana Jakarta.

YUDITIAR, ANGGA RAHMAT (2023) ANALISA GETARAN TERHADAP STRUKTUR JALAN REL PADA BANTALAN REL AKIBAT BEBAN DINAMIK KERETA API (Studi Kasus : Jalur Stasiun Tambun - Stasiun Bekasi Timur dan Stasiun Rawabuaya - Stasiun Kalideres ). S1 thesis, Universitas Mercu Buana Bekasi.

YULIAN, YUDA DWI (2022) ANALISIS SISTEM DRAINASE UNTUK MENANGGULANGI BANJIR DI PULAU UNTUNG JAWA KECAMATAN KEPULAUAN SERIBU SELATAN DKI JAKARTA. S1 thesis, Universitas Mercu Buana Bekasi.

YULIANTI, YESSY (2020) PELAKSANAAN PEKERJAAN KOLOM KOMPOSIT PADA PROYEK INDONESIA 1. S1 thesis, Universitas Mercu Buana Jakarta.

YULIANTO, ROBY SUGARA TRI (2019) PERANCANGAN SYSTEM INSTALASI PLTS ON-GRID UNTUK MENGOPTIMALKAN DAYA OPERATIONAL PADA GEDUNG BERTINGKAT DI APARTMENT TAMAN ANGGREK-TOWER E. S1 thesis, Universitas Mercu Buana Jakarta.

YULIARIF, BIMO (2017) SISTEM PERKUATAN KOLOM 12 METER PROYEK VERDE TWO APARTEMENT KUNINGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

YUNA, SYAWALIZA INDAH SARI (2023) STUDI KETERLAMBATAN PROYEK BERBASIS SISTEMATICS LITERATURE REVIEW. S1 thesis, Universitas Mercu Buana Jakarta.

YUNIAR, DITA (2023) ANALISIS HUBUNGAN ANTARA NILAI PAVEMENT CONDITION INDEX (PCI) DAN SURFACE DISTRESS INDEX (SDI) TERHADAP KERUSAKAN JALAN PADA RUAS JALAN RAYA NAROGONG. S1 thesis, Universitas Mercu Buana Bekasi.

YUNIEKA, NILA (2019) ANALISIS RESPON GETARAN PADA STRUKTUR BANGUNAN AKIBAT AKTIVITAS MANUSIA (Studi Kasus : Proyek Revitalisasi Wisma 48 Sport Center & Café). S1 thesis, Universitas Mercu Buana Bekasi.

YUNISYAHPUTRI, ALYA (2023) EVALUASI TINGKAT PENCAHAYAAN PADA RUAS JALAN JOGLO RAYA, JAKARTA BARAT. S1 thesis, Universitas Mercu Buana.

YUNITA, KURNIAWATI SUKMA (2019) ANALISIS KINERJA RUAS JALAN DAN SIMPANG TAK BERSINYAL (Studi Kasus Simpang Tiga Lengan Jalan Raya Jatikramat – Jalan dr. Ratna Jatiasih Kota Bekasi). S1 thesis, Universitas Mercu Buana Bekasi.

YUNITA, YUNITA (2023) ANALISIS KETERLAMBATAN PELAKSANAAN PEKERJAAN PROYEK MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA) (Studi Kasus : Pembangunan Proyek Rukan Batavia PIK Jakarta Utara). S1 thesis, Universitas Mercu Buana Jakarta.

YUNUS, IRFAN (2018) ANALISA PERKERASAN JALAN MENGGUNAKAN METODE MDP 2017 (Studi Kasus Jalur Trans Jakarta Koridor 10). S1 thesis, Universitas Mercu Buana Bekasi.

YUPPIE S, CHRISTIANTO (2020) ANALISIS KINERJA SUPPLY CHAIN MANAGEMENT MENGGUNAKAN METODE SUPPLY CHAIN OPERATIONS REFERENCE DAN ANALYTICAL HIERARCHY PROCESS PADA PROYEK APARTEMEN GREEN AVENUE BEKASI TIMUR. S1 thesis, Universitas Mercu Buana Bekasi.

YURISDAL, YURISDAL (2022) ANALISIS BIAYA PEKERJAAN REINFORCED CONCRETE PIER PADA PROYEK LIGHT RAIL TRANSIT DENGAN PENERAPAN REKAYASA NILAI. S2 thesis, Universitas Mercu Buana Jakarta.

YURRAZAK, IKBAL (2022) ANALISIS PENGARUH PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2015 TERHADAP KUALITAS PROYEK PADA PROYEK KONSTRUKSI GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

YUSUF, MOHAMAD (2019) PRESERVASI JALAN CILEGON - TANJUNG LESUNG. S1 thesis, Universitas Mercu Buana Jakarta.

YUSUF, MUHAMMAD (2022) ANALASIS FAKTOR FAKTOR PENGHAMBAT PEMODELAN UNTUK IMPLEMENTASI BUILDING INFORMATION MODELLING (IMB)PADA PROYEK BANGUNAN GEDUNG (Studi Kasus : Proyek Kawasan Traspark Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

YUSUF, SINATRYA (2019) ANALISIS KINERJA SIMPANG BERSINYAL DAN RUAS JALAN DENGAN METODE MKJI 1997 (Studi Kasus Simpang PGC Jl. Raya Bogor – Jl. Dewi Sartika Jakarta Timur). S1 thesis, Universitas Mercu Buana Bekasi.

YUTANTYO, RISKY PRADITYA (2022) ANALISIS KARAKTERISTIK PARKIR DAN KINERJA RUAS JALAN DI RUMAH SAKIT PADA MASA PANDEMI COVID 19 (STUDI KASUS RUMAH SAKIT MEILIA). S1 thesis, Universitas Mercu Buana Bekasi.

Yogaricatya Najemudin, Bramadi (2017) Analisis Efektivitas metode pelaksanaan dan Efisiensi Biaya dengan Metode Time Cost Trade Off Pekerjaan Jalan dan Saluran Rukan Palladium Proyek Golf Island, Pantai Indah Kapuk. S1 thesis, Universitas Mercu Buana Jakarta.

Z.H, MIKHA NEHEMIA (2021) ANALISIS UPAYA PENCEGAHAN DAN PENANGANAN WASTE MATERIAL PADA PROYEK APARTEMEN THE PAKUBUWONO MENTENG. S1 thesis, Universitas Mercu Buana Jakarta.

ZABIDI, FARHAN (2022) ANALISIS SAMBUNGAN END PLATE NON SEISMIC PADA BANGUNAN INDUSTRI PT. PRATAMA ABADI INDUSTRI. S1 thesis, Universitas Mercu Buana Bekasi.

ZAENUDDIN, MOH (2019) STUDI EKSPERIMENTAL PENGARUH FLY ASH TERHADAP ULTRA HIGH STRENGTH CONCRETE. S1 thesis, Universitas Mercu Buana Bekasi.

ZAGOTO, ILHAM KHARISMA (2020) EVALUASI PERFOMANCE JALAN PERKOTAAN (Jalan Panjang Arteri Kelapa Dua Raya). S1 thesis, Universitas Mercu Buana Jakarta.

ZAHRAN, ARIIQ MUHAMMAD (2020) LAPORAN PELAKSANAAN PEKERJAAN BALOK DAN PELAT PADA PROYEK PONDOK INDAH MALL 3 & OFFICE TOWER, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ZAHRAN, ARIIQ MUHAMMAD (2020) PENGARUH NILAI CBR TERHADAP TEBAL PERKERASAN LENTUR DENGAN METODE ANALISA KOMPONEN SKBI 1987 DAN METODE AASHTO 1993 (STUDI KASUS RUAS JALAN CAKUNG- CILINCING). S1 thesis, Universitas Mercu Buana Jakarta.

ZAHRIYAH, TAHTIDA (2019) PENGARUH DIVISI SUPPLY CHAIN MANAGEMENT (SCM) PADA PERUSAHAAN “X” UNTUK MENINGKATKAN KINERJA PENGADAAN MATERIAL RIGID PAVEMENT DI PROYEK KONSTRUKSI (STUDI KASUS PROYEK PEMBANGUAN JALAN TOL TRANS SUMATERA PAKET 1 RUAS BAKAUHENI – SIDOMULYO). S1 thesis, Universitas Mercu Buana Bekasi.

ZARKAS, ADHITYA (2020) IDENTIFIKASI HAMBATAN PENERAPAN LEAN CONSTRUCTION PADA PROYEK JAKARTA BANDUNG HIGH SPEED RAILWAY. S1 thesis, Universitas Mercu Buana Jakarta.

ZAVIRA, DIAN (2021) ANALISA RUAS JALAN TERHADAP ANTRIAN DAN TUNDAAN DI REL KERETA API (Studi kasus : Jalan Semanan Raya). S1 thesis, Universitas Mercu Buana Jakarta.

ZENICA, SATRIA BUDI (2020) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BEKISTING SEMI SYSTEM DENGAN BEKISTING FULL SYSTEM KOLOM PADA BANGUNAN BERTINGKAT. S1 thesis, Universitas Mercu Buana Bekasi.

ZERLITHA, AYU DEVI (2018) ANALISIS PENERAPAN KINERJA MUTU ISO 9001:2008 PT. ADHI KARYA (Persero). Tbk PADA PROYEK RENOVASI STADION UTAMA GELORA BUNG KARNO. S1 thesis, Universitas Mercu Buana Jakarta.

ZIAURRAHMAN, MOHAMAD (2020) ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK DENGAN METODE EARNED VALUE STUDI KASUS : PROYEK 1X1000 MW COAL FIRED POWER PLANT – CIREBON 2. S1 thesis, Universitas Mercu Buana Bekasi.

ZUARNIS, IRENE (2018) ANALISA KINERJA OPERASIONAL ANGKUTAN KOTA (Studi Kasus : Angkutan Kota Rute Tambun Selatan – Bekasi Timur). S1 thesis, Universitas Mercu Buana Bekasi.

ZULFA, DYAH ROBBIANA (2022) PENGARUH PENGGUNAAN LIMBAH GENTENG TANAH LIAT DAN ABU ARANG SEBAGAI SUBSTITUSI AGREGAT KASAR DAN SEMEN TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Bekasi.

ZULFAH, EVA (2019) ALTERNATIF DESAIN STRUKTUR GEDUNG LIPI. S1 thesis, Universitas Mercu Buana Jakarta.

ZULFIKAR, MOHAMAD (2023) ANALISIS PENGARUH TENAGA KERJA, PERALATAN, BAHAN DAN METODE KERJA TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PADA PEKERJAAN STRUKTUR PONDASI BORED PILE (Studi Kasus : Proyek Pembangunan Jembatan Callender Hamilton Di Area Jembatan Cisadane Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

ZULFIKAR, MUHAMMAD IRVAN (2017) PERANCANGAN INSTALASI LISTRIK DI HOTEL ARTOTEL JOGJA. S1 thesis, Universitas Mercu Buana Jakarta.

ZULKARNAIN, ZULKARNAIN (2018) PENGARUH PENAMBAHAN SILICA FUME PADA CAMPURAN BETON SCC DENGAN FLY ASH DAN SUPERPLATICIZER TERHADAP KEKUATAN, WORKABILITY DAN BIAYA BAHAN UNTUK CAMPURAN BETON MUTU TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

This list was generated on Fri Mar 29 14:39:52 2024 WIB.