GEOFORCE SEGMENTAL RETAINING WALL JEMBATAN TAHANG I DAN IV PANTAI INDAH KAPUK 2

MEIRANI, DIANA (2019) GEOFORCE SEGMENTAL RETAINING WALL JEMBATAN TAHANG I DAN IV PANTAI INDAH KAPUK 2. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1 Cover KP -.pdf

Download (76kB) | Preview
[img]
Preview
Text (ABSTRAK)
5 ABSTRACT.pdf

Download (115kB) | Preview
[img]
Preview
Text (LEMBAR PERNYATAAN)
3 surat pernyataan.pdf

Download (523kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
2 lembar pengesahan.pdf

Download (558kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
6 Kata Pengantar.pdf

Download (119kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
7 Daftar Isi.pdf

Download (116kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
9 Daftar Tabel.pdf

Download (82kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
8 Daftar Gambar.pdf

Download (106kB) | Preview
[img] Text (BAB I)
10 BAB 1 R2.pdf
Restricted to Registered users only

Download (725kB)
[img] Text (BAB II)
11 BAB 2 R2.pdf
Restricted to Registered users only

Download (413kB)
[img] Text (BAB III)
12 BAB 3 R2.pdf
Restricted to Registered users only

Download (488kB)
[img] Text (BAB IV)
13 BAB 4 R0.pdf
Restricted to Registered users only

Download (593kB)
[img] Text (BAB V)
14 BAB 5 R0.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB VI)
15 BAB 6 R0.pdf
Restricted to Registered users only

Download (300kB)
[img] Text (BAB VII)
16 BAB 7 R1.pdf
Restricted to Registered users only

Download (322kB)
[img] Text (BAB VIII)
17 BAB 8 ( R1 ).pdf
Restricted to Registered users only

Download (108kB)
[img] Text (DAFTAR PUSTAKA)
18 DAFTAR PUSTAKA .pdf
Restricted to Registered users only

Download (82kB)
[img] Text (LAMPIRAN)
19 LAMPIRAN.pdf
Restricted to Registered users only

Download (21MB)

Abstract

This practical work report contains methods for implementation installation of Geoforce Segmental Retaining Wall for extention to the Tahang I Bridge Project located in Pantai Indah Kapuk 2, Kosambi district, Tangerang City, Banten Province. PT. Kukuh Mandiri Lestari, as the owner gave the assignment to PT. Geoforce Indonesia, as the main contractor to build Geoforce Segmental Retaining Wall which is useful for the continuation of the construction of the bridge. The method that used in this report are observation method, interview method, descriptive method, and analys method. Implementation method of assembly geoforce segmental retaining wall are includes fabrication area preparation, installation of square pile , install levelling pad, implementation of fabric filter, landfilling, implementation of strength, hoarding reinforcement and compaction. Selection of retaining walls segmental and reinforced with square pile because after testing land power support testing is included in soft soil. Installation of sitepile as a retaining wall is felt cannot be done on soft soil if deemed necessary, it requires more depth. Keywords : Implementation method, retaining wall, compaction Laporan kerja praktik ini berisi tentang pembangunan Geoforce Segmental Retaining Wall yang berupa perpanjangan pada Proyek Jembatan Tahang I yang bertempat di Kawasan Pantai Indah Kapuk 2, Kecamatan Kosambi, Kota Tangerang, Provinsi Banten. PT. Kukuh Mandiri Lestari, selaku owner memberikan tugas kepada PT. Geoforce Indonesia, Selaku Kontraktor utama untuk membangun dinding penahan tanah segmental yang berguna untuk penerusan pembangunan jembatan utama yang sudah jadi . Metode yang digunakan dalam laporan ini adalah metode observasi, metode wawancara, metode deskriptif, dan metode analisis. Metode pelaksanaan pemasangan Geoforce Segmental Retaining Wall meliputi persiapan area fabrikasi, pemasangan square pile, pemasangan leveling pad, implementasi filter kain, implementasi kekuatan, penimbunan dan pemadatan. Pemilihan Geoforce Segmental Retaining Wall dan diperkuat dengan square pile karena setelah dilakukan pengujian daya dukung tanah termasuk pada tanah lunak. Pemasangan sitepile sebagai dinding penahan tanah dirasa tidak bisa dilakukan pada tanah lunak jika dirasa perlu, maka memerlukan kedalaman yang lebih. Kata Kunci : Metode Pelaksanaan, Dinding Penahan Tanah dan Pemadatan.

Item Type: Thesis (S1)
Call Number CD: KP/SIP. 19 226
NIM/NIDN Creators: 41115110032
Uncontrolled Keywords: Metode Pelaksanaan, Dinding Penahan Tanah dan Pemadatan.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: CALVIN PRASETYO
Date Deposited: 17 May 2023 07:06
Last Modified: 17 May 2023 07:06
URI: http://repository.mercubuana.ac.id/id/eprint/77266

Actions (login required)

View Item View Item