Items where Subject is "600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | R | S | T | U | W | Y | Z
Number of items at this level: 263.

A

ADITHYA, RIO CHANDRA (2019) METODE PELAKSANAAN PEKERJAAN GROUND ANCHOR SEBAGAI ELEMEN PENDUKUNG STRUKTUR PENAHAN TANAH. S1 thesis, Universitas Mercu Buana Jakarta.

AFANDI, MUHAMAD TOPAN (2018) PENGAMATAN PEKERJAAN STRUKTUR BAWAH (Sub Structure) PROYEK APARTEMEN SAMARA SUITES JL. GATOT SUBROTO JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AFANDY, ARIF (2018) DESAIN ALTERNATIF STRUKTUR ATAS JEMBATAN PADA JALAN KS.TUBUN TANGERANG-BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

AFANDY, ARIF and WIDODO, NANANG (2017) METODE PELAKSANAAN PELAT LANTAI PROYEK AEROPOLIS RESIDENCE 2 TOWER NEGLASARI – TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

AFRIANTI, RIFA (2018) PROYEK PEMBANGUNAN SOUTHGATE-TANJUNG BARAT JALAN RAYA TANJUNG BARAT No.163 JAGAKARSA JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

AGUSTA, YOFAN SAMAN (2018) ANALISIS WAKTU PELAKSANAAN PEKERJAAN BEKISTING SEMI MODERN DAN KONVENSIONAL PEMBANGUNAN APARTEMEN GRAND TAMAN MELATI MARGONDA 2 DEPOK MENGGUNAKAN METODE WEBCYCLONE. S1 thesis, Universitas Mercu Buana Jakarta.

AHMAD, JALIL (2019) ANALISIS PEMILIHAN PEMASOK PIPA HDPE DI PT XYZ MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP). S1 thesis, Universitas Mercu Buana Jakarta.

AJI, ARI PURNOMO (2018) LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

AKBAR, ILHAMI (2019) DESAIN PEMIPAAN PADA PENAMBAHAN WELLHEAD W-0320 DI PLATFORM BUKIT TUA - PETRONAS. S1 thesis, Universitas Mercu Buana.

AL'AS, SULTON JAMAL (2018) PEMANFAATAN PENGGUNAAN CRUMB RUBBER SEBAGAI BAHAN TAMBAH (ADDITIVE) PADA CAMPURAN ASPHALT CONCRETE – BINDER COURSE (AC – BC), DENGAN METODE UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

ALFIKI, RANDI (2019) PENGAMATAN PKERJAAN MEP PROYEK APARTMENT BREEZE TOWER BINTARO -TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ALIFIAN, RIZAL WAHYU (2019) PELAKSANAAN PEKERJAAN KONSTRUKSI BORE PILE DAN METODE PENGUJIANNYA PROYEK APARTEMEN EMERALD BINTARO JAYA. S1 thesis, Universitas Mercu Buana Jakarta.

ALVIAN, RISTU (2018) KINERJA RECLAIMED ASPAHALT PAVEMENT (RAP) DENGAN CAMPURAN ASPAL PENETRASI 60/70 DAN RESIDU OLI PADA "WARM MIX ASPHALT". S1 thesis, Universitas Mercu Buana Jakarta.

AMARULLOH, MUCHAMMAD AYUB (2019) PELAKSANAAN PRESSURE GROUTING PADA PROYEK APARTEMEN GREEN CLEOSA. S1 thesis, Universitas Mercu Buana Jakarta.

AMITRI, GUNTUR GUMELAR (2019) PERBAIKAN TANAH MENGGUNAKAN METODE PVD PADA PROYEK RUNWAY 3 (Studi Kasus: Bandar Udara Soekarno-Hatta). S1 thesis, Universitas Mercu Buana Jakarta.

AMRY, MUHAMMAD (2018) ANALISIS KONTRAK KONSTRUKSI RANCANG-BANGUN (Design-Build) DAN IMPLEMENTASINYA DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

ANDHIKA, WINDI (2018) ANALISIS KOMPONEN DAN PEMODELAN RASIO BIAYA TIDAK LANGSUNG TERHADAP NILAI KONTRAK PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRI, ANDRI (2019) EVALUASI PENERAPAN KONSEP GREEN BUILDING UNTUK KRITERIA APPROPRIATE SITE DEVELOPMENT PADA PERANCANGAN GEDUNG SEKOLAH YADIKA 1 DAN 2 TEGAL ALUR. S1 thesis, Universitas Mercu Buana.

ANDRIANTO, FAJAR and GUNAWAN, LUKMAN HAKIM (2017) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN GEDUNG PERKANTORAN OFFICE ONE JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIAWAN, FADLI and DAVYT, AL- QORANA (2017) PELAKSANAAN PEKERJAAN RAFT FOUNDATION PADA PROYEK APARTEMEN SILK TOWN TOWER ALEXANDRIA. S1 thesis, Universitas Mercu Buana Jakarta.

ANSHORI, HAFIZ (2019) ANALISIS PENJADWALAN PEKERJAAN DINDING DENGAN MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (Studi Kasus : Proyek Primrose Condovilla, Summarecon Bekasi, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

ARDI, FANI (2018) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO METODE PELAKSANAAN SHEAR WALL (Jalan Raya Jombang No. 42, Parigi, Pondok Aren, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ARDIYATO, AHMAD HERLANDY (2018) EVALUASI WAKTU PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI 2 DENGAN MENGGUNAKAN METODE PRECENDENCE DIAGRAM METHOD (PDM). S1 thesis, Universitas Mercu Buana Jakarta.

ARIANTI, ADE (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN PERMATA HIJAU SUITES Jalan Raya Kebayoran Lama No.55, Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

ARIFIANTI, AYU SETYA (2019) ANALISA KETERSEDAAN LAHAN PARKIR BAGI PENGHUNI APARTEMENT GREEN PARKVIEW. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, AGUSTINA EKA PUTRI (2018) FAKTOR – FAKTOR YANG MEMENGARUHI WAKTU PENYELESAIAN PEKERJAAN KONTRAK DESIGN AND BUILD METODE BERBASIS KINERJA PROYEK WISMA ATLET KEMAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

AVIANI, RAHMADIA NUR and RIFQI, MUHAMAD (2017) PERENCANAAN STRUKTUR STASIUN FATMAWATI MASS RAPID TRANSIT (MRT) JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

B

BAIHAQI, AHMAD (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN APARTEMEN DAAN MOGOT CITY JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

BIHALALIKA, PANDHUM (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE. S1 thesis, Universitas Mercu Buana Jakarta.

C

CAHYADI, IMAM ARIF (2019) METODE PELAKSANAAN STRUKTUR ATAS LANTAI 6 - 8 PROYEK NEW FACTORY PHASE II ( Office ) PT. SANKEI DHARMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

CHANDRA, SERLINA (2019) ANALISIS PERKUATAN STRUKTUR DENGAN METODE CONCRETE JACKETING (Studi Kasus Apartemen St.Moritz CBD Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

CHASANI, FARIS (2019) PENGAMATAN STRUKTUR KOLOM BALOK DAN PELAT LANTAI PADA PROYEK PEMBANGUNAN APARTEMENT CENTRO CITY JALAN MACAN DAAN MOGOT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

CHOLIS, AHMAD NUR (2019) ANALISA KETINGGIAN EFEKTIF GEDUNG DENGAN SISTEM PRECAST BEARING WALL (Studi Kasus Ecohome Apartment). S1 thesis, Universitas Mercu Buana Jakarta.

CHRISCAHYANTI, ERVIANA DWI (2018) ANALISIS PEMILIHAN MATERIAL RAMAH LINGKUNGAN DENGAN METODE VALUE ENGINEERING DAN ANALYTICAL HIERARCHY PROCESS (AHP) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

D

DARMAWAN, M FAHMI (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH RAFT FOUNDATION PADA PROYEK PEMBANGUNAN TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

DARMAWAN, MUHAMAD IVAN (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN PERMATA HIJAU SUITES Jalan Raya Kebayoran Lama No.55, Jakarta Selatan. S1 thesis, Universitas Mercu Buana.

DARMAWAN, MUHAMMAD IVAN (2019) PEMANFAATAN PENGGUNAAN LIMBAH BETON SEBAGAI PENGGANTI AGREGAT KASAR DAN MEDIUM PADA CAMPURAN LASTON AC-BC (ASPHALT CONCRETE – BINDER COURCE) DENGAN PENAMBAHAN ZAT ADDITIVE ANTISTRIPPING AGENT. S1 thesis, Universitas Mercu Buana Jakarta.

DERMAWAN, RAKHMAD RIZKY (2018) METODE PELAKSANAAN PEKERJAAN BALOK, PELAT, KOLOM DAN SHEAR WALL PROYEK YUKATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

DHURIA, SHELLA (2019) ANALISIS DAYA DUKUNG FONDASI TIANG PADA TANAH BERLENSA DI BORE HOLE 3 (Studi Kasus : Proyek Gedung Menara Mandiri Wijayakusuma, Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

DIAMANTA, NYDIA (2019) DESAIN ALTERNATIF GEDUNG KANTOR PUSAT PT YODYA KARYA DENGAN EFEKTIVITAS KETINGGIAN DAN LETAK DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

DZULFIKAR, MUHAMMAD (2018) KAJIAN TERHADAP PENYESUAIAN PERATURAN PEMBEBANAN JEMBATAN SNI 1725:2016 DENGAN BMS-1992 PADA BEBAN KENDARAAN DENGAN MENGGUNAKAN JEMBATAN SEDERHANA DAN MENERUS. S1 thesis, Universitas Mercu Buana Jakarta.

E

EDIAR, TIKI (2019) PENGAMATAN STRUKTUR KOLOM, BALOK DAN PELAT PT.HUTAMA KARYA (Persero). S1 thesis, Universitas Mercu Buana Jakarta.

ERNAWATI, RINA (2019) PERENCANAAN COUPLING BEAM DENGAN METODE DUAL SYSTEM STUDI KASUS PADA PROYEK APARTEMEN DI BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

ESTRALITA, DEVI (2019) PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN KEBAYORAN APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

F

FADILLAH, RIZKI (2019) PERANCANGAN MENARA LEMHANNAS DAN GEDUNG PANCA GATRA JL. MERDEKA SELATAN NO. 10 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FADLIANTO, SHALLI and ARISMA, TRIO FIKI (2017) PROYEK GRAHA CIKINI OFFICE CIKINI, JAKARTA PUSAT "METODE PEKERJAAN PELAT LANTAI KOMPOSIT BAJA DENGAN MENGGUNAKAN METODE BONDEK". S1 thesis, Universitas Mercu Buana Jakarta.

FAJRI, AGUS NUR (2018) PENGARUH ASPAL POLIMER CRUMB RUBBER PADA CAMPURAN LASTON AC-WC DENGAN KARAKTERISTIK UJI MARSHALL. S1 thesis, Universitas Mercu Buana Jakarta.

FATIMAH, NINING (2018) PROYEK APARTEMEN WEST VISTA (Jln. Lingkar Luar Barat No. 8 Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

FATIN, SABILA FAIRUZ (2019) KAJIAN PENERAPAN MATERIAL PADA SELUBUNG BANGUNAN YANG MEMPENGARUHI KENYAMANAN TERMAL PERPUSTAKAAN UMUM BANK INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

FATKHURROHMAN, FATKHURROHMAN (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN MAYAPADA HOSPITAL NEW EXTENTION 2 LEBAK BULUS-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZIAH, RATU AYU (2018) PROYEK PEMBANGUNAN GEDUNG LABORATORIUM PRASETIYA MULYA TAHAP 3 BSD TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FIRDAUS, MUHAMMAD RIZKY (2019) PENGARUH BUKAAN TERHADAP KENYAMANAN TERMAL RUANG IBADAH GEREJA HKBP KEBON JERUK. S1 thesis, Universitas Mercu Buana Jakarta.

FIRMANSYAH, ARDI (2019) KAJIAN TIPOLOGI FASADE BANGUNAN KHAS PECINAN PADA KORIDOR JALAN KISAMAUN PASAR LAMA - TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIA, ANI (2019) PEKERJAAN MEP PADA PROYEK PURI ORCHARD APARTEMENT. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIANTI, DIAN APRILIA (2018) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG ASTRA BIZ CENTER, BSD CITY. S1 thesis, Universitas Mercu Buana Jakarta.

FLIXYEN, YONATHAN CARLO (2019) PENGAWASAN PROYEK HUTAMA KARYA OFFICE JL. LETJEN M. T. HARYONO KAV 8-9 CIPINANG CEMPEDAK, JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

FUAT, ANIS (2018) PERANCANGAN INSTALASI PENERANGAN DI KANTOR TAIYUAN JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

G

GINANJAR, YUSUP (2019) PROYEK PEKERJAAN KONSTRUKSI PEMBANGUNAN GEDUNG ASEAN SECRETARIAT (ASEC). S1 thesis, Universitas Mercu Buana Jakarta.

GUMELAR, ESSA (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH RAFT FOUNDATION PADA PROYEK PEMBANGUNAN TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, BANI BUDIADI (2019) METODE PELAKSANAAN PELAT DAN BALOK PADA PROYEK DAAN MOGOT CITY APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, HENDRA (2019) SISTEM INSTALASI POWER SUPPLY PADA PHB UTAMA PT. NULAB PHARMACEUTICAL INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

GURNING, GEORGIO CALVIN SALOMO (2018) METODE PELAKSANAAN RAFT PONDASI DAN PILECAP PADA PROYEK PEMBANGUNAN GATEWAY PARK OF LRT (Jl. Kapin Raya Kampung Baru, RT.9/RW.8, Pondok Kelapa Pondokgede, Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

H

HABIBI, MUHAMMAD ARIS (2019) ANALISIS IMPLEMENTASI ISO 9001:2015 PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT (Studi Kasus PT. Hutama Karya Proyek Pengadaan Pekerjaan Konstruksi Design & Build Pengembangan RSKD Duren Sawit). S1 thesis, Universitas Mercu Buana Jakarta.

HADI, TOMMI PRASTYA (2019) METODE PELAKSANAAN PEKERJAAN DROP PANEL PADA PROYEK OFFICE CIPUTRA INTERNATIONAL TOWER 2. S1 thesis, Universitas Mercu Buana.

HADUN, HADUN (2019) PENGAMATAN PEKERJAAN M.E.P PROYEK THE AYOMA APARTMENT, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HAMID, ABDUL (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN NINES PLAZA & RESIDENCE - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HAMID, ABDUL (2018) PROYEK GEDUNG APARTAMEN THE PAKUBUWONO SPRING. S1 thesis, Universitas Mercu Buana Jakarta.

HAMZAH, FIKO FARNOLO (2019) PENGARUH VARIASI KADAR FILLER ABU CANGKANG KERANG TERHADAP PARAMETER MARSHALL DI LAPISAN LASTON AC-WC. S1 thesis, Universitas Mercu Buana Jakarta.

HANIFAN, BALQI (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK KEBAYORAN APARTEMENT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HARDIYANTI, DESIE and HALQI, ADAM AQSHA (2017) METODE PELAKSANAAN PEKERJAAN BORED PILE DAN PILE CAP PROYEK RUSUN TINGKAT TINGGI PASAR RUMPUT (Kawasan Pasar Rumput – Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

HARTANTO, INDRA (2019) PEMASANGAN INSTALASI PENANGKAL PETIR APARTEMENT TAMAN ANGGREK RESIDENCES TOWER-A - JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

HARYONO, EKO (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH PILE CAP PADA PROYEK PEMBANGUNAN JEMBATAN SUNGAI TAHANG SEDAYU INDO CITY - PANTAI INDAH KAPUK 2. S1 thesis, Universitas Mercu Buana.

HASAN, FAJAR AKHIRUDDIN (2018) ANALISIS PROSES TENDER DENGAN KOMBINASI METODE BLOCK TENDER DAN PEMILIHAN LANGSUNG MELALUI PENDEKATAN ANALYTICAL HIERARCHY PROCESS. S1 thesis, Universitas Mercu Buana Jakarta.

HASENDA, CARRERA PUTRI (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN NINES PLAZA & RESIDENCE - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, MOH. (2018) PROYEK APARTEMENT T PLAZA JL. PENJERNIHAN 1 PEJOMPONGAN JAKARTA PUSAT (Metode Pelaksanaan Dinding Shear Wall). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, MUHAMAD AZIS WAHYU (2018) STUDI VISKOSITAS PADA ASPAL MENGGUNAKAN ALAT VISKOSITAS DINAMIS, VISKOSITAS KINEMATIS, VISKOSITAS SAYBOLT FUROL DAN DYNAMIC SHEAR RHEOMETER (DSR). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RADIK FANDI (2019) PROYEK PEMBANGUNAN DAAN MOGOT CITY DAN MEISTERSTADT BATAM (PT. Megatika Internasional). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RAHMAT (2019) LAPORAN KERJA PRAKTEK STRUKTUR PROYEK GEDUNG SOUTHGATE - SERVICE APARTEMENT Tanjung Barat-Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, SYARIF (2018) STEEL CONSTRUCTION ERECTION NEW GREEN FIELD FOOD PET PLAN PROJECT (JL. Modern Industri No. IV Kawasan Modern Cikande Industrial Estate, Cikande, Serang 42186 - BANTEN). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, YADI (2019) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PADA PROYEK APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana.

HUDA, NURUL (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK APARTMENT T PLAZA PEJOMPONGAN JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

I

IMANSYAH, ASEP NUR (2017) METODE PELAKSANAAN (KOLOM TRANSFER)LANTAI 12 DI PROYEK PEMBANGUNAN GEDUNG APARTEMENT CITRA LAKE CITRA GARDEN 6 CENGKARENG. S1 thesis, Universitas Mercu Buana Jakarta.

INDARTO, RISKI (2018) METODE PEKERJAAN BEKISTING BONDEK PADA PELAT LANTAI PROYEK PEMBANGUNAN MENARA BNI PEJOMPONGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

IRDIANSAH, IVAN (2019) APARTEMEN DAAN MOGOT CITY METODE PELAKSANAN CORE WALL. S1 thesis, Universitas Mercu Buana Jakarta.

ISKANDAR, DENI (2018) KINERJA CAMPURAN ASPAL AC - WC DENGAN ASPAL PERTAMINA PENETRASI 60/70 DENGAN TAMBAHAN CAMPURAN PLASTIK BOTOL BEKAS DAN SERAT KELAPA. S1 thesis, Universitas Mercu Buana Jakarta.

ISMANTO, ADI (2019) DESAIN ALTERNATIF STRUKTUR ATAS MESS BERTINGKAT PT. NIKOMAS GEMILANG SERANG-BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

ISMANTO, HADI (2018) ANALISIS PENYELESAIAN SENGKETA KONSTRUKSI (Dewan Sengketa Vs Arbitrase) BERDASARKAN FIDIC CONDITION of CONTRACT 2017. S2 thesis, Universitas Mercu Buana Jakarta.

J

JAJULI, IRFAN NURDIN (2019) PENGARUH VARIASI TINGGI TINGKAT DAN BENTUK DENAH TERHADAP POLA SENDI PLASTIS DAN KINERJA STRUKTUR GEDUNG BERATURAN TAHAN GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

JANUARTO, JANUARTO (2018) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH DALAM PRODUKTIVITAS TENAGA KERJA BERBASIS LINE OF BALANCE PADA BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

Junianto, M Rizki (2018) METODE PELAKSANAAN PEKERJAAN BALOK, PELAT, KOLOM DAN SHEAR WALL PROYEK YUKATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

K

KARTAWIREJA, AHMAD FERDYANSYAH (2018) PEKERJAAN PEMBUATAN STRUKTUR AUTOMATEDPEOPLE MOVER SYSTEM (APMS) BANDARA INTERNASIONAL SOEKARNO-HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

KRYSTYAN, GYAN AGYE TRY (2019) PELAKSANAAN PEKERJAAN SHEAR WALL PADA PROYEK APARTMENT PROSPERITY RESIDENCE-THE LOTUS. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, AGUNG (2018) ANALISIS WORKABILITAS dan KEKUATAN CAMPURAN PERKERASAN KAKU DENGAN BAHAN ADDITIVES FLY ASH dan POZZOLITH 425 R -BASF. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ANDREW (2019) EVALUASI ANALISIS HIDROLOGI PERENCANAAN BANGUNAN KONSOLIDASI DAM (KD) 1-1 SUNGAI JENEBERANG, DESA LONJOBOKO’, KECAMATAN PARANGLOE, KABUPATEN GOWA, SULAWESI SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ANDREW (2019) EVALUASI ANALISIS HIDROLOGI PERENCANAAN BANGUNAN KONSOLIDASI DAM (KD) 1-1 SUNGAI JENEBERANG, DESA LONJOBOKO’, KECAMATAN PARANGLOE, KABUPATEN GOWA, SULAWESI SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ASEP (2019) LAPORAN KERJA PRAKTEK STRUKTUR PROYEK GEDUNG SOUTHGATE - SERVICE APARTEMENT Tanjung Barat-Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, MUHAMAD RUDI (2018) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK KONTRUKSI GEDUNG BERTINGKAT (Studi Kasus : Proyek Palm Regency Apartement & Mall, Ciledug, Tangerang ). S1 thesis, Universitas Mercu Buana Jakarta.

KUSNANDAR, PONCO and HASAN, FUAD (2017) TINJAUAN KHUSUS PEKERJAAN STRUKTUR PEMBESIAN PONDASI PILECAP PROYEK NEW OFFICE BUILDING. S1 thesis, Universitas Mercu Buana Jakarta.

KUSSUMARDIANADEWI, B.DETTY (2018) PEKERJAAN FINISHING PENUTUP LANTAI BERBASIS VALUE ENGINEERING PADA BANGUNAN PERKANTORAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

KUSUMAWARDANI, MEIVITA (2018) PEKERJAAN STRUKTUR LIFT PANORAMIC PROYEK GALERIA MALL VIVO SENTUL-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

KUSWANTO, PINGGIR (2019) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE EXTENDED HALF SLAB PROYEK TOL DEPOK - ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.

L

LAKSANA, GELEGAR ANGGA (2019) PERENCANAAN PEMBANGUNAN T HOTEL SANUR BALI. S1 thesis, Universitas Mercu Buana Jakarta.

LAKSANA, PUTRA (2018) PERENCANAAN ULANG TEBAL PERKERASAN LENTUR JALUR PANTURA SUBANG JAWA BARAT BERDASARKAN METODE ANALISIS KOMPONEN SNI 1732-1989-F DAN METODE AASHTO 1993. S1 thesis, Universitas Mercu Buana Jakarta.

LAOLI, YUSKAR (2019) APARTEMEN DAAN MOGOT CITY METODE PELAKSANAN CORE WALL. S1 thesis, Universitas Mercu Buana Jakarta.

LATIF, RIDHWAN (2018) EARNED VALUE ANALYSIS PROYEK PEMBANGUNAN SMP NOAH DI PASAR REBO - JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

LEATEMIA, IVANA YESIKA (2019) PERUBAHAN KARAKTERISTIK FASAD PADA BANGUNAN KOLONIAL GEREJA GPIB IMMANUEL (Studi Kasus: Depok Lama, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, OCTY TRI (2019) PERENCANAAN PROYEK PEMBANGUNAN MALL ABEPURA ABEPURA - PAPUA. S1 thesis, Universitas Mercu Buana Jakarta.

M

MAFRURI, MUSTOFA (2019) PEKERJAAN BANGUNAN PARKIR PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT BPRS HIK CILEDUG. S1 thesis, Universitas Mercu Buana Jakarta.

MAHARDIKA, INDRA (2018) PENGAWASAN PROYEK DAAN MOGOT CITY JL. DAAN MOGOT KM.16, RT.9/RW.6, SEMANAN, KALIDERES, JAKARTA BARAT, 15699. S1 thesis, Universitas Mercu Buana Jakarta.

MANIHURUK, MAYASARI (2018) ANALISA KINERJA RUAS JALAN DAN SIMPANG JALAN JEND GATOT SUBROTO SETELAH PEMBANGUNAN SIMPANG SUSUN SEMANGGI. S1 thesis, Universitas Mercu Buana Jakarta.

MARDHIKA, LUQMAN (2018) METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN. S1 thesis, Universitas Mercu Buana Jakarta.

MARDIYANTO, MUHAMAD (2019) PROYEK BHUVANA RESORT CIAWI-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

MARDOTILLAH, DODI (2019) METODE PELAKSANAAN PENGECORAN PEKERJAAN PILE CAP PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, ABDUL (2018) METODE PELAKSANAAN RAFT PONDASI DAN PILECAP PADA PROYEK PEMBANGUNAN GATEWAY PARK OF LRT (Jl. Kapin Raya Kampung Baru, RT.9/RW.8, Pondok Kelapa Pondokgede, Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

MAURIZKA, NARA PANDAN (2019) METODE PELAKSANAAN PELAT DAN BALOK PADA PROYEK DAAN MOGOT CITY APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

MAYNDRO, NIKI DZUL (2019) PENGAMATAN STRUKTUR PROYEK APARTEMEN EMERALD BINTARO PT. CATURBANGUN MANDIRIPERKASA. (Jl. Jombang Raya, Parigi. Pondok Aren. Tangerang selatan). S1 thesis, Universitas Mercu Buana Jakarta.

MIHARTI, DESY (2019) PENGAMATAN PEKERJAAN ARSITEKTUR FINISHING PROYEK PEMBANGUNAN VERDE TWO CONDOMINIUMS JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MORIZA, MORIZA (2019) ANALISIS PENERAPAN PENGAKUAN PENDAPATAN DAN BEBAN ATAS JASA KONSTRUKSI BERDASARKAN PSAK NO.34 2017 (Studi Kasus Pada PT.X). S1 thesis, Universitas Mercu Buana Jakarta.

MUKTI, HALI (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

MURSIDI, ABDUL HALIL MUBARAQ (2019) PERANCANGAN ALTERNATIF STRUKTUR GEDUNG 15 LANTAI DENGAN EFEKTIFITAS TATA LETAK DAN KETINGGIAN DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

MURWATI, SITI (2018) ANALISA PONDASI TIANG PANCANG DENGAN PENGUJIAN CONE PENETRATION TEST/SONDIR PADA BANGUNAN WATER FEATURE PROYEK LAVON SWANCITY CIKUPA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

MURWATI, SITI and TAUFIK, TAUFIK (2017) METODE PELAKSAAN PEKERJAAN PONDASI RAFT PADA PROYEK MENARA JAKARTA KEMAYORAN. S1 thesis, Universitas Mercu Buana Jakarta.

MUSLIM, ADIB (2019) PERENCANAAN ULANG STRUKTUR ATAS HOTEL H CIREBON MENGGUNAKAN METODE FLAT SLAB DENGAN DROP PANEL. S1 thesis, Universitas Mercu Buana Jakarta.

MUSTAQIM, SEPTIAN SETO GILANG (2018) STRUKTUR PROYEK GEDUNG MABES POLRI SISI BARAT KEBAYORAN BARU-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MUYADI, HARDY (2019) ANALISA KINERJA TERMAL TERHADAP FASADE BANGUNAN DENGAN SOFTWARE REVIT PADA BANGUNAN HK OFFICE. S1 thesis, Universitas Mercu Buana Jakarta.

N

N, PRADANA BAYU S (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE. S1 thesis, Universitas Mercu Buana Jakarta.

NAJIB, MUHAMMAD (2018) ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG PADA TANAH GRANULER (Studi Kasus : Proyek Gudang PT Inbisco Niagatama Semesta Serang). S1 thesis, Universitas Mercu Buana.

NAJMUDDIN, FAHMI TRY (2018) ANALISIS BIAYA PELAKSANAAN PEKERJAAN BEKISTING TABLE FORM DENGAN SISTEM ZONING PADA PROYEK PEMBANGUNAN APARTEMEN VERDE II CONDOMINIUMS (EAST TOWER). S1 thesis, Universitas Mercu Buana Jakarta.

NAUFAL, ALWAN MUHAMMAD (2018) IDENTIFIKASI NILAI STABILITAS CAMPURAN BERASPAL DENGAN ABU AMPAS TEBU PADA CAMPURAN AC-BC MENGGUNAKAN METODE UJI MARSHALL DAN WHEEL TRACKING. S1 thesis, Universitas Mercu Buana Jakarta.

NAUVAL, ALFADIN AZZAHRAWAANI EL (2018) PEKERJAAN BEKISTING KONVENSIONAL PADA PLAT LANTAI APARTEMENT BELLEVUE PLACE - JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

NAUVAL, ALFADIN AZZAHRAWAANI EL (2018) PERENCANAAN STRUKTUR DERMAGA TANJUNG BATU BANGKA BELITUNG DENGAN KAPASITAS 6000 DWT. S1 thesis, Universitas Mercu Buana Jakarta.

NAWAWI, MOH. (2018) PENERAPAN LEAN CONSTRUCTION DI PEKERJAAN MEKANIKAL, ELEKTRIKAL, PLUMBING (MEP) PADA PROYEK BANGUNAN TINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

NINGRUM, NOVITA SETIYARSI CAHYA (2018) IDENTIFIKASI POTENSI BAHAYA KERJA PADA PROYEK INSTALASI VERTICAL DRAIN DAN GEOTEXTILE DI KAWASAN INDUSTRI KENDAL. S1 thesis, Universitas Mercu Buana Jakarta.

NINGSIH, RANDIKA YULIA (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH PILE CAP PADA PROYEK PEMBANGUNAN JEMBATAN SUNGAI TAHANG SEDAYU INDO CITY - PANTAI INDAH KAPUK 2. S1 thesis, Universitas Mercu Buana Jakarta.

NIZERY, CHIKA PUSPITA RETNOANDANI (2018) ANALISIS OPTIMALISASI PENEMPATAN TOWER CRANE PADA BANGUNAN BERTINGKAT TINGGI (Studi Kasus : Apartemen Green Sedayu, Cengkareng). S1 thesis, Universitas Mercu Buana Jakarta.

NOVITASARI, BETTY (2018) EVALUASI TEBAL PERKERASAN RUAS JALAN UNGARAN -BAWEN PROVINSI JAWA TENGAH. S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, RAMA (2019) PEKERJAAN ARSITEKTURAL PADA PROYEK AMAZANA SERPONG RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, ARVIANTO EKO (2019) EVALUASI KINERJA DAN PERKUATAN STRUKTUR GEDUNG GUNA ALIH FUNGSI LANTAI PADA KANTOR CAMAT KEMBANGAN JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, RAMADITA SEPTIAN (2019) ANALISIS PERBANDINGAN METODE PEKERJAAN PELAT LANTAI KONVENSIONAL DAN PELAT LANTAI HALF SLAB (Studi Kasus Proyek Pembangunan Perpustakaan Nasional RI Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

NURCAHYA, WAHID ASMARA AJI (2019) EVALUASI KINERJA TERMAL SELUBUNG BANGUNAN PADA BANGUNAN RUMAH TINGGAL DIPERUMAHAN SEKTOR V BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

NURYADI, BAYU (2019) KAJIAN FASAD BANGUNAN TERHADAP NILAI OTTV (Studi Kasus : Gereja Pouk Maranatha Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

NURYANTO, WAHYU EKO (2018) METODE PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DENGAN ALAT PANCANG HYDRAULIC STATIC PILE DRIVER (HSPD) PROYEK CENGKARENG BUSINESS CITY LOT 01 - ONE MANSION APARTEMENT & THE 101 JAC. S1 thesis, Universitas Mercu Buana Jakarta.

NURZAMAN, FAHMI and SUPIAN, SUPIAN (2017) METODE PELAKSANAAN PEKERJAAN KOLOM LANTAI 18 PROYEK PEMBANGUNAN APARTEMEN MILLENNIUM VILLAGE KARAWACI – TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

NUSANTARA, BINTANG PUTRA (2018) ANALISIS WAKTU DAN BIAYA PELAKSANAAN KONSTRUKSI PEMASANGAN (ERECTION) MENGGUNAKAN MODEL U-SHAPE GIRDER PADA PROYEK LIGHT RAIL TRANSIT (LRT)-JABODEBEK LINTAS LAYANAN TAMAN MINI - CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

O

OKTAFIAN, ANDRIANSYAH (2019) TINJAUAN PERENCANAAN STABILITAS STRUKTUR BANGUNAN PELIMPAH PADA BENDUNGAN CIAWI, KABUPATEN BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

OLDI, ISRAMI DAI and DZULFIKAR, MUHAMMAD (2017) PROYEK PEMBANGUNAN PRASARANA KERETA API RINGAN LIGHT RAIL TRANSIT (LRT) “METODE PELAKSANAAN PILE INTEGRITY TEST (PIT) UNTUK PONDASI BORE PILE”. S1 thesis, Universitas Mercu Buana Jakarta.

P

PAMBUDI, SINGGIH (2018) PERENCANAAN BETON MUTU TINGGI MENGGUNAKAN SUPERPLASTICIZER LIGNO P100 DAN ACCELERATOR LIGNO AC610. S1 thesis, Universitas Mercu Buana Jakarta.

PAMBUDI, SINGGIH (2018) PERENCANAAN BETON MUTU TINGGI MENGGUNAKAN SUPERPLASTICIZER LIGNO P100 DAN ACCELERATOR LIGNO AC610. S1 thesis, Universitas Mercu Buana Jakarta.

PAMUNGKAS, A. RISKI BANI (2019) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE EXTENDED HALF SLAB PROYEK TOL DEPOK - ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, PUTRA ENGGAL (2019) METODE PELAKSANAAN PEKERJAAN CORE WALL PADA PROYEK SOCIAL SECURITY (SS) TOWER JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

PARDOSI, IMELDA (2018) PEMANFAATAN LIMBAH SLAG NIKEL DENGAN TAMBAHAN SUPERPLASTICIZER MIGHTY 21N-1 DALAM PEMBUATAN BETON MUTU TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

PRABOWO, SANDHIYA RAHMAD (2019) PROYEK APARTEMENT CENTRO CITY TOWER WESTPOINT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PRADANA, TAUFIK FAISAL SETIA (2018) METODE PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DENGAN ALAT PANCANG HYDRAULIC STATIC PILE DRIVER (HSPD) PROYEK CENGKARENG BUSINESS CITY LOT 01 - ONE MANSION APARTEMENT & THE 101 JAC. S1 thesis, Universitas Mercu Buana Jakarta.

PRAMONO, AGUNG (2019) PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK GRAND KAMALA LAGOON BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

PRAMUDITO, HENDY (2019) PENGAMATAN PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN ASSESSMENT CENTER BSSN SAWANGAN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

PRANATA, DONY (2018) DAMPAK PELAKSANAAN METODE DEWATERING TERHADAP PEKERJAAN SEMI BASEMENT RUMAH SAKIT ABDI WALUYO. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETIYO, RIFKI NUR (2018) EVALUASI DESAIN STRUKTUR BAWAH PADA PROYEK HOTEL ALOFT TB SIMATUPANG DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYA, ADI (2018) METODE PELAKSANAAN PEKERJAAN BALOK DAN PLAT LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, AGUNG (2019) METODE KERJA PELAKSANAAN BEKISTING PADA KOLOM DENGAN MENGGUNAKAN PERI SISTEM PROYEK ROSEVILLE SOHO & SUITE BSD-TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, BAYU DHIAN (2019) METODE PELAKSANAAN RAFT FOUNDATION PROYEK APARTEMEN SAUMATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana.

PRATAMA, FREZA HADI (2019) METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK DASWIN OFFICE TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, IKHSAN DIKA (2018) METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, M. FAJAR ANGGA (2019) KAJIAN ADAPTASI FASADE BANGUNAN INDIS TERHADAP IKLIM TROPIS PADA BANGUNAN GEDUNG BIRAO SCS & KANTOR POS TEGAL DIKOTA TEGAL. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, MUHAMMAD AGIS and AMALIA, RIZKA (2017) METODE PELAKSANAAN PONDASI BORED PILE PROYEK M-TOWN OFFICE SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, NANDA DHIKA (2019) KAJIAN TINGGI EFEKTIF SHEARWALL DENGAN VARIASI LETAK DAN TEBAL SHEARWALL PADA STUDI KASUS BANGUNAN GEDUNG TIPIS MEMANJANG. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, RANDY BASTIAN (2019) METODE PELAKSANAAN STRUKTUR ATAS LANTAI 6 - 8 PROYEK NEW FACTORY PHASE II ( Office ) PT. SANKEI DHARMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

PRIYANTO, DODIK (2018) OPTIMASI KEBUTUHAN TOWER CRANE BERBASIS LEAN CONSTRUCTION PADA BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

PUJIANA, PUJIANA (2018) ANALISIS WAKTU DAN METODE PELAKSANAAN PENGGUNAAN PONDASI KONSTRUKSI SARANG LABA-LABA PADA PROYEK PEMBANGUNAN KANTOR PERWAKILAN PROVINSI KALIMANTAN UTARA DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PUJIYANTO, PUJIYANTO (2018) STUDI PERBANDINGAN STRUKTUR ATAS 16 LANTAI DENGAN SHEAR WALL TERHADAP STRUKTUR TANPA SHEAR WALL (Studi Kasus: Apartemen Verde 1 Kuningan Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

PURWANTO, HERI (2019) METODE PELAKSANAAN STRUKTUR PROYEK SOCIAL SECURITY TOWER Jl. Rasuna Said, Kav. 112 Blok B Setia Budi Jakarta. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, FITRIANSYAH ADI (2018) PERBANDINGAN PRODUKTIVITAS BERDASARKAN HARGA SATUAN KONTRAKTOR PELAKSANA DAN SNI HARGA SATUAN 2016. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, PRIMA (2018) EFEKTIVITAS PENGGUNAAN BEKISTING DENGAN MENGGUNAKAN KOMBINASI C-TRUSS DIBANDINGKAN DENGAN BEKISTING KONVENSIONAL DARI SEGI BIAYA DAN METODA PELAKSANAAN UNTUK PEMBANGUNAN COOLING TOWER PADA LAHENDONG UNIT 5 & 6 GEOTHERMAL POWER PROJECT. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RAHADIAN NOVIANSYAH and DINI, VANY DIAN (2017) PEKERJAAN BEKISTING KOLOM DAN COREWALL PADA PROYEK RUMAH SUSUN POLRI PESING Alamat : Jalan Daan Mogot No. 47 Pesing Kedoya Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RAMA DARMAWAN (2019) TINJAUAN METODE PELAKSANAAN SHEAR WALL UNTUK PROSES BANGUNAN BERTINGKAT TOWER 2 DI PROYEK SYNTHESIS RESIDENCE KEMANG, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

PUTRA, RIZKY PRAMANA (2018) PENGAMATAN PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN APARTEMEN DAAN MOGOT CITY JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, ZELIKHA SILVIANA RAHMA (2018) PROYEK PEMBANGUNAN SOUTHGATE-TANJUNG BARAT JALAN RAYA TANJUNG BARAT No.163 JAGAKARSA JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

R

RACHMAN, ROBBY AWALUDIN (2019) PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK APARTEMENT TREEPARK CITY TOWER B CIKOKOL TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RACHMAN, RYANT (2018) FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN SUPERSTRUCTURE PADA PROYEK MASS RAPID TRANSIT CP103 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

RACHMAN, TRI HADIYANTO (2019) TINJAUAN METODE PELAKSANAAN SHEAR WALL UNTUK PROSES BANGUNAN BERTINGKAT TOWER 2 DI PROYEK SYNTHESIS RESIDENCE KEMANG, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

RAHMADANI, ADE and SAPUTRA, RAMA GANEZANUNGGAL (2017) METODE PELAKSANAAN COREWALL PADA PROYEK HOTEL AMARIS BY SANTIKA. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, HAEKAL (2018) ANALISIS AKSES DAN KARAKTERISTIK PARKIR KENDARAAN PADA AREA PARKIR PUSAT PERBELANJAAN CARREFOUR LEBAK BULUS – JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHANI, SANDY MULYA (2018) PENGAMATAN STRUKTUR ATAS PADA PROYEK APARTEMEN MILLENIUM VILLAGE LIPPO KARAWACI. S1 thesis, Universitas Mercu Buana Jakarta.

RAMDANI, DANI and CAHYADI, MUH. DWIKI (2017) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN GREEN OFFICE PARK 1, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RATNADEWI, WULAN (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN ASSESSMENT CENTER BSSN SAWANGAN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

RATNASARI, DEWI (2019) PROYEK PEMBANGUNAN GEDUNG OFFICE DAN PABRIK PT. VICTORY INDAH PELANGI, JATAKE, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

REHMAWAN, MAHMUT IBNU (2019) PELAKSANAAN PEKERJAAN KONSTRUKSI BORE PILE DAN METODE PENGUJIANNYA PROYEK APARTEMEN EMERALD BINTARO JAYA. S1 thesis, Universitas Mercu Buana Jakarta.

RIANTO, MUHAMMAD RIZQI (2018) PROYEK PEMBANGUNAN GEDUNG LABORATORIUM PRASETIYA MULYA TAHAP 3 BSD TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RIFQI, MUHAMAD (2018) PEMANFAAATAN PENGUNAAN SERBUK BATA MERAH SEBAGAI FILLER PENGGANTI PADA CAMPURAN ASPHALT (AC-WC) DENGAN MENGGUNAKAN METODE UJI MARSHALL DAN WHEEL TRACKING. S1 thesis, Universitas Mercu Buana Jakarta.

RINALDHI, LUTHFI (2019) PEKERJAAN BANGUNAN PARKIR PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT BPRS HIK CILEDUG. S1 thesis, Universitas Mercu Buana Jakarta.

RISTIYAWATI, LYSA (2018) ANALISIS FAKTOR KETERLAMBATAN METODE PEMASANGAN DINDING PARAMETER LUAR (FASADE) DITINJAU DARI SEGI WAKTU PELAKSANAAN (Studi Kasus : Proyek Wisma Kartika – Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

RISWANTO, FERY (2018) PROYEK PEMBANGUNAN “HIGH RISE BUILDING” THAMRIN NINE JAKARTA PUSAT (Metode Pemasangan ATR Self – Climbing Formwork system (Auto Jump Formwork) Akibat Bertemu Dengan Balok Baja Tanam di Lantai 35). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKIYANTO, BAYU (2018) IDENTIFIKASI RISIKO KETERLAMBATAN PEKERJAAN PONDASI BORE PILE DIAMETER 1000 MM PADA PROYEK GEDUNG NINES PLAZA & RESIDENCE AT CBD SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADLAN, ARIF (2019) PROSES PEMBUATAN PANEL LVMDP PROYEK HOTEL IBIS PALEMBANG DI PT. MAHKOTA PRIMA. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADON, MUHAMMAD (2019) PENGAMATAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK PEMBANGUNAN RUSUN POLRI PESING Jl. Daan Mogot, Pesing, Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

ROSDIAWATI, FIRDA (2019) PENGAMATAN MEKANIKAL ELEKTRIKAL PLUMBING PROYEK VERDE II CONDOMINIUMS JL. KUNINGAN MULIA NO.9C, KARET, KECAMATAN SETIABUDI, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

S

SAFITRI, RIZKA (2019) ANALISIS PENGENDALIAN MUTU PADA PELAKSANAAN PEKERJAAN TIMBUNAN ZONA 1 COFFERDAM PROYEK BENDUNGAN KARIAN. S1 thesis, Universitas Mercu Buana Jakarta.

SALEH, MOHAMMAD (2019) PERENCANAAN TAHAPAN PELAKSANAAN DAN PENJADWALAN PROYEK REKLAMASI PULAU “K” MENGGUNAKAN METODE HYDRAULIC FILL DI TAMAN IMPIAN JAYA ANCOL. S1 thesis, Universitas Mercu Buana Jakarta.

SANDI, BAGUS KURNIA (2019) METODE PELAKSANAAN STRUKTUR BALOK, KOLOM, PELAT LANTAI DAN SHEAR WALL PROYEK PEMBANGUNAN GEDUNG ABADI KLENDER PT. PRAJA VITA MULIA KLENDER - JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SANDI, YISRAEL (2019) STUDI PENGAMATAN KELAYAKAN FASILITAS UNTUK DISABILITAS PADA RUANG BANGUNAN BERSEJARAH DITINJAU DARI STANDAR BANGUNAN (Museum Wayang Kota Tua). S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, AGUS (2019) EFISIENSI SUBCON DALAM PELAKSANAAN PENGECORAN PLAT LANTAI (PROYEK APARTEMEN PROSPERITY RESIDENCE THE LOTUS) JL. Kembangan Raya No. 12A. S1 thesis, Universitas Mercu Buana.

SANTOSO, DANIS EKO (2019) ANALISIS PERBANDINGAN SISTEM STRUKTUR FLATE SLAB (DROP PANEL), FLATE PLATE DAN PELAT KONVENSIONAL. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, DANIS EKO (2018) STRUKTUR PROYEK GEDUNG MABES POLRI SISI BARAT KEBAYORAN BARU-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ARDI WAHID (2019) PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING Proyek Apartemen Sedayu City at Kelapa Gading, Jakarta Utara. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, BRAM PERMADI LINTAR (2017) ANALISIS EFISIENSI DAN KEHILANGAN AIR DI JARINGAN IRIGASI DAERAH IRIGASI SUBAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, JAKA (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK KEBAYORAN APARTEMENT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, ARISKA (2019) METODE PELAKSANAAN PENGUJIAN PILE DRIVING ANALYZER (PDA TEST) PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS MUHAMMADIYAH PROF. DR. HAMKA. S1 thesis, Universitas Mercu Buana.

SAPUTRI, MASITHOH WAHYU (2019) METODE PELAKSANAAN PENGUJIAN PILE DRIVING ANALYZER (PDA TEST) PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS MUHAMMADIYAH PROF. DR. HAMKA. S1 thesis, Universitas Mercu Buana.

SAPUTRO, ARIF (2018) EVALUASI KINERJA SIMPANG TAK BERSINYAL DAN RUAS JALAN SETIA DARMA II TAMBUN SELATAN KABUPATEN BEKASI JAWA BARAT DENGAN METODE MANUAL KAPASITAS JALAN INDONESIA (MKJI) 1997. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, TOFANI WAHYU (2018) PERENCANAAN PEMBANGUNAN RUMAH SUSUN PULO GEBANG, KEL. PENGGILINGAN KEC. CAKUNG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRO, WINDI AGUNG (2018) FAKTOR - FAKTOR PENYEBAB KEMIRINGAN STRUKTUR KINGPOST PADA PEKERJAAN STRUKTUR KOLOM BASEMENT (Study Kasus INDONESIA 1). S1 thesis, Universitas Mercu Buana Jakarta.

SARAGIH, SHELLA MIKHA PUTRI PERMATA Br (2019) IDENTIFIKASI INDIKATOR PENYEBAB KETERLAMBATAN PROYEK APARTEMEN PADA PEKERJAAN ARSITEKTUR (Studi Kasus : Proyek Apartemen Bintaro Plaza Residence 2 (Breeze Tower), Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

SARI, RESKA MORULITA (2019) PENGAMATAN STRUKTUR PROYEK APARTEMEN THE LOTUS JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SATRIYANTO, SURYA HARI (2019) PENGAMATAN PEKERJAAN SISTIM MEP PROYEK RUMAH SAKIT PENDIDIKAN UKRIDA JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SEFIANITA, PETRICIA AYU (2018) PERBANDINGAN PELAKSANAAN STRUKTUR PELAT LANTAI ANTARA METODE KONVENSIONAL DENGAN PRECAST HOLLOW CORE SLAB TERHADAP WAKTU PELAKSANAAN DENGAN PROGRAM EVALUATION REVIEW TECHNIQUE (Studi Kasus : Proyek Sint Carolus Borromeus – Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

SEPTININGRUM, DHINA PUSPITA (2018) PEKERJAAN STRUKTUR LIFT PANORAMIC PROYEK GALERIA MALL VIVO SENTUL-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTIONO, ANGGA (2018) METODE PEKERJAAN BEKISTING BONDEK PADA PELAT LANTAI PROYEK PEMBANGUNAN MENARA BNI PEJOMPONGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAJI, SETIAJI (2019) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PADA PROYEK APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana.

SETIAWAN, DANIEL (2019) PELAKSANAAN KONSTRUKSI PROYEK PEMBANGUNAN PRASARANA KERETA API LIGHT RAIL TRANSIT LINTAS TAMAN MINI - CIBUBUR. S1 thesis, Universitas Mercu Buana.

SETIAWAN, YUDHI (2019) METODE PELAKSANAAN PEKERJAAN GROUND ANCHOR SEBAGAI ELEMEN PENDUKUNG STRUKTUR PENAHAN TANAH. S1 thesis, Universitas Mercu Buana Jakarta.

SETYAWATI, RENNY (2019) PERENCANAAN DAN PENGENDALIAN MATERIAL PEMBANGUNAN GEDUNG OFFICE DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT.NUSA KONSTRUKSI ENJINIRING, Tbk. S1 thesis, Universitas Mercu Buana Jakarta.

SETYOKO, IMAM (2019) PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK ARKADIA OFFICE TOWER G. S1 thesis, Universitas Mercu Buana Jakarta.

SHOLAHUDDIN, MOH. (2018) ANALISIS PERBANDINGAN WAKTU PRODUKTIVITAS CLIMBING TOWER CRANE DAN TIED IN CRANE PADA BANGUNAN GEDUNG TINGKAT TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

SIDABUTAR, TOMOK SUTRISNO (2018) DAMPAK PELAKSANAAN METODE DEWATERING TERHADAP PEKERJAAN SEMI BASEMENT RUMAH SAKIT ABDI WALUYO. S1 thesis, Universitas Mercu Buana Jakarta.

SIMANULLANG, KRISNO ARIF (2018) ANALISIS PERBANDINGAN ZONING DAN SIKLUS PADA PELAKSANAAN PEKERJAAN BEKISTING LANTAI DAN BALOK MENGGUNAKAN ALUMA SYSTEM (Studi Kasus : Proyek South Hills Apartemen Kuningan, Jakarta Selatan ). S1 thesis, Universitas Mercu Buana Jakarta.

SIMARMATA, ELDA ADRIANI (2019) ANALISIS SIMPANG BERSINYAL PADA JL. LETJEN SUPRAPTO – JL. KRAMAT KWITANG DAN JL. ST. SENEN, JAKARTA PUSAT, DKI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SITANGGANG, ANASTASIUS JACKSON M (2019) PENGARUH PENERAPAN INTEGRASI METODE PERT DAN METODE SIX SIGMA PADA PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

SOSENA, SOFYAN DIMAS (2019) METODE PELAKSANAAN MASS CONCRETE PADA RAFT FOUNDATION DI PROYEK GREEN CLEOSA APARTMENT DAN CONDOTEL. S1 thesis, Universitas Mercu Buana Jakarta.

SUGITO, SEPTIYAN CAHYO HIDAYAT (2018) PENGARUH FILLER SERBUK KAYU TERHADAP KINERJA CAMPURAN ASPAL AC WC MENGGUNAKAN METODE WARM MIX. S1 thesis, Universitas Mercu Buana Jakarta.

SUJADMIKO, ADE (2018) PROYEK APARTEMENT T PLAZA JL. PENJERNIHAN 1 PEJOMPONGAN JAKARTA PUSAT (Metode Pelaksanaan Dinding Shear Wall). S1 thesis, Universitas Mercu Buana Jakarta.

SULAIMAN, AHMAD (2019) PEKERJAAN KOLOM DENGAN METODE COUPLER PROYEK APARTEMEN SAMARA SUITES (PANCORAN - JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana.

SUPRIANTO, DHODI (2019) METODE PEKERJAAN PILE CAP PROYEK TWO SENOPATI. S1 thesis, Universitas Mercu Buana Jakarta.

SUSANTI, ELI (2019) ANALISIS PERENCANAAN SISTEM PERPIPAAN AIR GAMBUT MENJADI AIR BERSIH, DENGAN SISTEM BRACKISH WATER REVERSE OSMOSIS (BWRO) PADA DISTRIK NURSERY AIR SUGIHAN, PALEMBANG-SUMATERA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHPUTRA, RIDHO (2019) ANALISIS PENYEBAB TERJADINYA PEKERJAAN REPAIR PADA HIGH RISE BUILDING (Studi Kasus : Thamrin Nine Project, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

T

TAUFIK, BAYU MUHAMAD (2018) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN JEMBATAN BAJA SEBAGAI ALTERNATIF PENGGANTI JEMBATAN BETON PADA PERKEBUNAN SINARMAS DI REGION RIAU. S1 thesis, Universitas Mercu Buana Jakarta.

TELAUMBANUA, REINHARD PUTRA BABTISTA (2019) PENGAMATAN STRUKTUR ATAS PADA PROYEK APARTEMEN SEDAYU CITY @KELAPAGADING. S1 thesis, Universitas Mercu Buana Jakarta.

TONDANG, RIO MANCONUARI (2018) METODE PELAKSANAAN PEKERJAAN BALOK DAN PLAT LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

TRIANING, CITRA and LAOLI, ALNIS GUSTIN (2017) ANCHORAGE OF BEAM AND SHEARWALL ( PENJANGKARAN PADA BALOK DAN DINDING GESER ). S1 thesis, Universitas Mercu Buana Jakarta.

TRIYADANA, NURHADI (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

U

ULKA, RIFA KAMILIA (2019) ANALISIS PEKERJAAN PENGECORAN MENGGUNAKAN PLACING BOOM DAN SISTEM KONVENSIONAL PADA PROYEK HIGH RISE BUILDING (Studi Kasus : Proyek Thamrin Nine Tower 1, Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

UMAMI, IBNU (2019) “PERBAIKAN TANAH MENGGUNAKAN METODE PVD PADA PROYEK RUNWAY 3” (Studi Kasus : Bandar Udara Soekarno-Hatta). S1 thesis, Universitas Mercu Buana Jakarta.

USTIARTI, FIEKA RARA (2019) TINGKAT PERUBAHAN TAMPAK BANGUNAN DAN DAMPAK VISUAL PADA PERUMAHAN TAMAN WISMA ASRI, BEKASI UTARA Studi Kasus: Jl. Taman Wisma Asri, Teluk Pucung, Bekasi Utara. S1 thesis, Universitas Mercu Buana.

UTAMI, GHINA (2018) ANALISIS FAKTOR - FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK GRAND CLASSIC CIKARANG. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, PRASTYO (2019) PERENCANAAN ROYAL ORCHARD YOGYAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, WAWAN SETIO BUDI (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK APARTMENT T PLAZA PEJOMPONGAN JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

W

WAHONO, NANANG ASEP (2018) LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

WAHYUDI, DIKI (2019) PROYEK PEKERJAAN KONSTRUKSI PEMBANGUNAN GEDUNG ASEAN SECRETARIAT (ASEC). S1 thesis, Universitas Mercu Buana Jakarta.

WIBAWA, RICKY SATRIA (2019) PERANCANGAN BANGUNAN HOTEL DAN RESORT. S1 thesis, Universitas Mercu Buana Jakarta.

WIBISONO, ANOM (2018) ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN DERMAGA (FIDIC Rainbow Contract 2017). S2 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, ANDRIE (2018) PEKERJAAN BEKISTING KONVENSIONAL PADA PLAT LANTAI APARTEMENT BELLEVUE PLACE - JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, CORNELIA ARIE (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN THE SIMA OFFICE TOWER DI CILANDAK. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, DIAN HARIYADI (2019) PELAKSANAAN PRESSURE GROUTING PADA PROYEK APARTEMEN GREEN CLEOSA. S1 thesis, Universitas Mercu Buana Jakarta.

WIDHYASTARI, ARSITA NURANNISA (2019) PENGAMATAN PROYEK APARTMENT MANGKULUHUR CITY Jalan Jenderal Gatot Subroto kav. 1-3, Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) EFISIENSI SISTEM PONDASI (GABUNGAN TIANG PANCANG DAN RAFT FOUNDATION) STRUKTUR GEDUNG DI ATAS TANAH LUNAK (Studi Kasus Proyek Pembangunan Apartemen Acacia Tower 30 Lantai Di Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) EFISIENSI SISTEM PONDASI (GABUNGAN TIANG PANCANG DAN RAFT FOUNDATION) STRUKTUR GEDUNG DI ATAS TANAH LUNAK (Studi Kasus Proyek Pembangunan Apartemen Acacia Tower 30 Lantai Di Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) METODE PELAKSANAAN STRUKTUR ATAS PROYEK BOXIES 123 BOGOR - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, DINNA DEWINDA (2018) IDENTIFIKASI RISIKO BAHAYA KERJA DI DAERAH BERTEGANGAN TINGGI PADA SWITCHYARD GARDU INDUK (GI) 150 KV SUNYARAGI - CIREBON. S1 thesis, Universitas Mercu Buana Jakarta.

WIJIANTY, PIPIT (2018) ANALISIS WAKTU PEKERJAAN STRUKTUR DENGAN METODE CRITICAL PATH METHOD (CPM) (Studi Kasus Proyek Pembangunan Rumah Dinas Anggota Puslabfor Polri Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

WULANDARI, POPPY (2018) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO METODE PELAKSANAAN SHEAR WALL (Jalan Raya Jombang No. 42, Parigi, Pondok Aren, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

Y

YOHANDRA, YOGI (2017) ANALISIS DAN PERENCANAAN SISTEM DRAINASE PERKOTAAN MENGGUNAKAN PROGRAM EPA SWMM 5.1 PADA KELURAHAN LUBUK BEGALUNG KECAMATAN LUBUK BEGALUNG KOTA PADANG SUMATERA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

YULIANTO, ROBY SUGARA TRI (2019) PERANCANGAN SYSTEM INSTALASI PLTS ON-GRID UNTUK MENGOPTIMALKAN DAYA OPERATIONAL PADA GEDUNG BERTINGKAT DI APARTMENT TAMAN ANGGREK-TOWER E. S1 thesis, Universitas Mercu Buana Jakarta.

Z

ZERLITHA, AYU DEVI (2018) ANALISIS PENERAPAN KINERJA MUTU ISO 9001:2008 PT. ADHI KARYA (Persero). Tbk PADA PROYEK RENOVASI STADION UTAMA GELORA BUNG KARNO. S1 thesis, Universitas Mercu Buana Jakarta.

ZULFIKAR, MUHAMMAD IRVAN (2017) PERANCANGAN INSTALASI LISTRIK DI HOTEL ARTOTEL JOGJA. S1 thesis, Universitas Mercu Buana Jakarta.

ZULKARNAIN, ZULKARNAIN (2018) PROYEK APARTEMEN TOMANG PARK. S1 thesis, Universitas Mercu Buana Jakarta.

This list was generated on Wed Sep 18 00:11:37 2019 WIB.