ANALISIS PERBANDINGAN BIAYA DAN WAKTU SALURAN PEMBUANG DENGAN METODE PENGECORAN COR IN-SITU, SHEET PILE DAN SOLDIER PILE PADA PROYEK BENDUNGAN CIAWI

MARDIANTO, TRI WAHYU (2020) ANALISIS PERBANDINGAN BIAYA DAN WAKTU SALURAN PEMBUANG DENGAN METODE PENGECORAN COR IN-SITU, SHEET PILE DAN SOLDIER PILE PADA PROYEK BENDUNGAN CIAWI. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
02. Lembar Pengesahan .pdf

Download (126kB) | Preview
[img]
Preview
Text
01. Halaman Judul.pdf

Download (25kB) | Preview
[img]
Preview
Text
03. Lembar Pernyataan.pdf

Download (199kB) | Preview
[img]
Preview
Text
04. Abstrak .pdf

Download (210kB) | Preview
[img]
Preview
Text
05. Kata Pengantar .pdf

Download (173kB) | Preview
[img]
Preview
Text
06. Daftar isi.pdf

Download (153kB) | Preview
[img]
Preview
Text
07. Daftar Tabel .pdf

Download (150kB) | Preview
[img]
Preview
Text
08. Daftar Gambar .pdf

Download (246kB) | Preview
[img] Text
09. Bab 1.pdf
Restricted to Registered users only

Download (144kB)
[img] Text
10. Bab 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
11. Bab 3.pdf
Restricted to Registered users only

Download (516kB)
[img] Text
12. Bab 4.pdf
Restricted to Registered users only

Download (928kB)
[img] Text
13. Bab 5.pdf
Restricted to Registered users only

Download (252kB)
[img] Text
14. Daftar Pustaka.pdf
Restricted to Registered users only

Download (217kB)
[img] Text
15. Lampiran.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Judul: Analisa Perbandingan Biaya dan Waktu Saluran Pembuang Dengan Metodde Pengecoran Cor In-Situ, Sheet Pile dan Soldier Pile Pada Proyek Bendungan Ciawi, NIM: 41117120059, Dosen Pembimbing: Irriene Indah Susanti, S.T., M.T Tahun 2020. Ada beberapa metode yang dipakai dalam pelaksanaan suatu proyek salah satunya adalah metode cor in situ/konvensional yang mana dalam pelaksanaannya dilakukan di lokasi proyek. Terdapat juga metode Sheet pile yaitu proses produksi dilakukan ditempat produksi sheet pile, kemudian dibawa ke lokasi proyek untuk disusun menjadi satu kesatuan struktur yang utuh. Terdapat juga metode Soldier pile yang mana dalam pelaksanaannya dilakukan di lokasi proyek. dalam tugas akhir ini, data analisa yang diperlukan untuk perbandingan tiga metode ini adalah data sekunder. Data sekunder adalah data yang diperoleh dari pihak pelaksana pekerjaan yaitu berupa RAB, time schedule, gambar pelaksanaan. Pada tugas akhir ini direncanakan alternatif desain dengan cara perbandingan analisa biaya dan waktu pelaksanaan. Dengan analisis perbandingan metode Cor in situ, dan Sheet Pile dan Soldier Pile didapatkan hasil metode cor in situ membutuhkan waktu pelaksanaan selama 89 hari dengan biaya Rp 24,363,845,462.75, metode sheet pile membutuhkan waktu pelaksanaan selama 47 Hari dengan biaya Rp. 13,412,932,091.22 dan metode Soldier Pile membutuhkan waktu pelaksanaan selama 58 Hari dengan biaya Rp. 19,632,444,148.59 Kata kunci: Analisa biaya, Analisa Waktu, Cor in situ, sheet pile, soldier pile Title: Comparative Analysis of Sewerage Cost and Time with In-Situ Casting, Sheet Pile and Soldier Pile Methods at the Ciawi Dam Project, NIM: 41117120059, Advisor: Irriene Indah Susanti, S.T., M.T Year 2020. There are several methods used in project implementation, one of which is the conventional method in which the implementation is carried out at the project site. There is also the Sheet pile method, where the production process is carried out at the sheet pile production site, then taken to the project site to be arranged into a single, unified structure. Location is also the Soldier pile method which in its implementation is carried out at the project site. In this final project, the data analysis needed to compare the three methods is secondary data. Secondary data is data obtained from the executor of the work, namely in the form of RAB, time schedule, and drawings of the implementation. In this final project, the design is planned by means of cost analysis and implementation comparison. With the comparative analysis of the Cor in situ method, and the Sheet Pile and Soldier Pile method, the results of the cast in situ method require 89 days of implementation at a cost of Rp. 24,363,845,462.75, the sheet pile method requires implementation time of 47 days at a cost of Rp. 13,412,932,091.22 and the Soldier Pile method requires 58 days of execution at a cost of Rp. 19,632,444,148.59 Keywords: Cost analysis, Time analysis, Cast in situ, sheet pile, soldier pile

Item Type: Thesis (S1)
Call Number CD: FT/SIP 20 024
NIM/NIDN Creators: 41118320011
Uncontrolled Keywords: Keywords: Cost analysis, Time analysis, Cast in situ, sheet pile, soldier pile
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: siti maisyaroh
Date Deposited: 09 Aug 2022 08:31
Last Modified: 09 Aug 2022 09:28
URI: http://repository.mercubuana.ac.id/id/eprint/67129

Actions (login required)

View Item View Item