FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK DEPO MASS RAPID TRANSIT (MRT) LEBAK BULUS

AHSAN, ALFAN ARIF (2021) FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK DEPO MASS RAPID TRANSIT (MRT) LEBAK BULUS. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
01. COVER.pdf

Download (386kB) | Preview
[img] Text (BAB I)
02. Bab 1.pdf
Restricted to Registered users only

Download (522kB)
[img] Text (BAB II)
03. Bab 2.pdf
Restricted to Registered users only

Download (771kB)
[img] Text (BAB III)
04. Bab 3.pdf
Restricted to Registered users only

Download (712kB)
[img] Text (BAB IV)
05. Bab 4.pdf
Restricted to Registered users only

Download (857kB)
[img] Text (BAB V)
06. Bab 5.pdf
Restricted to Registered users only

Download (413kB)
[img] Text (DAFTAR PUSTAKA)
07. Daftar Pustaka.pdf
Restricted to Registered users only

Download (47kB)
[img] Text (LAMPIRAN)
08. Lampiran.pdf
Restricted to Registered users only

Download (7MB)

Abstract

The construction of the Jakarta Lebak Bulus Mass Rapid Transit (MRT) Depot which is part of the Jakarta Mass Rapid Transit (MRT) Project which is expected to reduce congestion in the capital. The Jakarta Lebak Bulus Depot Mass Rapid Transit (MRT) construction project has been implemented since September 2016 by PT. Tokyu Construction Indonesia. In the implementation phase the Project has experienced delays in Work by 36%. The purpose and objectives of this research are as follows to find out the factors that cause delays in the implementation of the Lebak Bulus Jakarta Depot Mass Rapid Transit (MRT) project work and to find out the dominant factors causing the implementation of the project work to be hampered. The research was limited only to the location of the project, respondents came only from the contractor's side and only focused on the factors causing the delay. The data collection method used in this study is a questionnaire. Analysis of the data in this study using the SPSS Program. Based on the results of the study found that the cause of the delay in the project is the quality of the equipment used is not good, delays in procurement of equipment, delay in drawing shop approval and material approval. delays in equipment procurement are the most dominant factor causing delays. Keywords : Delay, Equipment Quality, Equipment Procurement, Shop Drawing Approval, Approval Material.

Item Type: Thesis (S1)
NIM/NIDN Creators: 41116120161
Uncontrolled Keywords: Delay, Equipment Quality, Equipment Procurement, Shop Drawing Approval, Approval Material.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 690.1-690.9 Standard Subdivisions of Planning, Anaysis, Engineering Design/Subdivisi Standar Dari Perencanaan, Analisa dan Teknik Bangunan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Dede Muksin Lubis
Date Deposited: 17 Dec 2021 03:49
Last Modified: 17 Dec 2021 03:49
URI: http://repository.mercubuana.ac.id/id/eprint/52383

Actions (login required)

View Item View Item