Items where Subject is "600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | W | Y | Z
Number of items at this level: 208.

A

ADRIYATNO, JIMMY (2018) EVALUASI PEKERJAAN INSTALASI FASAD CURTAIN WALL UNITIZED SYSTEM PADA BANGUNAN TWIST BUILDING DENGAN METODE OPERASI KONSTRUKSI BERULANG (CYCLONE) (Studi Kasus : Proyek Avian Tower Surabaya). S1 thesis, Universitas Mercu Buana Jakarta.

AFANDI, MUHAMAD TOPAN (2018) PENGAMATAN PEKERJAAN STRUKTUR BAWAH (Sub Structure) PROYEK APARTEMEN SAMARA SUITES JL. GATOT SUBROTO JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

AFRIANTI, RIFA (2018) PROYEK PEMBANGUNAN SOUTHGATE-TANJUNG BARAT JALAN RAYA TANJUNG BARAT No.163 JAGAKARSA JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

AGUSTA, YOFAN SAMAN (2018) ANALISIS WAKTU PELAKSANAAN PEKERJAAN BEKISTING SEMI MODERN DAN KONVENSIONAL PEMBANGUNAN APARTEMEN GRAND TAMAN MELATI MARGONDA 2 DEPOK MENGGUNAKAN METODE WEBCYCLONE. S1 thesis, Universitas Mercu Buana Jakarta.

AJI, ARI PURNOMO (2018) LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

ALFIAN, RAHMAT (2017) PENGAMATAN PEKERJAAN MEP BANGUNAN TRANSIT PADA KAWASAN TOD BANDARA SOEKARNO HATTA - TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ALFIKI, RANDI (2019) PENGAMATAN PKERJAAN MEP PROYEK APARTMENT BREEZE TOWER BINTARO -TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

AMARULLOH, MUCHAMMAD AYUB (2019) PELAKSANAAN PRESSURE GROUTING PADA PROYEK APARTEMEN GREEN CLEOSA. S1 thesis, Universitas Mercu Buana Jakarta.

AMRI, SAEFUL (2019) ANALISIS TINGGI EFEKTIF SHEAR WALL PADA SISTEM GANDA PEMBANGUNAN GEDUNG BETON BERTULANG BERLANTAI BANYAK PADA TANAH LUNAK LOKASI JAKARTA. STUDI KASUS DENAH PERSEGI. S1 thesis, Universitas Mercu Buana Jakarta.

AMRY, MUHAMMAD (2018) ANALISIS KONTRAK KONSTRUKSI RANCANG-BANGUN (Design-Build) DAN IMPLEMENTASINYA DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

ANDHIKA, WINDI (2018) ANALISIS KOMPONEN DAN PEMODELAN RASIO BIAYA TIDAK LANGSUNG TERHADAP NILAI KONTRAK PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRI, ANDRI (2019) EVALUASI PENERAPAN KONSEP GREEN BUILDING UNTUK KRITERIA APPROPRIATE SITE DEVELOPMENT PADA PERANCANGAN GEDUNG SEKOLAH YADIKA 1 DAN 2 TEGAL ALUR. S1 thesis, Universitas Mercu Buana.

ANGGRAINI, YUKI (2018) TINGKAT PERUBAHAN TAMPAK DEPAN BANGUNAN PADA KORIDOR UTAMA PERUMAHAN PALEM GANDA ASRI, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ARDI, FANI (2018) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO METODE PELAKSANAAN SHEAR WALL (Jalan Raya Jombang No. 42, Parigi, Pondok Aren, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ARIANTI, ADE (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN PERMATA HIJAU SUITES Jalan Raya Kebayoran Lama No.55, Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

ARIFIANTI, AYU SETYA (2019) ANALISA KETERSEDAAN LAHAN PARKIR BAGI PENGHUNI APARTEMENT GREEN PARKVIEW. S1 thesis, Universitas Mercu Buana Jakarta.

AZHAR, SAEPUL (2016) INSTALASI GROUND MOUNT ANTENA 1.8 M DAN KONFIGURASI MODEM SKYEDGE IP UNTUK KOMUNIKASI ATM. S1 thesis, Universitas Mercu Buana Jakarta.

AZIZ, MUHAMMAD NUSHRON (2018) INSTALASI SISTEM PARKIR OTOMATIS PADA MOBIL BMW SERIES-5 ( G30 ) DI PT. GAYA MOTOR. S1 thesis, Universitas Mercu Buana Jakarta.

B

BAIHAQI, AHMAD (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN APARTEMEN DAAN MOGOT CITY JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

BIHALALIKA, PANDHUM (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE. S1 thesis, Universitas Mercu Buana Jakarta.

C

CAHYADI, IMAM ARIF (2019) METODE PELAKSANAAN STRUKTUR ATAS LANTAI 6 - 8 PROYEK NEW FACTORY PHASE II ( Office ) PT. SANKEI DHARMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

CHANDRA, SERLINA (2019) ANALISIS PERKUATAN STRUKTUR DENGAN METODE CONCRETE JACKETING (Studi Kasus Apartemen St.Moritz CBD Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

CHASANI, FARIS (2019) PENGAMATAN STRUKTUR KOLOM BALOK DAN PELAT LANTAI PADA PROYEK PEMBANGUNAN APARTEMENT CENTRO CITY JALAN MACAN DAAN MOGOT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

CHOLIS, AHMAD NUR (2019) ANALISA KETINGGIAN EFEKTIF GEDUNG DENGAN SISTEM PRECAST BEARING WALL (Studi Kasus Ecohome Apartment). S1 thesis, Universitas Mercu Buana Jakarta.

CHRISCAHYANTI, ERVIANA DWI (2018) ANALISIS PEMILIHAN MATERIAL RAMAH LINGKUNGAN DENGAN METODE VALUE ENGINEERING DAN ANALYTICAL HIERARCHY PROCESS (AHP) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S2 thesis, Universitas Mercu Buana Jakarta.

D

DARMAWAN, M FAHMI (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH RAFT FOUNDATION PADA PROYEK PEMBANGUNAN TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

DARMAWAN, MUHAMAD IVAN (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN PERMATA HIJAU SUITES Jalan Raya Kebayoran Lama No.55, Jakarta Selatan. S1 thesis, Universitas Mercu Buana.

DIAMANTA, NYDIA (2019) DESAIN ALTERNATIF GEDUNG KANTOR PUSAT PT YODYA KARYA DENGAN EFEKTIVITAS KETINGGIAN DAN LETAK DINDING GESER. S1 thesis, Universitas Mercu Buana Jakarta.

DWIYANTO, FERY (2018) IDENTIFIKASI FAKTOR - FAKTOR PENYEBAB PEKERJAAN VARIATION ORDER PADA PROYEK APARTEMEN CITRA LAKE SUITE - JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

E

EFENDI, HASAN (2018) PERENCANAAN INSTALASI PLAMBING AIR BERSIH DAN AIR BUANGAN PASAR RAKYAT KANOMAN CIREBON. S1 thesis, Universitas Mercu Buana Jakarta.

ERNAWATI, RINA (2019) PERENCANAAN COUPLING BEAM DENGAN METODE DUAL SYSTEM STUDI KASUS PADA PROYEK APARTEMEN DI BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

ESTRALITA, DEVI (2019) PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN KEBAYORAN APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

F

FADILLAH, RIZKI (2019) PERANCANGAN MENARA LEMHANNAS DAN GEDUNG PANCA GATRA JL. MERDEKA SELATAN NO. 10 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

FAHMI, DZUL (2018) PERANCANGAN BANGUNAN GEDUNG MENARA LEMBAGA KETAHANAN NASIONAL (LEMHANNAS) DENGAN KONSEP SUSTAINABLE BUILDING JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

FARHAN, REZA (2018) RANCANG BANGUN ANTENA MIKROSTRIP DIPOLE L SHAPE PADA FREKUENSI 24 GHZ DAN 25.9 GHZ. S1 thesis, Universitas Mercu Buana Jakarta.

FATIMAH, NINING (2018) PROYEK APARTEMEN WEST VISTA (Jln. Lingkar Luar Barat No. 8 Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

FATIN, SABILA FAIRUZ (2019) KAJIAN PENERAPAN MATERIAL PADA SELUBUNG BANGUNAN YANG MEMPENGARUHI KENYAMANAN TERMAL PERPUSTAKAAN UMUM BANK INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

FATKHURROHMAN, FATKHURROHMAN (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN MAYAPADA HOSPITAL NEW EXTENTION 2 LEBAK BULUS-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZIAH, RATU AYU (2018) PROYEK PEMBANGUNAN GEDUNG LABORATORIUM PRASETIYA MULYA TAHAP 3 BSD TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FIRDAUS, MUHAMMAD RIZKY (2019) PENGARUH BUKAAN TERHADAP KENYAMANAN TERMAL RUANG IBADAH GEREJA HKBP KEBON JERUK. S1 thesis, Universitas Mercu Buana Jakarta.

FIRMANSYAH, ARDI (2019) KAJIAN TIPOLOGI FASADE BANGUNAN KHAS PECINAN PADA KORIDOR JALAN KISAMAUN PASAR LAMA - TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIA, ANI (2019) PEKERJAAN MEP PADA PROYEK PURI ORCHARD APARTEMENT. S1 thesis, Universitas Mercu Buana Jakarta.

FLIXYEN, YONATHAN CARLO (2019) PENGAWASAN PROYEK HUTAMA KARYA OFFICE JL. LETJEN M. T. HARYONO KAV 8-9 CIPINANG CEMPEDAK, JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

FUAT, ANIS (2018) PERANCANGAN INSTALASI PENERANGAN DI KANTOR TAIYUAN JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

G

GULTOM, LEONARD KRISTIAN PRANATA (2018) PERANCANGAN BANGUNAN GEDUNG LEMHANNAS JL.MEDAN MERDEKA JAKARTA PUSAT, INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

GUMELAR, ESSA (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH RAFT FOUNDATION PADA PROYEK PEMBANGUNAN TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, BANI BUDIADI (2019) METODE PELAKSANAAN PELAT DAN BALOK PADA PROYEK DAAN MOGOT CITY APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

GUNAWAN, HENDRA (2019) SISTEM INSTALASI POWER SUPPLY PADA PHB UTAMA PT. NULAB PHARMACEUTICAL INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

GURNING, GEORGIO CALVIN SALOMO (2018) METODE PELAKSANAAN RAFT PONDASI DAN PILECAP PADA PROYEK PEMBANGUNAN GATEWAY PARK OF LRT (Jl. Kapin Raya Kampung Baru, RT.9/RW.8, Pondok Kelapa Pondokgede, Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

H

HABIBI, MUHAMMAD ARIS (2019) ANALISIS IMPLEMENTASI ISO 9001:2015 PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT (Studi Kasus PT. Hutama Karya Proyek Pengadaan Pekerjaan Konstruksi Design & Build Pengembangan RSKD Duren Sawit). S1 thesis, Universitas Mercu Buana Jakarta.

HADI, TOMMI PRASTYA (2019) METODE PELAKSANAAN PEKERJAAN DROP PANEL PADA PROYEK OFFICE CIPUTRA INTERNATIONAL TOWER 2. S1 thesis, Universitas Mercu Buana.

HADUN, HADUN (2019) PENGAMATAN PEKERJAAN M.E.P PROYEK THE AYOMA APARTMENT, TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HAMDANI, AFIF (2018) ANALISIS PENGARUH PELAKSANAAN PEKERJAAN CORE WALL DENGAN MENGGUNAKAN RALLING CLIMBING SYSTEM TERHADAP PERCEPATAN PEMBANGUNAN PROYEK (Studi Kasus : Proyek PCPD Office Tower, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

HAMID, ABDUL (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN NINES PLAZA & RESIDENCE - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HAMID, ABDUL (2018) PROYEK GEDUNG APARTAMEN THE PAKUBUWONO SPRING. S1 thesis, Universitas Mercu Buana Jakarta.

HANIFAN, BALQI (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK KEBAYORAN APARTEMENT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HARTANTO, INDRA (2019) PEMASANGAN INSTALASI PENANGKAL PETIR APARTEMENT TAMAN ANGGREK RESIDENCES TOWER-A - JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

HASENDA, CARRERA PUTRI (2019) METODE PELAKSANAAN RAFT FOUNDATION PADA PROYEK PEMBANGUNAN APARTEMEN NINES PLAZA & RESIDENCE - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

HERMAWAN, DEDY (2018) PERANCANGAN BANGUNAN GEDUNG LEMBAGA KETAHANAN NASIONAL REPUBLIK INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, MOH. (2018) PROYEK APARTEMENT T PLAZA JL. PENJERNIHAN 1 PEJOMPONGAN JAKARTA PUSAT (Metode Pelaksanaan Dinding Shear Wall). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RADIK FANDI (2019) PROYEK PEMBANGUNAN DAAN MOGOT CITY DAN MEISTERSTADT BATAM (PT. Megatika Internasional). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RAHMAT (2019) LAPORAN KERJA PRAKTEK STRUKTUR PROYEK GEDUNG SOUTHGATE - SERVICE APARTEMENT Tanjung Barat-Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, YADI (2019) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PADA PROYEK APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana.

HIJRIYADI, FAJAR (2018) IMPLEMENTASI METODE EARNED VALUE PADA PEMBANGUNAN GEDUNG KANTOR UPBJJ-UT SORONG UNTUK PENGENDALIAN KINERJA PROYEK. S1 thesis, Universitas Mercu Buana Jakarta.

HUDA, NURUL (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK APARTMENT T PLAZA PEJOMPONGAN JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

I

INDARTO, RISKI (2018) METODE PEKERJAAN BEKISTING BONDEK PADA PELAT LANTAI PROYEK PEMBANGUNAN MENARA BNI PEJOMPONGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

IRAWAN, HARSUMDA BHANU (2018) INSTALASI VSAT 1,8M DENGAN MENGGUNAKAN MODEM SHIRON PT. INDONESIA COMNETS PLUS. S1 thesis, Universitas Mercu Buana Jakarta.

IRAWAN, IYAN (2017) PERENCANAAN INSTALASI LISTRIK ARUS KUAT PROYEK HOTEL UNITY CASA SEMINYAK-BALI DI PT. SKEMANUSA CONSULTAMA TEKNIK. S1 thesis, Universitas Mercu Buana Jakarta.

IRDIANSAH, IVAN (2019) APARTEMEN DAAN MOGOT CITY METODE PELAKSANAN CORE WALL. S1 thesis, Universitas Mercu Buana Jakarta.

J

JAENUDIN, JAENUDIN (2018) BANGUNAN GEDUNG LEMBAGA KETAHANAN NASIONAL & GEDUNG PANCA GATRA (Jl. Medan Merdeka Selatan, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

JAJULI, IRFAN NURDIN (2019) PENGARUH VARIASI TINGGI TINGKAT DAN BENTUK DENAH TERHADAP POLA SENDI PLASTIS DAN KINERJA STRUKTUR GEDUNG BERATURAN TAHAN GEMPA. S1 thesis, Universitas Mercu Buana Jakarta.

JANUARTO, JANUARTO (2018) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH DALAM PRODUKTIVITAS TENAGA KERJA BERBASIS LINE OF BALANCE PADA BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

K

KABAN, FIOLA FRICILLIA (2018) ANALISIS RISIKO WAKTU TUNGGU PENGADAAN MATERIAL KONSTRUKSI UNTUK BANGUNAN TYPE TRANSIT (Studi Kasus: Proyek Gedung Transit Oriented Developmemt Bandara Soekarno Hatta, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

KARTAWIREJA, AHMAD FERDYANSYAH (2018) PEKERJAAN PEMBUATAN STRUKTUR AUTOMATEDPEOPLE MOVER SYSTEM (APMS) BANDARA INTERNASIONAL SOEKARNO-HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

KRYSTYAN, GYAN AGYE TRY (2019) PELAKSANAAN PEKERJAAN SHEAR WALL PADA PROYEK APARTMENT PROSPERITY RESIDENCE-THE LOTUS. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ANDREW (2019) EVALUASI ANALISIS HIDROLOGI PERENCANAAN BANGUNAN KONSOLIDASI DAM (KD) 1-1 SUNGAI JENEBERANG, DESA LONJOBOKO’, KECAMATAN PARANGLOE, KABUPATEN GOWA, SULAWESI SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ANDREW (2019) EVALUASI ANALISIS HIDROLOGI PERENCANAAN BANGUNAN KONSOLIDASI DAM (KD) 1-1 SUNGAI JENEBERANG, DESA LONJOBOKO’, KECAMATAN PARANGLOE, KABUPATEN GOWA, SULAWESI SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, ASEP (2019) LAPORAN KERJA PRAKTEK STRUKTUR PROYEK GEDUNG SOUTHGATE - SERVICE APARTEMENT Tanjung Barat-Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, MUHAMAD RUDI (2018) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK KONTRUKSI GEDUNG BERTINGKAT (Studi Kasus : Proyek Palm Regency Apartement & Mall, Ciledug, Tangerang ). S1 thesis, Universitas Mercu Buana Jakarta.

KUSSUMARDIANADEWI, B.DETTY (2018) PEKERJAAN FINISHING PENUTUP LANTAI BERBASIS VALUE ENGINEERING PADA BANGUNAN PERKANTORAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

KUSUMAWARDANI, MEIVITA (2018) PEKERJAAN STRUKTUR LIFT PANORAMIC PROYEK GALERIA MALL VIVO SENTUL-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

L

LAKSANA, GELEGAR ANGGA (2019) PERENCANAAN PEMBANGUNAN T HOTEL SANUR BALI. S1 thesis, Universitas Mercu Buana Jakarta.

LAOLI, YUSKAR (2019) APARTEMEN DAAN MOGOT CITY METODE PELAKSANAN CORE WALL. S1 thesis, Universitas Mercu Buana Jakarta.

LEATEMIA, IVANA YESIKA (2019) PERUBAHAN KARAKTERISTIK FASAD PADA BANGUNAN KOLONIAL GEREJA GPIB IMMANUEL (Studi Kasus: Depok Lama, Jawa Barat). S1 thesis, Universitas Mercu Buana Jakarta.

LESTARI, OCTY TRI (2019) PERENCANAAN PROYEK PEMBANGUNAN MALL ABEPURA ABEPURA - PAPUA. S1 thesis, Universitas Mercu Buana Jakarta.

LISTANTO, NURUL (2018) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEMBAYARAN KONTRAKTOR KEPADA SUBKONTRAKTOR PADA PROYEK GEDUNG BERTINGKAT. S2 thesis, Universitas Mercu Buana Jakarta.

M

MAFRURI, MUSTOFA (2019) PEKERJAAN BANGUNAN PARKIR PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT BPRS HIK CILEDUG. S1 thesis, Universitas Mercu Buana Jakarta.

MAHARDIKA, INDRA (2018) PENGAWASAN PROYEK DAAN MOGOT CITY JL. DAAN MOGOT KM.16, RT.9/RW.6, SEMANAN, KALIDERES, JAKARTA BARAT, 15699. S1 thesis, Universitas Mercu Buana Jakarta.

MARDHIKA, LUQMAN (2018) METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN. S1 thesis, Universitas Mercu Buana Jakarta.

MARDIYANTO, MUHAMAD (2019) PROYEK BHUVANA RESORT CIAWI-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

MARDOTILLAH, DODI (2019) METODE PELAKSANAAN PENGECORAN PEKERJAAN PILE CAP PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

MAULANA, ABDUL (2018) METODE PELAKSANAAN RAFT PONDASI DAN PILECAP PADA PROYEK PEMBANGUNAN GATEWAY PARK OF LRT (Jl. Kapin Raya Kampung Baru, RT.9/RW.8, Pondok Kelapa Pondokgede, Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

MAURIZKA, NARA PANDAN (2019) METODE PELAKSANAAN PELAT DAN BALOK PADA PROYEK DAAN MOGOT CITY APARTMENT. S1 thesis, Universitas Mercu Buana Jakarta.

MAYNDRO, NIKI DZUL (2019) PENGAMATAN STRUKTUR PROYEK APARTEMEN EMERALD BINTARO PT. CATURBANGUN MANDIRIPERKASA. (Jl. Jombang Raya, Parigi. Pondok Aren. Tangerang selatan). S1 thesis, Universitas Mercu Buana Jakarta.

MIHARNO, SATRIYO (2016) PERANCANGAN SISTEM INSTALASI PENERANGAN DI SITE OFFICE PROJECT KOKAS3 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

MUFASSIR, TUBAGUS (2018) ANALISIS PERCEPATAN DURASI PROYEK DENGAN METODE PERTUKARAN WAKTU DAN BIAYA (TIME COST TRADE OFF METHOD) (Studi Kasus: Proyek Tower Orchid Pramuka). S1 thesis, Universitas Mercu Buana Jakarta.

MUKTI, HALI (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

MURWATI, SITI (2018) ANALISA PONDASI TIANG PANCANG DENGAN PENGUJIAN CONE PENETRATION TEST/SONDIR PADA BANGUNAN WATER FEATURE PROYEK LAVON SWANCITY CIKUPA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

MUSLIM, ADIB (2019) PERENCANAAN ULANG STRUKTUR ATAS HOTEL H CIREBON MENGGUNAKAN METODE FLAT SLAB DENGAN DROP PANEL. S1 thesis, Universitas Mercu Buana Jakarta.

MUSLIMIN, MUSLIMIN (2018) ANALISIS KARAKTER VISUAL FASAD BANGUNAN DERET BERDASARKAN LANGGAM ARSITEKTUR KLASIK DAN MODERN DI KORIDOR Jl.Gading Serpong Boulevard. S1 thesis, Universitas Mercu Buana Jakarta.

MUSTAQIM, SEPTIAN SETO GILANG (2018) STRUKTUR PROYEK GEDUNG MABES POLRI SISI BARAT KEBAYORAN BARU-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MUYADI, HARDY (2019) ANALISA KINERJA TERMAL TERHADAP FASADE BANGUNAN DENGAN SOFTWARE REVIT PADA BANGUNAN HK OFFICE. S1 thesis, Universitas Mercu Buana Jakarta.

N

N, PRADANA BAYU S (2018) METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE. S1 thesis, Universitas Mercu Buana Jakarta.

NAPITUPULU, AGUSTINA BR (2018) METODE EARNED VALUE UNTUK ANALISIS KINERJA WAKTU DAN BIAYA PELAKSANAAN PADA PROYEK PEMBANGUNAN EXTENTION GARDU INDUK 150 KV PT.PLN (PERSERO) BONTANG KALTIM. S1 thesis, Universitas Mercu Buana Jakarta.

NAWAWI, MOH. (2018) PENERAPAN LEAN CONSTRUCTION DI PEKERJAAN MEKANIKAL, ELEKTRIKAL, PLUMBING (MEP) PADA PROYEK BANGUNAN TINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

NEGARA, CYAN (2018) PENERAPAN PENJADWALAN PROYEK INSTALASI MICROWAVE MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM). S1 thesis, Universitas Mercu Buana Jakarta.

NIZERY, CHIKA PUSPITA RETNOANDANI (2018) ANALISIS OPTIMALISASI PENEMPATAN TOWER CRANE PADA BANGUNAN BERTINGKAT TINGGI (Studi Kasus : Apartemen Green Sedayu, Cengkareng). S1 thesis, Universitas Mercu Buana Jakarta.

NOVITA, NINA (2018) PERANCANGAN MENARA LEMHANNAS DAN PANCA GATRA. S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, MUHAMMAD KEMAL (2018) PERSEPSI KENYAMANAN TERMAL DI FOODLIBRARY MALL CIPUTRA JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

NUGRAHA, RAMA (2019) PEKERJAAN ARSITEKTURAL PADA PROYEK AMAZANA SERPONG RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, ARVIANTO EKO (2019) EVALUASI KINERJA DAN PERKUATAN STRUKTUR GEDUNG GUNA ALIH FUNGSI LANTAI PADA KANTOR CAMAT KEMBANGAN JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, RAMADITA SEPTIAN (2019) ANALISIS PERBANDINGAN METODE PEKERJAAN PELAT LANTAI KONVENSIONAL DAN PELAT LANTAI HALF SLAB (Studi Kasus Proyek Pembangunan Perpustakaan Nasional RI Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

NURCAHYA, WAHID ASMARA AJI (2019) EVALUASI KINERJA TERMAL SELUBUNG BANGUNAN PADA BANGUNAN RUMAH TINGGAL DIPERUMAHAN SEKTOR V BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

NURYADI, BAYU (2019) KAJIAN FASAD BANGUNAN TERHADAP NILAI OTTV (Studi Kasus : Gereja Pouk Maranatha Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

NURYANTO, WAHYU EKO (2018) METODE PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DENGAN ALAT PANCANG HYDRAULIC STATIC PILE DRIVER (HSPD) PROYEK CENGKARENG BUSINESS CITY LOT 01 - ONE MANSION APARTEMENT & THE 101 JAC. S1 thesis, Universitas Mercu Buana Jakarta.

O

OKTAFIAN, ANDRIANSYAH (2019) TINJAUAN PERENCANAAN STABILITAS STRUKTUR BANGUNAN PELIMPAH PADA BENDUNGAN CIAWI, KABUPATEN BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

P

PAMUNGKAS, DEVINA SONYA (2018) PENGARUH ORIENTASI BANGUNAN YANG MENGGUNAKAN VERTICAL GARDEN TERHADAP SUHU RUANGAN (Studi Kasus Bank BTPN Puri Kencana). S1 thesis, Universitas Mercu Buana Jakarta.

PANGESTU, REZA DWI (2019) METODE PELAKSANAAN PEKERJAAN SHEAR WALL PADA PROYEK PEMBAGUNAN EMBARCADERO PARK JL. JOMBANG RAYA, BINTARO-TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRABOWO, SANDHIYA RAHMAD (2019) PROYEK APARTEMENT CENTRO CITY TOWER WESTPOINT JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

PRADANA, TAUFIK FAISAL SETIA (2018) METODE PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG DENGAN ALAT PANCANG HYDRAULIC STATIC PILE DRIVER (HSPD) PROYEK CENGKARENG BUSINESS CITY LOT 01 - ONE MANSION APARTEMENT & THE 101 JAC. S1 thesis, Universitas Mercu Buana Jakarta.

PRAMONO, AGUNG (2019) PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK GRAND KAMALA LAGOON BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

PRAMUDITO, HENDY (2019) PENGAMATAN PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN ASSESSMENT CENTER BSSN SAWANGAN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

PRANATA, DONY (2018) DAMPAK PELAKSANAAN METODE DEWATERING TERHADAP PEKERJAAN SEMI BASEMENT RUMAH SAKIT ABDI WALUYO. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, AGUNG (2019) METODE KERJA PELAKSANAAN BEKISTING PADA KOLOM DENGAN MENGGUNAKAN PERI SISTEM PROYEK ROSEVILLE SOHO & SUITE BSD-TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, BAYU DHIAN (2019) METODE PELAKSANAAN RAFT FOUNDATION PROYEK APARTEMEN SAUMATA SUITES ALAM SUTERA - TANGERANG SELATAN. S1 thesis, Universitas Mercu Buana.

PRATAMA, FREZA HADI (2019) METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK DASWIN OFFICE TOWER JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, IKHSAN DIKA (2018) METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, M. FAJAR ANGGA (2019) KAJIAN ADAPTASI FASADE BANGUNAN INDIS TERHADAP IKLIM TROPIS PADA BANGUNAN GEDUNG BIRAO SCS & KANTOR POS TEGAL DIKOTA TEGAL. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, NANDA DHIKA (2019) KAJIAN TINGGI EFEKTIF SHEARWALL DENGAN VARIASI LETAK DAN TEBAL SHEARWALL PADA STUDI KASUS BANGUNAN GEDUNG TIPIS MEMANJANG. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, NANDA DHIKA (2019) KAJIAN TINGGI EFEKTIF SHEARWALL DENGAN VARIASI LETAK DAN TEBAL SHEARWALL PADA STUDI KASUS BANGUNAN GEDUNG TIPIS MEMANJANG. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, RANDY BASTIAN (2019) METODE PELAKSANAAN STRUKTUR ATAS LANTAI 6 - 8 PROYEK NEW FACTORY PHASE II ( Office ) PT. SANKEI DHARMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

PRAWIRO, AWANG ASMO (2018) KAJIAN KELAYAKAN AKSESIBILITAS DIFABEL DI PURI INDAH MALL KEMBANGAN SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

PRIYANTO, DODIK (2018) OPTIMASI KEBUTUHAN TOWER CRANE BERBASIS LEAN CONSTRUCTION PADA BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

PUJIANA, PUJIANA (2018) ANALISIS WAKTU DAN METODE PELAKSANAAN PENGGUNAAN PONDASI KONSTRUKSI SARANG LABA-LABA PADA PROYEK PEMBANGUNAN KANTOR PERWAKILAN PROVINSI KALIMANTAN UTARA DI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PURWANTO, HERI (2019) METODE PELAKSANAAN STRUKTUR PROYEK SOCIAL SECURITY TOWER Jl. Rasuna Said, Kav. 112 Blok B Setia Budi Jakarta. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, RAMA DARMAWAN (2019) TINJAUAN METODE PELAKSANAAN SHEAR WALL UNTUK PROSES BANGUNAN BERTINGKAT TOWER 2 DI PROYEK SYNTHESIS RESIDENCE KEMANG, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

PUTRA, RIZKY PRAMANA (2018) PENGAMATAN PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN APARTEMEN DAAN MOGOT CITY JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

Q

QAIS, MUHAMMAD AADIYAT (2019) PROYEK BANDAR UDARA MALI ALOR. S1 thesis, Universitas Mercu Buana Jakarta.

R

RACHMAN, ROBBY AWALUDIN (2019) PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK APARTEMENT TREEPARK CITY TOWER B CIKOKOL TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RACHMAN, TRI HADIYANTO (2019) TINJAUAN METODE PELAKSANAAN SHEAR WALL UNTUK PROSES BANGUNAN BERTINGKAT TOWER 2 DI PROYEK SYNTHESIS RESIDENCE KEMANG, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana.

RACHMAWAN, RIO (2018) TINJAUAN SAMBUNGAN KOLOM DAN BALOK SESUAI DENGAN SNI 2847:2013 PADA SUATU BANGUNAN RUMAH SAKIT DI JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHANI, ALFIAN ADITAMA (2019) PENGAMATAN FINISHING PROYEK RUSUN POLRI 17 LANTAI. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHANI, SANDY MULYA (2018) PENGAMATAN STRUKTUR ATAS PADA PROYEK APARTEMEN MILLENIUM VILLAGE LIPPO KARAWACI. S1 thesis, Universitas Mercu Buana Jakarta.

RATNADEWI, WULAN (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN ASSESSMENT CENTER BSSN SAWANGAN DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

RATNASARI, DEWI (2019) PROYEK PEMBANGUNAN GEDUNG OFFICE DAN PABRIK PT. VICTORY INDAH PELANGI, JATAKE, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RIANTO, MUHAMMAD RIZQI (2018) PROYEK PEMBANGUNAN GEDUNG LABORATORIUM PRASETIYA MULYA TAHAP 3 BSD TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

RINALDHI, LUTHFI (2019) PEKERJAAN BANGUNAN PARKIR PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT BPRS HIK CILEDUG. S1 thesis, Universitas Mercu Buana Jakarta.

RISWANTO, FERY (2018) PROYEK PEMBANGUNAN “HIGH RISE BUILDING” THAMRIN NINE JAKARTA PUSAT (Metode Pemasangan ATR Self – Climbing Formwork system (Auto Jump Formwork) Akibat Bertemu Dengan Balok Baja Tanam di Lantai 35). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKIYANTO, BAYU (2018) IDENTIFIKASI RISIKO KETERLAMBATAN PEKERJAAN PONDASI BORE PILE DIAMETER 1000 MM PADA PROYEK GEDUNG NINES PLAZA & RESIDENCE AT CBD SERPONG. S1 thesis, Universitas Mercu Buana Jakarta.

ROHADI, ANTON (2019) PENGARUH PERUBAHAN FUNGSI BANGUNAN TERHADAP TAMPAK BANGUNAN DIPERUMAHAN BOUGANVILEA LOKA, GRAHA RAYA, BINTARO, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADLAN, ARIF (2019) PROSES PEMBUATAN PANEL LVMDP PROYEK HOTEL IBIS PALEMBANG DI PT. MAHKOTA PRIMA. S1 thesis, Universitas Mercu Buana Jakarta.

ROMADON, MUHAMMAD (2019) PENGAMATAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK PEMBANGUNAN RUSUN POLRI PESING Jl. Daan Mogot, Pesing, Jakarta Barat. S1 thesis, Universitas Mercu Buana Jakarta.

ROSADI, DEDE (2018) INSTALASI PANEL KONTROL OTOMATIS DAN PENGOPRASIAN PADA POMPA CHILLER, PT RECKITT BENCKISER INDONESIA DI PT. SAHABAT INTI SOLUSINDO. S1 thesis, Universitas Mercu Buana Jakarta.

ROSDIAWATI, FIRDA (2019) PENGAMATAN MEKANIKAL ELEKTRIKAL PLUMBING PROYEK VERDE II CONDOMINIUMS JL. KUNINGAN MULIA NO.9C, KARET, KECAMATAN SETIABUDI, JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

S

SAFITRI, RIZKA (2019) ANALISIS PENGENDALIAN MUTU PADA PELAKSANAAN PEKERJAAN TIMBUNAN ZONA 1 COFFERDAM PROYEK BENDUNGAN KARIAN. S1 thesis, Universitas Mercu Buana Jakarta.

SALEH, MOHAMMAD (2019) PERENCANAAN TAHAPAN PELAKSANAAN DAN PENJADWALAN PROYEK REKLAMASI PULAU “K” MENGGUNAKAN METODE HYDRAULIC FILL DI TAMAN IMPIAN JAYA ANCOL. S1 thesis, Universitas Mercu Buana Jakarta.

SANDI, BAGUS KURNIA (2019) METODE PELAKSANAAN STRUKTUR BALOK, KOLOM, PELAT LANTAI DAN SHEAR WALL PROYEK PEMBANGUNAN GEDUNG ABADI KLENDER PT. PRAJA VITA MULIA KLENDER - JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SANDI, YISRAEL (2019) STUDI PENGAMATAN KELAYAKAN FASILITAS UNTUK DISABILITAS PADA RUANG BANGUNAN BERSEJARAH DITINJAU DARI STANDAR BANGUNAN (Museum Wayang Kota Tua). S1 thesis, Universitas Mercu Buana Jakarta.

SANDYAGA, JEFRY CHRISTOPHER (2017) INSTALASI PERALATAN STUDIO DAN PENYIARAN DI STUDIO IV LEMBAGA PENYIARAN PUBLIK TELEVISI REPUBLIK INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, AGUS (2019) EFISIENSI SUBCON DALAM PELAKSANAAN PENGECORAN PLAT LANTAI (PROYEK APARTEMEN PROSPERITY RESIDENCE THE LOTUS) JL. Kembangan Raya No. 12A. S1 thesis, Universitas Mercu Buana.

SANTOSO, DANIS EKO (2018) STRUKTUR PROYEK GEDUNG MABES POLRI SISI BARAT KEBAYORAN BARU-JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, ARDI WAHID (2019) PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING Proyek Apartemen Sedayu City at Kelapa Gading, Jakarta Utara. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRA, JAKA (2018) METODE PELAKSANAAN STRUKTUR ATAS PROYEK KEBAYORAN APARTEMENT JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, ARISKA (2019) METODE PELAKSANAAN PENGUJIAN PILE DRIVING ANALYZER (PDA TEST) PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS MUHAMMADIYAH PROF. DR. HAMKA. S1 thesis, Universitas Mercu Buana.

SAPUTRI, MASITHOH WAHYU (2019) METODE PELAKSANAAN PENGUJIAN PILE DRIVING ANALYZER (PDA TEST) PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS MUHAMMADIYAH PROF. DR. HAMKA. S1 thesis, Universitas Mercu Buana.

SAPUTRO, TOFANI WAHYU (2018) PERENCANAAN PEMBANGUNAN RUMAH SUSUN PULO GEBANG, KEL. PENGGILINGAN KEC. CAKUNG JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

SARAGIH, SHELLA MIKHA PUTRI PERMATA Br (2019) IDENTIFIKASI INDIKATOR PENYEBAB KETERLAMBATAN PROYEK APARTEMEN PADA PEKERJAAN ARSITEKTUR (Studi Kasus : Proyek Apartemen Bintaro Plaza Residence 2 (Breeze Tower), Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

SARI, RESKA MORULITA (2019) PENGAMATAN STRUKTUR PROYEK APARTEMEN THE LOTUS JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SARTONO, SARTONO (2019) METODE PELAKSANAAN RAFT FOUNDATION THAMRIN NINE TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

SATRIYANTO, SURYA HARI (2019) PENGAMATAN PEKERJAAN SISTIM MEP PROYEK RUMAH SAKIT PENDIDIKAN UKRIDA JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTININGRUM, DHINA PUSPITA (2018) PEKERJAAN STRUKTUR LIFT PANORAMIC PROYEK GALERIA MALL VIVO SENTUL-BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTIONO, ANGGA (2018) METODE PEKERJAAN BEKISTING BONDEK PADA PELAT LANTAI PROYEK PEMBANGUNAN MENARA BNI PEJOMPONGAN-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAJI, SETIAJI (2019) METODE PELAKSANAAN PEKERJAAN PELAT LANTAI PADA PROYEK APARTEMEN ROYAL SENTUL PARK BOGOR. S1 thesis, Universitas Mercu Buana.

SETYAWAN, ANGGIA TEDJA (2018) PENGARUH PERUBAHAN DESAIN STRUKTUR PONDASI TERHADAP WAKTU PELAKSANAAN PROYEK MALL PESONA SQUARE DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

SETYAWATI, RENNY (2019) PERENCANAAN DAN PENGENDALIAN MATERIAL PEMBANGUNAN GEDUNG OFFICE DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT.NUSA KONSTRUKSI ENJINIRING, Tbk. S1 thesis, Universitas Mercu Buana Jakarta.

SETYOKO, IMAM (2019) PENGAMATAN PEKERJAAN FINISHING ARSITEKTUR PROYEK ARKADIA OFFICE TOWER G. S1 thesis, Universitas Mercu Buana Jakarta.

SHODIQ, MUHAMAD IRSYAD (2018) PENGAWASAN PADA PEKERJAAN MEP PROYEK APARTEMENT MANGKULUHUR CITY SEMANGGI - JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SHOLAHUDDIN, MOH. (2018) ANALISIS PERBANDINGAN WAKTU PRODUKTIVITAS CLIMBING TOWER CRANE DAN TIED IN CRANE PADA BANGUNAN GEDUNG TINGKAT TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

SIDABUTAR, TOMOK SUTRISNO (2018) DAMPAK PELAKSANAAN METODE DEWATERING TERHADAP PEKERJAAN SEMI BASEMENT RUMAH SAKIT ABDI WALUYO. S1 thesis, Universitas Mercu Buana Jakarta.

SITANGGANG, ANASTASIUS JACKSON M (2019) PENGARUH PENERAPAN INTEGRASI METODE PERT DAN METODE SIX SIGMA PADA PELAKSANAAN PEKERJAAN PONDASI TIANG PANCANG BANGUNAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

SOSENA, SOFYAN DIMAS (2019) METODE PELAKSANAAN MASS CONCRETE PADA RAFT FOUNDATION DI PROYEK GREEN CLEOSA APARTMENT DAN CONDOTEL. S1 thesis, Universitas Mercu Buana Jakarta.

SUJADMIKO, ADE (2018) PROYEK APARTEMENT T PLAZA JL. PENJERNIHAN 1 PEJOMPONGAN JAKARTA PUSAT (Metode Pelaksanaan Dinding Shear Wall). S1 thesis, Universitas Mercu Buana Jakarta.

SULAIMAN, AHMAD (2019) PEKERJAAN KOLOM DENGAN METODE COUPLER PROYEK APARTEMEN SAMARA SUITES (PANCORAN - JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana.

SUPRIANTO, DHODI (2019) METODE PEKERJAAN PILE CAP PROYEK TWO SENOPATI. S1 thesis, Universitas Mercu Buana Jakarta.

SYAHPUTRA, RIDHO (2019) ANALISIS PENYEBAB TERJADINYA PEKERJAAN REPAIR PADA HIGH RISE BUILDING (Studi Kasus : Thamrin Nine Project, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

T

TELAUMBANUA, REINHARD PUTRA BABTISTA (2019) PENGAMATAN STRUKTUR ATAS PADA PROYEK APARTEMEN SEDAYU CITY @KELAPAGADING. S1 thesis, Universitas Mercu Buana Jakarta.

TRIYADANA, NURHADI (2018) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES. S1 thesis, Universitas Mercu Buana Jakarta.

U

UMAM, SAEFUL (2019) ANALISIS ALTERNATIF PENJADWALAN MENGGUNAKAN CRITICAL PATH METHOD ( CPM ) (Studi Kasus Proyek Pembangunan Wisma Flat Kedoya Selatan - Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

USTIARTI, FIEKA RARA (2019) TINGKAT PERUBAHAN TAMPAK BANGUNAN DAN DAMPAK VISUAL PADA PERUMAHAN TAMAN WISMA ASRI, BEKASI UTARA Studi Kasus: Jl. Taman Wisma Asri, Teluk Pucung, Bekasi Utara. S1 thesis, Universitas Mercu Buana.

UTOMO, PRASTYO (2019) PERENCANAAN ROYAL ORCHARD YOGYAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

UTOMO, WAWAN SETIO BUDI (2019) METODE PELAKSANAAN PEKERJAAN STRUKTUR PELAT LANTAI DAN BALOK PROYEK APARTMENT T PLAZA PEJOMPONGAN JAKARTA PUSAT. S1 thesis, Universitas Mercu Buana Jakarta.

W

WAHONO, NANANG ASEP (2018) LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

WATI, TRI WAHYU INDAH KARTIKA MUTIARA (2018) PERANCANGAN MENARA LEMBAGA KETAHANAN NASIONAL (LEMHANNAS) Green Architecture. S1 thesis, Universitas Mercu Buana Jakarta.

WIBAWA, RICKY SATRIA (2019) PERANCANGAN BANGUNAN HOTEL DAN RESORT. S1 thesis, Universitas Mercu Buana Jakarta.

WIBISONO, ANOM (2018) ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN DERMAGA (FIDIC Rainbow Contract 2017). S2 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, CORNELIA ARIE (2019) PENGAMATAN PEKERJAAN MEP PROYEK PEMBANGUNAN THE SIMA OFFICE TOWER DI CILANDAK. S1 thesis, Universitas Mercu Buana Jakarta.

WIBOWO, DIAN HARIYADI (2019) PELAKSANAAN PRESSURE GROUTING PADA PROYEK APARTEMEN GREEN CLEOSA. S1 thesis, Universitas Mercu Buana Jakarta.

WIDHYASTARI, ARSITA NURANNISA (2019) PENGAMATAN PROYEK APARTMENT MANGKULUHUR CITY Jalan Jenderal Gatot Subroto kav. 1-3, Jakarta Selatan. S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) EFISIENSI SISTEM PONDASI (GABUNGAN TIANG PANCANG DAN RAFT FOUNDATION) STRUKTUR GEDUNG DI ATAS TANAH LUNAK (Studi Kasus Proyek Pembangunan Apartemen Acacia Tower 30 Lantai Di Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) EFISIENSI SISTEM PONDASI (GABUNGAN TIANG PANCANG DAN RAFT FOUNDATION) STRUKTUR GEDUNG DI ATAS TANAH LUNAK (Studi Kasus Proyek Pembangunan Apartemen Acacia Tower 30 Lantai Di Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.

WIDIANINGSIH, SRI (2019) METODE PELAKSANAAN STRUKTUR ATAS PROYEK BOXIES 123 BOGOR - JAWA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

WIDODO, NANANG (2018) EFEKTIFITAS KETINGGIAN SHEARWALL GEDUNG KINO TOWER DAN ANALISIS PUSHOVER. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, AHMAD PUTRA (2019) ANALISIS QUANTITY TAKE OFF DAN HARGA SATUAN PADA ITEM PEKERJAAN PENYEBAB DEVIASI BIAYA PELAKSANAAN BASEMENT METODE SEMI TOPDOWN TERHADAP BUDGET PADA PROYEK THE PAKUBUWONO MENTENG. S1 thesis, Universitas Mercu Buana Jakarta.

WIJIANTY, PIPIT (2018) ANALISIS WAKTU PEKERJAAN STRUKTUR DENGAN METODE CRITICAL PATH METHOD (CPM) (Studi Kasus Proyek Pembangunan Rumah Dinas Anggota Puslabfor Polri Bogor). S1 thesis, Universitas Mercu Buana Jakarta.

WULANDARI, POPPY (2018) PROYEK PEMBANGUNAN APARTEMEN EMERALD BINTARO METODE PELAKSANAAN SHEAR WALL (Jalan Raya Jombang No. 42, Parigi, Pondok Aren, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

Y

YASYALLAH, YASYALLAH (2018) ANALISIS TINGKAT PERUBAHAN PADA FASAD BANGUNAN PECINAN DI KORIDOR JALAN CILANGKAP PASAR LAMA KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

YULIANTO, ROBY SUGARA TRI (2019) PERANCANGAN SYSTEM INSTALASI PLTS ON-GRID UNTUK MENGOPTIMALKAN DAYA OPERATIONAL PADA GEDUNG BERTINGKAT DI APARTMENT TAMAN ANGGREK-TOWER E. S1 thesis, Universitas Mercu Buana Jakarta.

Z

ZULKARNAIN, ZULKARNAIN (2018) PROYEK APARTEMEN TOMANG PARK. S1 thesis, Universitas Mercu Buana Jakarta.

This list was generated on Wed Sep 18 11:50:06 2019 WIB.