Items where Subject is "600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | B | F | H | I | K | M | N | O | P | R | S | T | W | Y
Number of items at this level: 43.

A

ADITHYA, RIO CHANDRA (2019) ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DAN BEKISTING ALUMINIUM (ALUMINIUM FORMWORK) TERHADAP BIAYA DAN WAKTU PADA PROYEK APARTEMEN SAUMATA SUITES. S1 thesis, Universitas Mercu Buana Jakarta.

ADRIANI, LIGIA MOY (2019) ANALISIS PERBANDINGAN METODE PELAKSANAAN PEKERJAAN DINDING AAC BLOCK DENGAN SAMURAI PANEL DITINJAU DARI SEGI BIAYA DAN WAKTU (Studi Kasus : Proyek West Vista Apartemen Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

ALWANDA, APRILLIANI (2019) ANALISIS PERBANDINGAN MUTU DAN BIAYA PADA PEKERJAAN WATERPROOFING DAK KONVENSIONAL (SIKA) DAN WATERPROOFING DAK PENETRON (Studi Kasus : Proyek Perumahan Discovery Aluvia, Bintaro Jaya, Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

ARGANDARI, LIANITA KEMALA (2018) EFEKTIVITAS PENGGUNAAN TOWER CRANE PADA PROYEK ROSEVILLE SOHO BSD-TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

B

BARATRI, BIMA (2019) ANALISIS KINERJA PROYEK TERHADAP WAKTU DAN BIAYA DENGAN METODE EARNED VALUE ANALYSIS (Studi kasus pembangunan gedung Cilandak Bussiness Square 9 Tower). S1 thesis, Universitas Mercu Buana Jakarta.

BOWO, EDI (2018) PENGARUH CCO (CONTRACT CHANGE ORDER) TERHADAP BIAYA DAN WAKTU (Studi Kasus : Pembangunan Water Intake Instalasi Pengolahan Air Kapasitas 500 liter/detik Cikarang Kabupaten Bekasi). S1 thesis, Universitas Mercu Buana Jakarta.

F

FATHURROHIM, RIAN (2018) ANALISIS PRODUKTIVITAS TERHADAP TENAGA KERJA PEKERJAAN PEMBESIAN PLAT LANTAI DENGAN METODE WORK SAMPLING (Studi Kasus Proyek Loftvilles City Apartment Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

FIKRI, MOHAMAD (2018) PENGARUH KEPUASAN KERJA DAN KOMITMEN ORGANISASI TERHADAP INTENSI TURNOVER KARYAWAN PADA PT Batara Surya Semesta Jakarta. S1 thesis, Universitas Mercu Buana Jakarta.

FITRIANSYAH, KHAIKAL RIFQI (2018) ANALISIS PADA PELAKSANAAN PEKERJAAN BEKISTING PLAT LANTAI MENGGUNAKAN BEKISTING RING-LOCK SCAFFOLDING DAN ALUMA SYSTEM TERHADAP PERBANDINGAN BIAYA DAN WAKTU (Studi Kasus : Kota Kasablanka 3). S1 thesis, Universitas Mercu Buana Jakarta.

H

HANDOKO, FEBRI (2019) ANALISIS PERENCANAAN BIAYA PADA PROYEK REVITALISASI BANGUNAN GEDUNG HOTEL (Studi kasus : Proyek Renovasi The Sultan Hotel & Residence, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

HANNA ASMASYAHIDAH, HANNA ASMA (2018) PENGARUH MOTIVASI INTRINSIK DAN KEPEMIMPINAN AKADEMIK KI HAJAR DEWANTARA TERHADAP PRESTASI KERJA DOSEN DI UNIVERSITAS MERCU BUANA. S1 thesis, Universitas Mercu Buana Jakarta.

I

IRIYANTO, TOTO (2019) PERHITUNGAN WAKTU CHANGE OVER PADA MESIN FILLER ZILLI & BELLINI (Z & B) PRODUK KECAP PT. KRAFT HEINZ ABC INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

K

KOTA, DOMINIKUS DARIUS (2019) ANALISIS PERENCANAAN DAN PENGADAAN PERSEDIAAN PILLOWS DENGAN MENGGUNAKAN METODE MRP (MATERIAL REQUIREMENT PLANNING) (Studi Kasus PT. HPT). S1 thesis, Universitas Mercu Buana Jakarta.

KUSMANTO, KUSMANTO (2018) ANALISIS BIAYA PERCEPATAN MENGGUNAKAN PERI PD8 TABLE FORM SYSTEM PADA PEKERJAAN STRUKTUR LANTAI (Studi Kasus Pada Proyek Padina Soho dan Residence). S1 thesis, Universitas Mercu Buana Jakarta.

M

MARBUN, MARIA MAHDALENA (2018) STUDI KINERJA BIM (BUILDING INFORMATION MODELLING) MELALUI SOFTWARE REVIT 2016 PADA PROSES PERENCANAAN KONSTRUKSI (Studi Kasus : Superblok Akr Gallery West). S1 thesis, Universitas Mercu Buana Jakarta.

MARGIONO, TEGAR (2018) ANALISIS PERBANDINGAN SISTEM PELAT KONVENSIONAL DAN PRECAST HALF SLAB DITINJAU DARI SEGI BIAYA DAN WAKTU STUDI KASUS PROYEK SPRINGWOOD RESIDENCE TANGERANG-BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

N

NEGARA, CYAN (2019) ANALISIS WAKTU DAN BIAYA PROYEK PHASE2C PEGASUS INSTALASI ANTENA MICROWAVE DENGAN MENGGUNAKAN METODE CRITICAL PATH DAN EARNED VALUE. S1 thesis, Universitas Mercu Buana Jakarta.

NINGRUM, RULIA KUSUMA (2019) ANALISIS BIAYA DAN WAKTU RENCANA PERCEPATAN PELAKSANAAN PEKERJAAN PERKERASAN JALAN PADA PROYEK PENAMBAHAN LAJUR KE-3 RUAS BALARAJA BARAT - CIKANDE JALAN TOL TANGERANG – MERAK PAKET 1 KM. 39+360 – KM. 43+500. S1 thesis, Universitas Mercu Buana Jakarta.

O

OKTAVIANI, OKKY (2019) ANALISIS BIAYA-VOLUME-LABA DALAM PERENCANAAN LABA PT COOLPAD ELECTRONIC INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

P

POERWANTI, PUTRI AGUSTINA (2018) EVALUASI KEBIJAKAN PENEMPATAN BARANG DALAM MENINGKATKAN EFISIENSI BIAYA TRANSPORTASI DENGAN PENDEKATAN LINEAR PROGRAMMING. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, BAGUS TRI (2018) PENINGKATAN KINERJA CARD READER ATM (AUTOMATED TELLER MACHINE) BERBASIS FUZZY TIME SERIES. S2 thesis, Universitas Mercu Buana.

PURMIADI, RIKAT ASA (2018) ANALISIS WAKTU PELAKSANAAN PEKERJAAN PENANGANAN DRAINASE LINGKUNGAN KAWASAN PONDOK GEDE. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, CAESARANI GLORIA (2018) PENYEBAB VARIATION ORDER DAN DAMPAK PADA BIAYA PELAKSANAAN PROYEK GEDUNG PERKANTORAN KAWASAN NIAGA TERPADU SUDIRMAN. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRI, DYAH WIDYANINGTYAS PRAMUDI ABADI (2018) PENERAPAN SISTEM ACTIVITY BASED COSTING SEBAGAI DASAR PEMBEBANAN BIAYA OVERHEAD PABRIK PADA PRODUK (Studi Kasus Pada PT. Gudang Garam, Tbk.). S1 thesis, Universitas Mercu Buana Jakarta.

R

RACHMAYANTI, LUTFIA WAHYU (2019) PERBANDINGAN ANALISIS EFISIENISI BIAYA DAN EFEKTIFITAS WAKTU PELAKSANAAN PEKERJAAN PEMASANGAN DINDING PRECAST DAN BATA RINGAN PADA FACADE APARTEMEN. S1 thesis, Universitas Mercu Buana Jakarta.

RAHMAH, DWI RIZKIA (2019) ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH OPTIMAL TENAGA KERJA DENGAN METODE WORK SAMPLING DI LABORATORIUM COKE OVEN PLANT PT KRAKATAU STEEL (PERSERO) Tbk. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADAN, LUTHFI SURYA (2019) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PEKERJAAN SALURAN IRIGASI ANTARA METODE COR IN-SITU DAN PRACETAK PADA PROYEK PEMBANGUNAN JARINGAN UTAMA DAN JARINGAN TERSIER (3.289 HA) DI. BATANG ANAI II-LANJUTAN (PIRIMP) DI KABUPATEN PADANG PARIAMAN. S1 thesis, Universitas Mercu Buana Jakarta.

RISWANTO, RISWANTO (2018) ANALISIS DAMPAK FAKTOR CUACA TERHADAP BIAYA DAN WAKTU PELAKSANAAN BAGI KONTRAKTOR. S2 thesis, Universitas Mercu Buana Jakarta.

RIZKI, SURYA SANDIKA (2019) KETERKAITAN MUTU DAN WAKTU TERHADAP MASS CONCRETE RAFT FOUNDATION PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

ROHMAN, ZAINUR (2019) ANALISA PENGENDALIAN BIAYA & WAKTU PADA PROYEK RUMAH SUSUN RAWA BUAYA DENGAN METODE EARNED VALUE ANALYSIS & CPM DI PT X. S1 thesis, Universitas Mercu Buana Jakarta.

S

SAEFUDIN, ASEP (2018) RANCANG BANGUN SISTEM MANAJEMEN STOK BERBASIS WEB PADA TOKO AL-BAROKAH. S1 thesis, Universitas Mercu Buana Jakarta.

SAGIMIN, THONI (2018) PENGARUH KEPEMIMPINAN TRANSFORMASIONAL DAN BUDAYA ORGANISASI TERHADAP KEPUASAN KERJA PADA KARYAWAN PT. X DI JAKARTA. S2 thesis, Universitas Mercu Buana Jakarta.

SARWANDI, PUTRO (2018) ANALISIS PERBANDINGAN BIAYA DAN WAKTU DENGAN METODE NETWORK PLANNING PEKERJAAN FINISHING DINDING PLESTER ACI DAN STICK ON WALL PADA PROYEK APARTEMEN BRANZ BSD. S1 thesis, Universitas Mercu Buana Jakarta.

SETIAWAN, MARJI (2018) ANALISIS KETERLAMBATAN PEKERJAAN DENGAN MENGGUNAKAN METODE EARNED VALUE (Studi Kasus : Dermaga 007 Pelabuhan Tanjung Priok Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.

SUGIARTO, SUGIARTO (2019) PERANCANGAN DAN FABRIKASI CNC ROUTER 3 AXIS DENGAN BIAYA RENDAH. S1 thesis, Universitas Mercu Buana Jakarta.

SURYANI, ERI (2019) PENGARUH SKEPTISME PROFESIONAL DAN TEKANAN WAKTU TERHADAP PENDETEKSIAN FRAUD (Studi Empiris Pada Kantor Akuntan Publik di Jakarta Barat dan Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

SUSANDI, SUSANDI (2018) PENERAPAN PENJADWALAN PROYEK JALAN TOL BERBASIS M-PERT DAPAT MENGURANGI KETERLAMBATAN WAKTU PELAKSANAAN PROYEK. S2 thesis, Universitas Mercu Buana Jakarta.

T

TIRZANA, RUBY (2018) PENGARUH KOMPETENSI PEDAGOGIK,KOMPETENSI KEPRIBADIAN DAN KOMPETENSI PROFESIONAL TERHADAP KINERJA GURU (PADA SEKOLAH AL AZHAR BSD). S2 thesis, Universitas Mercu Buana Jakarta.

TOHIRIN, ACHMAD (2018) ANALISIS PENGENDALIAN BIAYA MATERIAL KONSTRUKSI DENGAN METODE ANALISA VARIAN. S1 thesis, Universitas Mercu Buana Jakarta.

TRIATMIKO, BAGAS AGUNG (2019) KETERKAITAN MUTU DAN WAKTU TERHADAP MASS CONCRETE RAFT FOUNDATION PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta.

W

WIBOWO, ARI (2018) EVALUASI PERENCANAAN ANGGARAN BIAYA PROYEK KONSTRUKSI ( Studi kasus : Proyek Pembangunan Rukos Green kemangisan Paviliun Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

WICAKSONO, CANDRA SULISTIYO (2018) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN PADA PEKERJAAN DINDING FAÇADE MENGGUNAKAN MATERIAL KONVENSIONAL DAN PRECAST (Studi Kasus Pada Proyek Rainbow Springs Condovillas). S1 thesis, Universitas Mercu Buana Jakarta.

Y

YANI, ACHMAD (2018) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PEKERJAAN ALUMINIUM COMPOSITE PANEL DENGAN MENGGUNAKAN SISTEM KONVENSIONAL DAN SISTEM OPEN JOINT. S1 thesis, Universitas Mercu Buana Jakarta.

This list was generated on Fri Aug 23 20:16:26 2019 WIB.