FITRIYANTA, RONI (2026) PENINGKATAN EFISIENSI PRODUKSI PADA LINI PERAKITAN ISUZU TRAGA DENGAN METODE LINE BALANCING DAN ELIMINATE, COMBINE, REARRANGE , SIMPLIFY (ECRS). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
Cover.pdf Download (706kB) | Preview |
|
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (330kB) |
||
|
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (353kB) |
||
|
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (248kB) |
||
|
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Restricted to Registered users only Download (346kB) |
||
|
Text (LAMPIRAN)
Lampiran.pdf Restricted to Registered users only Download (833kB) |
Abstract
This research is motivated by the failure to achieve production efficiency targets on the Isuzu Traga assembly line due to high idle time, unbalanced workloads, and non-value-added activities, which create bottlenecks and hinder optimal capacity. This study aims to identify the root causes of idle time and line imbalance, and subsequently optimize production efficiency by integrating Line Balancing and the ECRS (Eliminate, Combine, Rearrange, Simplify) method. A case study approach was employed using direct observation, stopwatch time studies, and company documentation. Performance was analyzed using metrics such as line efficiency, balance delay, smoothness index, cycle time, and production capacity. A Fishbone Diagram was used to identify root causes, Value Stream Mapping (VSM) to visualize process flow, and ECRS to propose work method improvements. Results indicate that the primary issues stemmed from suboptimal work methods, uneven workload distribution, and non-value-added activities. Following the integration of ECRS and Line Balancing, the total process time decreased by 8% (from 8,281.67 to 7,599.70 seconds) and work elements were reduced from 21 to 20. Significant improvements were achieved: line efficiency increased from 83% to 98%, balance delay dropped from 17% to 2%, and the smoothness index improved from 93.01 to 3.01. Furthermore, takt time decreased from 480 to 390 seconds, increasing production capacity from 60 to 74 units per day. Keywords: Line Balancing, ECRS, Fishbone Diagram Penelitian ini dilatarbelakangi oleh belum tercapainya target efisiensi lini perakitan Isuzu Traga akibat tingginya idle time, ketidakseimbangan beban kerja, serta adanya aktivitas non-nilai tambah yang menyebabkan bottleneck. Penelitian bertujuan mengoptimalkan efisiensi produksi melalui integrasi metode Line Balancing dan konsep ECRS (Eliminate, Combine, Rearrange, Simplify). Studi kasus dilakukan dengan observasi langsung, pengukuran waktu kerja (stopwatch), dan dokumentasi. Analisis dilakukan menggunakan indikator line efficiency, balance delay, smoothness index, cycle time, dan kapasitas produksi. Akar masalah diidentifikasi melalui Fishbone Diagram, sementara aliran proses dipetakan menggunakan Value Stream Mapping (VSM).Hasil penelitian menunjukkan bahwa masalah utama berasal dari metode kerja yang tidak optimal dan beban kerja tidak merata. Penerapan integrasi ECRS dan Line Balancing berhasil mengurangi waktu proses sebesar 8% (dari 8.281,67 menjadi 7.599,70 detik) dan jumlah elemen kerja menjadi 20. Peningkatan performa signifikan tercapai: efisiensi lini naik dari 83% menjadi 98%, balance delay turun menjadi 2%, serta smoothness index menurun drastis menjadi 3,01. Selain itu, peningkatan kapasitas produksi naik dari 60 unit/hari menjadi 74 unit/hari seiring penurunan takt time menjadi 390 detik. Kata Kunci : Line Balancing, ECRS, Fishbone Diagram
Actions (login required)
![]() |
View Item |
