Items where Subject is "700 Arts/Seni, Seni Rupa, Kesenian > 710 Civic and Lanscape Art/Seni Perkotaan dan Pertamanan > 711 Area Planning/Perencanaan Wilayah Perkotaan dan Pertamanan > 711.7 Plans for Transportation Facilities/Perencanaan untuk Fasilitas Transportasi > 711.75 Railroad Transportation Facilities/Fasilitas Transportasi Kereta Api"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | D | I | K | O | P | S
Number of items at this level: 9.

A

ALWI, MUKHLIS SA'DUDDIN (2020) IDENTIFIKASI DAN PENENTUAN STRATEGI KETEPATAN WAKTU PENJADWALAN KERETA API COMMUTER LINE PADA RUTE PEMBERANGKATAN STASIUN JAKARTA KOTA - BEKASI MENGGUNAKAN STATISTICAL PROCESS CONTROL, FISHBONE DAN ANALYTICAL HIERARCHY PROCESS. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

ARISMA, TRIO FIKI (2019) EVALUASI KINERJA STASIUN KERETA API KERETA REL LISTRIK DURI BERDASARKAN STANDAR PELAYANAN MINIMUM. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

D

DIKA, DIYAR RISMAN (2020) PERAWATAN SISTEM PENGEREMAN PADA KERETA PENUMPANG TIPE K1 DI DIPO KERETA BESAR JAKARTA MANGGARAI PT.KERETA API INDONESIA (PERSERO). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

DWIJAYANTO, DIYOGA ALFAHRI (2018) MUTU DARI METODE SAND CONE TEST PADA PROYEK PEMBANGUNAN JALAN KERETA API LINTAS SUMATERA, LANGSA-BESITANG KM. 441+000 S/D 444+000 (BSL 10). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

I

IMANTO, TEGUH (2020) PERAWATAN AC (AIR CONDITIOER) PACKAGE KERETA API K1 DI DIPO KERETA JAKARTA MANGGARAI (JAKR) PT. KERETA API INDONESIA (PERSERO). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

K

KHOIRUNNISA, NURUL (2018) PENGARUH KUALITAS PELAYANAN TERHADAP LOYALITAS PELANGGAN KERETA API (SURVEI PADA MAHASISWA MERCU BUANA PELANGGAN PT. KERETA API COMMUTER LINE JABODETABEK). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

O

OLDI, ISRAMI DAI and DZULFIKAR, MUHAMMAD (2017) PROYEK PEMBANGUNAN PRASARANA KERETA API RINGAN LIGHT RAIL TRANSIT (LRT) “METODE PELAKSANAAN PILE INTEGRITY TEST (PIT) UNTUK PONDASI BORE PILE”. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

P

PRATAMA, TOMY AJI (2018) PERAWATAN BOGIE TB 1014 DI PT. KERETA API INDONESIA (PERSERO). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

S

SUSILOTOMO, FERDIAN (2019) IDENTIFIKASI FAKTOR RISIKO YANG MEMPENGARUHI KETERLAMBATAN WAKTU PADA PROYEK JALUR GANDA KERETA API LINTAS BOGOR - SUKABUMI (Studi kasus : Paket 2 oleh kontraktor PT. XY dan Paket 3 oleh Kontraktor PT. XZ). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

This list was generated on Tue Sep 29 01:59:35 2020 WIB.