Items where Subject is "000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 090 Manuscripts, Rare Books, and Other Rare Printed Materials/Manuskrip Naskah-naskah, Buku-buku Langka, dan Bahan Cetakan Langka Lainnya > 098 Prohibited Works, Forgeries, Hoaxes/Buku-buku Terlarang, Pemalsuan, Penipuan > 098.1 Prohibited Works/Buku-buku Terlarang > 098.12 Prohibited by Civil Authorities/Dilarang oleh Otoritas Sipil"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | C | D | F | H | I | J | K | L | M | N | P | R | S | T | W | Y
Number of items at this level: 77.

A

AJI, ARI PURNOMO (2019) ANALISIS KAPASITAS SISTEM DRAINASE KOMPLEK RUSUN NAGRAK CILINCING - JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

AMIR, ADI LUKMAN (2019) EVALUASI TERHADAP BIAYA DAN WAKTU MENGGUNAKAN EARNED VALUE METHOD (EVM) DAN STRUCTURAL EQUATION MODELING (SEM) PADA PROYEK BANGUNAN PARKIR. S2 thesis, Universitas Mercu Buana Jakarta.

AMRAN, MUHAMMAD ALI (2018) OPTIMALISASI PEKERJAAN DIAPHRAGM WALL BERBASIS VALUE ENGINEERING (VE) PADA BANGUNAN GEDUNG HUNIAN BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.

ANDREANTO, ANDREANTO (2018) PELAKSANAAN PEKERJAAN SHEAR WALL PROYEK GRAHA TELKOMSIGMA II. S1 thesis, Universitas Mercu Buana Jakarta.

ANDRIAWAN, ERIK (2019) METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK GEDUNG ARANDRA RESIDENCE JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

ANNAM, MUHAMMAD KHOERUL (2018) PELAKSANAAN PEKERJAAN BALOK DAN PELAT LANTAI PROYEK PASAR IKAN MODERN MUARA BARU JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

ANSORI, ZENAL (2023) ANALISIS RISIKO PADA KONTRAK DESIGN AND BUILD YANG MEMPENGARUHI KETERLAMBATAN PROYEK(Studi Kasus : Proyek Samesta Mahata Margonda). S1 thesis, Universitas Mercu Buana Jakarta.

ARIAN, FERI (2019) KAJIAN BIAYA DAN WAKTU PELAKSANAAN SISTEM GROUND ANCHOR SEBAGAI PENGGANTI SISTEM STRUTTING PADA PROYEK GEDUNG MARKAS BESAR POLRI SISI BARAT (JALAN TRUNOJOYO NO. 3, JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

C

CITRA, ZEL (2018) OPTIMASI KINERJA PROYEK MELALUI PERCEPATAN DENGAN METODE CRASHING DAN LINEAR PROGRAMMING BERBASIS APLIKASI PADA PELAKSANAAN PEMBANGUNAN GUDANG CURAH. S2 thesis, Universitas Mercu Buana Jakarta.

D

DAELEN, MARINUS VINCENT VAN (2023) IDENTIFIKASI POTENSI BAHAYA DI KETINGGIAN DAN USULAN PERBAIKAN SMK3 PADA PROYEK GEDUNG APARTEMEN. (Studi Kasus: The Savyavasa Luxury Residence, Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

DAMAI, DIAN MURTI DWI ELYAS TYAS (2022) PENERAPAN METODE VALUE ENGINEERING PADA PROYEK KINGLAND AVENUE APARTMENT THE VENETIAN TOWER. S1 thesis, Universitas Mercu Buana Jakarta.

DAMARESTA, GALIH ADI (2022) ANALISIS KESELAMATAN LALU LINTAS PADA SIMPANG TAK BERSINYAL DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (STUDI KASUS: JL. IPDA TUT HARSONO – JL. KUSUMANEGARA, KOTA YOGYAKARTA). S1 thesis, Universitas Mercu Buana Jakarta.

DEWANTA, NICOLAS ANGGA (2019) KAJIAN ANALISIS PERENCANAAN NORMALISASI KALI LAGOA DENGAN MENGGUNAKAN SOFTWARE HEC-RAS STUDI KASUS: SALURAN DRAINASE KOTA ADMINISTRASI JAKARTA UTARA PROVINSI DKI JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

DINA, DESY MEI (2023) ANALISIS KEPUASAN PENGGUNA JALAN TOL TERHADAP STANDAR PELAYANAN MINIMAL (SPM) DI WILAYAH JABODETABEK DENGAN METODE SEM-PLS. S2 thesis, Universitas Mercu Buana Jakarta.

F

FAJRI, FAIZ ARKA (2023) ANALISIS PENGARUH PENGGUNAAN ABU TERBANG PADA CAMPURAN BETON TERHADAP KUAT TEKAN. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZAN, MOHAMAD SAN SAN (2019) ANALISA PRODUKTIVITAS PENGELASAN REL LIGHT RAIL TRANSIT DENGAN MENGGUNAKAN FLASH BUTT WELDING DAN ALUMINO THERMIT WELDING TERHADAP WAKTU PELAKSANAAN (STUDI KASUS: PROYEK LRT JAKARTA VELODROME – KELAPA GADING). S1 thesis, Universitas Mercu Buana Jakarta.

FITRIANI, EKA NUR (2019) ANALISIS PRODUKTIVITAS PEKERJAAN PREFABRICATED VERTICAL DRAIN DENGAN MODEL JARINGAN SYARAF TIRUAN. S2 thesis, Universitas Mercu Buana Jakarta.

FUAD, MUHAMMAD ARVIN (2023) ANALISIS PANJANG ANTRIAN DAN TUNDAAN AKIBAT PENUTUPAN PALANG PINTU KERETA API (STUDI KASUS: JALAN BENDI UTAMA JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

H

HASIBUAN, AJAHAR (2023) ANALISIS PENGARUH KINERJA KONTRAKTOR DAN KONSULTAN PENGAWAS TERHADAP KEBERHASILAN PROYEK JALAN NASIONAL BERBASIS KONTRAK LONG SEGMENT DI PROVINSI JAMBI. S2 thesis, Universitas Mercu Buana Jakarta.

HERWANSAH, EKA FERDI (2019) ANALISIS RUAS JALAN DAN KAPASITAS PARKIR OFF STREET MALL (Studi Kasus : Transmart Carrefour, Depok). S1 thesis, Universitas Mercu Buana Jakarta.

Handoyo, Handoyo (2021) OPTIMASI WAKTU DAN BIAYA PEKERJAAN STRUKTUR MENGGUNAKAN METODE CPM DAN TIME COST TRADE OFF (Studi Kasus : Pembangunan Wisma Barito Pacific II, Jakarta Barat). S1 thesis, Universitas Mercu Buana Jakarta.

I

INDRIYADI, DYAH KARTIKA (2023) STUDI PERBANDINGAN ANALISIS NON-LINIER STATIK PUSHOVER DENGAN ANALISIS NON-LINIER DINAMIK RIWAYAT WAKTU PADA BANGUNAN GEDUNG PERKANTORAN DI KOTA SURABAYA. S1 thesis, Universitas Mercu Buana Jakarta.

IRAWAN, ALRYAN MUHAMMAD (2022) ANALISIS PENGGUNAAN SERBUK KACA DAN ZAT EPOXY TERHADAP KUAT TEKAN DAN KERAPATAN BETON DENGAN PENGARUH MAGNESIUM SULFAT. S1 thesis, Universitas Mercu Buana Jakarta.

ISMANTO, HADI (2018) ANALISIS PENYELESAIAN SENGKETA KONSTRUKSI (Dewan Sengketa Vs Arbitrase) BERDASARKAN FIDIC CONDITION of CONTRACT 2017. S2 thesis, Universitas Mercu Buana Jakarta.

Isnanto, Kusnadi (2021) PENGARUH SUBTITUSI SEBAGIAN BAHAN B3 SLAG ( GROUND GRANULATED BLAST FURNANCE ) TERHADAP BETON MUTU TINGGI ( HIGH STRENGHT CONCRETE ). S1 thesis, Universitas Mercu Buana Jakarta.

J

JATMIKA, ARGA (2018) METODE PELAKSANAAN SAMBUNGAN BAJA PADA PROYEK PEMBANGUNAN STASIUN LRT JABODEBEK LINTAS PELAYANAN CAWANG-CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

K

KARISMA, GANDHA (2023) OPTIMASI KINERJA BIAYA DAN WAKTU MENGGUNAKAN TIME COST TRADE OFF DAN MIXED INTEGER LINEAR PROGRAMMING (Study Kasus : Infrastruktur Gudang Maximos Cakung Cilincing, Jakarta Timur). S1 thesis, Universitas Mercu Buana Jakarta.

KATON, MUTIARA (2023) EVALUASI KINERJA PROYEK MENGGUNAKAN EARNED VALUE MANAGEMENT DAN EARNED DURATION MANAGEMENT (Studi Kasus : Pembangunan Jembatan Bogeg, Serang-Banten). S1 thesis, Universitas Mercu Buana Jakarta.

KURNIA, PANJI AHMAD (2018) ANALISIS LALU LINTAS BERDASARKAN HUBUNGAN VOLUME, KECEPATAN DAN KERAPATAN DI JALAN MARGONDA RAYA. S1 thesis, Universitas Mercu Buana Jakarta.

KURNIAWAN, AGUNG (2017) METODE PELAKSANAAN SHEAR WALL DAN RAMP PADA PROYEK TREE PARK CITY. S1 thesis, Universitas Mercu Buana Jakarta.

KUSUMANINGRUM, RIANDHA (2023) ANALISIS KECELAKAAN LALU LINTAS DENGAN METODE ACCIDENT RATE (STUDI KASUS : JALAN MT. HARYONO – JALAN GATOT SUBROTO KOTA JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

KUSUMASTUTI, DHANIA (2023) ANALISIS ESTIMASI BIAYA KONSTRUKSI BERBASIS VALUE ENGINEERING DAN LIFE CYCLE COST PADA BENDUNGAN URUGAN BATU. S2 thesis, Universitas Mercu Buana Jakarta.

L

LESTARI, NOVI DWI (2019) EVALUASI KAPASITAS LANDASAN PACU SERTA TINGKAT KEPUASAN PENUMPANG TERHADAP JASA PELAYANAN DI BANDAR UDARA INTERNASIONAL HALIM PERDANAKUSUMA. S1 thesis, Universitas Mercu Buana Jakarta.

M

MAFRURI, MUSTOFA (2019) ANALISIS KINERJA RUAS DAN SIMPANG TAK BERSINYAL DI JALAN DOKTOR SAHARJO TEBET JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

MAHVUT, HASAN (2021) PERBANDINGAN DISTRIBUSI SHOP DRAWING MENGGUNAKAN BAHAN BAKU KERTAS DAN DISTRIBUSI SHOP DRAWING MENGGUNAKAN PAPERLESS PENGGUNAAN GADGET (TABLET) TERHADAP KEEFEKTIFAN DAN KEEFISIEN MENGGUNAKAN ROOT CAUSE ANALYSIS. S1 thesis, Universitas Mercu Buana Jakarta.

MAJID, ABDUL (2017) STRUKTUR BOX CULVERT UNDER PASS PROYEK JALUR KERETA API BANDARA SOEKARNO HATTA-JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

MANGGALA, MELVIN GISELLE (2023) PENGUKURAN RESPONS STRUKTUR JEMBATAN GANTUNG ASIMETRIS AKIBAT BEBAN DINAMIK PEJALAN KAKI. S2 thesis, Universitas Mercu Buana Jakarta.

MARGARETHA, NADIA (2019) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK MASS RAPID TRANSIT CP 102 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

MARLINA, ANNISA INTAN (2018) PELAKSANAAN PEKERJAAN STRUKTUR SHEAR WALL PROYEK GREEN SEDAYU APARTEMENT TOWER 2 CENGKARENG - JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

MUBIN, SULTONI (2018) PELAKSANAAN PEKERJAAN SHEAR WALL PROYEK GRAHA TELKOMSIGMA II. S1 thesis, Universitas Mercu Buana Jakarta.

MURTADHO, ARIFQI (2019) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE SECANT PILE PROYEK TOL DEPOK-ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.

MUSLIM, ADIB (2018) PELAKSANAAN PERUBAHAN DIMENSI DAN PENAMBAHAN TULANGAN KOLOM PROYEK PEMBANGUNAN LAVANYA GARDEN APARTEMENT CINERE, DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

N

NAJIB, MUHAMMAD (2018) ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG PADA TANAH GRANULER (Studi Kasus : Proyek Gudang PT Inbisco Niagatama Semesta Serang). S1 thesis, Universitas Mercu Buana.

NICO ARIWIBOWO, NICO (2019) DESAIN KOMPARASI STRUKTUR BAGIAN ATAS MENURUT SNI 03-1726-2002 DAN SNI 03-1726-2012 (Studi Kasus Gedung X Buah Batu – Bandung). S1 thesis, Universitas Mercu Buana Jakarta.

NOVELIA, TRIANA (2019) ANALISIS PERBANDINGAN PENGGUNAAN METODE PELAKSANAAN TANGGA KONVENSIONAL DENGAN METODE PELAKSANAAN TANGGA PRECAST DARI SEGI BIAYA DAN WAKTU DI PROYEK RUSUN PENJARINGAN JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

NURDESSE, PUSPA ULFAH (2019) EARNED VALUE ANALYSIS PADA PROYEK KONSTRUKSI (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG R1 ASHLEY HOTEL – JAKARTA PUSAT). S1 thesis, Universitas Mercu Buana Jakarta.

P

PITALOKA, FANNY (2023) ANALISA KETERLAMBATAN PELAKSANAAN PEKERJAAN PEMASANGAN ALUMINIUM COMPOSITE PANEL DENGAN MELAKUKAN PENJADWALAN ULANG MENGGUNAKAN METODE PERT DAN SIMULASI MONTE CARLO (Studi Kasus Proyek Pemasangan ACP Gedung A2 Kantor Pusat Direktorat Jenderal Pajak, Gatot Subroto). S1 thesis, Universitas Mercu Buana Jakarta.

PRADANA, ULFA ARDHI (2022) EVALUASI PENJADWALAN DENGAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (STUDI KASUS : PROYEK CENTRAL CONTROL BUILDING). S1 thesis, Universitas Mercu Buana Jakarta.

PRAMONO, ARIF YUN (2019) ALTERNATIF PENJADWALAN TERHADAP PEKERJAAN STRUKTUR DENGAN METODE CPM (CRITICAL PATH METHOD) Studi Kasus Proyek Rukan Graha Emerald Gading Serpong. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, RYANTO AGUNG (2019) ANALISIS NILAI LABOUR UTILIZATION FACTOR (LUF) PEKERJA MENGGUNAKAN METODE WORK SAMPLING PADA PEKERJAAN PEMBESIAN BALOK (STUDI KASUS : PROYEK KANTOR DAN GUDANG PENYIMPANAN PT. BEZAYA, PASIR KOJA, BANDUNG). S1 thesis, Universitas Mercu Buana Jakarta.

PURNOMO, ARIS SETYO (2019) ANALISA KINERJA ARUS LALU LINTAS RUAS JALAN AKSES JALAN HUSEIN SASTRA NEGARA DAN SIMPANG TAK BERSINYAL MENUJU BANDAR UDARA SOEKARNO - HATTA. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, GILANG PERMANA (2021) ANALISA CONSTRUCTION ENGINEERING JEMBATAN CONTINUOS 3 SPAN BERDASARKAN METODE BALANCE CANTILEVER. S1 thesis, Universitas Mercu Buana Jakarta.

Prasetio, Eko Bekti (2021) ANALISIS PERBANDINGAN PENGENDALIAN WAKTU PADA PEKERJAAN KONSTRUKSI DENGAN METODE LINE OF BALANCE DAN MANUAL-PROGRAM EVALUATION AND REVIEW TECHNIQUE (Studi kasus : Apartemen Capital Square Surabaya). S1 thesis, Universitas Mercu Buana Jakarta.

R

RAHMAN, ARIP (2018) METODE PELAKSANAAN SOLDIER PILE PROYEK THE PARK MALL SAWANGAN, DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, HAEKAL (2017) METODE PELAKSANAAN PELAT MENGGUNAKAN BONDEK PADA PROYEK MENARA BNI PEJOMPONGAN. S1 thesis, Universitas Mercu Buana Jakarta.

RAMDHANI, YUWANA NUGRAHA (2019) ANALISIS ANGKUTAN SEDIMEN PADA PERENCANAAN DERMAGA PT KRAKATAU BANDAR SAMUDERA CILEGON. S1 thesis, Universitas Mercu Buana Jakarta.

RAYNALDI, MUHAMMAD (2022) ANALISIS FAKTOR RISIKO YANG BERPENGARUH TERHADAP KINERJA WAKTU DENGAN METODE PROBABILITY IMPACT MATRIX ( Studi Kasus : Proyek Ruko Aristoteles Summarecon Serpong ). S1 thesis, Universitas Mercu Buana Jakarta.

RIFAIH, RIFAIH (2019) ANALISIS KELAYAKAN ASSESSMENT GREEN BUILDING DENGAN GREENSHIP RATING TOOLS UNTUK BANGUNAN BARU. S2 thesis, Universitas Mercu Buana Jakarta.

RINGINA, NADIA HANA (2016) KERJA PRAKTIK METODE PELAKSANAAN PEKERJAAN HELIPAD APARTMENT WANG RESIDENCE. S1 thesis, Universitas Mercu Buana Jakarta.

RIZKI, IBNU KHOIRU (2023) PENGARUH PINTU PERLINTASAN KERETA API SEBIDANG TERHADAP KINERJA JL.KH.MAULANA HASANUDIN , BATU CEPER, TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

ROJAK, ABDUL (2022) ANALISIS RISIKO PELAKSANAAN PROYEK KONSTRUKSI DIMASA PANDEMI COVID 19 DI PT XYZ. S1 thesis, Universitas Mercu Buana Jakarta.

S

SANTOSO, AGUS AHMAD (2023) PENGARUH GRADASI AGREGAT CAMPURAN BERASPAL TERHADAP KEDALAMAN ALUR RODA MELALUI PENGUJIAN STABILITAS DINAMIS MENGGUNAKAN ALAT WHEEL TRACKING MACHINE. S1 thesis, Universitas Mercu Buana Jakarta.

SEPTIASARI, DEPITA (2018) PELAKSANAAN PEKERJAAN STRUKTUR SHEAR WALL PROYEK GREEN SEDAYU APARTEMENT TOWER 2 CENGKARENG - JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

SIDABUTAR, TOMOK SUTRISNO (2019) ANALISIS SIMPANG TIDAK BERSINYAL DAN KINERJA JALAN (STUDI KASUS PEREMPATAN KAMPUNG GAGA-KALIDERES). S1 thesis, Universitas Mercu Buana Jakarta.

SOFIAN, AHMAD (2022) ANALISIS EFISIENSI BIAYA DAN WAKTU PEMAKAIAN KOMBINASI ALUMMINIUM FORMWORK DAN BEKISTING SEMI KONVENSIONAL PADA BANGUNAN BERTINGKAT TINGGI. S1 thesis, Universitas Mercu Buana Jakarta.

SUJAYATI, SUJAYATI (2019) TINJAUAN PERUBAHAN DESAIN PADA PROYEK PEMBANGUNAN HOTEL GRANDHIKA ISKANDARSYAH JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

SULISTYANINGTYAS, CHATARINA BIMA (2018) PENERAPAN M-PERT PADA STRUKTUR BANGUNAN RUMAH SAKIT DAPAT MENINGKATKAN KINERJA WAKTU. S2 thesis, Universitas Mercu Buana Jakarta.

SUPRIYONO, ALHABIB MOHAMMAD (2018) DESAIN CABLE STAYED BRIDGE SEBAGAI ALTERNATIF PENGGANTI SUSPENSION BRIDGE ( STUDI KASUS : JEMBATAN GABUS CS ). S1 thesis, Universitas Mercu Buana Jakarta.

SUTANTO, AGUNG BUDI (2019) FAKTOR FAKTOR PENYEBAB KETERLAMBATAN PADA TAHAP PELAKSANAAN PEKERJAAN PROYEK MAMPANG OFFICE. S1 thesis, Universitas Mercu Buana Jakarta.

T

TIYANI, DESY (2018) METODE PELAKSANAAN SAMBUNGAN BAJA PADA PROYEK PEMBANGUNAN STASIUN LRT JABODEBEK LINTAS PELAYANAN CAWANG-CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

TRIANA, ANDRI ANGGA (2019) ANALISIS KINERJA BIAYA DAN WAKTU DENGAN KONSEP EARNED VALUE ANALYSIS PADA PROYEK BANGUNAN PERKANTORAN DI KAWASAN TEBET JAKARTA SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.

TRIMIARSIH, ETIK (2019) ANALISIS PERCEPATAN UNTUK PELAKSANAAN PROYEK KONTRUKSI ( Studi Kasus : Proyek Pembangunan Gudang PT. Inbisco Niagatama Semesta, Serang, Banten ). S1 thesis, Universitas Mercu Buana Jakarta.

W

WAHYUNINGSIH, NUR CAHYANTI (2019) ANALISIS HIDROGRAF BANJIR UNTUK SUB DAERAH ALIRAN KALI SUNTER DENGAN PERANGKAT LUNAK HEC - HMS. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, IGNATIUS RADITYA NATA (2018) PEMBUATAN MANUAL KONSTRUKSI BAJA BERDASARKAN PROFIL BAJA STANDAR YANG ADA DI INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

WIJAYA, NUR APREVIANI (2018) METODE PELAKSANAAN PEKERJAAN STRUKTUR ATAS ( LANTAI 3, 4, 5 ) PROYEK HOTEL SAYAGA CIBINONG – BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.

Y

YULIANTI, SANTI (2018) PELAKSANAAN PERUBAHAN DIMENSI DAN PENAMBAHAN TULANGAN KOLOM PROYEK PEMBANGUNAN LAVANYA GARDEN APARTEMENT CINERE, DEPOK. S1 thesis, Universitas Mercu Buana Jakarta.

YULIARIF, BIMO (2018) DESAIN STRUKTUR ATAS SEKOLAH DI SEMARANG. S1 thesis, Universitas Mercu Buana.