Items where Subject is "600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 625 Engineering Of Railroads, Roads/Rekayasa Rel Kereta Api, Jalan > 625.2 Railroad Rolling Stock/Perlengkapan Kereta Api"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: Thesis
Number of items at this level: 8.

Thesis

AMALIA, DIAH FITRANI (2019) ANALISIS EFEKTIVITAS LAYANAN (ANGKUTAN UMUM KERETA REL LISTRIK COMMUTER LINE RUTE BOGOR – TANAH ABANG). S1 thesis, Universitas Mercu Buana Jakarta.

AMALIA, RIZKA (2018) ANALISIS KEPUASAN PENUMPANG TERHADAP PELAYANAN KERETA BANDARA SOEKARNO-HATTA RUTE STASIUN BANDARA SOEKARNO-HATTA – STASIUN SUDIRMAN BARU/BNI CITY. S1 thesis, Universitas Mercu Buana Jakarta.

ANGGARA, ERA (2020) RANCANG BANGUN PALANG PINTU KERETA APIOTOMATIS MENGGUNAKAN SENSOR ULTRASONIK BERBASIS ANDROID. S1 thesis, Universitas Mercu Buana.

KAMBUNA, MUHAMMAD NOVAN SYAHPUTRA (2018) SISTEM PENGEREMAN PADA KERETA PENUMPANG TIPE K3 DI DIPO KERETA BESAR MANGGARAI JAKARTA PT. KERETA API INDONESIA (PERSERO). S1 thesis, Universitas Mercu Buana Jakarta.

NIRMALASARI, DHESI PUTRI (2021) PENJADWALAN ULANG PEKERJAAN PEMANCANGAN CFG (CEMENT FLY-ASH GRAVEL) PILE DAN SPUNPILE SUBGRADE AKIBAT PENYESUAIAN PENGGUNAAN MATERIAL SPUNPILE (Studi Kasus : Stasiun Karawang Proyek Kereta Cepat Jakarta-Bandung). S1 thesis, Universitas Mercu Buana Jakarta.

NUGROHO, EKO AGUS (2018) ANALISIS KETERLAMBATAN PROYEK PEKERJAAN PERKERASAN BETON LANTAI STABLING CUCI KERETA DI STASIUN JAKARTA KOTA DAOP 1 JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, TOMY AJI (2018) PERAWATAN BOGIE TB 1014 DI PT. KERETA API INDONESIA (PERSERO). S1 thesis, Universitas Mercu Buana Jakarta.

SULISTYONINGSIH, WURI DYAH (2021) ANALISIS KEPUASAN PENUMPANG TERHADAP PELAYANAN KERETA API LOKAL MERAK. S1 thesis, Universitas Mercu Buana Jakarta.

This list was generated on Fri Mar 29 14:13:40 2024 WIB.