Items where Division is "Fakultas Teknik > Teknik Sipil" and Year is 2025

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: , | A | B | C | D | E | F | H | I | K | M | N | O | P | R | S | T | W | Y | Z
Number of items: 94.

,

, FIRMANSYAH (2025) ANALISIS PENGARUH PUTARAN BALIK ARAH TERHADAP KINERJA DAN TINGKAT PELAYANAN JALAN (STUDI KASUS: U-TURN JALAN RADIN INTEN II JAKARTA TIMUR). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

, SONY (2025) EVALUASI KINERJA PELAYANAN BRT SEMARANG STUDI KASUS: KORIDOR 4 TRAYEK TERMINAL CANGKIRAN – STASIUN TAWANG. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

A

ADITYA, ADINDA PUTRI (2025) STUDI PRESERVASI PERKERASAN JALAN LENTUR DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN SURFACE DISTRESS INDEX (SDI). (STUDI KASUS JALAN TEUKU UMAR - JALAN BINTARO UTAMA 5, TANGERANG SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

ADITYA, RAMA SURYA (2025) ANALISIS TINGKAT RISIKO PEKERJAAN STRUKTUR ATAS PADA PROYEK PEMBANGUNAN GEDUNG SAVYAVASA APARTMENT DENGAN MENGGUNAKAN METODE HIRARC. S1 thesis, Universitas Mercu Buana Jakarta.

AGHISNA, MUHAMMAD AFIF (2025) ANALISIS TARIF BERDASARKAN BIAYA OPERASIONAL KENDARAAN (BOK) DAN ABILITY TO PAY (ATP) PADA LAYANAN JABODETABEK RESIDENCE CONNEXION PERUM DAMRI. S1 thesis, Universitas Mercu Buana Jakarta.

AGUSTINA, EVITA (2025) PENERAPAN KONSEP VALUE ENGINEERING UNTUK MENINGKATKAN KINERJA BIAYA PADA PEKERJAAN ARSITEKTUR PROYEK PERUMAHAN. S1 thesis, Universitas Mercu Buana Jakarta.

ALDIANTO, IDRIS ABASTIAN (2025) ANALISIS RISIKO K3 MENGGUNAKAN PENDEKATAN HIRADC DAN JSA (Studi Kasus PMJ Tower Pulogadung). S1 thesis, Universitas Mercu Buana Jakarta.

ALFATIH, MUHAMMAD KEMAL (2025) ANALISIS DAYA DUKUNG DAN PENURUNAN FONDASI BOREPILE BERDASARKAN DATA PENGUJIAN STANDAR PENTRATION TEST (SPT). S1 thesis, Universitas Mercu Buana Jakarta.

ANAM, RIFQI KHOIRUL (2025) ANALISIS STABILITAS TANAH TIMBUNAN BADAN JALAN DENGAN PERKUATAN SOIL REPLACEMENT DAN GEOSINTETIK (Studi Kasus Proyek Jalan Tol Bocimi 3B Sta 32+925 - 32+950). S1 thesis, Universitas Mercu Buana Jakarta.

APRIANSYAH, MUHAMAD FAUZI (2025) ANALISIS EFEKTIVITAS SISTEM PERKAKUAN VERTIKAL GEDUNG BETON BERTULANG BERLANTAI BANYAK DENGAN SISTEM DINDING GESER DAN PERBESARAN KOLOM-SABUK (STUDI KASUS : GEDUNG PUSAT LABORATORIUM PENGUJIAN MUTU DAN KEAMANAN PAKAN). S1 thesis, Universitas Mercu Buana - Buncit.

ARDIANSYAH, YAYAN (2025) PENGARUH VARIATION ORDER TERHADAP BIAYA PADA PROYEK PEMBANGUNAN MUSEUM ADHI PRADANA DI SENTUL BOGOR. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

ARGA, DONDA TRIFILA (2025) ANALISIS EFEKTIVITAS BIM 5D DALAM PERHITUNGAN QUANTITY TAKE-OFF DENGAN SOFTWARE PENDUKUNG AUTODEKS REVIT PADA PROYEK JALAN TOL PROBOLINGGO - BANYUWANGI. S1 thesis, Universitas Mercu Buana Jakarta.

ARIEF, ILHAM MUHAMMAD (2025) ANALISIS PERBANDINGAN METODE PELAKSANAAN PEMASANGAN DINDING AAC BLOCK DAN DINDING EXPANDABLE POLYSTYRENE STYROFOAM PANEL DITINJAU DARI SEGI BIAYA DAN WAKTU PELAKSANAAN (STUDI KASUS : PROYEK DHARMAWANGSA TOWERS JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

ARIYANTO, PAULUS (2025) ANALISIS JALUR KRITIS PEKERJAAN BORE PILE MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) UNTUK MENINGKATKAN KINERJA WAKTU PADA PEMBANGUNAN SMART AND GREEN CAMPUS. S1 thesis, Universitas Mercu Buana Jakarta.

ASSEGAF, APRILIA LAILATUR R (2025) ANALISIS NILAI HASIL TERHADAP BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI PROJECT GREEN TERRACE AMBOJA BAMBU APUS, CIPAYUNG. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, SYIFA PUTRI (2025) IMPLEMENTASI MANAJEMEN RISIKO PROYEK PEMBANGUNAN TERMINAL KIJING MEMPAWAH, KALIMANTAN BARAT. S1 thesis, Universitas Mercu Buana Jakarta.

AULIA, VIVI (2025) ANALISIS MANAJEMEN RISIKO PADA PELAKSANAAN PEMBANGUNAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT TINGGI (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG BANK BNI DI PIK 2). S1 thesis, Universitas Mercu Buana Jakarta.

AYYUBI, SHALAHUDDIN AL (2025) PENGARUH KADAR AIR PADA KEKUATAN GESER PADA TANAH LEMPUNG. S1 thesis, Universitas Mercu Buana Jakarta.

AZHARI, FADHILLA (2025) EVALUASI KINERJA LALU LINTAS AKIBAT PENUTUPAN AKSES KENDARAAN PRIBADI PADA JALAN PINTU BESAR SELATAN MENUJU TRANSPORTASI MASSAL (STUDI KASUS: JALAN PANCORAN KOTA ADMINISTRASI JAKARTA BARAT). S1 thesis, Universitas Mercu Buana - Buncit.

B

BAITI, NURUL (2025) ANALISIS PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHINYA PADA PEKERJAAN BORE PILE (STUDI KASUS: PROYEK PEMBANGUNAN JALAN TOL SERANG – PANIMBANG SEKSI 3 (CILELES – PANIMBANG)). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

BUSTAMIN, NABILA PUTRI ARIESTA (2025) PERBANDINGAN KAPASITAS DAYA DUKUNG FONDASI TIANG PANCANG DAN FONDASI TIANG BOR PADA PROYEK LRT JAKARTA RUTE VELODROME - MANGGARAI FASE 1B. S1 thesis, Universitas Mercu Buana Jakarta.

C

CAHYANINGSIH, AULIA PUTRI (2025) ANALISIS CACAT KONSTRUKSI MENGGUNAKAN METODE SIX SIGMA PADA PEKERJAAN STRUKTUR BASEMENT PROYEK PUSAT PELAYANAN IBU DAN ANAK RS PIK, PIK 2, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

D

DIANA, LALA (2025) ANALISIS PENGARUH FAKTOR KETERLAMBATAN KONSTRUKSI TERHADAP KINERJA MUTU PROYEK MELALUI STANDAR KUALITAS DAN SPESIFIKASI. S2 thesis, Universitas Mercu Buana Jakarta.

E

EFENDI, NURUL (2025) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PONDASI SPUN PILE DENGAN BOR PILE PADA PROYEK KONSTRUKSI ( Studi kasus Proyek PT. Ultra sakti Narogong). S1 thesis, Universitas Mercu Buana Jakarta.

F

FAIR, ROBBY JUNI (2025) OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN PENERAPAN METODE CRASHING. S2 thesis, Universitas Mercu Buana Jakarta.

FAJAR, AHMAD RIAN (2025) IMPLEMENTASI METODE LEAN CONSTRUCTION PADA PEKERJAAN ERECTION PCI-GIRDER PROYEK STRATEGIS KAWASAN ISTANA KEPRESIDENAN IBUKOTA NUSANTARA DAPAT MENINGKATKAN KINERJA WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

FAJAR, DUDI AHMAD (2025) ANALISIS MANAJEMEN WAKTU DENGAN METODE CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUATION REVIEW TECHNIQUE (PERT) UNTUK MENENTUKAN DURASI OPTIMAL (STUDI KASUS : PROYEK KONSTRUKSI DALAM PENGERJAAN (KDP) LANJUTAN UNIVERSITAS NEGERI GORONTALO ). S1 thesis, Universitas Mercu Buana Jakarta.

FARISI, M. IQBAL AL (2025) EVALUASI TOL KATARAJA SEKSI 1 JEMBATAN KALI PERANCIS DENGAN MENGANALISA CONSTRUCTION ENGINEERING MENGGUNAKAN METODE BALANCE CANTILEVER. S1 thesis, Universitas Mercu Buana Jakarta.

FAUZI, FAJAR (2025) ANALISIS TARIF JALAN TOL BERDASARKAN PENDEKATAN WILLINGNESS TO PAY (WTP) DAN ABILITY TO PAY (ATP) STUDI KASUS JALAN TOL PEJAGAN - PEMALANG (SEKSI IV TEGAL TIMUR - SEWAKA). S1 thesis, Universitas Mercu Buana Jakarta.

FIRDAUS, ROBERT FANNY AL (2025) ANALISIS BIAYA DAN WAKTU PEKERJAAN BOX GIRDER DENGAN METODE CAST IN SITE DAN PRECAST (Studi Kasus: Proyek Jembatan C2 Simpang Susun Serpong-Balaraja). S1 thesis, Universitas Mercu Buana Jakarta.

FIRMANSYAH, ERWIN (2025) ANALISIS FAKTOR PENYEBAB KERUSAKAN BANGUNAN APARTMENT DENGAN METODE ROOT CAUSE ANALYSIS (RCA) (STUDY KASUS : APARTMENT BOTANICA TOWER 3 KEBAYORAN LAMA). S1 thesis, Universitas Mercu Buana Jakarta.

FIRMANSYAH, MUHAMMAD RIZKY (2025) PENGARU HIMPLEMENTASI KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA KONSTRUKSI ( Studi Kasus : Proyek Pembangunan Apartemen Kiara Beachfront Nusa Dua). S1 thesis, Universitas Mercu Buana Jakarta.

H

HADID, MUHAMMAD IQBAL AL (2025) ANALISIS PRODUKTIVITAS TENAGA KERJA PEKERJAAN FABRIKASI BAJA (STUDI KASUS: PROYEK NEW FACTORY PT SIGMA REKAYASA PRIMA, CIKARANG). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

HAMID, MUHAMMAD FANNANY (2025) ANALISIS STRUKTUR TOWER TELEKOMUNIKASI TERHADAP BEBAN ANGIN DAN PERANGKAT TERPASANG MENGGUNAKAN APLIKASI MS. TOWER V.6.20 (STUDI KASUS : TOWER SST 4 LEG - 52M). S1 thesis, Universitas Mercu Buana Jakarta.

HARTANTO, SINGGIH (2025) ANALISIS PRODUKTIVITAS PENGGUNAAN ALAT BERAT GIRDER LAUNCHER PADA PEKERJAAN FLYOVER ( STUDI KASUS : PROYEK FLYOVER DK 141 STASIUN TEGAL LUAR KCJB). S1 thesis, Universitas Mercu Buana Jakarta.

HASAN, MUHAMMAD (2025) ANALISA KINERJA SIMPANG TIGA TAK BERSINYAL DAN RUAS JALAN PADA SIMPANG JALAN RAYA JAMBORE CIBUBUR KOTA JAKARTA TIMUR MENGGUNAKAN PKJI 2023. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

HIDAYAT, ADINDA SAFITRI PUTRIE (2025) EVALUASI KESADARAN PEKERJA TERHADAP IMPLEMENTASI K3 PADA PEKERJAAN FINISHING (Studi Kasus : Proyek Apartemen ABC, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, LUTFI (2025) OPTIMALISASI KAPASITAS RUNWAY 1, 2 ,DAN 3 DENGAN METODE TIME SPACE ANALYSIS BANDAR UDARA INTERNASIONAL SOEKARNO HATTA - TANGERANG, BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

HIDAYAT, RIKI (2025) PENGARUH SUBSTITUSI SEMEN DENGAN ABU CANGKANG BEKICOT TERKALSINASI TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

I

IQBAL, NUR MUHAMMAD (2025) ANALISIS PERAN BIM PADA PELAKSANAAN PRA KONSTRUKSI GEDUNG STUDI KASUS PROYEK CWJ-02 PEMBANGUNAN 6 GEDUNG UNIVERSITAS JAMBI. S1 thesis, Universitas Mercu Buana Jakarta.

ISLAMINATY, ILMY (2025) EVALUASI KINERJA OPERASIONAL DAN KUALITAS PELAYANAN KA LOKAL WALAHAR CIKARANG - PURWAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.

ISMAWAN, DIAN (2025) PENGARUH SUBSITUSI SEMEN MENGGUNAKAN ABU BATANG JAGUNG (ZEA MAYS) DAN PENAMBAHAN SERBUK CANGKANG BEKICOT (ACHATINA FULICA) TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

K

KEAAN, CHRISTOFORUS LAMBI' (2025) STABILISASI TANAH LEMPUNG MENGGUNAKAN BAHAN CAMPURAN SEMEN DAN ABU TERBANG (FLY ASH) PADA KELURAHAN KAPUK MUARA. S1 thesis, Universitas Mercu Buana Jakarta.

KHOTIMAH, HUSNUL (2025) ANALISIS FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN ELEVEE PENTHOUSE AND RESIDENCE (ALAM SUTERA). S1 thesis, Universitas Mercu Buana Jakarta.

KRISNANTO, EKA (2025) PEMANFAATAN PENGGUNAAN LIMBAH GRANIT DAN LIMBAH BOTOL KACA SEBAGAI SUBTITUSI AGREGAT KASAR TERHADAP KUAT TEKAN BETON DENGAN PENAMBAHAN SIKACIM CONCRETE. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

KURNIAWAN, ANDREAS NOVI (2025) ANALISIS METODE CRAWLER CRANE DAN LAUNCHER UNTUK EFISIENSI BIAYA DAN WAKTU PEKERJAAN PEMASANGAN PCI GIRDER PADA PROYEK PEMBANGUNAN JALAN TOL JOGJA – BAWEN SEKSI 01. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

KUSUMA, ANGGA DITYA (2025) PENGEMBANGAN PROSES BISNIS DALAM PENGADAAN RUMAH INSTAN SEDERHANA SEHAT BERBASIS RISIKO UNTUK MENINGKATKAN KINERJA DI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT. S2 thesis, Universitas Mercu Buana Jakarta.

M

MAGDALENA, SARA (2025) ANALISIS FAKTOR PENGARUH TERJADINYA COST OVERRUN BERBASIS RELATIVE IMPORTANCE INDEX (RII) PADA PROYEK KONSTRUKSI (STUDI KASUS : PROYEK PEMBANGUNAN JALAN TOL ANCOL TIMUR – PLUIT (ELEVATED)). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

MAHESA, IVAN (2025) EVALUASI DAYA DUKUNG TIANG BOR PADA PROYEK LRT JAKARTA FASE 1B P148B UNTUK MENINGKATKAN EFISIENSI MATERIAL BETON. S1 thesis, Universitas Mercu Buana Jakarta.

MAJID, FADI ASLAM (2025) ANALISIS PENGENDALIAN RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) DENGAN MENGGUNAKAN METODE HAZARD IDENTIFICATION, RISK ASSEESSMENT, AND RISK CONTROL (HIRARC). S1 thesis, Universitas Mercu Buana Jakarta.

N

NADILLAH, RARA SALSA (2025) ANALISIS PERBANDINGAN WAKTU PELAKSANAAN PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI ANTARA METODE BETON KONVENSIONAL DAN PRECAST PADA PROYEK PEMBANGUNAN RUSUN PASPAMPRES – IBU KOTA NUSANTARA. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

NUGRAHA, ADIBTIA JATI (2025) ANALISIS PERKERASAN LENTUR PADA RUNWAY DAN TAXIWAY BANDAR UDARA BUDIARTO CURUG - TANGERANG DENGAN METODE FAA (FEDERATION AVIATION ADMINISTRATION). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

O

OCTAVIANI, AILIA (2025) ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG BERDASARKAN DATA PENGUJIAN CONE PENETRATION TEST (CPT) (STUDI KASUS : BANGUNAN EQUIPMENT ROOM STASIUN TANAH ABANG PROYEK PEKERJAAN PENINGKATAN SISTEM PERSINYALAN DAN TELEKOMUNIKASI PERKEETAAPIAN PADA LINTAS JATINEGARA – BOGOR DAN MANGGARAI – JAKARTAKOTA). S1 thesis, Universitas Mercu Buana - Buncit.

OVILIA, EMA KHOIRUNISA (2025) ANALISIS FAKTOR KETERLAMBATAN PROYEK BERBASIS PMBOK SEVENTH EDITION DENGAN METODE RELATIVE IMPORTANCE INDEX (STUDI KASUS : PROYEK PEKERJAAN CORRECTIVE BUILDING MAINTENANCE - SMO). S1 thesis, Universitas Mercu Buana - Buncit.

P

PADMARINY, AMELIASARY SAFINA (2025) PERBANDINGAN PELAKSANAAN PEKERJAAN PIER HEAD DENGAN METODE SOSROBAHU DAN CAST IN SITU KONVENSIONAL DARI SISI BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN TOL CIMANGGIS - CIBITUNG SEKSI II ELEVATED TRANSYOGIE. S1 thesis, Universitas Mercu Buana Jakarta.

PERDANA, FATHONI ARIEF (2025) PERANCANGAN STRUKTUR BAJA PIPE RACK DENGAN METODE ANALISA GEMPA STATIK EKIVALEN (STUDI KASUS: PLTU DI KALIMANTAN SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.

PERWIRA, ALBI SEPTA NARISYA (2025) ANALISIS FAKTOR - FAKTOR WASTE MATERIAL PADA PROYEK JALAN & JEMBATAN (STUDI KASUS: PROYEK PEMBANGUNAN JALAN & JEMBATAN SMARTFREN BSD TANGERANG SELATAN). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

PRASAPTIAMI, INKA (2025) ANALISIS KINERJA WAKTU PELAKSANAAN DENGAN METODE EARNED SCHEDULE PADA PROYEK PEMBANGUNAN GEDUNG AULA DI JAKARTA SELATAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

PRASETYO, DONI (2025) ANALISIS QUANTITY TAKE OFF STRUKTUR BAWAH MENGGUNAKAN SOFTWARE REVIT 2021 DAN TEKLA STRUCTURES PADA PROYEK RUMAH SAKIT HEWAN TAMAN SAFARI. S1 thesis, Universitas Mercu Buana Jakarta.

PRASETYO, DWI (2025) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG SENKOM PONDOK GEDE JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.

PRATAMA, LANTIF ANGGRAHITA (2025) ANALISIS PERHITUNGAN KAPASITAS APRON DAN LANDASAN PACU (RUNWAY) PADA BANDAR UDARA ILAGA PAPUA. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

PRATAMA, NANDA FADILAH ADE (2025) IMPLEMENTASI TEKNOLOGI LIDAR & BUILDING INFORMATION MODELING PADA PROYEK JALAN DALAM FASE TENDER TERHADAP BIAYA DAN WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.

PRATOMO, RIDWAN DWI (2025) ANALISIS PANJANG ANTRIAN DAN TUNDAAN AKIBAT PENUTUPAN PALANG PINTU KERETA API (Studi Kasus: Jalan Jembatan Halimun, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, ADRIANUS ARJUNA DEWANTA (2025) ANALISIS DIMENSI BORED PILE TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PROYEK HOTEL ARTOTEL MAGELANG. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, ASHAKI HILAL KEMALA (2025) IMPLEMENTASI PLANNING DAN MONITORING SCHEDULE BERBASIS DIGITALISASI SECARA REALTIME MENGGUNAKAN ORACLE PRIMAVERA P6 PADA PROYEK LRT MALOLOS - CLARK RAILWAY (BLUMENTRIT PROJECT EXTENSION) CPS-01 FILIPINA. S1 thesis, Universitas Mercu Buana Jakarta.

PUTRA, MUHAMMAD FARHAN SYAH (2025) ANALISA PENGARUH GEOMETRIK U-TURN TERHADAP KAPASITAS JALAN PADA RUAS JALAN TMP-TARUNA KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.

R

RAHMATTULLOH, NUR (2025) PEMANFAATAN LIMBAH STEEL SLAG EX. POSCO KRAKATAU SEBAGAI SUBSTITUSI AGREGAT KASAR TERHADAP NILAI DAYA DUKUNG LAPIS PONDASI PADA PERKERASAN JALAN TOL. S1 thesis, Universitas Mercu Buana Jakarta.

RAJAGUKGUK, ERISA MARGARETHA (2025) IMPLEMENTASI METODE EARNED VALUE DAN CRITICAL PATH METHOD DAPAT MENINGKATKAN KINERJA BIAYA DAN WAKTU (STUDI KASUS : PROYEK PEMBANGUNAN/RENOVASI GEDUNG KANTOR DAN PENATAAN RUANG KERJA BP2MI). S1 thesis, Universitas Mercu Buana Jakarta.

RAMADHAN, FANDWIN (2025) EFISIENSI PENGGUNAAN BEKISTING SLIDING SYSTEM SEBAGAI PENGGANTI BEKISTING KONVENSIONAL PADA PEKERJAAN STRUKTUR CAPPING BEAM. S1 thesis, Universitas Mercu Buana Jakarta.

RAZZAK, ADAM FADHIL AL (2025) EFEKTIVITAS PENGGUNAAN METODE CRITICAL CHAIN PROJECT MANAGEMENT DALAM PENYELESAIAN PROYEK SEWAGE TREATMENT PLANT CAPACITY 40 MPH, DELTAMAS CIKARANG. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

REZKI, MUHAMMAD (2025) EVALUASI DAYA DUKUNG TIANG BOR BERDASARKAN DATA UJI N-SPT PADA PROYEK RUMAH SUSUN CILANGKAP. S1 thesis, Universitas Mercu Buana Jakarta.

RIYADY, AFIF (2025) ANALISIS PERBANDINGAN MATERIAL BATA RINGAN DENGAN PRECAST DITINJAU DARI SEGI BIAYA, WAKTU DAN METODE PELAKSANAAN PADA PEKERJAAN DINDING FASADE (Studi Pada : Proyek Apartemen Samara Suites - Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.

RIZKIYA, DENIRA PUTRI (2025) STUDI PERBAIKAN TANAH LUNAK MENGGUNAKAN KOMBINASI PVD DAN PRELOADING UNTUK MEMPERCEPAT PENURUNAN PADA EXIT TOLL KM 151 JALAN TOL PADALARANG - CILEUNYI. S1 thesis, Universitas Mercu Buana Jakarta.

RIZKY, MOCHAMMAD RAYHAN ALL (2025) EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN APARTEMENT XYZ PEKERJAAN STRUKTUR (Studi Kasus : Proyek XYZ, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

RIZQI, AHMAD AENUR (2025) ANALISIS KETERLAMBATAN PENGADAAN MATERIAL PADA PROYEK (Studi Kasus : Pelebaran Ruas Jalan Moga - Pulosari). S1 thesis, Universitas Mercu Buana Jakarta.

ROKHMALIA, LATIFA (2025) ANALISIS EFISIENSI BIAYA BERBASIS PENERAPAN KONSEP VE PADA PROYEK BANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.

ROSALINDA, OKTA (2025) ANALISIS FAKTOR DOMINAN PENYEBAB KETERLAMBATAN PROYEK GEDUNG APARTEMEN SAVYAVASA JAKARTA SELATAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

S

SALAM, DARUS (2025) ANALISIS PENERAPAN KONSEP EARNED VALUE UNTUK PENGENDALIAN BIAYA DAN WAKTU PELAKSANAAN PEMBANGUNAN RUMAH SUSUN KAMPUNG AKUARIUM TAHAP 2 BLOK C - JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.

SALSABILA, RIFANY RIZKI (2025) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU BERDASARKAN ISO 9001:2015 PADA PROYEK PEMBANGUNAN WTP (WATER TREATMENT PLANT) BANK INDONESIA KARAWANG. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

SANTOSO, FINNA AURELIA SANTOS (2025) ANALISIS METODE PERBANDINGAN METODE CPM DAN PERT PADA PENJADWALAN PROYEK PEMBANGUNAN SUPERBLOK PAKUWON MIXED USE BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

SANTOSO, ILHAM (2025) ANALISIS KINERJA STRUKTUR GEDUNG BERTINGKAT (STUDI KASUS : PROYEK GEDUNG DATA CENTER DI CIKARANG). S1 thesis, Universitas Mercu Buana Jakarta.

SAPUTRI, AZZAKKIYAH DINA (2025) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PEMBANGUNAN BALAI LATIHAN KERJA KUPANG. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

SAPUTRO, FARHANS AGUNG (2025) ANALISIS KINERJA RUAS JALAN DAN SIMPANG BERSINYAL TIGA KAKI PADA JALAN RAYA BOGOR - JALAN RAYA CIRACAS MENGGUNAKAN PKJI 2023. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.

SARI, DEVITA (2025) ANALISIS FAKTOR KETERLAMBATAN PROYEK ATLAS SPORT CLUB DI KAWASAN PANTAI INDAH KAPUK 2 DENGAN METODE FAULT TREE ANALYSIS (FTA) DAN METODE EVENT TREE ANALYSIS (ETA). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

SARI, INTINING MAWAR (2025) ANALISIS FAKTOR-FAKTOR PENERAPAN KONSTRUKSI RAMPING (LEAN CONSTRUCTION) DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) PADA PEMBANGUNAN GEDUNG TRAINING CENTER DI CIBITUNG GUNA MENGHASILKAN VALUE MAKSIMAL. S1 thesis, Universitas Mercu Buana Jakarta.

SITUNGKIR, YOHANES ANDRYANO HALOMOAN (2025) ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNGAN PABRIK MANDU SEAWEED CJ FOODS DENGAN METODE EARNED VALUE ANALYSIS. S1 thesis, Universitas Mercu Buana Jakarta.

SYARIF, DANISY ARDANIL (2025) ANALISIS PERSEPSI PENGGUNA TERHADAP LAYANAN ANGKUTAN UMUM KERETA REL LISTRIK COMMUTER LINE (STUDI KASUS : RUTE CAWANG - BOGOR). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

T

TARIGAN, KRISAN EWALDO (2025) PERENCANAAN STRUKTUR BETON BERTULANG GEDUNG 8 LANTAI (THE GREEN CONDOVILLA) AKIBAT KETIDAKBERATURAN HORIZONTAL. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

TIARANI, DANIYA (2025) FAKTOR PENGARUH TERJADINYA TIME OVERRUN DAN COST OVERRUN PROYEK KONSTRUKSI PADA KAWASAN INDUSTRI DI PROVINSI BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.

W

WAHYUDI, DIKI (2025) ANALISIS PEMANFAATAN LIMBAH GRC (GLASSFIBRE REINFORCED CEMENT) DAN FLY ASH SEBAGAI BAHAN SUBTITUSI DALAM CAMPURAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.

WIDI, FITRIANI SETIANING (2025) ANALISIS KINERJA PROYEK DENGAN SISTEM KONVENSIONAL DAN BUILDING INFORMATION MODELLING PADA PELAKSANAAN PEMBANGUNAN JEMBATAN CALLENDER HAMILTON (Studi Kasus : Jembatan Cikao). S1 thesis, Universitas Mercu Buana Jakarta.

Y

YUNUS, SYAHREZA FAHLEVI (2025) ANALISIS BIAYA DAN WAKTU METODE DIESEL HAMMER DAN HYDRAULIC STATIC PILE DRIVE PADA PONDASI TIANG PANCANG UKURAN 25X25 (Studi Kasus: Proyek Gedung Ponpes Tahfidz Tafsir Alqur'an Cinere, Depok). S1 thesis, Universitas Mercu Buana Jakarta.

Z

ZAHRAN, AUDREY ATHAYA (2025) ANALISIS KINERJA RUAS JALAN DAN SIMPANG BERSINYAL MENGGUNAKAN PKJI 2023 PADA JALAN RAYA PASAR MINGGU – JALAN RAYA KALIBATA , PANCORAN JAKARTA SELATAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

ZIVANDRA, MUHAMMAD FAUZAN (2025) ANALISIS PEMILIHAN MODA TRANSPORTASI TRANSJAKARTA DAN LRT STUDI KASUS RUTE CIBUBUR - DUKUH ATAS. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

This list was generated on Thu Apr 17 12:32:38 2025 WIB.