![]() | Up a level |
, FIRMANSYAH (2025) ANALISIS PENGARUH PUTARAN BALIK ARAH TERHADAP KINERJA DAN TINGKAT PELAYANAN JALAN (STUDI KASUS: U-TURN JALAN RADIN INTEN II JAKARTA TIMUR). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
, SONY (2025) EVALUASI KINERJA PELAYANAN BRT SEMARANG STUDI KASUS: KORIDOR 4 TRAYEK TERMINAL CANGKIRAN – STASIUN TAWANG. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
ABDUL HAFID, MUHAMMAD (2025) ANALISIS PENGARUH IMPLEMENTASI BIM (BUILDING INFORMATION MODELLING) DALAM KINERJA KONTRAKTOR PADA PROYEK KONSTRUKSI (STUDI KASUS : PROYEK TOLL CORRIDOR DEVELOPMENT PHASE 2&3 TMII). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
ADDLI, FAUZZAN F’MALIKA (2025) ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) MENGGUNAKAN METODE JOB SAFETY ANALYSIS PADA PEKERJAAN STRUKTUR ATAS PIER PROYEK PEMBANGUNAN LRT JAKARTA PHASE 1B. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
ADITYA, ADINDA PUTRI (2025) STUDI PRESERVASI PERKERASAN JALAN LENTUR DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN SURFACE DISTRESS INDEX (SDI). (STUDI KASUS JALAN TEUKU UMAR - JALAN BINTARO UTAMA 5, TANGERANG SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.
ADITYA, GANANG RIZKY (2025) ANALISIS PENGIRIMAN MATERIAL KONSTRUKSI DENGAN METODE TRUCKING DAN JOINT SHIPMENT MULTIPLE PROJECT TERHADAP BIAYA DAN WAKTU. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
ADITYA, RAMA SURYA (2025) ANALISIS TINGKAT RISIKO PEKERJAAN STRUKTUR ATAS PADA PROYEK PEMBANGUNAN GEDUNG SAVYAVASA APARTMENT DENGAN MENGGUNAKAN METODE HIRARC. S1 thesis, Universitas Mercu Buana Jakarta.
ADLI, BIYAN MUFTI (2025) ANALISISIS PENERAPAN SISTEM MANAJEMEN LINGKUNGAN ISO 14001: 2015 PADA PROYEK PEMBANGUNAN MASJID AL-AZZHAR PODOMORO PARK BUAH BATU BANDUNG. S1 thesis, Universitas Mercu Buana Jakarta.
AFRIZAL, TRIYAN KHOERUL (2025) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PERKERASAN JALAN MENGGUNAKAN METODE WIRTGEN SP 500 DBI DAN WIRTGEN SP 500 NON DBI (Studi Kasus: Proyek Jalan Tol Jakarta - Cikampek II Selatan Paket II B Ruas Sukaragam - Sukabungah STA. 20+250 - STA. 20+275 dan STA. 23+100 - STA. 23+125). S1 thesis, Universitas Mercu Buana Jakarta.
AGHISNA, MUHAMMAD AFIF (2025) ANALISIS TARIF BERDASARKAN BIAYA OPERASIONAL KENDARAAN (BOK) DAN ABILITY TO PAY (ATP) PADA LAYANAN JABODETABEK RESIDENCE CONNEXION PERUM DAMRI. S1 thesis, Universitas Mercu Buana Jakarta.
AGUSTINA, EVITA (2025) PENERAPAN KONSEP VALUE ENGINEERING UNTUK MENINGKATKAN KINERJA BIAYA PADA PEKERJAAN ARSITEKTUR PROYEK PERUMAHAN. S1 thesis, Universitas Mercu Buana Jakarta.
AGUSTINO, RIZAK AGRI (2025) ANALISIS WAKTU MENGGUNAKAN METODE FAST TRACK PADA PEKERJAAN STRUKTUR PROYEK MASJID (Studi Kasus: Proyek Masjid Raya Baitul Mukhtar, Kab.Tangerang-Banten). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
AJI, FEBRIAN NURMA STYAWAN BAYU (2025) ANALISIS KINERJA JALAN AKSES TOL KARANG TENGAH 2 TANGERANG MENGGUNAKAN METODE PKJI 2023 DAN SOFTWARE PTV VISSIM (STUDI KASUS JALAN PURI PERMATA, TANGERANG). S1 thesis, Universitas Mercu Buana Jakarta.
ALDIANTO, IDRIS ABASTIAN (2025) ANALISIS RISIKO K3 MENGGUNAKAN PENDEKATAN HIRADC DAN JSA (Studi Kasus PMJ Tower Pulogadung). S1 thesis, Universitas Mercu Buana Jakarta.
ALFAIZI, MOHAMMAD RENDY (2025) ANALISIS TINGKAT KESELAMATAN LALU LINTAS BAGI PENYEBERANG MENGGUNAKAN METODE PEDESTRIAN RISK INDEX (PRI) PADA SISWA PENYEBERANGAN DI SEKOLAH SDN 01 PAGI PONDOK LABU JAKARTA. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
ALFATIH, MUHAMMAD KEMAL (2025) ANALISIS DAYA DUKUNG DAN PENURUNAN FONDASI BOREPILE BERDASARKAN DATA PENGUJIAN STANDAR PENTRATION TEST (SPT). S1 thesis, Universitas Mercu Buana Jakarta.
AMIN, MUCHAMAD NUR (2025) ANALISIS FAKTOR DAN VARIABEL DOMINAN PENYEBAB TERJADI NYA COST OVERRUN GALIAN PILECAP PROYEK LRT JAKARTA PHASE 1B. S1 thesis, Universitas Mercu Buana Jakarta.
ANAM, RIFQI KHOIRUL (2025) ANALISIS STABILITAS TANAH TIMBUNAN BADAN JALAN DENGAN PERKUATAN SOIL REPLACEMENT DAN GEOSINTETIK (Studi Kasus Proyek Jalan Tol Bocimi 3B Sta 32+925 - 32+950). S1 thesis, Universitas Mercu Buana Jakarta.
ANUGRAH, FEBRIAN (2025) ANALISA KINERJA SIMPANG BERSINYAL(APILL) DAN RUAS JALAN PADA JALAN RAYA BOGOR-JALAN H BOKIR BIN DJI'UN, KOTA JAKARTA TIMUR MENGGUNAKAN PKJI 2023. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
APRIANSYAH, MUHAMAD FAUZI (2025) ANALISIS EFEKTIVITAS SISTEM PERKAKUAN VERTIKAL GEDUNG BETON BERTULANG BERLANTAI BANYAK DENGAN SISTEM DINDING GESER DAN PERBESARAN KOLOM-SABUK (STUDI KASUS : GEDUNG PUSAT LABORATORIUM PENGUJIAN MUTU DAN KEAMANAN PAKAN). S1 thesis, Universitas Mercu Buana - Buncit.
ARDHIVA, MONICA (2025) EVALUASI KINERJA DAN PELAYANAN ANGKUTAN UMUM TERHADAP KEPUASAN MASYARAKAT PENGGUNA LRT JABODEBEK (Studi Kasus: Cawang-Dukuh Atas). S1 thesis, Universitas Mercu Buana Jakarta.
ARDIANSYAH, YAYAN (2025) PENGARUH VARIATION ORDER TERHADAP BIAYA PADA PROYEK PEMBANGUNAN MUSEUM ADHI PRADANA DI SENTUL BOGOR. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
ARGA, DONDA TRIFILA (2025) ANALISIS EFEKTIVITAS BIM 5D DALAM PERHITUNGAN QUANTITY TAKE-OFF DENGAN SOFTWARE PENDUKUNG AUTODEKS REVIT PADA PROYEK JALAN TOL PROBOLINGGO - BANYUWANGI. S1 thesis, Universitas Mercu Buana Jakarta.
ARIEF, ILHAM MUHAMMAD (2025) ANALISIS PERBANDINGAN METODE PELAKSANAAN PEMASANGAN DINDING AAC BLOCK DAN DINDING EXPANDABLE POLYSTYRENE STYROFOAM PANEL DITINJAU DARI SEGI BIAYA DAN WAKTU PELAKSANAAN (STUDI KASUS : PROYEK DHARMAWANGSA TOWERS JAKARTA SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.
ARIYANTO, PAULUS (2025) ANALISIS JALUR KRITIS PEKERJAAN BORE PILE MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) UNTUK MENINGKATKAN KINERJA WAKTU PADA PEMBANGUNAN SMART AND GREEN CAMPUS. S1 thesis, Universitas Mercu Buana Jakarta.
ARYANTI, LINA (2025) ANALISIS KINERJA OPERASIONAL DAN KEPUASAN PENGGUNA BUS TRANSJAKARTA KORIDOR 7F KP.RAMBUTAN – JUANDA (VIA TOL) DENGAN METODE QUALITY FUNCTION DEPLOYMENT (QFD). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
ASSEGAF, APRILIA LAILATUR R (2025) ANALISIS NILAI HASIL TERHADAP BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI PROJECT GREEN TERRACE AMBOJA BAMBU APUS, CIPAYUNG. S1 thesis, Universitas Mercu Buana Jakarta.
AULIA, SYIFA PUTRI (2025) IMPLEMENTASI MANAJEMEN RISIKO PROYEK PEMBANGUNAN TERMINAL KIJING MEMPAWAH, KALIMANTAN BARAT. S1 thesis, Universitas Mercu Buana Jakarta.
AULIA, VIVI (2025) ANALISIS MANAJEMEN RISIKO PADA PELAKSANAAN PEMBANGUNAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT TINGGI (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG BANK BNI DI PIK 2). S1 thesis, Universitas Mercu Buana Jakarta.
AYYUBI, SHALAHUDDIN AL (2025) PENGARUH KADAR AIR PADA KEKUATAN GESER PADA TANAH LEMPUNG. S1 thesis, Universitas Mercu Buana Jakarta.
AZHARI, ANDI NAUFAL ZAQIE (2025) ANALISIS DAERAH RAWAN KECELAKAAN LALU LINTAS PADA JALAN TEGAR BERIMAN KABUPATEN BOGOR. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
AZHARI, FADHILLA (2025) EVALUASI KINERJA LALU LINTAS AKIBAT PENUTUPAN AKSES KENDARAAN PRIBADI PADA JALAN PINTU BESAR SELATAN MENUJU TRANSPORTASI MASSAL (STUDI KASUS: JALAN PANCORAN KOTA ADMINISTRASI JAKARTA BARAT). S1 thesis, Universitas Mercu Buana - Buncit.
AZZAHRA, ANNISA NUR'AINI (2025) EVALUASI GEOMETRIK JALAN PADA TANJAKAN SIKUT, KABUPATEN PASURUAN, JAWA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.
BAGASKARA, MUHAMMAD HARRIS (2025) ANALISIS PENGARUH KANDUNGAN KADAR LUMPUR PADA PASIR CIMALAKA TERHADAP KUAT TEKAN BETON DENGAN BAHAN TAMBAH FBAS. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
BAITI, NURUL (2025) ANALISIS PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHINYA PADA PEKERJAAN BORE PILE (STUDI KASUS: PROYEK PEMBANGUNAN JALAN TOL SERANG – PANIMBANG SEKSI 3 (CILELES – PANIMBANG)). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
BATISTA, ERWIN (2025) ANALISIS PENGENDALIAN MUTU PEKERJAAN TIMBUNAN RANDOM BATU PADA PROYEK PEMBANGUNAN BENDUNGAN WAY APU. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
BUSTAMIN, NABILA PUTRI ARIESTA (2025) PERBANDINGAN KAPASITAS DAYA DUKUNG FONDASI TIANG PANCANG DAN FONDASI TIANG BOR PADA PROYEK LRT JAKARTA RUTE VELODROME - MANGGARAI FASE 1B. S1 thesis, Universitas Mercu Buana Jakarta.
CAHYANINGSIH, AULIA PUTRI (2025) ANALISIS CACAT KONSTRUKSI MENGGUNAKAN METODE SIX SIGMA PADA PEKERJAAN STRUKTUR BASEMENT PROYEK PUSAT PELAYANAN IBU DAN ANAK RS PIK, PIK 2, JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.
CAHYONO, MUHAMAD SATRIO BUDI (2025) ANALISIS TINGKAT PELAYANAN (LEVEL OF SERVICE) DAN POLA PERGERAKAN PENUMPANG PADA PENINGKATAN STASIUN TANAH ABANG. S1 thesis, Universitas Mercu Buana Jakarta.
CHRISTOPHER, RICCO AUDRYAN (2025) ANALISIS FASILITAS PELAYANAN PENUMPANG DI STASIUN LEMAHABANG GUNA MENDUKUNG RENCANA KRL RUTE CIKARANG – CIKAMPEK. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
CITRA, EVA MARIANA (2025) ANALISIS WAKTU DAN BIAYA TERHADAP PERCEPATAN PROYEK DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Pabrik Makanan Bekasi). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
DAMERA, MUHAMMAD EWALDO (2025) ANALISIS RISIKO DAN STRATEGI MITIGASI KEGAGALAN MUTU PADA PROYEK KONSTRUKSI MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
DEWI, ENDAH ROSALIA (2025) EVALUASI EFEKTIVITAS REKAYASA LALU LINTAS PASCA PENUTUPAN PUTARAN DI KAWASAN KOMERSIAL (STUDI KASUS: CITYWALK SUDIRMAN, JAKARTA). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
DIANA, LALA (2025) ANALISIS PENGARUH FAKTOR KETERLAMBATAN KONSTRUKSI TERHADAP KINERJA MUTU PROYEK MELALUI STANDAR KUALITAS DAN SPESIFIKASI. S2 thesis, Universitas Mercu Buana Jakarta.
DONITA, DEVA (2025) ANALISIS PENGGUNAAN METODE CABLE TRENCH SEBAGAI PENGGANTI RAISED FLOOR PADA BANGUNAN MOTOR CONTROL CENTER (MCC) UNTUK MENDAPATKAN EFESIENSI BIAYA DAN WAKTU PROYEK SISTEM PENYEDIAAN AIR MINUM. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
DYANI, RIFDAH (2025) ANALISIS PERUBAHAN VOLUME PADA PEKERJAAN ARSITEKTUR AKIBAT CLASH DETECTION DENGAN PEKERJAAN MEP BERBASIS BUILDING INFORMATION MODELING (BIM) (STUDI KASUS : PROYEK THE DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA PHASE II CIVIL WORKS TOWER AB). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
EDRIANSAH, DIMAS (2025) ANALISIS PENGARUH SUPPLY CHAIN TERHADAP PRODUKSI BETON METODE SUPPLY CHAIN OPERATIONS REFERENCE DAN ANALYTIC HIERARCHY PROCESS (STUDI KASUS : PROYEK CREATIVO TOWER BINTARO). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
EFENDI, NURUL (2025) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PONDASI SPUN PILE DENGAN BOR PILE PADA PROYEK KONSTRUKSI ( Studi kasus Proyek PT. Ultra sakti Narogong). S1 thesis, Universitas Mercu Buana Jakarta.
FADHILAH, SYAHRUL (2025) ANALISIS PENGARUH VOLUME KENDARAAN TERHADAP TINGKAT KERUSAKAN JALAN MENGGUNAKAN METODE SURFACE DISTRESS INDEX (SDI) (Studi Kasus : Jalan Griya Loka Raya, Kec. Serpong, Kota Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.
FADILAH, RISKA (2025) ANALISIS EFEKTIVITAS PENGGUNAAN JEMBATAN PENYEBERANGAN ORANG (JPO) DI PERKOTAAN (STUDI KASUS : JPO DI RUAS JALAN RAYA DAAN MOGOT). S1 thesis, Universitas Mercu Buana Jakarta.
FAIR, ROBBY JUNI (2025) OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN PENERAPAN METODE CRASHING. S2 thesis, Universitas Mercu Buana Jakarta.
FAJAR, AHMAD RIAN (2025) IMPLEMENTASI METODE LEAN CONSTRUCTION PADA PEKERJAAN ERECTION PCI-GIRDER PROYEK STRATEGIS KAWASAN ISTANA KEPRESIDENAN IBUKOTA NUSANTARA DAPAT MENINGKATKAN KINERJA WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.
FAJAR, DUDI AHMAD (2025) ANALISIS MANAJEMEN WAKTU DENGAN METODE CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUATION REVIEW TECHNIQUE (PERT) UNTUK MENENTUKAN DURASI OPTIMAL (STUDI KASUS : PROYEK KONSTRUKSI DALAM PENGERJAAN (KDP) LANJUTAN UNIVERSITAS NEGERI GORONTALO ). S1 thesis, Universitas Mercu Buana Jakarta.
FAJAR, MUHAMMAD RIZKY (2025) ANALISIS KINERJA SIMPANG BERSINYAL JALAN GODEAN – JALAN KABUPATEN – JALAN TITI BUMI, GAMPING, SLEMAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
FAKHIRA, ALIFIA DHIA (2025) ANALISIS PERBANDINGAN QUANTITY TAKE OFF PEKERJAAN STRUKTUR BANGUNAN MENGGUNAKAN AUTODESK REVIT DAN TEKLA STRUCTURES (Studi Kasus : Rumah Tinggal Type 160). S1 thesis, Universitas Mercu Buana Jakarta.
FARHAN, MOHMAMAD KOLEL (2025) ANALISA DAYA DAN CONTROLLING PANEL 3 FASA PADA PABRIK TAHU MAMPANG PRAPATAN MENGGUNAKAN FUZZY LOGIC BERBASIS IoT. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
FARISI, M. IQBAL AL (2025) EVALUASI TOL KATARAJA SEKSI 1 JEMBATAN KALI PERANCIS DENGAN MENGANALISA CONSTRUCTION ENGINEERING MENGGUNAKAN METODE BALANCE CANTILEVER. S1 thesis, Universitas Mercu Buana Jakarta.
FAUZI, ALVA AZMI (2025) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN MASJID AGUNG KOTA PODOMORO, TENJO. S1 thesis, Universitas Mercu Buana Jakarta.
FAUZI, FAJAR (2025) ANALISIS TARIF JALAN TOL BERDASARKAN PENDEKATAN WILLINGNESS TO PAY (WTP) DAN ABILITY TO PAY (ATP) STUDI KASUS JALAN TOL PEJAGAN - PEMALANG (SEKSI IV TEGAL TIMUR - SEWAKA). S1 thesis, Universitas Mercu Buana Jakarta.
FEBRIYANI, EKA RISMAH (2025) ANALISIS PENGARUH FAKTOR KEBIJAKAN, KOMITMEN DAN FINANSIAL TERHADAP BIAYA INVESTASI BERBASIS VALUE ENGINEERING PADA PROYEK GREEN DATA CENTER. S2 thesis, Universitas Mercu Buana Jakarta.
FIRDAUS, ROBERT FANNY AL (2025) ANALISIS BIAYA DAN WAKTU PEKERJAAN BOX GIRDER DENGAN METODE CAST IN SITE DAN PRECAST (Studi Kasus: Proyek Jembatan C2 Simpang Susun Serpong-Balaraja). S1 thesis, Universitas Mercu Buana Jakarta.
FIRMANSYAH, ERWIN (2025) ANALISIS FAKTOR PENYEBAB KERUSAKAN BANGUNAN APARTMENT DENGAN METODE ROOT CAUSE ANALYSIS (RCA) (STUDY KASUS : APARTMENT BOTANICA TOWER 3 KEBAYORAN LAMA). S1 thesis, Universitas Mercu Buana Jakarta.
FIRMANSYAH, MUHAMMAD RIZKY (2025) PENGARU HIMPLEMENTASI KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA KONSTRUKSI ( Studi Kasus : Proyek Pembangunan Apartemen Kiara Beachfront Nusa Dua). S1 thesis, Universitas Mercu Buana Jakarta.
HADID, MUHAMMAD IQBAL AL (2025) ANALISIS PRODUKTIVITAS TENAGA KERJA PEKERJAAN FABRIKASI BAJA (STUDI KASUS: PROYEK NEW FACTORY PT SIGMA REKAYASA PRIMA, CIKARANG). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
HALAWA, SLAMAT ADIANTO (2025) ANALISIS CONTRACT CHANGE ORDER TERHADAP BIAYA DAN WAKTU PADA PROYEK PENANGANAN LONGSOR TRACK KERETA API. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
HAMID, MUHAMMAD FANNANY (2025) ANALISIS STRUKTUR TOWER TELEKOMUNIKASI TERHADAP BEBAN ANGIN DAN PERANGKAT TERPASANG MENGGUNAKAN APLIKASI MS. TOWER V.6.20 (STUDI KASUS : TOWER SST 4 LEG - 52M). S1 thesis, Universitas Mercu Buana Jakarta.
HANA, M. WAFIQ YUSRUL (2025) PENGARUH PEMANFAATAN LIMBAH GRANIT SUBSTITUSI AGREGAT KASAR DAN ABU BATU SEBAGAI SUBSTITUSI AGREGAT HALUS TERHADAP KUAT TEKAN BETON DENGAN PENAMBAHAN SUPERPLASTISIZER. S1 thesis, Universitas Mercu Buana Jakarta.
HARTANTO, SINGGIH (2025) ANALISIS PRODUKTIVITAS PENGGUNAAN ALAT BERAT GIRDER LAUNCHER PADA PEKERJAAN FLYOVER ( STUDI KASUS : PROYEK FLYOVER DK 141 STASIUN TEGAL LUAR KCJB). S1 thesis, Universitas Mercu Buana Jakarta.
HASAN, MUHAMMAD (2025) ANALISA KINERJA SIMPANG TIGA TAK BERSINYAL DAN RUAS JALAN PADA SIMPANG JALAN RAYA JAMBORE CIBUBUR KOTA JAKARTA TIMUR MENGGUNAKAN PKJI 2023. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
HIDAYAT, ADINDA SAFITRI PUTRIE (2025) EVALUASI KESADARAN PEKERJA TERHADAP IMPLEMENTASI K3 PADA PEKERJAAN FINISHING (Studi Kasus : Proyek Apartemen ABC, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.
HIDAYAT, LUTFI (2025) OPTIMALISASI KAPASITAS RUNWAY 1, 2 ,DAN 3 DENGAN METODE TIME SPACE ANALYSIS BANDAR UDARA INTERNASIONAL SOEKARNO HATTA - TANGERANG, BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.
HIDAYAT, RIKI (2025) PENGARUH SUBSTITUSI SEMEN DENGAN ABU CANGKANG BEKICOT TERKALSINASI TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.
IBRANI, SULTHAN GAVRILA (2025) ANALISIS EFEKTIVITAS PENYEBRANGAN SEBIDANG PELICAN CROSSING PADA KAWASAN ALAM SUTERA. S1 thesis, Universitas Mercu Buana Jakarta.
INDRATAMA SANJOKOPUTRA, CHRYSANDHIKA RAFAEL (2025) PENGARUH VARIASI GROUND GRANULATED BLAST FURNACE SLAG (GGBS) DAN SERABUT KELAPA TERHADAP KUAT TEKAN DAN LENTUR PAVING BLOCK UNTUK PERKERASAN JALAN. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
IQBAL, NUR MUHAMMAD (2025) ANALISIS PERAN BIM PADA PELAKSANAAN PRA KONSTRUKSI GEDUNG STUDI KASUS PROYEK CWJ-02 PEMBANGUNAN 6 GEDUNG UNIVERSITAS JAMBI. S1 thesis, Universitas Mercu Buana Jakarta.
ISLAMINATY, ILMY (2025) EVALUASI KINERJA OPERASIONAL DAN KUALITAS PELAYANAN KA LOKAL WALAHAR CIKARANG - PURWAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.
ISMAWAN, DIAN (2025) PENGARUH SUBSITUSI SEMEN MENGGUNAKAN ABU BATANG JAGUNG (ZEA MAYS) DAN PENAMBAHAN SERBUK CANGKANG BEKICOT (ACHATINA FULICA) TERHADAP KUAT TEKAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.
KEAAN, CHRISTOFORUS LAMBI' (2025) STABILISASI TANAH LEMPUNG MENGGUNAKAN BAHAN CAMPURAN SEMEN DAN ABU TERBANG (FLY ASH) PADA KELURAHAN KAPUK MUARA. S1 thesis, Universitas Mercu Buana Jakarta.
KEZIA SAAPANG, KARYN LISA (2025) ANALISIS TINGKAT KEPUASAN TERHADAP KUALITAS PELAYANAN JASA ANGKUTAN FEEDER SEMARANG (STUDI KASUS: FEEDER IV). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
KHAIRUNNISA, MEILIANTI (2025) ANALISIS PENGARUH PALANG PERLINTASAN KERETA API TERHADAP KINERJA JALAN (STUDI KASUS: JALAN RAWAJATI TIMUR, JAKARTA SELATAN). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
KHOTIMAH, HUSNUL (2025) ANALISIS FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN ELEVEE PENTHOUSE AND RESIDENCE (ALAM SUTERA). S1 thesis, Universitas Mercu Buana Jakarta.
KRISNANTO, EKA (2025) PEMANFAATAN PENGGUNAAN LIMBAH GRANIT DAN LIMBAH BOTOL KACA SEBAGAI SUBTITUSI AGREGAT KASAR TERHADAP KUAT TEKAN BETON DENGAN PENAMBAHAN SIKACIM CONCRETE. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
KURNIAWAN, ALAN WIJAYA (2025) PEMILIHAN MODA TRANSPORTASI ANGKUTAN UMUM TERPADU RUTE TAMBUN-JAKARTA. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
KURNIAWAN, ANDREAS NOVI (2025) ANALISIS METODE CRAWLER CRANE DAN LAUNCHER UNTUK EFISIENSI BIAYA DAN WAKTU PEKERJAAN PEMASANGAN PCI GIRDER PADA PROYEK PEMBANGUNAN JALAN TOL JOGJA – BAWEN SEKSI 01. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
KURNIAWAN, ELI (2025) ANALISIS FAKTOR PENGARUH MANAJEMEN KOMUNIKASI DAN PRODUKTIVITAS TENAGA KERJA TERHADAP PROYEK PLTU UNTUK MENINGKATKAN EFISIENSI WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.
KUSUMA, ANGGA DITYA (2025) PENGEMBANGAN PROSES BISNIS DALAM PENGADAAN RUMAH INSTAN SEDERHANA SEHAT BERBASIS RISIKO UNTUK MENINGKATKAN KINERJA DI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT. S2 thesis, Universitas Mercu Buana Jakarta.
MAGDALENA, SARA (2025) ANALISIS FAKTOR PENGARUH TERJADINYA COST OVERRUN BERBASIS RELATIVE IMPORTANCE INDEX (RII) PADA PROYEK KONSTRUKSI (STUDI KASUS : PROYEK PEMBANGUNAN JALAN TOL ANCOL TIMUR – PLUIT (ELEVATED)). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
MAHENDRA, ANANDA JULIANO (2025) ANALISIS KINERJA LAYANAN BRT TRANS SEMARANG KORIDOR 1 MANGKANG-PENGGARON DENGAN METODE QUALITY FUNCTION DEPLOYMENT (QFD). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
MAHESA, IVAN (2025) EVALUASI DAYA DUKUNG TIANG BOR PADA PROYEK LRT JAKARTA FASE 1B P148B UNTUK MENINGKATKAN EFISIENSI MATERIAL BETON. S1 thesis, Universitas Mercu Buana Jakarta.
MAJID, FADI ASLAM (2025) ANALISIS PENGENDALIAN RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) DENGAN MENGGUNAKAN METODE HAZARD IDENTIFICATION, RISK ASSEESSMENT, AND RISK CONTROL (HIRARC). S1 thesis, Universitas Mercu Buana Jakarta.
MARYANTO, TRI (2025) PERBAIKAN GEOMETRIK JALAN KERETA API DI LENGKUNG 39 DAN LENGKUNG 41 LINTAS CIBATU-GARUT. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
MAULANA, ARDIAN (2025) ANALISIS BIAYA DAN WAKTU PADA PROYEK GEDUNG BERTINGKAT DEPOK MENGGUNAKAN METODE EARNED VALUE ANALYSIS (EVA). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
MEILANDO, ANGGI DIO (2025) ANALISIS FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA) BRAYAN KAPASITAS 500 LITER PER DETIK. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
NABILAH, BALQIS FARAH INAS (2025) ANALISIS DEBIT BANJIR PADA SISTEM SALURAN DRAINASE DI KECAMATAN KOJA, KOTA JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.
NADILLAH, RARA SALSA (2025) ANALISIS PERBANDINGAN WAKTU PELAKSANAAN PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI ANTARA METODE BETON KONVENSIONAL DAN PRECAST PADA PROYEK PEMBANGUNAN RUSUN PASPAMPRES – IBU KOTA NUSANTARA. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
NAFIZATURRAHMI, NAFIZATURRAHMI (2025) ANALISIS PENERAPAN VALUE ENGINEERING DALAM RANCANG BANGUN GREEN BUILDING PADA PROYEK ARUMAYA OFFICE. S1 thesis, Universitas Mercu Buana Jakarta.
NASHIR, MUHAMMAD FARRAS (2025) PENGARUH SUHU CURING TERHADAP KARAKTERISTIK MEKANIK PAVING BLOCK DENGAN CAMPURAN FLY ASH DAN SERABUT KELAPA DALAM PERKERASAN JALAN. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
NISA, NURUL (2025) ANALISIS PROBABILITAS PERPINDAHAN MODA DARI MOBIL PRIBADI KE TRANSPORTASI UMUM KERETA REL LISTRIK (STUDI KASUS: KRL RUTE TANAH ABANG - RAWA BUNTU). S1 thesis, Universitas Mercu Buana Jakarta.
NOER, SARAH PUTRI (2025) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PADA PROYEK UNDERPASS AKSES KADUSIRUNG 2, BSD BARAT II.3 MENGGUNAKAN SOFTWARE SPSS (STATISTICAL PRODUCT AND SERVICE SOLUTIONS). S1 thesis, Universitas Mercu Buana Jakarta.
NOPITA, SUSANA (2025) ANALISIS KINERJA PROYEK DITINJAU DARI SEGI BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE ANALYSIS (Studi Kasus : Proyek Pembangunan Pusat Data Nasional di Cikarang). S1 thesis, Universitas Mercu Buana Jakarta.
NUGRAHA, ADIBTIA JATI (2025) ANALISIS PERKERASAN LENTUR PADA RUNWAY DAN TAXIWAY BANDAR UDARA BUDIARTO CURUG - TANGERANG DENGAN METODE FAA (FEDERATION AVIATION ADMINISTRATION). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
NURACHMAH, RD. HANIFAH ASYIFA (2025) IMPLEMENTASI 4D BIM PADA TIME SCHEDULE MANAGEMENT PROYEK PEMBANGUNAN GEDUNG BRI SEMARANG. S1 thesis, Universitas Mercu Buana Jakarta.
OCTAVIANI, AILIA (2025) ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG BERDASARKAN DATA PENGUJIAN CONE PENETRATION TEST (CPT) (STUDI KASUS : BANGUNAN EQUIPMENT ROOM STASIUN TANAH ABANG PROYEK PEKERJAAN PENINGKATAN SISTEM PERSINYALAN DAN TELEKOMUNIKASI PERKEETAAPIAN PADA LINTAS JATINEGARA – BOGOR DAN MANGGARAI – JAKARTAKOTA). S1 thesis, Universitas Mercu Buana - Buncit.
OKTAVIANTO, RIZKI DWI (2025) OPTIMASI LETAK EFEKTIF DINDING GESER DALAM MENAHAN GAYA GEMPA DENGAN STUDI KASUS GEDUNG BERTAPAK PERSEGI PANJANG. S1 thesis, Universitas Mercu Buana Jakarta.
OVILIA, EMA KHOIRUNISA (2025) ANALISIS FAKTOR KETERLAMBATAN PROYEK BERBASIS PMBOK SEVENTH EDITION DENGAN METODE RELATIVE IMPORTANCE INDEX (STUDI KASUS : PROYEK PEKERJAAN CORRECTIVE BUILDING MAINTENANCE - SMO). S1 thesis, Universitas Mercu Buana - Buncit.
PADMARINY, AMELIASARY SAFINA (2025) PERBANDINGAN PELAKSANAAN PEKERJAAN PIER HEAD DENGAN METODE SOSROBAHU DAN CAST IN SITU KONVENSIONAL DARI SISI BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN TOL CIMANGGIS - CIBITUNG SEKSI II ELEVATED TRANSYOGIE. S1 thesis, Universitas Mercu Buana Jakarta.
PANGARIBUAN, NATANAEL KEMULIANTA (2025) PEMANFAATAN LIMBAH GRANIT SEBAGAI SUBSTITUSI ANGREGAT KASAR DAN ABU BATU SEBAGAI SUBSTITUSI AGREGAT HALUS TERHADAP KUAT TEKAN DAN KUAT LENTUR BETON DENGAN PENAMBAHAN SUPERPLASTICIZER. S1 thesis, Universitas Mercu Buana Jakarta.
PERDANA, FATHONI ARIEF (2025) PERANCANGAN STRUKTUR BAJA PIPE RACK DENGAN METODE ANALISA GEMPA STATIK EKIVALEN (STUDI KASUS: PLTU DI KALIMANTAN SELATAN). S1 thesis, Universitas Mercu Buana Jakarta.
PERWIRA, ALBI SEPTA NARISYA (2025) ANALISIS FAKTOR - FAKTOR WASTE MATERIAL PADA PROYEK JALAN & JEMBATAN (STUDI KASUS: PROYEK PEMBANGUNAN JALAN & JEMBATAN SMARTFREN BSD TANGERANG SELATAN). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
PRADITYA, DENDY (2025) ANALISIS PEMILIHAN MODA TRANSPORTASI TRANSJAKARTA DAN LRT JAKARTA PADA JALUR RAWAMANGUN – MANGGARAI. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PRAKOSO, AJI (2025) EVALUASI DESAIN STRUKTUR ATAS PENINJAUAN PELAT LANTAI KONVENSIONAL DENGAN PELAT LANTAI PRACETAK TIPE HALF SLAB DAN TIPE FULL SLAB. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PRASAPTIAMI, INKA (2025) ANALISIS KINERJA WAKTU PELAKSANAAN DENGAN METODE EARNED SCHEDULE PADA PROYEK PEMBANGUNAN GEDUNG AULA DI JAKARTA SELATAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PRASETYO, DIMAS FAUZI (2025) ANALISIS PERBANDINGAN PELAKSANAAN ERECTION GIRDER DENGAN METODE CRANE DAN METODE LAUNCHER (STUDI KASUS: PROYEK TOL CIAWI – SUKABUMI SEKSI 3). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PRASETYO, DONI (2025) ANALISIS QUANTITY TAKE OFF STRUKTUR BAWAH MENGGUNAKAN SOFTWARE REVIT 2021 DAN TEKLA STRUCTURES PADA PROYEK RUMAH SAKIT HEWAN TAMAN SAFARI. S1 thesis, Universitas Mercu Buana Jakarta.
PRASETYO, DWI (2025) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG SENKOM PONDOK GEDE JAKARTA TIMUR. S1 thesis, Universitas Mercu Buana Jakarta.
PRATAMA, LANTIF ANGGRAHITA (2025) ANALISIS PERHITUNGAN KAPASITAS APRON DAN LANDASAN PACU (RUNWAY) PADA BANDAR UDARA ILAGA PAPUA. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PRATAMA, MUHAMMAD ANGGA (2025) INTEGRASI BIM 4D & 5D PADA ESTIMASI BIAYA PEKERJAAN STRUKTUR ATAS PEMBANGUNAN APARTEMEN UNTUK MENINGKATKAN AKURASI BIAYA & EFISIENSI WAKTU. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PRATAMA, NANDA FADILAH ADE (2025) IMPLEMENTASI TEKNOLOGI LIDAR & BUILDING INFORMATION MODELING PADA PROYEK JALAN DALAM FASE TENDER TERHADAP BIAYA DAN WAKTU. S1 thesis, Universitas Mercu Buana Jakarta.
PRATOMO, RIDWAN DWI (2025) ANALISIS PANJANG ANTRIAN DAN TUNDAAN AKIBAT PENUTUPAN PALANG PINTU KERETA API (Studi Kasus: Jalan Jembatan Halimun, Jakarta Pusat). S1 thesis, Universitas Mercu Buana Jakarta.
PRAYITNO, MUHAMMAD DAFFA NUH (2025) ANALISIS KINERJA OPERASIONAL, KEPUASAN PELAYANAN, DAN PERHITUNGAN TARIF BISKITA KORIDOR 2 DI KOTA BOGOR. S1 thesis, Universitas Mercu Buana Jakarta.
PRIYATAMA, ABHIYAN RASENDRIYA (2025) ANALISIS PENYEBAB PEKERJAAN TAMBAH KURANG PADA PROYEK PERPUSTAKAAN UNIVERSITAS PERTAHANAN RISENTUL JAWA BARAT. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
PURVIYANTO, EKO JUNIA (2025) ANALISIS EFEKTIFITAS METODE BEKISTING PCH (PERT CONSTRUCTION HIRE) PADA PROYEK PEMBANGUNAN RUMAH SUSUN TERHADAP COST OF MONEY STUDI KASUS : PEMBANGUNAN RUMAH SUSUN DI IKN. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
PUTRA, ADAM DWI (2025) ANALISIS TINGKAT PELAYANAN PEJALAN KAKI TERHADAP PEMANFAATAN TROTOAR DAN JEMBATAN PENYEBERANGAN ORANG (JPO) DI JALAN H.R RASUNA SAID – JAKARTA. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PUTRA, ADRIANUS ARJUNA DEWANTA (2025) ANALISIS DIMENSI BORED PILE TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PROYEK HOTEL ARTOTEL MAGELANG. S1 thesis, Universitas Mercu Buana Jakarta.
PUTRA, ASHAKI HILAL KEMALA (2025) IMPLEMENTASI PLANNING DAN MONITORING SCHEDULE BERBASIS DIGITALISASI SECARA REALTIME MENGGUNAKAN ORACLE PRIMAVERA P6 PADA PROYEK LRT MALOLOS - CLARK RAILWAY (BLUMENTRIT PROJECT EXTENSION) CPS-01 FILIPINA. S1 thesis, Universitas Mercu Buana Jakarta.
PUTRA, HAZZA SAKHA ANJANU (2025) ANALISIS KEPUASAN PENGGUNA JASA TRANSJAKARTA TERHADAP FASILITAS HALTE CAWANG SENTRAL. S1 thesis, Universitas Mercu Buana Jakarta.
PUTRA, M REKSA HIKMAH (2025) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN KOLOM MENGGUNAKAN BEKISTING KONVENSIONAL DENGAN BEKISTING ALUMINIUM PADA BANGUNAN BERTINGKAT (STUDI KASUS : PROYEK RUMAH SUSUN KEMENTERIAN KEUANGAN RI). S1 thesis, Universitas Mercu Buana Jakarta.
PUTRA, MARCIANO DWIKI (2025) ANALISIS RISIKO PENGADAAN MATERIAL PADA PROYEK RUMAH MEWAH MENGGUNAKAN METODE PROBABILITY IMPACT MATRIX (STUDI KASUS: PROYEK PEMBANGUNAN RUMAH MEWAH DI KOTA BANDUNG). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
PUTRA, MUHAMMAD FARHAN SYAH (2025) ANALISA PENGARUH GEOMETRIK U-TURN TERHADAP KAPASITAS JALAN PADA RUAS JALAN TMP-TARUNA KOTA TANGERANG. S1 thesis, Universitas Mercu Buana Jakarta.
PUTRA, RESTU ILAHI MELENIA PANCA (2025) ANALISA HYDRAULIC STATIC PILE DRIVER (HSPD) 100T SEBAGAI KOREKSI DAYA DUKUNG TANAH BERDASARKAN NILAI UJI SPT. S1 thesis, Universitas Mercu Buana Jakarta.
RAHMATTULLOH, NUR (2025) PEMANFAATAN LIMBAH STEEL SLAG EX. POSCO KRAKATAU SEBAGAI SUBSTITUSI AGREGAT KASAR TERHADAP NILAI DAYA DUKUNG LAPIS PONDASI PADA PERKERASAN JALAN TOL. S1 thesis, Universitas Mercu Buana Jakarta.
RAHMAWATI, ADDINA KAMILA (2025) PERANCANGAN ULANG STRUKTUR ATAS DAN ANALISIS PUSHOVER PADA GEDUNG - T UNIVERSITAS MERCU BUANA DENGAN MENGGUNAKAN MIDAS GEN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
RAJAGUKGUK, ERISA MARGARETHA (2025) IMPLEMENTASI METODE EARNED VALUE DAN CRITICAL PATH METHOD DAPAT MENINGKATKAN KINERJA BIAYA DAN WAKTU (STUDI KASUS : PROYEK PEMBANGUNAN/RENOVASI GEDUNG KANTOR DAN PENATAAN RUANG KERJA BP2MI). S1 thesis, Universitas Mercu Buana Jakarta.
RAMADHAN, FANDWIN (2025) EFISIENSI PENGGUNAAN BEKISTING SLIDING SYSTEM SEBAGAI PENGGANTI BEKISTING KONVENSIONAL PADA PEKERJAAN STRUKTUR CAPPING BEAM. S1 thesis, Universitas Mercu Buana Jakarta.
RAMDHAN, MUHAMMAD (2025) ANALISIS INTEGRATIF ANALYTIC HIERARCHY PROCESS (AHP) DAN IMPORTANCE - PERFORMANCE ANALYSIS (IPA) PADA MODEL EXECUTION CENTRE COMMUNICATION (ECC) FASE KONSTRUKSI MEGAPROJECT OIL AND GAS RESIDUE CATALYTIC CRACKING (RCC) BALONGAN. S2 thesis, Universitas Mercu Buana Jakarta.
RAYHAN, MUHAMMAD (2025) ANALISA KERUSAKAN PERKERASAN JALAN KAKU DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN SURFACE DISTRESS INDEX (SDI) (STUDI KASUS JALAN RAYA CICANGKAL KAB. BOGOR). S1 thesis, Universitas Mercu Buana Jakarta.
RAZZAK, ADAM FADHIL AL (2025) EFEKTIVITAS PENGGUNAAN METODE CRITICAL CHAIN PROJECT MANAGEMENT DALAM PENYELESAIAN PROYEK SEWAGE TREATMENT PLANT CAPACITY 40 MPH, DELTAMAS CIKARANG. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
RESMITASARI, MEYSHIVA AULIA (2025) ANALISA EFEKTIFITAS JALUR SEPEDA DIRUAS JALAN DI DAERAH PEJAMBON KOTA JAKARTA PUSAT MENGGUNAKAN METODE BICYCLE LEVEL OF SERVICE (BLOS). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
REZKI, MUHAMMAD (2025) EVALUASI DAYA DUKUNG TIANG BOR BERDASARKAN DATA UJI N-SPT PADA PROYEK RUMAH SUSUN CILANGKAP. S1 thesis, Universitas Mercu Buana Jakarta.
RIYADI, AGUS (2025) PENGARUH U-TURN TERHADAP KARAKTERISTIK ARUS LALU LINTAS DI RUAS JALAN CUT MUTIA BEKASI MENGGUNAKAN PKJI-2023. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
RIYADY, AFIF (2025) ANALISIS PERBANDINGAN MATERIAL BATA RINGAN DENGAN PRECAST DITINJAU DARI SEGI BIAYA, WAKTU DAN METODE PELAKSANAAN PADA PEKERJAAN DINDING FASADE (Studi Pada : Proyek Apartemen Samara Suites - Jakarta Selatan). S1 thesis, Universitas Mercu Buana Jakarta.
RIZKIAH, ALLYTA (2025) EVALUASI KINERJA OPERSIONAL ANGKUTAN UMUM TRANSJAKARTA KORIDOR 3F RUTE KALIDERES - SENAYAN BANK DKI. S1 thesis, Universitas Mercu Buana Jakarta.
RIZKIYA, DENIRA PUTRI (2025) STUDI PERBAIKAN TANAH LUNAK MENGGUNAKAN KOMBINASI PVD DAN PRELOADING UNTUK MEMPERCEPAT PENURUNAN PADA EXIT TOLL KM 151 JALAN TOL PADALARANG - CILEUNYI. S1 thesis, Universitas Mercu Buana Jakarta.
RIZKY, MOCHAMMAD RAYHAN ALL (2025) EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN APARTEMENT XYZ PEKERJAAN STRUKTUR (Studi Kasus : Proyek XYZ, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.
RIZQI, AHMAD AENUR (2025) ANALISIS KETERLAMBATAN PENGADAAN MATERIAL PADA PROYEK (Studi Kasus : Pelebaran Ruas Jalan Moga - Pulosari). S1 thesis, Universitas Mercu Buana Jakarta.
RIZQY, KHAIRUL (2025) ANALISIS OPTIMASI PENGGUNAAN ALAT BERAT PADA PEKERJAAN GALIAN DAN PENGANGKUTAN (STUDI KASUS : Proyek Terminal Kalibaru Tahap 1B Pelabuhan Tanjung Priok). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
ROKHMALIA, LATIFA (2025) ANALISIS EFISIENSI BIAYA BERBASIS PENERAPAN KONSEP VE PADA PROYEK BANGUNAN GEDUNG. S1 thesis, Universitas Mercu Buana Jakarta.
ROSALINDA, OKTA (2025) ANALISIS FAKTOR DOMINAN PENYEBAB KETERLAMBATAN PROYEK GEDUNG APARTEMEN SAVYAVASA JAKARTA SELATAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
SALAM, DARUS (2025) ANALISIS PENERAPAN KONSEP EARNED VALUE UNTUK PENGENDALIAN BIAYA DAN WAKTU PELAKSANAAN PEMBANGUNAN RUMAH SUSUN KAMPUNG AKUARIUM TAHAP 2 BLOK C - JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.
SALSABILA, RIFANY RIZKI (2025) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU BERDASARKAN ISO 9001:2015 PADA PROYEK PEMBANGUNAN WTP (WATER TREATMENT PLANT) BANK INDONESIA KARAWANG. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
SALSABILA, RIFDAH (2025) ANALISA FAKTOR YANG MEMPENGARUHI PEMILIHAN MODA TRANSPORTASI MENUJU TEMPAT KERJA MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
SANTOSO, FINNA AURELIA SANTOS (2025) ANALISIS METODE PERBANDINGAN METODE CPM DAN PERT PADA PENJADWALAN PROYEK PEMBANGUNAN SUPERBLOK PAKUWON MIXED USE BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.
SANTOSO, ILHAM (2025) ANALISIS KINERJA STRUKTUR GEDUNG BERTINGKAT (STUDI KASUS : PROYEK GEDUNG DATA CENTER DI CIKARANG). S1 thesis, Universitas Mercu Buana Jakarta.
SANTOSO, RATCANO RESA (2025) PENGARUH KUALITAS PELAYANAN, EFEKTIVITAS INTERMODA DAN KEPUASAN PELANGGAN DI STASIUN HALIM TERHADAP LOYALITAS PENUMPANG KERETA CEPAT JAKARTA BANDUNG. S1 thesis, Universitas Mercu Buana Jakarta.
SAPUTRI, AZZAKKIYAH DINA (2025) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PEMBANGUNAN BALAI LATIHAN KERJA KUPANG. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
SAPUTRO, FARHANS AGUNG (2025) ANALISIS KINERJA RUAS JALAN DAN SIMPANG BERSINYAL TIGA KAKI PADA JALAN RAYA BOGOR - JALAN RAYA CIRACAS MENGGUNAKAN PKJI 2023. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
SARI, DEVITA (2025) ANALISIS FAKTOR KETERLAMBATAN PROYEK ATLAS SPORT CLUB DI KAWASAN PANTAI INDAH KAPUK 2 DENGAN METODE FAULT TREE ANALYSIS (FTA) DAN METODE EVENT TREE ANALYSIS (ETA). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
SARI, INTINING MAWAR (2025) ANALISIS FAKTOR-FAKTOR PENERAPAN KONSTRUKSI RAMPING (LEAN CONSTRUCTION) DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) PADA PEMBANGUNAN GEDUNG TRAINING CENTER DI CIBITUNG GUNA MENGHASILKAN VALUE MAKSIMAL. S1 thesis, Universitas Mercu Buana Jakarta.
SILABAN, RUTH MITA BONITA (2025) ANALISIS KINERJA PROYEK TERHADAP MATERIAL PADA PEMBANGUNAN MARKETING GALLERY AREUM PARC BOGOR DENGAN MENGGUNAKAN METODE EARNED VALUE ANALYSIS (EVA). S1 thesis, Universitas Mercu Buana Jakarta.
SIRAIT, CHRISTIAN P (2025) ANALISIS FAKTOR-FAKTOR PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2015 TERHADAP KEBERHASILAN PELAKSANAAN KONSTRUKSI PT. KARYA KONSTRINDO. S1 thesis, Universitas Mercu Buana Jakarta.
SITUNGKIR, YOHANES ANDRYANO HALOMOAN (2025) ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNGAN PABRIK MANDU SEAWEED CJ FOODS DENGAN METODE EARNED VALUE ANALYSIS. S1 thesis, Universitas Mercu Buana Jakarta.
SUTRISNA, NUR (2025) ANALISIS KONDISI KERUSAKAN PERMUKAAN JALAN PADA PERKERASAN JALAN LENTUR DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN SURFACE DISTRESS INDEX (SDI) (Studi Kasus: Ruas Jalan Letnan Sutopo Serpong - Tangerang Selatan). S1 thesis, Universitas Mercu Buana Jakarta.
SYAHIDAR, AHMAD KAMIL (2025) ANALISIS SISTEM PERKAKUAN PEMBESARAN KOLOM -BALOK (SABUK) GEDUNG DENGAN VARIASI LETAK, BENTUK DAN UKURAN KOLOM PEMBESARAN. S1 thesis, Universitas Mercu Buana Jakarta.
SYAHRIN, MUHAMMAD ALFI (2025) ANALISIS PERBANDINGAN BANGUNAN KONVENSIONAL DAN NON KONVENSIONAL (MODULAR OR PREFABRICATED BUILDING) TERHADAP BIAYA DAN WAKTU PEKERJAAN (STUDI KASUS : PEMBANGUNAN PROYEK CAMP FACILITY AREA PERTAMBANGAN AMMAN MINERAL NUSA TENGGARA, SUMBAWA). S1 thesis, Universitas Mercu Buana Jakarta.
SYAIFULLAH, ALIM (2025) ANALISA PERBANDINGAN TEBAL PERKERASAN BERBUTIR TANPA PENGIKAT MENGGUNAKAN MDP 2024 DAN AASHTO 1993 PADA JALAN TAMBANG PENGANGKUT BAUKSIT DAN TAILING DI KABUPATEN MEMPAWAH, KALIMANTAN BARAT. S1 thesis, Universitas Mercu Buana Jakarta.
SYARIF, DANISY ARDANIL (2025) ANALISIS PERSEPSI PENGGUNA TERHADAP LAYANAN ANGKUTAN UMUM KERETA REL LISTRIK COMMUTER LINE (STUDI KASUS : RUTE CAWANG - BOGOR). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
TARIGAN, KRISAN EWALDO (2025) PERENCANAAN STRUKTUR BETON BERTULANG GEDUNG 8 LANTAI (THE GREEN CONDOVILLA) AKIBAT KETIDAKBERATURAN HORIZONTAL. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
TIARANI, DANIYA (2025) FAKTOR PENGARUH TERJADINYA TIME OVERRUN DAN COST OVERRUN PROYEK KONSTRUKSI PADA KAWASAN INDUSTRI DI PROVINSI BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.
ULHAQ, ELIYA DHIYAH (2025) ANALISIS PENERAPAN KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK LIGHT RAIL TRANSIT (LRT) (STUDI KASUS : PROYEK PEMBANGUNAN LRT FASE 1B VELODROME – MANGGARAI). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
WAHYUDI, DIKI (2025) ANALISIS PEMANFAATAN LIMBAH GRC (GLASSFIBRE REINFORCED CEMENT) DAN FLY ASH SEBAGAI BAHAN SUBTITUSI DALAM CAMPURAN BETON. S1 thesis, Universitas Mercu Buana Jakarta.
WARDIANA, ASEP (2025) ANALISIS PERCEPATAN PEKERJAAN DENGANMETODE CRASHING PADA PEKERJAAN PEMBANGUNAN RUANG PRODUKSI (STUDI KASUS: PROYEK PT TAISHAN ALKES INDONESIA, KAB.TANGERANG BANTEN). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
WIBOWO, RENDY RIDLA (2025) OPTIMASI LETAK DINDING GESER GEDUNG BETON BERTULANG BERTAPAK T DENGAN KETINGGIAN 11 TINGKAT. S1 thesis, Universitas Mercu Buana Jakarta.
WIBOWO, SUSENO (2025) EVALUASI PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2015 PADA PROYEK PENINGKATAN JALAN DI JAKARTA UTARA. S1 thesis, Universitas Mercu Buana Jakarta.
WICAKSANA PURTONO, BAYU SATRIA (2025) ANALISIS TINGKAT KECELAKAAN LALU LINTAS METODE AEK & UCL(STUDI KASUS RUAS JALAN RAYA KRANGGAN – JALAN RAYA HANKAM). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
WIDI, FITRIANI SETIANING (2025) ANALISIS KINERJA PROYEK DENGAN SISTEM KONVENSIONAL DAN BUILDING INFORMATION MODELLING PADA PELAKSANAAN PEMBANGUNAN JEMBATAN CALLENDER HAMILTON (Studi Kasus : Jembatan Cikao). S1 thesis, Universitas Mercu Buana Jakarta.
WIJAYA, RIZKI RAMDHAN (2025) EVALUASI GEOMETRIK JALAN PADA RUAS JALAN SUKANAGARA - JALAN BUKA NAGARA , KECAMATAN LEMBANG, KABUPATEN BANDUNG BARAT. S1 thesis, Universitas Mercu Buana Jakarta.
YOFIZAR, MUHAMMAD YUSUF (2025) ANALISIS PENGARUH KERUSAKAN JALAN TERHADAP KINERJA RUAS JALAN BENTENG BETAWI, KOTA TANGERANG, BANTEN. S1 thesis, Universitas Mercu Buana Jakarta.
YUNUS, SYAHREZA FAHLEVI (2025) ANALISIS BIAYA DAN WAKTU METODE DIESEL HAMMER DAN HYDRAULIC STATIC PILE DRIVE PADA PONDASI TIANG PANCANG UKURAN 25X25 (Studi Kasus: Proyek Gedung Ponpes Tahfidz Tafsir Alqur'an Cinere, Depok). S1 thesis, Universitas Mercu Buana Jakarta.
ZAHRAN, AUDREY ATHAYA (2025) ANALISIS KINERJA RUAS JALAN DAN SIMPANG BERSINYAL MENGGUNAKAN PKJI 2023 PADA JALAN RAYA PASAR MINGGU – JALAN RAYA KALIBATA , PANCORAN JAKARTA SELATAN. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
ZEIN, ZAKI (2025) IMPLEMENTASI SISTEM ENTERPRISE RESOURCE PLANNING (ERP) PADA CV. BINTANG ILMU DENGAN MODUL ODOO INVENTORY DAN AKUNTANSI. S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
ZIVANDRA, MUHAMMAD FAUZAN (2025) ANALISIS PEMILIHAN MODA TRANSPORTASI TRANSJAKARTA DAN LRT STUDI KASUS RUTE CIBUBUR - DUKUH ATAS. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.