Items where Division is "Pascasarjana > Magister Teknik Sipil" and Year is 2018

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 19.

AMRY, MUHAMMAD (2018) ANALISIS KONTRAK KONSTRUKSI RANCANG-BANGUN (Design-Build) DAN IMPLEMENTASINYA DI INDONESIA. S2-Magister thesis, Universitas Mercu Buana Jakarta.

CHRISCAHYANTI, ERVIANA DWI (2018) ANALISIS PEMILIHAN MATERIAL RAMAH LINGKUNGAN DENGAN METODE VALUE ENGINEERING DAN ANALYTICAL HIERARCHY PROCESS (AHP) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG. S2-Magister thesis, Universitas Mercu Buana Jakarta.

ISMANTO, HADI (2018) ANALISIS PENYELESAIAN SENGKETA KONSTRUKSI (Dewan Sengketa Vs Arbitrase) BERDASARKAN FIDIC CONDITION of CONTRACT 2017. S2-Magister thesis, Universitas Mercu Buana Jakarta.

JANUARTO, JANUARTO (2018) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH DALAM PRODUKTIVITAS TENAGA KERJA BERBASIS LINE OF BALANCE PADA BANGUNAN BERTINGKAT TINGGI. S2-Magister thesis, Universitas Mercu Buana Jakarta.

KUSSUMARDIANADEWI, B.DETTY (2018) PEKERJAAN FINISHING PENUTUP LANTAI BERBASIS VALUE ENGINEERING PADA BANGUNAN PERKANTORAN BERTINGKAT TINGGI. S2-Magister thesis, Universitas Mercu Buana Jakarta.

LISTANTO, NURUL (2018) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEMBAYARAN KONTRAKTOR KEPADA SUBKONTRAKTOR PADA PROYEK GEDUNG BERTINGKAT. S2-Magister thesis, Universitas Mercu Buana Jakarta.

MALINDA, YOSIE (2018) ANALISIS KENDALA PENGGUNAAN E-CATALOGUE PADA PROSES PENGADAAN PROYEK KONSTRUKSI JALAN (DI DKI JAKARTA). S2-Magister thesis, Universitas Mercu Buana Jakarta.

MARTANTI, ANA YUNI (2018) PENGARUH CONTRACT CHANGE ORDER TERHADAP PEMBIAYAAN KONTRAKTOR PADA PROYEK KONSTRUKSI PEMERINTAH. S2-Magister thesis, Universitas Mercu Buana Jakarta.

NASUTION, LUTFI AULIA (2018) EFEKTIVITAS KOMUNIKASI INTERPERSONAL SUPERVISOR TERHADAP KINERJA WAKTU TUKANG HARIAN MELALUI PROYEK DELAY (Studi kasus proyek-proyek di PT X). S2-Magister thesis, Universitas Mercu Buana Jakarta.

NAWAWI, MOH. (2018) PENERAPAN LEAN CONSTRUCTION DI PEKERJAAN MEKANIKAL, ELEKTRIKAL, PLUMBING (MEP) PADA PROYEK BANGUNAN TINGKAT TINGGI. S2-Magister thesis, Universitas Mercu Buana Jakarta.

PRIYANTO, DODIK (2018) OPTIMASI KEBUTUHAN TOWER CRANE BERBASIS LEAN CONSTRUCTION PADA BANGUNAN BERTINGKAT TINGGI. S2-Magister thesis, Universitas Mercu Buana Jakarta.

RAHAYUDI, GUSTIYAN DWI (2018) ANALISIS TUGAS DAN TANGGUNG JAWAB PROJECT MANAGER PADA KONTRAKTOR NASIONAL. S2-Magister thesis, Universitas Mercu Buana Jakarta.

RISWANTO, RISWANTO (2018) ANALISIS DAMPAK FAKTOR CUACA TERHADAP BIAYA DAN WAKTU PELAKSANAAN BAGI KONTRAKTOR. S2-Magister thesis, Universitas Mercu Buana Jakarta.

SHOLAHUDDIN, MOH. (2018) ANALISIS PERBANDINGAN WAKTU PRODUKTIVITAS CLIMBING TOWER CRANE DAN TIED IN CRANE PADA BANGUNAN GEDUNG TINGKAT TINGGI. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

SIHOMBING, EBEN EZER (2018) ANALISIS PEMILIHAN SISTEM BEKISTING PADA PROYEK GEDUNG RUMAH SUSUN MENGGUNAKAN METODE AHP DAN METODE SMART. S2-Magister thesis, Universitas Mercu Buana Jakarta.

SINTAULI, GABRIELLA MARIA MAGDALENA (2018) PENERAPAN METODE LINE OF BALANCE DAN SIX SIGMA PADA PEKERJAAN FINISHING BANGUNAN GEDUNG BERTINGKAT TINGGI. S2-Magister thesis, Universitas Mercu Buana Jakarta.

SUSANDI, SUSANDI (2018) PENERAPAN PENJADWALAN PROYEK JALAN TOL BERBASIS M-PERT DAPAT MENGURANGI KETERLAMBATAN WAKTU PELAKSANAAN PROYEK. S2-Magister thesis, Universitas Mercu Buana Jakarta.

WIBISONO, ANOM (2018) ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN DERMAGA (FIDIC Rainbow Contract 2017). S2-Magister thesis, Universitas Mercu Buana Jakarta.

WIBOWO, PAKSI DWIYANTO (2018) PENERAPAN DEFINITIVE TECHNIQUE BERBASIS JAVA PADA PROSES TENDER PROYEK RUMAH SAKIT DAPAT MENINGKATKAN WINNING RATIO. S2-Magister thesis, Universitas Mercu Buana Jakarta.

This list was generated on Fri Apr 3 14:51:26 2020 WIB.