FADLI, LATHIF HANAFI (2021) IMPLEMENTASI PDCA – DELAPAN LANGKAH UNTUK MENINGKATKAN PRODUKTIVITAS PADA PRODUK COMPOUND TREAD OFF ROAD TBR DI PT GAJAH TUNGGAL TBK. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 Cover.pdf Download (520kB) | Preview |
|
Text (BAB I)
02 Bab 1.pdf Restricted to Registered users only Download (519kB) |
||
Text (BAB II)
03 BAB 2.pdf Restricted to Registered users only Download (906kB) |
||
Text (BAB III)
04 BAB 3.pdf Restricted to Registered users only Download (160kB) |
||
Text (BAB IV)
05 BAB 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
06 BAB 5.pdf Restricted to Registered users only Download (169kB) |
||
Text (DAFTAR PUSTAKA)
08 Daftar Pustaka.pdf Restricted to Registered users only Download (119kB) |
||
Text (LAMPIRAN)
09 Lampiran.pdf Restricted to Registered users only Download (2MB) |
Abstract
This study aims to implement the PDCA-8 Steps to improve the productivity of the TBR Tread Off Road compound at PT Gajah Tunggal Tbk. The implementation begins with determining the theme of improvement with the Pareto diagram to determine the priority of production machines, resulting in the theme of improvement of increasing the productivity of Tread Off Road TBR compound on the MCG10 masterbatch production machine and MCA3 final batch. The second step, determining the target of improvement using histogram data, obtained a target of 1.596 tons / hour referring to the productivity of the Rim Chafter compound. The third step, looking for all possible causes by observing and categorizing the 4M with the help of a checksheet. The fourth step, implementation of the root cause analysis using a fishbone diagram. The root of the problem is found in the method, where the masterbatch 1, masterbatch 3 and final batch methods can still be maximized in terms of speed, temperature limits and carbon injection methods. The fifth and sixth steps, Plan & implement Corrective Actions using the 5W + 1H method. The improvement plan is a modification process 1 and a modification process 2. The seventh stage, evaluation of the results using the Pareto diagram for productivity and SPC for quality. The result was that productivity increased by 31.15% and quality increased by an average CPK of 2.33. Costs can also be saved up to 41.67%. The final stage of the PDCA is eight steps, namely standardizing and establishing the next plan. Standardization by changing the document specification of the Tread Off Road TBR compound production process and the next plan is determined using a histogram, improvement the productivity of the BEC compound. Keywords: PDCA, Productivity, Production, Quality, Compound, Repair. Penelitian ini bertujuan mengimplementasikan PDCA-8 Langkah untuk perbaikan produktivitas compound Tread Off Road TBR di PT Gajah Tunggal Tbk. Implementasi diawali dengan Penentuan tema perbaikan dengan diagram pareto untuk mengetahui prioritas mesin produksi, menghasilkan tema perbaikan meningkatkan produktivitas compound Tread Off Road TBR pada mesin produksi masterbatch MCG10 dan final batch MCA3. langkah kedua, penentuan target perbaikan dengan data histogram didapatkan Target 1,596 Ton/Jam mengacu pada produktivitas compound Rim Chafter. Langkah ketiga, mencari semua penyebab yang mungkin dengan melakukan observasi dan pengkategorian 4M dengan bantuan checksheet. Langkah keempat, pelaksanaan analisa akar masalah menggunakan diagram tulang ikan. Akar masalah didapatkan pada metode, dimana metode masterbatch 1, masterbatch 3 dan final batch masih dapat maksimalkan dari segi kecepatan, batasan temperatur dan metode injeksi karbon. Langkah kelima dan keenam, Merencanakan & melaksanakan Tindakan Perbaikan menggunakan metode 5W+1H. Rencana perbaikan ada proses modifikasi 1 dan proses modifikasi 2. Tahapan ketujuh, evaluasi hasil menggunakan diagram pareto untuk produktivitas dan SPC untuk kualitas. Hasilnya untuk produktivitas meningkat sebesar 31,15% dan kualitas meningkat dengan rata-rata CPK 2,33. Biaya juga dapat dihemat hingga 41,67%. Tahapan terakhir PDCA delapan langkah yaitu melakukan standarisasi dan menetapkan rencana selanjutnya. Standarisasi dengan merubah dokumen spesifikasi proses produksi compound Tread Off Road TBR dan rencana selanjutnya ditentukan menggunakan histogram, melakukan perbaikan produktivitas pada compound BEC. Kata Kunci : PDCA, Produktivitas, Produksi, Kualitas, Compound, Perbaikan.Kata Kunci : PDCA, Produktivitas, Produksi, Kualitas, Compound, Perbaikan.
Actions (login required)
View Item |