UTOMO, PUJI (2020) ANALISIS PERCEPATAN DURASI PROYEK DENGAN METODE PERTUKARAN WAKTU DAN BIAYA (TIME COST TRADE OFF METHOD) DENGAN ALTERNATIF PENAMBAHAN JAM KERJA DAN PENAMBAHAN JUMLAH TENAGA KERJA. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01.Halaman Judul.pdf Download (113kB) | Preview |
|
|
Text (ABSTRAK)
02.Abstrak.pdf Download (107kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
04.Lembar Pernyataan.pdf Download (554kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
03.Lembar Pengesahan.pdf Download (539kB) | Preview |
|
|
Text (KATA PENGANTAR)
05.KATA PENGANTAR.pdf Download (146kB) | Preview |
|
|
Text (DAFTAR ISI)
06.DAFTAR ISI.pdf Download (80kB) | Preview |
|
|
Text (DAFTAR TABEL)
07.DAFTAR TABEL.pdf Download (103kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
08.DAFTAR GAMBAR.pdf Download (194kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
09.DAFTAR LAMPIRAN.pdf Download (233kB) | Preview |
|
Text (BAB I)
10.BAB I.pdf Restricted to Registered users only Download (125kB) |
||
Text (BAB II)
11.BAB II.pdf Restricted to Registered users only Download (478kB) |
||
Text (BAB III)
12.BAB III.pdf Restricted to Registered users only Download (195kB) |
||
Text (BAB IV)
13.BAB IV.pdf Restricted to Registered users only Download (748kB) |
||
Text (BAB V)
14.BAB V.pdf Restricted to Registered users only Download (94kB) |
||
Text (DAFTAR PUSTAKA)
15.DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (178kB) |
||
Text (LAMPIRAN)
16.Lampiran.pdf Restricted to Registered users only Download (2MB) |
Abstract
In analyzing the acceleration of the project duration using the Time Cost Trade Off method. Analysis is done by speeding up (crashing) the implementation time by using alternatives to increase working hours (overtime) and increasing the number of workers. The case study was carried out on the Premier Estate 3 development project undertaken by PT.Rekacipta Bangun Pratama Contractor, the duration of the project implementation was generally carried out 6 months, but the developer requested that the work be completed in 4.5 months (15 July 2019 - 30 November 2019). Thus the need for accelerating the implementation of the project 1.5 months from the normal Schedule. The data needed in this study include the S curve, the recapitulation of project cost calculations, the list of Budget Plans (RAB), and the list of unit price of the worker's wages. The research method used is to design network planning, calculate the cost slope on the addition of working hours and increase the number of workers, calculate the direct costs and indirect costs for each activity that changes due to changes in the duration of implementation, acceleration of work duration, calculation of the cost slope, and determination optimum cost and duration due to the application of the crashing method. After acceleration with the crashing method, an alternative to the addition of working hours obtained a reduction in total cost of Rp. 7,144,751 of the total normal cost of Rp. 5,016,380,000 to Rp. 5,009,235,249 with a duration of 131 days. As for the alternative to the addition of work, a reduction in total cost of Rp. 20,660,172 of the total normal cost of Rp. 5,016,380,000 to Rp. 4,995,719,828 with a duration of 125 days. Keywords: Acceleration, Time Cost Trade Off, Cost Slope. Dalam melakukan analisa percepatan durasi proyek menggunakan metode Time Cost Trade Off. Analisa dilakukan dengan cara mempercepat (crashing) waktu pelaksanaan dengan menggunakan alternatif menambah jam kerja (lembur) dan penambahan jumlah tenaga kerja. Studi kasus dilakukan pada proyek pembangunan Premier Estate 3 yang dikerjakan oleh Kontraktor PT.Rekacipta Bangun Pratama, durasi pelaksanaan proyek pada umumnya dikerjakan 6 bulan, tetapi pihak pengembang meminta pekerjaan selesai dalam 4,5 bulan (15 Juli 2019 - 30 November 2019). Dengan demikian perlu adanya percepatan pelaksanan proyek 1,5 bulan dari Schedule normal. Data-data yang dibutuhkan dalam penelitian ini antara lain kurva S, rekapitulasi perhitungan biaya proyek, daftar Rencana Anggaran Biaya (RAB), dan daftar harga satuan upah pekerja. Metode penelitian yang digunakan adalah dengan merancang network planning, menghitung cost slope pada penambahan jam kerja dan penambahan jumlah tenaga kerja, menghitung biaya langsung dan biaya tidak langsung pada setiap kegiatan yang berubah akibat perubahan durasi pelaksanaan, percepatan durasi pekerjaan, perhitungan cost slope, serta penentuan biaya dan durasi optimum akibat penerapan metode crashing. Setelah dilakukan percepatan dengan metode crashing, untuk alternatif penambahan jam kerja diperoleh pengurangan total cost sebesar Rp. 7.144.751 dari total cost normal Rp. 5.016.380.000 menjadi Rp. 5.009.235.249 dengan durasi 131 hari. Sementara untuk alternatif penambahan jumlah kerja terjadi pengurangan total cost sebesar Rp. 20.660.172 dari total cost normal Rp. 5.016.380.000 menjadi Rp. 4,995,719,828 dengan durasi 125 hari. Kata Kunci: Percepatan, Time Cost Trade Off, Cost Slope.