FIRMANSYAH, ARDHI (2015) ANALISIS KETERLAMBATAN PEMBANGUNAN GEDUNG ALPHA BONAVENTURA-RUMAH SAKIT ATMAJAYA JAKARTA. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Hal Cover.pdf Download (218kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (98kB) | Preview |
|
Text (BAB I)
3. Bab 1.pdf Restricted to Registered users only Download (67kB) |
||
Text (BAB II)
4. BAB 2.pdf Restricted to Registered users only Download (297kB) |
||
Text (BAB III)
5. BAB 3.pdf Restricted to Registered users only Download (261kB) |
||
Text (BAB IV)
6. BAB 4.pdf Restricted to Registered users only Download (539kB) |
||
Text (BAB V)
7. BAB 5.pdf Restricted to Registered users only Download (104kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8. daftar pustaka dan lampiran.pdf Restricted to Registered users only Download (95kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 15 108 |
NIM/NIDN Creators: | 41113120113 |
Uncontrolled Keywords: | Faktor Keterlambatan, Faktor Ekstern, Faktor Intern, Kontraktor, Tenaga Kerja |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 29 Aug 2015 15:21 |
Last Modified: | 30 Aug 2022 14:34 |
URI: | http://repository.mercubuana.ac.id/id/eprint/9986 |
Actions (login required)
View Item |