ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DAN BEKISTING ALFORM (ALUMINIUM FORMWORK)TERHADAP BIAYA DAN WAKTU (Studi kasus : Pembangunan Proyek Apartemen Mahatta Serpong, Tangerang)

PUTRA, BAGUS ADI MAULANA (2023) ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DAN BEKISTING ALFORM (ALUMINIUM FORMWORK)TERHADAP BIAYA DAN WAKTU (Studi kasus : Pembangunan Proyek Apartemen Mahatta Serpong, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
01 COVER.pdf

Download (618kB) | Preview
[img]
Preview
Text (ABSTRAK)
02 ABSTRAK.pdf

Download (115kB) | Preview
[img] Text (BAB I)
03 BAB 1.pdf
Restricted to Registered users only

Download (737kB)
[img] Text (BAB II)
04 BAB 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB III)
05 BAB 3.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB IV)
06 BAB 4.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB V)
07 BAB 5.pdf
Restricted to Registered users only

Download (82kB)
[img] Text (DAFTAR PUSTAKA)
08 DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (104kB)
[img] Text (LAMPIRAN)
09 LAMPIRAN.pdf
Restricted to Registered users only

Download (238kB)

Abstract

The implementation of projects for structural work, especially in the construction of highrise buildings, there are 3 (three) pareto items or items that have the most influence on their sustainability. Such items are foundry, ironing and formwork work. So far, formwork is the item that uses the most resources (resources) to find out the comparison between aluminum formwork and conventional formwork against costs. he purpose of this study was to determine the comparison between aluminum formwork and conventional formwork with respect to cost and time. Based on the results of the research that has been done, it can be said that the aluminum practicum implementation method is easier than conventional. In the cost of aluminum formwork is more expensive by Rp. 140,366,036 or 7,82 %. from the value of conventional formwork, aluminum formwork will be cheaper if the floor being worked on is more than 40 floors, because the use cycle of conventional formwork will be more wasteful than aluminum. The implementation time of aluminum formwork is relatively faster than conventional formwork. Using conventional formwork based on optimistic, are 71 day. Meanwhile, if you use aluminum formwork based on optimisti is 62 day. Keywords: Shearwall, Corelift, Kumkang Kind

Item Type: Thesis (S1)
Call Number CD: FT/SIP. 23 016
NIM/NIDN Creators: 41117120141
Uncontrolled Keywords: Shearwall, Corelift, Kumkang Kind
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: ADELINA HASNA SETIAWATI
Date Deposited: 19 May 2023 08:11
Last Modified: 19 May 2023 08:11
URI: http://repository.mercubuana.ac.id/id/eprint/77389

Actions (login required)

View Item View Item