PUTRA, BAGUS ADI MAULANA (2023) ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DAN BEKISTING ALFORM (ALUMINIUM FORMWORK)TERHADAP BIAYA DAN WAKTU (Studi kasus : Pembangunan Proyek Apartemen Mahatta Serpong, Tangerang). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 COVER.pdf Download (618kB) | Preview |
|
|
Text (ABSTRAK)
02 ABSTRAK.pdf Download (115kB) | Preview |
|
Text (BAB I)
03 BAB 1.pdf Restricted to Registered users only Download (737kB) |
||
Text (BAB II)
04 BAB 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
05 BAB 3.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB IV)
06 BAB 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
07 BAB 5.pdf Restricted to Registered users only Download (82kB) |
||
Text (DAFTAR PUSTAKA)
08 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (104kB) |
||
Text (LAMPIRAN)
09 LAMPIRAN.pdf Restricted to Registered users only Download (238kB) |
Abstract
The implementation of projects for structural work, especially in the construction of highrise buildings, there are 3 (three) pareto items or items that have the most influence on their sustainability. Such items are foundry, ironing and formwork work. So far, formwork is the item that uses the most resources (resources) to find out the comparison between aluminum formwork and conventional formwork against costs. he purpose of this study was to determine the comparison between aluminum formwork and conventional formwork with respect to cost and time. Based on the results of the research that has been done, it can be said that the aluminum practicum implementation method is easier than conventional. In the cost of aluminum formwork is more expensive by Rp. 140,366,036 or 7,82 %. from the value of conventional formwork, aluminum formwork will be cheaper if the floor being worked on is more than 40 floors, because the use cycle of conventional formwork will be more wasteful than aluminum. The implementation time of aluminum formwork is relatively faster than conventional formwork. Using conventional formwork based on optimistic, are 71 day. Meanwhile, if you use aluminum formwork based on optimisti is 62 day. Keywords: Shearwall, Corelift, Kumkang Kind
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 23 016 |
NIM/NIDN Creators: | 41117120141 |
Uncontrolled Keywords: | Shearwall, Corelift, Kumkang Kind |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | ADELINA HASNA SETIAWATI |
Date Deposited: | 19 May 2023 08:11 |
Last Modified: | 19 May 2023 08:11 |
URI: | http://repository.mercubuana.ac.id/id/eprint/77389 |
Actions (login required)
View Item |