PENETAPAN STANDAR WAKTU PRODUKSI BERDASARKAN PENGUKURAN KERJA PADA PT.LEDIN

Rivany, Syahrul Bahtiar (2006) PENETAPAN STANDAR WAKTU PRODUKSI BERDASARKAN PENGUKURAN KERJA PADA PT.LEDIN. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
03101-242 SYAHRUL BAHTIAR RIVANY COVER.pdf

Download (806kB) | Preview
[img] Text (BAB I)
03101-242 SYAHRUL BAHTIAR RIVANY BAB I.pdf
Restricted to Registered users only

Download (762kB)
[img] Text (BAB II)
03101-242 SYAHRUL BAHTIAR RIVANY BAB II.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB III)
03101-242 SYAHRUL BAHTIAR RIVANY BAB III.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB IV)
03101-242 SYAHRUL BAHTIAR RIVANY BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB V)
03101-242 SYAHRUL BAHTIAR RIVANY BAB V.pdf
Restricted to Registered users only

Download (692kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
03101-242 SYAHRUL BAHTIAR RIVANY DAFTAR PUSTAKA DAN LAMPIRAN.pdf
Restricted to Registered users only

Download (822kB)
Item Type: Thesis (S1)
Call Number CD: LT.III
Call Number: SE/06/01 BAH p
NIM/NIDN Creators: 03101-242
Uncontrolled Keywords: PENETAPAN STANDAR WAKTU PRODUKSI
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: Admin Perpus UMB
Date Deposited: 10 Nov 2006 11:03
Last Modified: 23 Jul 2026 07:59
URI: http://repository.mercubuana.ac.id/id/eprint/36894

Actions (login required)

View Item View Item