NURACHMAH, RD. HANIFAH ASYIFA (2025) IMPLEMENTASI 4D BIM PADA TIME SCHEDULE MANAGEMENT PROYEK PEMBANGUNAN GEDUNG BRI SEMARANG. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01. COVER.pdf Download (845kB) | Preview |
|
![]() |
Text (BAB I)
02. BAB 1 .pdf Restricted to Registered users only Download (440kB) |
|
![]() |
Text (BAB II)
03. BAB 2 .pdf Restricted to Registered users only Download (479kB) |
|
![]() |
Text (BAB III)
04. BAB 3 .pdf Restricted to Registered users only Download (257kB) |
|
![]() |
Text (BAB IV)
05. BAB 4 .pdf Restricted to Registered users only Download (2MB) |
|
![]() |
Text (BAB V)
06. BAB 5 .pdf Restricted to Registered users only Download (172kB) |
|
![]() |
Text (DAFTAR PUSTAKA)
07. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (196kB) |
|
![]() |
Text (LAMPIRAN)
08. LAMPIRAN .pdf Restricted to Registered users only Download (3MB) |
Abstract
Large-scale building projects often face challenges related to coordination and data integration, particularly in clash detection and project progress monitoring. In the BRI Tower Building construction project in Semarang, limitations in clash detection during planning and design, as well as conventional methods of monitoring and visualization, such as using Excel and CAD software, have become significant obstacles. These limitations result in a lack of interactive features and in-depth analysis, hindering the coordination process between teams. This research aims to implement Building Information Modeling (BIM) to enhance project schedule management through three main stages. First, a 3D model is created using Revit based on shop drawings. Second, work duration is calculated and scheduling is carried out using Microsoft Project. Third, the resulting 3D model is integrated into Navisworks to perform clash detection and time management analysis. The research process began with data collection, including shop drawings and the S-curve. The building structure was modeled using Revit, followed by scheduling with Microsoft Project. The resulting 4D model was then imported into Navisworks to detect clashes through the Clash Detection feature. The results show that integrating the 4D model with the project schedule can identify clashes between structural systems more efficiently, thereby improving project coordination and management overall. Keywords: Building Information Modeling (BIM), clash detection, schedule management, Revit, Microsoft Project, Navisworks Proyek pembangunan gedung skala besar sering kali menghadapi tantangan terkait koordinasi dan integrasi data, terutama dalam hal deteksi benturan (clash detection) dan monitoring kemajuan proyek. Pada proyek pembangunan Gedung BRI Semarang, keterbatasan deteksi benturan dalam perencanaan dan desain serta metode konvensional dalam monitoring dan visualisasi, seperti penggunaan Excel dan perangkat lunak CAD, telah menjadi hambatan signifikan. Keterbatasan tersebut menyebabkan kurangnya fitur interaktif dan analisis mendalam, yang mempersulit proses koordinasi antar tim. Penelitian ini bertujuan untuk mengimplementasikan Building Information Modeling (BIM) guna meningkatkan manajemen jadwal proyek melalui tiga tahap utama. Pertama, pemodelan 3D dibuat menggunakan Revit berdasarkan gambar shop drawing. Kedua, durasi pekerjaan dihitung dan penjadwalan dilakukan dengan Microsoft Project. Ketiga, model 3D yang dihasilkan diintegrasikan ke dalam Navisworks untuk melakukan deteksi benturan dan analisis manajemen waktu. Proses penelitian dimulai dengan pengumpulan data, termasuk gambar shop drawing dan kurva S. Pemodelan struktur gedung dilakukan menggunakan Revit, dilanjutkan dengan penjadwalan menggunakan Microsoft Project. Model 4D yang dihasilkan kemudian diimpor ke dalam Navisworks untuk memeriksa benturan melalui fitur Clash Detection. Hasil penelitian menunjukkan bahwa integrasi model 4D dengan jadwal proyek mampu mengidentifikasi benturan antar sistem struktur secara lebih efisien, sehingga meningkatkan koordinasi dan pengelolaan proyek secara keseluruhan. Kata kunci: Building Information Modeling (BIM), clash detection, manajemen jadwal, Revit, Microsoft Project, Navisworks
Actions (login required)
![]() |
View Item |