ANALISIS FAKTOR-FAKTOR PENYEBAB KLAIM DI MASA PENDEMI PADA PROYEK PEMBANGKIT LISTRIK DI INDONESIA

NUGROHO, RUDY (2022) ANALISIS FAKTOR-FAKTOR PENYEBAB KLAIM DI MASA PENDEMI PADA PROYEK PEMBANGKIT LISTRIK DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1.COVER.pdf

Download (347kB) | Preview
[img]
Preview
Text (ABSTRAK)
2.ABSTRAK.pdf

Download (111kB) | Preview
[img] Text (BAB I)
3.BAB 1.pdf
Restricted to Registered users only

Download (160kB)
[img] Text (BAB II)
4.BAB 2.pdf
Restricted to Registered users only

Download (281kB)
[img] Text (BAB III)
5.BAB 3.pdf
Restricted to Registered users only

Download (167kB)
[img] Text (BAB IV)
6.BAB 4.pdf
Restricted to Registered users only

Download (385kB)
[img] Text (BAB V)
7.BAB 5.pdf
Restricted to Registered users only

Download (146kB)
[img] Text (DAFTAR PUSTAKA)
8.DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (322kB)
[img] Text (LAMPIRAN)
9.LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB)

Abstract

The 2019 Corona virus appeared suddenly in China which continuously spread across the world, including in Indonesia, the massive and fast spread of which made governments around the world react by immediately closing their ports and international airports so that the movement and mobilization of people between countries came to a halt. . Governments in the world, including Indonesian Government, have begun to make changes to regulations related to entry and exit requirements between countries as well as new normal regulations. This research aims to find out how strong or significant the relationship between time delays and contract price increases due to the government issuing regulatory changes to suppress the disease of covid-19 which has multiple impact on the emergence of claims in power plant projects in Indonesia and to determine what factors dominantly affecting time delays and contract price increases during the covid-19 pandemic. This research conclusion is that there was a significant relation between time delay and a significant relation on increase in contract prices. For the relationship between time delay and increased of contract price toward claims, there was a strong relationship where time delay and increased contract price would certainly lead to project claims. Changes in government regulations during the COVID-19 pandemic have caused inefficiency in power plant construction projects in Indonesia. Keywords : claim, covid-19 Pandemic, time delay, contract prices, , Power Plant

Item Type: Thesis (S2)
Call Number CD: CD/557. 22 033
NIM/NIDN Creators: 55720110012
Uncontrolled Keywords: klaim, pendemi Covid-19, keterlambatan waktu, kenaikan harga kontrak, pembangkit listrik.
Subjects: 100 Philosophy and Psychology/Filsafat dan Psikologi > 150 Psychology/Psikologi > 154 Subconscious and Altered States and Process/Psikologi Bawah Sadar > 154.6 Sleep Phenomena/Fenomena Tidur > 154.63 Dreams/Mimpi > 154.634 Analysis/Analisis
500 Natural Science and Mathematics/Ilmu-ilmu Alam dan Matematika > 530 Physics/Fisika
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Pascasarjana > Magister Teknik Sipil
Depositing User: ADELINA HASNA SETIAWATI
Date Deposited: 28 Jan 2023 08:11
Last Modified: 28 Jan 2023 08:11
URI: http://repository.mercubuana.ac.id/id/eprint/73809

Actions (login required)

View Item View Item