SETIAWAN, CHANDRA (2022) ANALISIS PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP KINERJA BIAYA PELAKSANAAN PADA PROYEK HOTEL PONDOK INDAH INTERCONTINENTAL JAKARTA. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01.COVER.pdf Download (547kB) | Preview |
|
|
Text (ABSTRAK)
02.ABSTRAK.pdf Download (111kB) | Preview |
|
Text (BAB I)
03.BAB 1.pdf Restricted to Registered users only Download (141kB) |
||
Text (BAB II)
04.BAB 2.pdf Restricted to Registered users only Download (365kB) |
||
Text (BAB III)
05.BAB 3.pdf Restricted to Registered users only Download (314kB) |
||
Text (BAB IV)
06.BAB 4.pdf Restricted to Registered users only Download (619kB) |
||
Text (BAB V)
07.BAB 5.pdf Restricted to Registered users only Download (140kB) |
||
Text (DAFTAR PUSTAKA)
08.DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (128kB) |
||
Text (LAMPIRAN)
09.LAMPIRAN.pdf Restricted to Registered users only Download (2MB) |
Abstract
ANALISIS PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP KINERJA BIAYA PELAKSANAAN PADA PROYEK HOTEL PONDOK INDAH INTERCONTINENTAL JAKARTA
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 22 044 |
NIM/NIDN Creators: | 41117120020 |
Uncontrolled Keywords: | ANALISIS PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP KINERJA BIAYA PELAKSANAAN PADA PROYEK HOTEL PONDOK INDAH INTERCONTINENTAL JAKARTA |
Subjects: | 300 Social Science/Ilmu-ilmu Sosial > 340 Law/Ilmu Hukum > 347 Civil Procedure and Courts/Prosedur Sipil dan Pengadilan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Dede Muksin Lubis |
Date Deposited: | 23 Aug 2022 07:31 |
Last Modified: | 23 Aug 2022 07:31 |
URI: | http://repository.mercubuana.ac.id/id/eprint/68283 |
Actions (login required)
View Item |