PERBAIKAN ALIRAN PROSES SERTIFIKASI TEKNIK DAN MANAJEMEN INDUSTRI DI LSP TMI DENGAN MENGGUNAKAN METODE VALUE STREAM MAPPING (VSM)

SHALEH, IBNU (2020) PERBAIKAN ALIRAN PROSES SERTIFIKASI TEKNIK DAN MANAJEMEN INDUSTRI DI LSP TMI DENGAN MENGGUNAKAN METODE VALUE STREAM MAPPING (VSM). S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
1. Halaman Judul.pdf

Download (34kB) | Preview
[img]
Preview
Text
2. Abstrak.pdf

Download (113kB) | Preview
[img]
Preview
Text
3. Surat Pernyataan.pdf

Download (578kB) | Preview
[img]
Preview
Text
4. Lembar Pengesahan.pdf

Download (551kB) | Preview
[img]
Preview
Text
5. Kata Pengantar.pdf

Download (75kB) | Preview
[img]
Preview
Text
6. Daftar Isi.pdf

Download (140kB) | Preview
[img]
Preview
Text
7. Daftar Tabel.pdf

Download (132kB) | Preview
[img]
Preview
Text
8. Daftar Gambar.pdf

Download (128kB) | Preview
[img] Text
9. Bab 1.pdf
Restricted to Registered users only

Download (106kB)
[img] Text
10. Bab 2.pdf
Restricted to Registered users only

Download (497kB)
[img] Text
11. Bab 3.pdf
Restricted to Registered users only

Download (121kB)
[img] Text
12. Bab 4.pdf
Restricted to Registered users only

Download (475kB)
[img] Text
13. Bab 5.pdf
Restricted to Registered users only

Download (105kB)
[img] Text
14. Bab 6.pdf
Restricted to Registered users only

Download (89kB)
[img] Text
15. Daftar Pustaka.pdf
Restricted to Registered users only

Download (117kB)

Abstract

ABSTRAK Lembaga Sertifikasi Profesi Teknik dan Manajemen Industri (LSP TMI) merupakan Lembaga yang telah mendapatkan lisensi oleh BNSP untuk menyelenggarakan uji kompetensi sesuai dengan skema. Sebagai lemabga yang independent dan Profesional di sektor Teknik dan Manajemen Industri. LSP TMI harus menjaga kualitas pada prosesnya terdapat keterlambatan terhadap waktu yang sudah ditentukan oleh LSP TMI yaitu 14 Hari. Tujuan penelitian ini melakukan perbaikan aliran proses sertifikasi agar dilakukan percepatan waktu dengan menghilangkan kegiatan yang tidak memberi niali tambah pada proses sertifikasi di LSP TMI dan mengidentifikasi faktor apa saja yang menjadi penyebab waktu proses sertifikasi menjadi lebih lama dari standar yang ditetukan oleh LSP TMI dan dilakukan percapatan dengan metode value stream mapping. Current state mapping dibuat untuk mengidentifikasi waste, sedangkan future state mapping dibuat untuk melakukan perbaikan. Hasil penelitian yang diperoleh dari studi kasus ini bahwa dalam proses sertifikasi di LSP TMI dilakukan percepatan waktu proses sertifikasi, pengelompokan kegiatan menjadi 9 tahapan proses sertifikasi di LSP TMI, hasil analisis waste yaitu waiting didapat dari diagram pareto dan fishbone. Serta analisis waktu kerja current state dengan waktu siklius (867,3), waktu normal (867,3) dan waktu baku (954,1) dan future state waktu siklius (157), waktu normal (157) dan waktu baku (172,7) satuan menit. Kata kunci: Asesmen, Sertifikasi profesi, Lean manufacturing, Value Stream Mapping dan Pemborosan. ABSTRACT The Industrial Engineering and Management Professional Certification Institute (LSP TMI) is an institution that has been licensed by BNSP to conduct competency tests according to the scheme. As an independent and professional organization in the Industrial Engineering and Management sector. The TMI LSP must maintain the quality of the process within the time limit determined by the TMI LSP, which is 14 days. The purpose of this research is to improve the process flow so that time is accelerated by eliminating activities that do not add information to the certification process at the TMI LSP and identifying what factors cause the certification time to be longer than the standards set by the TMI LSP and accelerating it with the method. value stream mapping. A current state map was created to identify waste, while a future country map was created to make improvements. The research results obtained from this case study show that in the certification process at the TMI LSP, the process time is accelerated, the certification of grouping activities into 9 stages of certification at the TMI LSP, the results of the waste analysis are waiting to be obtained from the Pareto and fishbone diagrams. As well as analysis of work time current state with cyclius time (867.3), normal time (867.3) and standard time (954.1) and future cyclical time (157), normal time (157) and standard time (172 , 7) units of minutes. Keywords: Assessment, Professional Certification, Lean manufacturing, Value Stream Mapping, Waste

Item Type: Thesis (S1)
Call Number CD: FT/IND 20 068
NIM/NIDN Creators: 41616210001
Uncontrolled Keywords: Kata kunci: Asesmen, Sertifikasi profesi, Lean manufacturing, Value Stream Mapping dan Pemborosan.
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.4 Executive Management/Manajemen Eksekutif
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 20 May 2022 03:54
Last Modified: 20 May 2022 03:54
URI: http://repository.mercubuana.ac.id/id/eprint/61361

Actions (login required)

View Item View Item