ABDILLAH, CHANDRA FANY (2020) PENINGKATAN KINERJA PROYEK BERBASIS BUILDING INFORMATION MODELING-QUANTITY TAKE OFF PADA CONCOURSE STASIUN LINGKAR REL TERPADU. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1.Cover.pdf Download (979kB) | Preview |
|
Text (BAB I)
2. Bab 1.pdf Restricted to Registered users only Download (290kB) |
||
Text (BAB II)
3. Bab 2.pdf Restricted to Registered users only Download (192kB) |
||
Text (BAB III)
4.Bab 3.pdf Restricted to Registered users only Download (225kB) |
||
Text (BAB IV)
5.Bab 4.pdf Restricted to Registered users only Download (307kB) |
||
Text (BAB V)
6.Bab 5.pdf Restricted to Registered users only Download (85kB) |
||
Text (DAFTAR PUSTAKA)
7.Daftar Pustaka.pdf Restricted to Registered users only Download (92kB) |
||
Text (LAMPIRAN)
8.Lampiran.pdf Restricted to Registered users only Download (3MB) |
Abstract
Indonesian infrastructure is ranked 30th according to the IMF’s World Economic Forum (WEF) 2018, to improve the rankings, the LRT project infrastructure development is one of the attractive solutions to consider. In transportation infrastructure project in the world experiencing cost overrun of 10-28%, to overcome this problem researchers use BIM based on Quantity Take Off. The result of the analysis of the most influential factors in the application of BIM based on Quantity Take-Off in concourse project at LRT Station by using the Relative Importance Index (RII) obtained 10 factors that most influences namely BIM based Quantity Take Off in sequence are, Bill of Quantity, RKS and Specifications, Cost Database, BIM Modeling, Quantity Take Off, Individual Model Selection, Operator Experience, Calculation Process, and Operator Education. While the results of the case study analysis, by applying BIM based on Quantity Take Off using Revit Software, in addition to accelerating the volume calculation time, also resulted in a cost efficiency of 8,61%. Keyword: Concourse Project at Station LRT, BIM based Quantity Take Off, Relative Importance Index, Cost Efficiency Infrastruktur Indonesia menempati peringkat 30 berdasarkan World Economic Forum (WEF) IMF 2018, untuk meningkatan peringkat maka pembangunan infrastruktur proyek LRT adalah salah satu solusi yang menarij untuk dipertimbangkan. Pada proyek infrastruktur transportasi di dunia mengalami cost overrun sebesar 10-28%, untuk mengatasi masalah itu peneliti menggunakan BIM based on Quantity Take Off. Hasil dari analisa faktor-faktor yang paling berpengaruh dalam penerapan BIM berbasis Quantity Take-Off pada proyek Concourse di Stasiun LRT dengan menggunakan Relative Importance Index (RII) diperoleh 10 faktor-faktor yang paling mempengaruhi yaitu BIM based Quantity Take-Off secara berurutan adalah Gambar, Bill Of Quantity, RKS dan Spesifikasi, Cost Database, Permodelan BIM, Quantity Take-Off, Seleksi Individual Model, Pengalaman Operator, Proses Kalkulasi, dan Pendidikan Operator. Sedangkan dari hasil analisa studi kasus, dengan menerapkan BIM berbasis Quantity Take Off menggunakan software Revit, selain percepatan waktu perhitungan volume, juga menghasilkan efisiensi biaya sebesar 8,61 %. KATA KUNCI: Proyek Concourse Stasiun LRT, BIM based Quantity Take Off, Relative Importance Index, Efisiensi Biaya
Actions (login required)
View Item |