PENGARUH FAKTOR RISIKO TERHADAP KETERLAMBATAN PROYEK (Studi Kasus : Proyek Jalan Tol Jakarta - Cikampek II (Elevated) STA 28+450-STA 47+500)

ISMAWARDHANY, RIZKI (2020) PENGARUH FAKTOR RISIKO TERHADAP KETERLAMBATAN PROYEK (Studi Kasus : Proyek Jalan Tol Jakarta - Cikampek II (Elevated) STA 28+450-STA 47+500). S1-Sarjana thesis, Universitas Mercu Buana Jatisampurna.

[img]
Preview
Text
1. HALAMAN JUDUL.pdf

Download (36kB) | Preview
[img]
Preview
Text
2. ABSTRAK.pdf

Download (105kB) | Preview
[img]
Preview
Text
3. LEMBAR PERNYATAAN KEASLIAN.pdf

Download (219kB) | Preview
[img]
Preview
Text
4. LEMBAR PENGESAHAN.pdf

Download (195kB) | Preview
[img]
Preview
Text
5. KATA PENGANTARR.pdf

Download (152kB) | Preview
[img]
Preview
Text
6. DAFTAR ISI.pdf

Download (184kB) | Preview
[img]
Preview
Text
7. DAFTAR TABEL.pdf

Download (104kB) | Preview
[img]
Preview
Text
8. DAFTAR GAMBAR.pdf

Download (100kB) | Preview
[img]
Preview
Text
9. DAFTAR LAMPIRAN.pdf

Download (100kB) | Preview
[img] Text
10. BAB I.pdf
Restricted to Registered users only

Download (301kB)
[img] Text
11. BAB II.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
12. BAB III.pdf
Restricted to Registered users only

Download (512kB)
[img] Text
13. BAB IV.pdf
Restricted to Registered users only

Download (725kB)
[img] Text
14. BAB V.pdf
Restricted to Registered users only

Download (409kB)
[img] Text
15. DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (198kB)
[img] Text
16. LAMPIRAN.pdf
Restricted to Registered users only

Download (892kB)

Abstract

ABSTRAK Dalam pengerjaan proyek konstruksi berskala besar seperti proyek infrastruktur tak dapat terhindar dari risiko dari berbagai aspek yang mampu mempengaruhi biaya, mutu, dan waktu. Salah satunya risiko yang mempengaruhi waktu dapat menyebabkan keterlambatan pada proyek sehingga proyek tidak selesai sesuai dengan waktu yang telah ditentukan dalam kontrak, seperti yang terjadi pada proyek jalan tol JakartaCikampek II (Elevated). Oleh karena itu, diperlukan adanya penelitian terhadap faktorfaktor risiko pada proyek Tol Jakarta-Cikampek II (Elevated) yang berpotensi mengakibatkan keterlambatan waktu penyelesaian proyek, untuk selanjutnya diberikan respon dan saran yang disesuaikan dengan jenis resiko yang mungkin terjadi berupa tindakan korektif (perbaikan) dan tindakan preventif (pencegahan) yang tepat guna meminimalisir probabilitas terjadinya risiko dan dampak yang ditimbulkan, sehingga proyek dapat diselesaikan sesuai dengan batasan biaya dan waktu yang telah ditentukan. Dalam penelitian ini peneliti menggunakan metode penelitian kuantitatif dengan cara menyebarkan kuisioner kepada responden yang merupakan karyawan di PT. Acset Indonusa Tbk. selaku kontraktor. Analisis dimulai dengan identifikasi risiko melalui studi literature, kemudian dilakukan penyebaran kuisioner. Selanjutnya analisis data dilakukan untuk mendapatkan nilai yang mewakili jawaban responden menggunakan metode Severity Index (SI). Setelah diketahui nilai yang mewakili jawaban responden, analisa data dilanjutkan dengan menggunakan matriks Probabilitas dan Dampak untuk mengetahui tingkat masing-masing risiko. Dari hasil analisis data dan penelitian menunjukkan terdapat enam risiko-risiko dominan yang berpengaruh terhadap keterlambatan proyek yaitu kemacetan di sekitar proyek, ketersediaan SDM (Sumber Daya Manusia), pengontrolan pekerjaan dilapangan, adanya pekerjaan tambah kurang, perencanaan dan penjadwalan, serta perubahan metode kerja oleh kontraktor. Kata Kunci : Risiko, Keterlambatan, Jalan Tol, Severity Index. ABTSRACT In the large-scale construction projects such as infrastructure projects which can not be avoid from the risks of various aspects that can affect the costs, quality, and time. One of the risks that affecting the time can cause delays in the project so that the project does not finish according to the time specified in the contract, as happened in the Jakarta-Cikampek II (Elevated) toll road project. Therefore, a research is needed for a risk factors in the Jakarta-Cikampek II (Elevated) Toll Road project that could potentially result in delays in project completion, and to be given responses and suggestions based on the type of risk that might happen in the form of the appropriate corrective (improvement) and preventive action to minimize the probability of the occurrence of risks and the impact caused, so that the project can be completed in accordance with the cost and time limits which have been determined. In this research, the reseacher uses quantitative research methods by distributing questionnaires to respondents who are employees at PT. Acset Indonusa Tbk. as a contractor. The analysis starts with the identification of risk through a literature study, then distributes the questionnaire. Futhermore, the data analysis was performed to obtain a value that represents the respondent's answer using the Severity Index (SI) method. After knowing the value that represents the respondent's answer, the data analysis is continued by using the Probability and Impact matrix to determine the level of each risk. From the results of data analysis and research there are six dominant risks that affect project delays namely congestion around the project, availability of HR (Human Resources), control of work in the field, the existence of added and reduced work, planning and scheduling, and changes in work methods by the contractor. Keywords: Risk, Delay, Toll Road, Severity Inde.

Item Type: Thesis (S1-Sarjana)
Call Number CD: FT/SIP 19 016
NIM: 41115210042
Uncontrolled Keywords: Risiko, Keterlambatan, Jalan Tol, Severity Index.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 17 Mar 2020 05:07
Last Modified: 17 Mar 2020 05:07
URI: http://repository.mercubuana.ac.id/id/eprint/55620

Actions (login required)

View Item View Item