MEISAROH, MYRNA (2021) PENINGKATAN KINERJA BIAYA BERBASIS BUILDING INFORMATION MODELING (BIM) BASED QUANTITY TAKE-OFF PADA PEKERJAAN STRUKTUR BANGUNAN RUMAH SAKIT. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01. Myrna Meisaroh-Cover-Rev3.pdf Download (474kB) | Preview |
|
Text (BAB I)
1_BAB 1.pdf Restricted to Registered users only Download (440kB) |
||
Text (BAB I)
2_Bab 2.pdf Restricted to Registered users only Download (276kB) |
||
Text (BAB III)
3_BAB 3.pdf Restricted to Registered users only Download (377kB) |
||
Text (BAB IV)
4_BAB 4.pdf Restricted to Registered users only Download (762kB) |
||
Text (BAB V)
5_BAB 5.pdf Restricted to Registered users only Download (114kB) |
||
Text (DAFTAR PUSTAKA)
6_DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (134kB) |
||
Text (LAMPIRAN)
55718120019-Myrna Meisaroh-Lampiran (2).pdf Restricted to Registered users only Download (3MB) |
Abstract
Indonesia's population is ranked 4th in the world after India and the Estimation is one of the causes of the cost overrun.Implementation of Building Information Modeling Quantity take-off (BIM QTO) in hospital structural work can be done if the cost breakdown is ≤ 24%. Statistical analysis by using the Relative Importance Index (RII) has a result in 10 rankings of factors that influence the implementation of BIM QTO, namely drawing, completeness Bill of Quantity (BoQ), TOR & specifications, cost reduction, preparation of activities in the work breakdown structure, cost breakdown, 3D modeling details, Data Interoperability, Quantity Take Off, Subcont & Supplier pricing, and cost database. Study cases with the implementation of BIM QTO on hospital building structures work cost efficiency up to 5.34%. Keywords: Hospital, Structure, BIM Quantity Take-Off, Cost Efficient Jumlah penduduk Indonesia menduduki peringkat ke-4 dunia setelah Cina, India dan Amerika Serikat, disaat pandemi global Covid-19 ini, Indonesia juga tercatat dengan kasus infeksi dan kematian terbanyak akibat Covid-19 di ASEAN, oleh karena itu Rumah Sakit di Indonesia menjadi kebutuhan yang penting dalam pelayanan kesehatan. Oleh karena itu, proyek pembangunan gedung rumah sakit menjadi salah satu drived demand akan terpenuhinya pelayanan kesehatan bagi masyarakat Indonesia. KEYWORDS : Rumah Sakit, Struktur, BIM Quantity Take-Off, Efisiensi Biaya.
Actions (login required)
View Item |