Up a level |
AZHAR, MOHAMMAD RIFA'I (2019) EFISIENSI WAKTU KERJA PEMBUATAN BRACKET CROSS COMP K81 A, PADA STASIUN KERJA 1 DAN 2 DENGAN METODE LINE BALANCING PT. RODA PRIMA LANCAR. S1 thesis, Universitas Mercu Buana Jakarta.
ELIZABETH, MARTINA (2017) WAKTU BAKU PROSES PRODUKSI DI PT. HOTMAL JAYA PERKASA. S1 thesis, Universitas Mercu Buana Jakarta.
GINANJAR, FAJAR (2017) PERANCANGAN PROTOTIPE KWH METER BERBASIS IOT DENGAN PEMBATAS WAKTU UNTUK PENYAMBUNGAN SEMENTARA. S1 thesis, Universitas Mercu Buana Jakarta.
HERMAN, JENI (2017) PENJADWALAN PROYEK UNTUK MENDAPATKAN EFESIENSI WAKTU DAN BIAYA DI UNIT RENOVASIA APARTMEN THE BELLEZZA SUITES DENGAN METODE CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUTION AND REVIEW TECHNIQUE (PERT). S1 thesis, Universitas Mercu Buana Jakarta.
MILE, FEBRIAN RIZKIAN HILAN (2018) PENERAPAN METODE PENJADWALAN PRODUKSI PADA STRANDING MACHINE PLANT MV/HV DI PT SUPREME CABLE MANUFACTURING AND COMMERCE. S1 thesis, Universitas Mercu Buana Jakarta.
NUGRAHA, ANDRIAN (2024) PENERAPAN ANALISIS MANAJEMEN WAKTU DENGAN METODE CPM DAN PERT (STUDI KASUS : PROYEK REVITALISASI TERMINAL PENUMPANG TIPE A PATRIA - BLITAR). S1 thesis, Universitas Mercu Buana Jakarta.
PRAKOSO, KATYUDI TRI (2017) EFEK WAKTU MILLING TERHADAP KARAKTERISASI PEMBUATAN KOMPOSIT BaFe12O19/Fe3O4. S1 thesis, Universitas Mercu Buana Jakarta.
PURMIADI, RIKAT ASA (2018) ANALISIS WAKTU PELAKSANAAN PEKERJAAN PENANGANAN DRAINASE LINGKUNGAN KAWASAN PONDOK GEDE. S1 thesis, Universitas Mercu Buana Jakarta.
SUSANDI, SUSANDI (2018) PENERAPAN PENJADWALAN PROYEK JALAN TOL BERBASIS M-PERT DAPAT MENGURANGI KETERLAMBATAN WAKTU PELAKSANAAN PROYEK. S2 thesis, Universitas Mercu Buana Jakarta.