LISTYOWATI, ERVINA (2021) ANALISIS DAYA DUKUNG DAN PENURUNAN TIANG BORED PILE MENGGUNAKAN METODE ANALITIS, dan HASIL UJI PEMBEBANAN (Studi Kasus Proyek Pembangunan LRT JABODEBEK Ruas Cawang-Cibubur Pier TMKR 47, TMKR 48, TMKR 49, TMKR50). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01. Cover.pdf Download (865kB) | Preview |
|
Text (BAB I)
02. Bab 1.pdf Restricted to Registered users only Download (273kB) |
||
Text (BAB II)
03. Bab 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
04. Bab 3.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB IV)
05. Bab 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
06. Bab 5.pdf Restricted to Registered users only Download (246kB) |
||
Text (DAFTAR PUSTAKA)
07. Daftar Pustaka.pdf Restricted to Registered users only Download (270kB) |
||
Text (LAMPIRAN)
08. Lampiran.pdf Restricted to Registered users only Download (2MB) |
Abstract
ANALISIS DAYA DUKUNG DAN PENURUNAN TIANG BORED PILE MENGGUNAKAN METODE ANALITIS, dan HASIL UJI PEMBEBANAN (Studi Kasus Proyek Pembangunan LRT JABODEBEK Ruas Cawang-Cibubur Pier TMKR 47, TMKR 48, TMKR 49, TMKR50)
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41117110102 |
Uncontrolled Keywords: | ANALISIS DAYA DUKUNG DAN PENURUNAN TIANG BORED PILE MENGGUNAKAN METODE ANALITIS, dan HASIL UJI PEMBEBANAN (Studi Kasus Proyek Pembangunan LRT JABODEBEK Ruas Cawang-Cibubur Pier TMKR 47, TMKR 48, TMKR 49, TMKR50) |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | ASHAIDAH AZLYA PUTRI |
Date Deposited: | 06 Nov 2023 02:22 |
Last Modified: | 06 Nov 2023 02:22 |
URI: | http://repository.mercubuana.ac.id/id/eprint/83859 |
Actions (login required)
View Item |