IMPLEMENTASI VALUE STREAM MAPPING UNTUK MENGURANGI WASTE PADA PERAWATAN MAIN LANDING GEAR RETRACT ACTUATOR PN 273A2101-101 DI PT. GMF AEROASIA Tbk.

FAHMI, MOH. ILHAM DZUL (2021) IMPLEMENTASI VALUE STREAM MAPPING UNTUK MENGURANGI WASTE PADA PERAWATAN MAIN LANDING GEAR RETRACT ACTUATOR PN 273A2101-101 DI PT. GMF AEROASIA Tbk. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1. Cover_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (113kB) | Preview
[img]
Preview
Text (ABSTRAK)
4. Abstrak_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (27kB) | Preview
[img]
Preview
Text (LEMBAR PERNYATAAN)
2. Lembar Pernyataan_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (29kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
3. Lembar Pengesahan_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (53kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
5-Kata Pengantar.pdf

Download (25kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
6. Daftar isi_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (216kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
8. Daftar Tabel_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (109kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
7. Daftar Gambar_Moh. Ilham Dzul Fahmi_41619120011.pdf

Download (107kB) | Preview
[img] Text (BAB I)
9. BAB I_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (47kB)
[img] Text (BAB II)
10. BAB II_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (354kB)
[img] Text (BAB III)
11. BAB III_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (88kB)
[img] Text (BAB IV)
12. BAB IV_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (482kB)
[img] Text (BAB V)
13. BAB V_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (425kB)
[img] Text (BAB VI)
14. BAB VI_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (28kB)
[img] Text (DAFTAR PUSTAKA)
15. Daftar Pustaka_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (79kB)
[img] Text (LAMPIRAN)
16. Lampiran_Moh. Ilham Dzul Fahmi_41619120011.pdf
Restricted to Registered users only

Download (32kB)

Abstract

PT. GMF AeroAsia Tbk. is a company engaged in aircraft maintenance, aircraft components, and aircraft engines. In the component services unit fuel and hydraulic shop service, one of the main projects is maintenance of landing gear components, one of which is the main landing gear retract actuator PN 273A2101-101. In practice, there are indications of waste because the project should be completed in 30 days, but in reality exceeds the target. To identify what happened to the component maintenance system, a current state mapping and process activity mapping were made to identify value added activities and non-value added activities with reference to the last three projects implemented in 2019. After identification, identification of waste that was carried out was carried out. occurs in the maintenance system. As an effort to reduce this waste, future state mapping, projected improvements, and gate system improvements were made. If the recommendation for improvement is carried out, the lead time can be reduced from an average of 37.4 days (299.5 hours) to 27.6875 days (221.5 hours). Keywords: Waste, current state mapping, process activity mapping, value added activity, non value added activity, future state mapping, lead time. PT. GMF AeroAsia Tbk. adalah perusahaan yang bergerak di bidang perawatan pesawat, komponen pesawat, dan engine pesawat. Pada dinas component services unit fuel and hydraulic shop, salah satu project utamanya adalah perawatan komponen landing gear, salah satunya adalah main landing gear retract actuator PN 273A2101-101. Pada pelaksanaannya, terjadi indikasi waste karena project yang harusnya diselesaikan dalam 30 hari, namun pada kenyataannya melebihi target tersebut. Untuk melakukan identifikasi terhadap apa yang terjadi pada sistem perawatan komponen tersebut, dibuatlah current state mapping dan process activity mapping untuk mengidentifikasi value added activity dan non value added activity dengan referensi tiga project terakhir yang dilaksanakan pada tahun 2019. Setelah teridentifikasi, dilakukan identifikasi terhadap waste yang terjadi pada sistem perawatan. Sebagai upaya untuk mengurangi waste tersebut, dibuatlah future state mapping, proyeksi perbaikan, dan perbaikan gate system. Apabila rekomendasi perbaikan tersebut dilakukan, maka lead time dapat berkurang dari rata-rata 37,4 hari (299,5 jam) menjadi 27.6875 hari (221,5 jam). Kata kunci: Waste, current state mapping, process activity mapping, value added activity, non value added activity, future state mapping, lead time.

Item Type: Thesis (S1)
NIM/NIDN Creators: 41619120011
Uncontrolled Keywords: Waste, current state mapping, process activity mapping, value added activity, non value added activity, future state mapping, lead time.
Subjects: 300 Social Science/Ilmu-ilmu Sosial > 320 Political dan Government Science/Ilmu Politik dan Ilmu Pemerintahan > 322 Relation of The State of Organized Groups/Hubungan Negara dengan Kelompok Sosial yang Terorganisir > 322.3 Business and Industry/Bisnis dan Industri
300 Social Science/Ilmu-ilmu Sosial > 330 Economics/Ilmu Ekonomi > 338 Production, Industrial Economics/Produksi, Ekonomi Industri > 338.4 Secondary Industries and Services/Industri dan Jasa Sekunder
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Dede Muksin Lubis
Date Deposited: 19 Sep 2023 07:58
Last Modified: 19 Sep 2023 07:58
URI: http://repository.mercubuana.ac.id/id/eprint/81137

Actions (login required)

View Item View Item