NUGRAHA, RIYANTO (2015) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK PIK. MALL DAN HOTEL UNTUK ACUAN PENGENDALIAN PELAKSANAAN PROYEK TAHAP BERIKUTNYA. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Hal Cover.pdf Download (868kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (242kB) | Preview |
|
Text (BAB I)
3. Bab 1.pdf Restricted to Registered users only Download (343kB) |
||
Text (BAB II)
4. Bab 2.pdf Restricted to Registered users only Download (524kB) |
||
Text (BAB III)
5. Bab 3.pdf Restricted to Registered users only Download (341kB) |
||
Text (BAB IV)
6. Bab 4.pdf Restricted to Registered users only Download (750kB) |
||
Text (BAB V)
7. Bab 5.pdf Restricted to Registered users only Download (168kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8. Hal Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (3MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 15 030 |
NIM/NIDN Creators: | 41109120004 |
Uncontrolled Keywords: | Keterlambatan, Pengendalian, Pekerjaan struktur, Proyek, Jadwal, Regresi |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 15 Feb 2015 15:10 |
Last Modified: | 13 Aug 2022 11:32 |
URI: | http://repository.mercubuana.ac.id/id/eprint/8097 |
Actions (login required)
View Item |