CAHYO, AHMAD NUR (2019) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE SECANT PILE PROYEK TOL DEPOK-ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1.COVER.pdf Download (76kB) | Preview |
|
|
Text (ABSTRAK)
2.ABSTRAK.pdf Download (310kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
3.LEMBAR PERNYATAAN CAHYO.pdf Download (142kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
4.LEMBAR PENGESAHAN.pdf Download (1MB) | Preview |
|
|
Text (KATA PENGANTAR)
5.KATA PENGANTAR.pdf Download (154kB) | Preview |
|
|
Text (DAFTAR ISI)
6.DAFTAR ISI.pdf Download (154kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
7.DAFTAR GAMBAR.pdf Download (102kB) | Preview |
|
Text (BAB I)
8.BAB I PENDAHULUAN.pdf Restricted to Registered users only Download (165kB) |
||
Text (BAB II)
9.BAB II DATA PROYEK.pdf Restricted to Registered users only Download (621kB) |
||
Text (BAB III)
10.BAB III SISTEM MANAJEMEN PROYEK.pdf Restricted to Registered users only Download (341kB) |
||
Text (BAB IV)
11.BAB IV.pdf Restricted to Registered users only Download (848kB) |
||
Text (BAB V)
12.BAB V.pdf Restricted to Registered users only Download (946kB) |
||
Text (BAB VI)
13.BAB VI.pdf Restricted to Registered users only Download (98kB) |
||
Text (BAB VII)
14.BAB VII.pdf Restricted to Registered users only Download (114kB) |
||
Text (BAB VIII)
15.BAB VIII.pdf Restricted to Registered users only Download (80kB) |
||
Text (DAFTAR PUSTAKA)
16. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (99kB) |
||
Text (LAMPIRAN)
17.LAMPIRAN.pdf Restricted to Registered users only Download (6MB) |
Abstract
Infrastructure development project toll road Depok – Antasari stage-2 connecting segments brigif - sawangan with the length of the road is 6,265 km, early work on sta. 05+775.247 to 12+040. This practical work report discusses about Work Implementation Bridge Structure With Secant Pile Method using bore pile diameter 80 cm which depth average is 18 m ~ 8 m. Secant pile method choosen because can speed up the construction period and make it easier work implementation on field with secant pile. Key word : Practical Work, Work Implementation Bridge Structure With Secant Pile Method on Project Toll Depok - Antasari Proyek pembangunan insfrastruktur Tol Depok – Antasari tahap-2 yang menghubungkan ruas brigif - sawangan dengan panjang jalan 6,265 km, awal pekerjaan pada sta. 05+775.247 s/d 12+040. Laporan Kerja Pratik ini membahas tentang Pelaksanaan Pekerjaan Struktur Jembatan Metode Secant Pile dengan bore pile diameter 80 cm yang rata-rata kedalaman 18 m ~ 8 m. Metode secant pile dipilih karena dapat mempercepat masa kontruksi serta mempermudah metode pelaksanaan di lapangan dengan secant pile. Kata kunci : Kerja Praktek, Pelaksanaan Pekerjaan Struktur Jembatan Metode Secant Pile Proyek Tol Depok - Antasari