ANALISIS PERCEPATAN WAKTU DAN BIAYA PELAKSANAAN PROYEK GUDANG DENGAN PENAMBAHAN JAM KERJA LEMBUR MENGGUNAKAN METODE TIME COST TRADE OFF (PROYEK PEMBANGUNAN GUDANG JURUMUDI BARU TANGERANG)

FADILLAH, DERI (2022) ANALISIS PERCEPATAN WAKTU DAN BIAYA PELAKSANAAN PROYEK GUDANG DENGAN PENAMBAHAN JAM KERJA LEMBUR MENGGUNAKAN METODE TIME COST TRADE OFF (PROYEK PEMBANGUNAN GUDANG JURUMUDI BARU TANGERANG). S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
41116310035 - Deri Fadillah - Cover.pdf

Download (1MB) | Preview
[img]
Preview
Text
41116310035 - Deri Fadillah - Abstrak.pdf

Download (47kB) | Preview
[img] Text
41116310035 - Deri Fadillah - BAB 1.pdf
Restricted to Registered users only

Download (82kB)
[img] Text
41116310035 - Deri Fadillah - BAB 2.pdf
Restricted to Registered users only

Download (186kB)
[img] Text
41116310035 - Deri Fadillah - BAB 3.pdf
Restricted to Registered users only

Download (200kB)
[img] Text
41116310035 - Deri Fadillah - BAB 4.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
41116310035 - Deri Fadillah - BAB 5.pdf
Restricted to Registered users only

Download (53kB)
[img] Text
41116310035 - Deri Fadillah - Daftar Pustaka.pdf
Restricted to Registered users only

Download (198kB)
[img] Text
41116310035 - Deri Fadillah - Lampiran.pdf
Restricted to Registered users only

Download (417kB)

Abstract

ABSTRAK Analisis Percepatan Waktu dan Biaya Pelaksanaan Proyek Gudang dengan Penambahan Jam Lembur Menggunakan Metode Time Cost Trade Off Proyek Pembangunan Gudang Jurumudi Baru Tangerang, Deri Fadillah, 41116310035, Alli Sunandar, S.ST, MT., 2021. Tuntutan dalam bidang pembangunan di Negara berkembang mengalami peningkatan, sehingga kegiatan pembangunan di lakukan berbagai pihak dengan tujuan untuk meningkatkan kualitas taraf kehidupan masyarakat. Waktu pelaksanaan pembangunan merupakan hal yang harus dipertimbangkan agar pembangunan dapat berjalan dan selesai sesuai dengan kesepakatan antara pihak Owner dan Kontraktor. Dalam proses pelaksanaan pembangunan terdapat hal yang dapat mempengaruhi waktu dan biaya pelaksanaan agar pembangunan dapat diselesaikan sebelum waktu yang sudah ditentukan. Oleh karena itu percepatan waktu pelaksanaan proyek sangat diperlukan agar tujuan tersebut dapat dicapai dengan baik. Dalam peneliitian ini penulis melakukan analisis percepatan waktu dan biaya optimal dengan penambahan jam lembur menggunakan metode Time Cost Trade Off pada proyek Pembangunan Gudang Jurumudi Baru. Total biaya dan waktu yang dibutukan pada perencanaan awal yaitu sebesar Rp. 17.247.071.429,00 dengan waktu 317 hari. Dari hasil penelitian ini, proyek dapat dipercepat 36 hari dari waktu perencanaan dengan total biaya Rp. 18.266.807.205,63 dengan waktu 281 hari dengan selisih biaya mencapai RP. 1.019.735.776,63 sehingga biaya pembangunan naik sebesar 0.06%. Kata Kunci : Time Cost Trade Off, Jurumudi Baru, Percepatan, Biaya, Waktu, Efektifitas.ABSTRACT Analysis of the Acceleration of Time and Cost of Warehouse Projects with Additional Hours of Overtime Using the Time Cost Trade Off Method for the Jurumudi Baru Tangerang Warehouse Development Project, Deri Fadillah, 41116310035, Ali Sunandar, S.ST, MT., 2021. Demands in the field of development in developing countries have increased, so that development activities are carried out by various parties with the aim of improving the quality of people's lives. The timing of the construction implementation is something that must be considered so that the construction can run and be completed in accordance with the agreement between the Owner and the Contractor. In the process of implementing development, there are things that can affect the time and cost of implementation so that development can be completed before the specified time. Therefore, the acceleration of project implementation time is needed so that these goals can be achieved properly. In this research, the author analyzes the acceleration of time and optimal costs by adding overtime hours using the Time Cost Trade Off method on the New Driver Warehouse Construction project. The total cost and time required for the initial planning is Rp. 17,247,071,429.00 with 317 days. From the results of this study, the project can be accelerated 36 days from the planning time with a total cost of Rp. 18,266,807,205.63 with a time of 281 days with the difference in costs reaching RP. 1,019,735,776.63 so that the construction cost increased by 0.06%. Keywords: Time Cost Trade Off, Jurumudi Baru, Acceleration, Cost, Time, Effectiveness

Item Type: Thesis (S1)
Call Number CD: FT/SIP 22 059
NIM/NIDN Creators: 41116310035
Uncontrolled Keywords: Kata Kunci : Time Cost Trade Off, Jurumudi Baru, Percepatan, Biaya, Waktu, Efektifitas.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: siti maisyaroh
Date Deposited: 29 Dec 2022 04:20
Last Modified: 29 Dec 2022 04:20
URI: http://repository.mercubuana.ac.id/id/eprint/72934

Actions (login required)

View Item View Item