ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN TENAGA KERJA DAN JAM KERJA (LEMBUR) MENGGUNAKAN METODE TIME COST TRADE OFF (Studi kasus: Pembangunan Proyek Apartment The Conexio)

WAHYUDI, M. ANDI (2020) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN TENAGA KERJA DAN JAM KERJA (LEMBUR) MENGGUNAKAN METODE TIME COST TRADE OFF (Studi kasus: Pembangunan Proyek Apartment The Conexio). S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
00. COVER.pdf

Download (30kB) | Preview
[img]
Preview
Text
01. HAL JUDUL.pdf

Download (28kB) | Preview
[img]
Preview
Text
02. LEMBAR PENGESAHAN TTD.pdf

Download (148kB) | Preview
[img]
Preview
Text
03. SURAT PERNYATAAN TTD.pdf

Download (35kB) | Preview
[img]
Preview
Text
04. ABSTRAK.pdf

Download (66kB) | Preview
[img]
Preview
Text
05. KATA PENGANTAR.pdf

Download (74kB) | Preview
[img]
Preview
Text
06. DAFTAR ISI TA.pdf

Download (86kB) | Preview
[img]
Preview
Text
07. DAFTAR TABEL.pdf

Download (28kB) | Preview
[img]
Preview
Text
08. DAFTAR GAMBAR.pdf

Download (47kB) | Preview
[img]
Preview
Text
09. DAFTAR LAMPIRAN.pdf

Download (22kB) | Preview
[img] Text
10. BAB 1.pdf
Restricted to Registered users only

Download (103kB)
[img] Text
11. BAB 2.pdf
Restricted to Registered users only

Download (326kB)
[img] Text
12. BAB 3.pdf
Restricted to Registered users only

Download (189kB)
[img] Text
13. BAB 4.pdf
Restricted to Registered users only

Download (363kB)
[img] Text
14. BAB 5.pdf
Restricted to Registered users only

Download (48kB)
[img] Text
15. DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (52kB)
[img] Text
16. LAMPIRAN-LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Judul: “Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Tenaga Kerja Dan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off”, (Studi kasus: Pembangunan Proyek Apartment The Conexio), Nama: M. Andi Wahyudi, Nim: 41118320074, Dosen Pembimbing: Ir. Hamonangan Girsang, ST.MT.IPM., 2020. Pengelolaan proyek secara sistematis diperlukan untuk memastikan waktu pelaksanaan proyek sesuai dengan kontrak atau bahkan lebih cepat, sehingga biaya yang dikeluarkan bisa memberikan keuntungan dan juga menghindarkan dari adanya denda akibat keterlambatan penyelesaian proyek. Penelitian ini membahas percepatan waktu dan biaya proyek pada pelaksanaan proyek pembangunan gedung bertingkat (High Rise Building) dengan metode Time Cost Trade Off. Penulis akan melakukan analisis skenario percepatan penyelesaian proyek dengan membandingkan penambahan jam kerja sebanyak 4 jam (skenario 1) dan penambahan tenaga kerja (skenario 2). Hasil dari analisis didapatkan estimasi waktu untuk percepatan pelaksanaan proyek adalah dari normal duration 600 hari kalender, setelah dilakukan crash duration terdapat percepatan waktu menjadi 582 hari kalender. Dengan efisiensi waktu sebesar 18 hari / 3,00 %. Adapun biaya total akibat percepatan waktu (termasuk biaya tidak langsung) untuk penambahan jam kerja lembur selama 4 jam (skenario 1) didapatkan normal cost sebesar Rp.66.637.746.719,- (excl. PPN), kemudian setelah crash cost terdapat kenaikan biaya menjadi Rp.70.224.661.008,- (excl. PPN) dengan over cost sebesar Rp.3.586.914.289,- / 5,38%. Sedangkan dengan penambahan tenaga kerja (skenario 2) didapatkan normal cost sebesar Rp.66.637.746.719,- (excl. PPN), kemudian setelah crash cost terdapat kenaikan biaya menjadi Rp.71.454.128.134,- (excl. PPN) dengan over cost sebesar Rp.4.816.381.415,- / 7,23%. Kata kunci: perceparan proyek, time cost trade off, crash duration, crash cost. http://digilib.mercubuana.ac.id/ Abstrak v ABSTRACT Title: "Analysis of the Acceleration of Time and Cost of Construction Projects by Adding Labor and Working Hours (Overtime) Using the Time Cost Trade Off Method" (Case study: Construction of The Conexio Apartment Project), By: M. Andi Wahyudi, Student Identity Number: 41118320074, Supervisor: Ir. Hamonangan Girsang, ST.MT.IPM., 2020. Systematic project management is needed to ensure the project implementation time is in accordance with the contract or even faster, so the costs incurred can provide benefits and also avoid the existence of fines due to delays in project completion. This study discusses the acceleration of time and costs project in the implementation of high rise building construction projects using the Time Cost Trade Off method. The author will analyze the scenario of accelerating the completion of the project by comparing the addition of working hours by 4 hours (scenario 1) and additional labor (scenario 2). The results of the analysis found the estimated time to accelerate the implementation of the project is from the normal duration of 600 calendar days, after a crash duration there is an acceleration of time to 582 calendar days. With a time efficiency of 18 days / 3.00%. The total cost due to acceleration of time (including indirect costs) for the addition of overtime hours for 4 hours (scenario 1) obtained a normal cost of Rp.66,637,746,719,- (excl. PPN), then after the crash cost there is an increase in the cost to Rp.70,224,661,008,- (excl. PPN) with an over cost of Rp.3,586,914,289,- / 5.38%. Whereas with the addition of labor (scenario 2) a normal cost of Rp.66,637,746,719 (excl. PPN), then after the crash cost there is an increase in the cost to Rp.71,454,128,134 (excl. PPN) with an over cost of Rp.4,816,381,415.- / 7.23%. Keywords: project acceleration, time cost trade off, crash duration, crash cos

Item Type: Thesis (S1)
Call Number CD: FT/SIP 20 034
NIM/NIDN Creators: 41118320074
Uncontrolled Keywords: Keywords: project acceleration, time cost trade off, crash duration, crash cost
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: siti maisyaroh
Date Deposited: 10 Aug 2022 03:54
Last Modified: 10 Aug 2022 03:54
URI: http://repository.mercubuana.ac.id/id/eprint/67187

Actions (login required)

View Item View Item