PURI PUSPITA, RAHAYU (2020) TINJAUAN STUDI POTENSI SUMBER DAYA AIR UNTUK PEMBANGKIT LISTRIK TENAGA MINIHIDRO DI SUNGAI CIKANDANG, GARUT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. Cover.pdf Download (33kB) | Preview |
|
|
Text (ABSTRAK)
2. ABSTRAK.pdf Download (27kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
4. Lembar Pernyataan.pdf Download (215kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
3. Lembar Pengesahan.pdf Download (227kB) | Preview |
|
|
Text (KATA PENGANTAR)
5. KATA PENGANTAR.pdf Download (67kB) | Preview |
|
|
Text (DAFTAR ISI)
6. DAFTAR ISI.pdf Download (54kB) | Preview |
|
|
Text (DAFTAR TABEL)
7. DAFTAR TABEL.pdf Download (28kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
8. DAFTAR GAMBAR.pdf Download (81kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
9. DAFTAR LAMPIRAN.pdf Download (62kB) | Preview |
|
Text (BAB I)
10. Bab 1.pdf Restricted to Registered users only Download (123kB) |
||
Text (BAB II)
11. Bab 2.pdf Restricted to Registered users only Download (658kB) |
||
Text (BAB III)
12. Bab 3.pdf Restricted to Registered users only Download (253kB) |
||
Text (BAB IV)
13. Bab 4.pdf Restricted to Registered users only Download (3MB) |
||
Text (BAB V)
14. Bab 5.pdf Restricted to Registered users only Download (37kB) |
||
Text (DAFTAR PUSTAKA)
15. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (80kB) |
||
Text (LAMPIRAN)
16. Lampiran.pdf Restricted to Registered users only Download (7MB) |
Abstract
The development of the construction of a Small Hydro Power Plant or PLTM is expected to grow even more, its use being a solution for the lack of accessibility of rural communities to electricity needs. The large potential of water resources that can be converted into electrical energy, one of which is in the Cikandang River, Garut. In this final project, a hydrological analysis will be conducted in the Cikandang River, Garut using existing data from the Cikandang PLTM without changing the design of the Cikandang PLTM building. The research method was carried out by collecting rainfall data for 10 years from 2004-2013 obtained from 3 rainfall stations located around the watershed, namely Pakenjeng Station, Cibeureum Station and Kertamanah Station. Climatology data from Papandayan Station for the calculation of evapotranspiration using the Modified Penmann Method. Calibration of direct measurement debit data with the results of the Rainfall Run-off method of discharge calculation with the NRECA model. Based on the results of reliable discharge modeling using the NRECA model, the power that can be generated from the Cikandang River is Q45% = 12.98 m³ / s = 5608.55 Kw = 5.61 MW, Q50% = 11.79 m³ / s = 5095.93 Kw = 5.10 MW, Q60% = 9.42 m³ / s = 4072.34 Kw = 4.07 MW with these results the Cikandang River, in Jatiwangi Village, Garut Regency has the potential to be used as a Small Hydro Power Plant. Keywords : PLTM, Debit, NRECA Method, Power, Energy. Pengembangan pembangunan Pembangkit Listrik Tenaga Minihidro atau PLTM diharapkan dapat tumbuh lebih besar lagi pemanfaatannya menjadi solusi atas kurangnya aksesibilitas masyarakat pedesaan terhadap kebutuhan listrik. Banyaknya potensi sumber daya air yang dapat diubah menjadi energi listrik, salah satunya di Sungai Cikandang, Garut. Pada penelitian Tugas Akhir ini akan dilakukan analisa hidrologi di Sungai Cikandang, Garut dengan menggunakan data existing PLTM Cikandang tanpa mengubah desain bangunan PLTM Cikandang. Metode penelitian yang dilakukan yaitu dengan mengumpulkan data curah hujan selama 10 tahun dari tahun 2004-2013 yang didapat dari 3 stasiun curah hujan yang berada di sekitar DAS, yaitu Stasiun Pakenjeng, Stasiun Cibeureum dan Stasiun Kertamanah. Data klimatologi dari Stasiun Papandayan untuk perhitungan evapotranspirasi dengan Metode Penmann Modifikasi. Kalibrasi data debit pengukuran langsung dengan hasil perhitungan debit metode Rainfall Run-off dengan model NRECA. Berdasarkan hasil pemodelan debit andal menggunakan model NRECA didapatkan daya yang dapat dibangkitkan dari Sungai Cikandang adalah Q45% = 12,98 m³/s = 5608,55 Kw = 5,61 MW, Q50% = 11,79 m³/s = 5095,93 Kw = 5.10 MW, Q60% = 9,42 m³/s = 4072,34 Kw = 4,07 MW dengan hasil tersebut maka Sungai Cikandang, di Desa Jatiwangi, Kabupaten Garut memiliki potensi untuk dijadikan sebagai Pembangkit Listrik Tenaga Minihidro. Kata Kunci : PLTM, Debit, Metode NRECA, Daya, Energi
Actions (login required)
View Item |