RIFKI, AUNUR (2014) ANALISIS KONTRIBUSI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PADA PROYEK APARTEMEN GREEN LAKE VIEW CIPUTAT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text
SKRIPSI FULL.pdf Restricted to Registered users only Download (7MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FT/SIP. 14 061 |
| NIM/NIDN Creators: | 41110110019 |
| Uncontrolled Keywords: | Faktor, Keterlambatan, Penyebab |
| Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.1 Structural Engineering and Underground Construction/Teknik Struktural dan Konstruksi Bawah Tanah |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 21 Jul 2014 11:23 |
| Last Modified: | 04 Jul 2026 02:29 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/12322 |
Actions (login required)
![]() |
View Item |
