NURMANSYAH, RENO (2014) ANALISA KINERJA BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN STUDENT BOARDING HOUSE 2 PRESIDENT UNIVERSITY, JABABEKA - CIKARANG. S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (26kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (445kB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (62kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (208kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (158kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (871kB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (59kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (7MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 14 014 |
NIM/NIDN Creators: | 41109120048 |
Uncontrolled Keywords: | Jadwal, Biaya, Waktu, Nilai Hasil, Earned Value |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 23 May 2014 16:14 |
Last Modified: | 12 May 2017 02:02 |
URI: | http://repository.mercubuana.ac.id/id/eprint/11939 |
Actions (login required)
View Item |