MULYASA, MULYASA (2026) ANALISIS PENGGUNAAN KONSEP PRECEDENCE DIAGRAM METHODE (PDM) DENGAN BANTUAN MICROSOFT PROJECT SEBAGAI FASILITAS PENCATAT KINERJA WAKTU PELAKSANAAN PADA PROYEK RUMAH SUSUN. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
COVER.pdf Download (2MB) | Preview |
|
|
Text (BAB I)
BAB 1.pdf Restricted to Registered users only Download (2MB) |
||
|
Text (BAB II)
BAB 2.pdf Restricted to Registered users only Download (5MB) |
||
|
Text (BAB III)
BAB 3.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB IV)
BAB 4.pdf Restricted to Registered users only Download (5MB) |
||
|
Text (BAB V)
BAB 5.pdf Restricted to Registered users only Download (505kB) |
||
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (282kB) |
||
|
Text (LAMPIRAN)
LAMPIRAN.pdf Restricted to Registered users only Download (4MB) |
Abstract
ANALISIS PENGGUNAAN KONSEP PRECEDENCE DIAGRAM METHODE (PDM) DENGAN BANTUAN MICROSOFT PROJECT SEBAGAI FASILITAS PENCATAT KINERJA WAKTU PELAKSANAAN PADA PROYEK RUMAH SUSUN
| Item Type: | Thesis (S1) |
|---|---|
| NIM/NIDN Creators: | 41122110020 |
| Uncontrolled Keywords: | PRECEDENCE DIAGRAM METHODE, MICROSOFT PROJECT, PENJADWALAN PROYEK, LINTASAN KRITIS, KURVA-S |
| Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.9 Construction Management/Manajemen Konstruksi |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | khalimah |
| Date Deposited: | 10 Nov 2026 04:29 |
| Last Modified: | 10 Nov 2026 04:29 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/104791 |
Actions (login required)
![]() |
View Item |
