ANALISIS FAKTOR-FAKTOR DOMINAN YANG MEMPENGARUHI KINERJA BIAYA TERHADAP METODE KERJA SISTEM SHORING DENGAN SISTEM BRACKET TRUSS PADA KONSTRUKSI PIER-HEAD JALAN TOL LAYANG

HUTABARAT, BOBBY (2017) ANALISIS FAKTOR-FAKTOR DOMINAN YANG MEMPENGARUHI KINERJA BIAYA TERHADAP METODE KERJA SISTEM SHORING DENGAN SISTEM BRACKET TRUSS PADA KONSTRUKSI PIER-HEAD JALAN TOL LAYANG. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

[img]
Preview
Text (COVER)
HAL COVER.pdf

Download (389kB) | Preview
[img] Text (ABSTRAK)
ABSTRAK.pdf
Restricted to Registered users only

Download (84kB)
[img] Text (BAB 1)
BAB I.pdf
Restricted to Registered users only

Download (118kB)
[img] Text (BAB 2)
BAB II.pdf
Restricted to Registered users only

Download (321kB)
[img] Text (BAB 3)
BAB III.pdf
Restricted to Registered users only

Download (222kB)
[img] Text (BAB 4)
BAB IV.pdf
Restricted to Registered users only

Download (350kB)
[img] Text (BAB 5)
BAB V.pdf
Restricted to Registered users only

Download (140kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
HAL DAFTAR PUSTAKA DAN LAMPIRAN.pdf
Restricted to Registered users only

Download (317kB)
Item Type: Thesis (S1)
NIM/NIDN Creators: 4111532057
Uncontrolled Keywords: Konstruksi Pier-Head, Sistem Shoring, Sistem Bracket Truss, Biaya
Subjects: 300 Social Science/Ilmu-ilmu Sosial > 380 Commerce, Communications, Transportation (Perdagangan, Komunikasi, Transportasi) > 388 Ground Transportation/Transportasi Jalan Raya > 388.1 Roads/Jalan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 625 Engineering Of Railroads, Roads/Rekayasa Rel Kereta Api, Jalan > 625.7 Road Engineering/Teknik Jalan Raya
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 27 Oct 2025 02:32
Last Modified: 27 Oct 2025 02:32
URI: http://repository.mercubuana.ac.id/id/eprint/99825

Actions (login required)

View Item View Item