MUSDALIFAH, SEKAR ARUM (2025) PENGUKURAN WAKTU BAKU DAN ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH OPERATOR PROSES FILLING LIP TINT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 COVER.pdf Download (896kB) | Preview |
|
![]() |
Text (BAB I)
02 BAB 1.pdf Restricted to Registered users only Download (318kB) |
|
![]() |
Text (BAB II)
03 BAB 2.pdf Restricted to Registered users only Download (377kB) |
|
![]() |
Text (BAB III)
04 BAB 3.pdf Restricted to Registered users only Download (207kB) |
|
![]() |
Text (BAB IV)
05 BAB 4.pdf Restricted to Registered users only Download (616kB) |
|
![]() |
Text (BAB V)
06 BAB 5.pdf Restricted to Registered users only Download (200kB) |
|
![]() |
Text (DAFTAR PUSTAKA)
07 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (205kB) |
|
![]() |
Text (LAMPIRAN)
08 LAMPIRAN.pdf Restricted to Registered users only Download (3MB) |
Abstract
In the filling process of lip tint at a cosmetic manufacturing company during the period of January–July 2024, 17 output data were collected, showing that 58.82% did not meet the daily production target. This study aims to measure the standard time and workload of operators to provide recommendations for the optimal number of operators required to achieve the daily production target. The research was conducted using the work sampling method. An experiment was carried out by reducing the number of operators from five to four to assess the impact on standard time and workload. Observations were performed over 4 working hours with a 5- minute interval across 6 consecutive batches. The results showed that the standard time for four operators ranged between 0.545 and 0.558 minutes, with an average workload of 99.99%. Based on the calculated standard time and workload, it is recommended that the filling process be handled by four operators, allowing one operator to be allocated to another work area. Keyword: Standart Time, Workload Analysis, Work Sampling Pada proses filling lip tint disalah satu perusahaan maklon kosmetik periode Januari-Juli 2024, diperoleh 17 data output dan sebanyak 58,82% tidak memenuhi target harian. Penelitian yang dilakukan bertujuan untuk mengukur waktu baku dan beban kerja operator sehingga diperoleh rekomendasi jumlah operator agar dapat memenuhi target harian produksi. Penelitian ini dilakukan dengan metode work sampling. Pada penelitian ini, dilakukan percobaan mengurangi jumlah operator dari 5 orang menjadi 4 orang untuk mengukur dampak terhadap waktu baku dan beban kerja. Pengamatan dilakukan pada 4 jam kerja dengan selang waktu 5 menit sebanyak 6 batch berurutan. Berdasarkan hasil penelitian diperoleh waktu baku untuk 4 orang operator berkisar antara 0.545 – 0.558 menit, dengan rata-rata beban kerja 99.99%. Berdasarkan perhitungan waktu baku dan beban kerja, diperoleh rekomendasi jumlah operator yaitu 4 orang, sehingga 1 operator dapat ditempatkan pada area kerja lain. Kata Kunci: Waktu Baku, Analisis Beban Kerja, Work Sampling.