ANALISIS KINERJA LAYANAN BUS RAPID TRANSIT (BRT) KORIDOR 7 (KP. RAMBUTAN – KP. MELAYU)

SILVANO, VERIAN GUSTAM (2017) ANALISIS KINERJA LAYANAN BUS RAPID TRANSIT (BRT) KORIDOR 7 (KP. RAMBUTAN – KP. MELAYU). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.

[img]
Preview
Text (COVER)
COVER.pdf

Download (836kB) | Preview
[img] Text (BAB 1)
BAB I.pdf
Restricted to Registered users only

Download (251kB)
[img] Text (BAB 2)
BAB II.pdf
Restricted to Registered users only

Download (478kB)
[img] Text (BAB 3)
BAB III.pdf
Restricted to Registered users only

Download (216kB)
[img] Text (BAB 4)
BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB 5)
BAB V.pdf
Restricted to Registered users only

Download (155kB)
[img] Text (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB)
Item Type: Thesis (S1)
NIM/NIDN Creators: 41115320017
Uncontrolled Keywords: BRT, Transjakarta, jalur, okupansi, headway, kecepatan, waktu tempuh, armada bus.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi
700 Arts/Seni, Seni Rupa, Kesenian > 710 Civic and Lanscape Art/Seni Perkotaan dan Pertamanan > 711 Area Planning/Perencanaan Wilayah Perkotaan dan Pertamanan > 711.7 Plans for Transportation Facilities/Perencanaan untuk Fasilitas Transportasi
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 14 Jun 2025 03:29
Last Modified: 14 Jun 2025 03:29
URI: http://repository.mercubuana.ac.id/id/eprint/95792

Actions (login required)

View Item View Item