ANALISIS METODE PERBANDINGAN METODE CPM DAN PERT PADA PENJADWALAN PROYEK PEMBANGUNAN SUPERBLOK PAKUWON MIXED USE BEKASI

SANTOSO, FINNA AURELIA SANTOS (2025) ANALISIS METODE PERBANDINGAN METODE CPM DAN PERT PADA PENJADWALAN PROYEK PEMBANGUNAN SUPERBLOK PAKUWON MIXED USE BEKASI. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
01 Cover.pdf

Download (2MB) | Preview
[img] Text (BAB I)
02 Bab 1.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB II)
03 Bab 2.pdf
Restricted to Registered users only

Download (5MB)
[img] Text (BAB III)
04 Bab 3.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB IV)
05 Bab 4.pdf
Restricted to Registered users only

Download (7MB)
[img] Text (BAB V)
06 Bab 05.pdf
Restricted to Registered users only

Download (658kB)
[img] Text (DAFTAR PUSTAKA)
07 Daftar Pustaka.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (LAMPIRAN)
08 Lampiran.pdf
Restricted to Registered users only

Download (776kB)

Abstract

ANALISIS METODE PERBANDINGAN METODE CPM DAN PERT PADA PENJADWALAN PROYEK PEMBANGUNAN SUPERBLOK PAKUWON MIXED USE BEKASI

Item Type: Thesis (S1)
Call Number CD: FT/SIP. 25 055
NIM/NIDN Creators: 41121010064
Uncontrolled Keywords: Penjadwalan, CPM, PERT, Jalur Kritis, Percepatan Waktu, Proyek Kontruksi
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.9 Construction Management/Manajemen Konstruksi
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.1 Plans and Drawings Construction/Rancangan dan Menggambar Konstruksi Bangunan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.3 Construction Specifications/Spesifikasi Konstruksi Bangunan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: khalimah
Date Deposited: 22 Mar 2025 02:01
Last Modified: 22 Mar 2025 02:01
URI: http://repository.mercubuana.ac.id/id/eprint/95021

Actions (login required)

View Item View Item