ANALISIS PRODUKTIVITAS PEKERJAAN STRUKTUR LANTAI KONVENSIONAL DAN HOLLOW CORE FLOOR PANEL (HCFP) PADA PROYEK GEDUNG PAINTING PT ASTRA HONDA MOTOR PLANT KARAWANG

CHRISANTI, RACHEL (2017) ANALISIS PRODUKTIVITAS PEKERJAAN STRUKTUR LANTAI KONVENSIONAL DAN HOLLOW CORE FLOOR PANEL (HCFP) PADA PROYEK GEDUNG PAINTING PT ASTRA HONDA MOTOR PLANT KARAWANG. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
0. COVER.pdf

Download (330kB) | Preview
[img]
Preview
Text (ABSTRAK)
0.1. ABSTRAK .pdf

Download (97kB) | Preview
[img] Text (BAB I)
1. BAB I.pdf
Restricted to Registered users only

Download (30kB)
[img] Text (BAB II)
2. BAB II.pdf
Restricted to Registered users only

Download (374kB)
[img] Text (BAB III)
3. BAB III.pdf
Restricted to Registered users only

Download (258kB)
[img] Text (BAB IV)
4. BAB IV.pdf
Restricted to Registered users only

Download (687kB)
[img] Text (BAB V)
5. BAB V.pdf
Restricted to Registered users only

Download (96kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
0.2 Hal Daftar Pustaka & Lampiran.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Waktu pelaksanaan konstruksi yang sangat mendesak merupakan salah satu kendala yang sering dihadapi oleh para profesional di bidang konstruksi. Akibatnya, banyak perusahaan yang melakukan usaha untuk mempercepat siklus waktu proyek agar proses distribusi dapat diperpendek. Oleh karena itu, pemilihan metode konstruksi yang tepat digunakan dengan tujuan memenuhi kebutuhan pencapaian waktu yang efektif dan efisien. Metodologi penelitian ini dilakukan dengan mengidentifikasi metode pekerjaan melalui pengamatan pada pekerjaan pelaksanaan pemasangan kemudian menentukan aktivitas pekerjaan/work task, durasi, dan kebutuhan sumber daya pada pekerjaan masing-masing. Setelah mendapatkan data yang dibutuhkan disimulasikan dengan sistem operasi WebCyclone melalui hasil coding yang telah dibuat. Pada kajian ini digunakan simulasi dengan perangkat WebCyclone untuk mengetahui nilai produktivitas, durasi dan biaya operasi pembangunannya. Dari kedua metode tersebut, didapat hasil analisis produktivitas pemasangan dengan metode konvensional sebesar 0,276 unit/jam atau 2,208 unit/hari dengan total waktu yang dibutuhkan untuk 100 unit adalah 46 hari dengan biaya Rp. 1.957.361.309,- sedangkan pemasangan dengan metode Hollow Core Floor Panel (HCFP) adalah 0,354 unit/jam atau 2.832 unit/hari dengan total waktu yang dibutuhkan untuk 100 unit adalah 36 hari dengan biaya Rp. 2.103.968.736,-. Dari kedua alternatif yang dibandingkan maka metode yang paling efisien terhadap waktu adalah metode Hollow Core Floor Panel (HCFP). Dari sisi biaya metode Hollow Core Floor Panel (HCFP) lebih mahal dibandingkan metode konvensional, tetapi jika dibandingkan secara keseluruhan durasi penyelesaian proyek, waktu yang ditempuh metode konvensional membutuhkan biaya yang cenderung lebih mahal.The time pressing of construction is one of the obstacles often faced by professionals in the construction field. As a result, many companies are making efforts to speed up the cycle time of the project so that the distribution process can be shortened. Therefore, the selection of appropriate construction methods used with the aim of meeting the needs of the achievement of an effective and efficient time. The research methodology is done by identifying the methods of work through observation of the implementation work installation then determine the work task, duration, and resource requirements at their respective jobs. After getting the required data simulated with the operating system WebCyclone through coding results that have been made. In this study used a simulation by the WebCyclone to know the value of productivity, duration and cost of construction operations. From both methods, the result of analysis by the conventional method of installation productivity of 0,276 units/hour or 2,208 units/day with total time required for 100 units is 46 days at a cost IDR 1.957.361.309,- while the Hollow Core Floor Panel (HCFP) method is 0,354 units / hour or 2,832 units / day with the total time required for 100 units is 36 days at a cost of IDR 2.103.968.736,-. Of the two alternatives compared to the most efficient methods of the time is a method of Hollow Core Floor Panel (HCFP). In terms of cost, Hollow Core Floor Panel (HCFP) method is more expensive than the conventional method, but when compared to the overall duration of the completion of the project, the time taken by conventional methods costs that tend to be more expensive

Item Type: Thesis (S1)
Call Number CD: FT/SIP. 17 178
NIM/NIDN Creators: 41115120101
Uncontrolled Keywords: Produktivitas, Precast, HCFP, Waktu, Biaya, WebCyclone
Subjects: 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 060 General Organizations, Foundations, and Museology/Organisasi-organisasi Umum, dan Museologi > 069 Museology (Museum science)/Museologi > 069.2 Museum Management and Use of Physical Plant/Manajemen Museum > 069.22 Planning for Buildings/Merencanakan Bangunan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: NAJLA
Date Deposited: 01 Apr 2024 06:52
Last Modified: 01 Apr 2024 06:52
URI: http://repository.mercubuana.ac.id/id/eprint/87802

Actions (login required)

View Item View Item