PENGENDALIAN PERSEDIAAN BAHAN BAKU BIJI PLASTIK DALAM MENGEFISIENKAN BIAYA PERSEDIAAN BERDASARKAN ECONOMIC ORDER QUANTITY

ROKHAYATI, ANIK (2017) PENGENDALIAN PERSEDIAAN BAHAN BAKU BIJI PLASTIK DALAM MENGEFISIENKAN BIAYA PERSEDIAAN BERDASARKAN ECONOMIC ORDER QUANTITY. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
01.HAL COVER.pdf

Download (285kB) | Preview
[img]
Preview
Text (ABSTRAK)
02.ABSTRAK.pdf

Download (136kB) | Preview
[img] Text (BAB I)
03.BAB I.pdf
Restricted to Registered users only

Download (105kB)
[img] Text (BAB II)
04.BAB II.pdf
Restricted to Registered users only

Download (254kB)
[img] Text (BAB II)
05.BAB III.pdf
Restricted to Registered users only

Download (79kB)
[img] Text (BAB IV)
06.BAB IV.pdf
Restricted to Registered users only

Download (291kB)
[img] Text (BAB V)
07.BAB V.pdf
Restricted to Registered users only

Download (292kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
08.DAFTAR PUSTAKA DAN LAMPIRAN.pdf
Restricted to Registered users only

Download (184kB)

Abstract

Penelitian ini memiliki tujuan untuk meneliti penggunaan metode Economic Order Quantity (EOQ) dalam pengendalian bahan baku perusahaan PT Trisinar Indopratama. Objek penelitian ini adalah jumlah pembelian, jumlah persediaan, jumlah pemakaian bahan baku, serta biaya pemesanan dan biaya penyimpanan bahan baku. Hasil penelitian menunjukkan bahwa rata-rata pemesanan bahan baku biji plastik aktual perusahaan 34.917 kg dengan frekuensi pembelian 12 kali, jarak waktu antar pesanan 14 hari, stok pengaman dan ROP belum ditentukan oleh perusahaan dan TIC Rp 79.929.843. Pasokan biji plastik yang optimal dengan metode EOQ adalah 13.645 kg, dengan frekuensi pembelian 18 kali, stok pengaman adaalah 15.786 kg dan ROP harus dilakukan pada saat gudang bahan baku 12.110 kg, jarak waktu antar pesanan 16 hari, sedangkan TIC Rp 34.291.461,00. Kesimpulan dari penelitian ini adalah metode perhitungan EOQ dalam menghitung bahan baku biji plastik lebih efisien dibandingkan dengan kebijakan perusahaan. Hal ini dapat dibuktikan dari hasil perbandingan TIC yang lebih efisien dengan menggunakan metode EOQ untuk menghemat biaya dan mampu meningkatkan keuntungan. Saran bagi manajemen perusahaan adalah dengan menggunakan metode EOQ dalam proses pengendalian bahan baku perusahaan.The purpose of this research was to apply Economic Order Quantity (EOQ) method in controlling raw material of PT Trisinar Indopratama company. The object of this study is amount of the purchases, amount of the inventory, and amount of the raw material usage. The results showed that the average ordering plastic resin raw material 34.917 and raw materials with 12 times purchase frequency, 12 days interval between orders, safety stock and ROP not yet determined by the company and TIC Rp79.929,843,00. The optimal supply of EOQ seeds is 13.645 kg, with frequency of purchase 18 times, safety stock is 15.786 kg and ROP must be done when raw material price is 12.110 kg, time spacing between orders is 16 days, while TIC is Rp34.291.461,00. The conclusion of this research is EOQ calculation method in calculating plastic resin raw material more efficient than company policy. This can be evidenced from the more efficient TIC comparison using the EOQ method to save costs and increase profits. Suggestion for company management is by using EOQ method in process of raw material control of company.

Item Type: Thesis (S1)
Call Number CD: FE/MJ. 17 550
NIM/NIDN Creators: 43113110203
Uncontrolled Keywords: Kuantitas Pesanan Optimal (EOQ), Stok Pengaman (SS), Frekuensi Pemesanan (MI), Pemesanan Kembali (ROP), Total Biaya Persediaan (TIC)
Subjects: 300 Social Science/Ilmu-ilmu Sosial > 330 Economics/Ilmu Ekonomi
600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.7 Management of Supplies/Manajemen Persediaan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: NAJLA
Date Deposited: 08 Mar 2024 04:32
Last Modified: 08 Mar 2024 04:32
URI: http://repository.mercubuana.ac.id/id/eprint/86954

Actions (login required)

View Item View Item