NOVIANA, RENI (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BASEMENT PROYEK APARTEMEN CENTRO CITY TOWER WESTPOINT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 Cover.pdf Download (3MB) | Preview |
|
Text (BAB I)
02 Bab 1.pdf Restricted to Registered users only Download (687kB) |
||
Text (BAB II)
03 Bab 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
04 Bab 3.pdf Restricted to Registered users only Download (858kB) |
||
Text (BAB IV)
05 Bab 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
06 Bab 5.pdf Restricted to Registered users only Download (673kB) |
||
Text (DAFTAR PUSTAKA)
07 Daftar Pustaka.pdf Restricted to Registered users only Download (538kB) |
||
Text (LAMPIRAN)
08 Lampiran.pdf Restricted to Registered users only Download (2MB) |
Abstract
ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BASEMENT PROYEK APARTEMEN CENTRO CITY TOWER WESTPOINT
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41117110110 |
Uncontrolled Keywords: | ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BASEMENT PROYEK APARTEMEN CENTRO CITY TOWER WESTPOINT |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | ASHAIDAH AZLYA PUTRI |
Date Deposited: | 06 Nov 2023 02:48 |
Last Modified: | 06 Nov 2023 02:48 |
URI: | http://repository.mercubuana.ac.id/id/eprint/83862 |
Actions (login required)
View Item |