HANIFAH, FARIDA NUR (2018) MANAJEMEN RISIKO DALAM PENGADAAN MATERIAL KONSTRUKSI PADA PROYEK PEMBANGUNAN HOTEL RESORT PULLMAN MANDALIKA LOMBOK TENGAH. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 Cover R1.pdf Download (839kB) | Preview |
|
Text (BAB I)
02 Bab 1.pdf Restricted to Registered users only Download (132kB) |
||
Text (BAB II)
03 Bab 2.pdf Restricted to Registered users only Download (449kB) |
||
Text (BAB III)
04 Bab 3.pdf Restricted to Registered users only Download (536kB) |
||
Text (BAB IV)
05 Bab 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
06 Bab 5.pdf Restricted to Registered users only Download (407kB) |
||
Text (DAFTAR PUSTAKA)
08 Daftar Pustaka R1.pdf Restricted to Registered users only Download (207kB) |
||
Text (LAMPIRAN)
09 Lampiran R1.pdf Restricted to Registered users only Download (282kB) |
Abstract
Title : Risk Management Procurement of Construction Materials In The Development Pulman Hotel Resort Mandalika Lombok Tengah Project; Authors : Farida Nur Hanifah; NIM : 41116120163; Lecturer : Ir. Mawardi Amin, M.T. Indonesia's economic growth at 4.73 per cent per September 2015 is still far from expectations, especially since Indonesia needs a minimum of 7 per cent growth to become a developed country by 2025. By embracing the spirit of acceleration, the Indonesian government has made a number of efforts in order to encourage investment in various infrastructure-related sectors. Regulatory, fiscal, and institutional improvements have been made to encourage the achievement of priority project milestones. The research process is carried out by means of risk identification with risk management guidelines for Standard Australian Standard / New Zealand Standard (AS / NZS 4360: 1999). From this study, the percentage of a low-risk level matrix is 7%, moderate risk is 17%, high risk is 36%, and extreme risk is 40%, so it can be concluded that based on 42 risk variables for construction material procurement, the highest risk is the percentage of risk status. Keywords: Risk management ; material procurement; construction materials; project risk; standard AS / NZS 4360 Judul : Manajemen Risiko Dalam Pengadaan Material Konstruksi Pada Proyek Pembangunan Hotel Resort Pulman Mandalika Lombok Tengah; Nama : Farida Nur Hanifah; NIM : 41116120163; Dosen Pembimbing : Ir. Mawardi Amin, M.T. Pertumbuhan ekonomi Indonesia di angka 4,73 persen per September 2015 masih jauh dari harapan, terutama karena Indonesia membutuhkan pertumbuhan minimal 7 persen agar dapat menjadi negara maju pada tahun 2025. Dengan menganut semangat percepatan, pemerintah Indonesia telah melakukan sejumlah upaya dalam rangka mendorong investasi untuk beragam sektor terkait infrastruktur. Perbaikan dalam regulasi, fiskal, dan kelembagaan telah dilakukan guna mendorong pencapaian milestones proyek prioritas. Proses penelitian dilakukan dengan cara identifikasi risiko dengan acuan manajemen risiko Standard Australian Standard/New Zealand Standard (AS/NZS 4360:1999). Dari penelitian tersebut didapatkan nilai prosentase matriks tingkat risiko rendah 7%, risiko sedang 17%, risiko tinggi 36%, dan risiko extreme 40%, sehingga dapat disimpulkan bahwa berdasarkan 42 variabel risiko pengadaan material konstruksi bahwa risiko tinggi paling dominan dalam prosentase status risiko. Kata kunci : Manajemen risiko ; pengadaan material ; material konstruksi ; risiko proyek ; standard AS/NZS 4360
Actions (login required)
View Item |