EVALUASI PEMBOROSAN PROSES REPLATING LUNAS KAPAL PADA PERUSAHAAN INDUSTRI PERKAPALAN DI JAKARTA

BUDI, EKO SETYO (2015) EVALUASI PEMBOROSAN PROSES REPLATING LUNAS KAPAL PADA PERUSAHAAN INDUSTRI PERKAPALAN DI JAKARTA. S2 thesis, Universitas Mercu Buana Jakarta - Menteng.

[img] Text (Cover)
01 Cover Pengesahan Daftar Isi.pdf

Download (287kB)
[img] Text (Abstrak)
abstrak.pdf

Download (103kB)
[img] Text (Bab 1)
03 BAB I PENDAHULUAN.pdf
Restricted to Registered users only

Download (174kB)
[img] Text (Bab 2)
04 BAB II KAJIAN PUSTAKA.pdf
Restricted to Registered users only

Download (390kB)
[img] Text (Bab 3)
05 BAB III METODOLOGI.pdf
Restricted to Registered users only

Download (182kB)
[img] Text (Bab 4)
bab 4.pdf
Restricted to Registered users only

Download (653kB)
[img] Text (Bab 5)
07 BAB V PEMBAHASAN.pdf
Restricted to Registered users only

Download (398kB)
[img] Text (Bab 6)
08 BAB VI KESIMPULAN SARAN.pdf
Restricted to Registered users only

Download (102kB)
[img] Text (Daftar Pustaka)
09 Daftar Pustaka Lampiran CV.pdf
Restricted to Registered users only

Download (290kB)

Abstract

Shipbuilding industrial company is a industrial company engaged in new construction and repair of ships. The effectiveness and efficiency of working time is very important and affects the condition of the company. Time efficiency can be done in a way to minimize activities that do not provide added value called waste. Required an approach to eliminate waste that occurs, one of them with approach by lean shipbuilding. With a lean strategy which means an effort to jointly eliminate waste, the company is expected to increase the ratio of added value to waste. Wastage identified directly in the field with observation and processing time activities, and the mapping in detail with Process Activity Mapping (PAM) and analyzed the root cause, then do repairs using lean shipbuilding principles. The results of research directly in the field is then processed by using the Process Activity Mapping (PAM) showed the value added (71%), non value added but necessary (19%) and non-value added (10%). Estimate of repair can eliminate Waste completion time by 30%. Keywords: Lean Shipbuilding, Process Activity Mapping, Waste

Item Type: Thesis (S2)
Call Number CD: CDT-553-15-055
NIM/NIDN Creators: 55313310005
Uncontrolled Keywords: Lean Shipbuilding, Process Activity Mapping, Waste. MTI, MAGISTER TEKNIK INDUSTRI
Subjects: 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik
Divisions: Pascasarjana > Magister Teknik Industri
Depositing User: RIA SYAFITRI
Date Deposited: 27 Jun 2022 06:54
Last Modified: 16 Mar 2023 03:48
URI: http://repository.mercubuana.ac.id/id/eprint/64063

Actions (login required)

View Item View Item