ANALISIS OPTIMALISASI PELAKSANAAN WAKTU PROYEK TANGKI SILO DENGAN MENGGUNAKAN METODE CPM DAN PERT DI PT.SINAR SAKTI JAYA

., ANDIANTO (2017) ANALISIS OPTIMALISASI PELAKSANAAN WAKTU PROYEK TANGKI SILO DENGAN MENGGUNAKAN METODE CPM DAN PERT DI PT.SINAR SAKTI JAYA. S1-Sarjana thesis, Universitas Mercu Buana Jatisampurna.

[img]
Preview
Text
COVER.pdf

Download (311kB) | Preview
[img]
Preview
Text
ABSTRAK.pdf

Download (106kB) | Preview
[img] Text
BAB I.pdf
Restricted to Registered users only

Download (243kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (229kB)
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (265kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (705kB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (39kB)
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (25kB)
[img] Text
DAFTAR PUSTAKA DAN LAMPIRAN.pdf
Restricted to Registered users only

Download (338kB)

Abstract

ABSTRAK. PT.Sinar Sakti Jaya yang bergerak dibidang Contruction dan Engineering dalam pekerjaannya sering mendapatkan banyak proyek. Suatu proyek dikerjakan dengan perencanaan yang matang agar proyek selesai sesuai dengan jangka waktu yang telah ditentukan. Penjadwalan proyek adalah suatu bentuk perencanaan proyek yang dibuat dengan tujuan agar proyek selesai tepat waktu. Critical Path Method (CPM) dan Project Evaluation Review Technic (PERT) adalah dua dari beberapa metode yang digunakan untuk membuat penjadwalan proyek. Dua metode penjadwalan proyek ini memiliki dua pendekatan deterministik dan PERT menggunakan pendekatan probabilistik. Sering dalam suatu proyek terjadi keterlambatan dalam penyelesaiannya karena faktor-faktor yang tidak diperhitungkan sebelumnya sehingga kontraktor perlu membuat alternatif lain dalam pengerjaan proyek agar selesai sesuai dengan rencana. Salah satu alternatif untuk mempercepat penyelesaian proyek adalah dengan penambahan jam kerja sehingga membutuhkan biaya lebih besar dari perencanaan sebelumnya agar proyek selesai tepat waktu. dengan pengujian metode CPM dan PERT hasilpun dapat di ketahui dengan metode CPM waktu pengerjaan tangki Silo dapat si selesaikan selama 26 hari sedangkan dengan metode PERT hasil pengerjaan dapat diselesaikan 28 hari dari jadwal yang telah di tentukan 25 hari, penulispun mengembangkan metode PERT dengan teori probabilitas memberikan pilihan dengan penambahan 1 jam kerja dan 2 jam kerja guna untuk bisa mencapai 25 hari waktu selesai proyek. Kata kunci : Penjadwalan,CPM, PERT, Waktu Proyek, Biaya. ABSTRACT. PT.Sinar Sakti Jaya engaged in Contruction and Engineering in his work often get many projects. A project is undertaken with careful planning for the project to be completed within the specified timeframe. Project scheduling is a form of project planning that is created with the aim that the project is completed on time. Critical Path Method (CPM) and Project Evaluation Review Technic (PERT) are two of several methods used to make project scheduling. Two methods of scheduling this project have two deterministic approaches and PERT using a probabilistic approach. Often in a project there is a delay in the settlement due to factors that are not calculated before so that the contractor needs to make another alternative in project work to finish according to the plan. One alternative to accelerate the completion of the project is to increase the hours of work so that it costs more than previous planning for the project to finish on time. By testing CPM and PERT method resultpun can be known by CPM method Silo tank processing time can be completed for 26 days whereas with PERT method of workmanship can be completed 28 days from the schedule that has been determined 25 days, the author develops PERT method with the theory of probability to give Option with the addition of 1 working hours and 2 working hours in order to be able to reach 25 days of project completion time. Keywords: Scheduling, CPM, PERT, Project Time, Cost.

Item Type: Thesis (S1-Sarjana)
Call Number CD: FT/IND 17 042
NIM: 41613310024
Uncontrolled Keywords: Penjadwalan,CPM, PERT, Waktu Proyek, Biaya.
Subjects: 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik
600 Technology/Teknologi > 680 Manufacture For Specific Uses/Industri Pembuatan produk untuk penggunaan tertentu
600 Technology/Teknologi > 680 Manufacture For Specific Uses/Industri Pembuatan produk untuk penggunaan tertentu > 680.1-680.9 Standard Subdivisions of Manufacture For Specific Uses/Subdivisi Standar Dari Industri Pembuatan Produk Untuk Penggunaan Tertentu
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 09 Feb 2021 04:42
Last Modified: 09 Feb 2021 04:42
URI: http://repository.mercubuana.ac.id/id/eprint/59583