SETYAWAN, TRI LEKSANA (2019) PENERAPAN BIM BERBASIS QUANTITY TAKE-OFF PADA PEKERJAAN FIT-OUT BANGUNAN KANTOR. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. Halaman Judul.pdf Download (104kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (179kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
4. Lembar Pernyataan & Cek Turnitin.pdf Download (360kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
3. Lembar Pengesahan.pdf Download (137kB) | Preview |
|
|
Text (KATA PENGANTAR)
5. Kata Pengantar.pdf Download (26kB) | Preview |
|
|
Text (DAFTAR ISI)
6. Daftar Isi.pdf Download (27kB) | Preview |
|
|
Text (DAFTAR TABEL)
7. Daftar Tabel.pdf Download (102kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
8. Daftar Gambar.pdf Download (24kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
9. Daftar Lampiran.pdf Download (100kB) | Preview |
|
Text (BAB I)
10. BAB 1.pdf Restricted to Registered users only Download (433kB) |
||
Text (BAB II)
11. BAB 2.pdf Restricted to Registered users only Download (347kB) |
||
Text (BAB III)
12. BAB 3.pdf Restricted to Registered users only Download (617kB) |
||
Text (BAB IV)
13. BAB 4.pdf Restricted to Registered users only Download (737kB) |
||
Text (BAB V)
14. BAB 5.pdf Restricted to Registered users only Download (148kB) |
||
Text (DAFTAR PUSTAKA)
15. Daftar Pustaka.pdf Restricted to Registered users only Download (344kB) |
||
Text (LAMPIRAN)
16. Lampiran.pdf Restricted to Registered users only Download (3MB) |
Abstract
Office Fit-Out work usually is completed in the last phase of a building project before it is ready for occupancy. An important element of Office Fit-out work is; 1. Function 2. Convenience 3. Elements of Company identity and reputation. To achieve this company's reputation the cost of office fit-out work becomes unlimited. Generating BoQ require a Quantity Take-Off process, manual quantity take-off will need a long time, low of accuracy and cause of cost overrun average 11%. Quantity take-off automatically using BIM based Quantity take off is a solution for costing activities. This study uses the Relative Important Index to find the main factors that influence the BIM Quantity Take-Off process with the results of 10 main factors consist of 1. Drawing, 2. BoQ 3. Work & material specification, 4. Operator Experiences, 5. BIM Modeling 5D, 6. Individual Selection Model, 7. Quantity Take-Off, 8. Calculation Process, 9 Cost database, 10. Operator education Bim based Quantity Take-off was applied to the Fit Out Office Project and succeeded in increasing efficiency by 6.18% compared to manual calculations. KEYWORDS : Office Fit-Out;BIM based Quantity Take Off Pekerjaan Fit-Out kantor dikerjakan pada fase terakhir dari sebuah proyek bangunan sebelum siap dihuni. Unsur penting dari pekerjaan Fit-out Kantor adalah; 1. Fungsi 2. Kenyamanan 3. Unsur Identitas dan reputasi perusahaan. Untuk pencapaian reputasi perusahaan ini biaya pekerjaan fit-out kantor menjadi unlimited. Untuk membuat BoQ memerlukan proses Quantity Take-Off jika dilakukan secara manual akan membutuhkan waktu lima kali lebih lama, berakurasi rendah dan menimbulkan cost overrun rata rata sebesar 11% , Peneliti memilih menggunakan BIM based Quantity take-off BIM untuk mengatasi permasalahan ini. Penelitian ini menggunakan alat statistik Relative Important Index (RII) untuk menemukan faktor faktor utama yang mempengaruhi proses penerapan BIM based Quantity Take-Off dengan hasil 10 faktor utama yakni: 1. Gambar, 2 BoQ, 3 RKS & Spesifikasi, 4 Pengalaman Operator, 5 Permodelan BIM 5D, 6. Seleksi Individual model, 7. Quantity Take-Off, 8. Proses Kalkulasi, 9. Cost database, 10. Pendidikan operator Bim based Quantity Take-off ini diterapkan pada Proyek Fit-Out kantor pada material lantai, dinding dan plafond, dan berhasil meningkatkan efisiensi sebesar 6,18% dibandingkan dengan perhitungan manual. KEYWORDS : Fit-Out Bangunan Kantor; BIM berbasis Quantity Take-Off