PROYEK PEMBANGUNAN PRASARANA KERETA API RINGAN LIGHT RAIL TRANSIT (LRT) “METODE PELAKSANAAN PILE INTEGRITY TEST (PIT) UNTUK PONDASI BORE PILE”

OLDI, ISRAMI DAI (2017) PROYEK PEMBANGUNAN PRASARANA KERETA API RINGAN LIGHT RAIL TRANSIT (LRT) “METODE PELAKSANAAN PILE INTEGRITY TEST (PIT) UNTUK PONDASI BORE PILE”. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
01.HAL COVER.pdf

Download (308kB) | Preview
[img]
Preview
Text (ABSTRAK)
02.ABSTRAAK.pdf

Download (345kB) | Preview
[img] Text (BAB I)
03.Bab 1.pdf
Restricted to Registered users only

Download (328kB)
[img] Text (BAB II)
04.Bab 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB III)
05.Bab 3.pdf
Restricted to Registered users only

Download (548kB)
[img] Text (BAB IV)
06.Bab 4.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB V)
07.Bab 5.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB VI)
08.Bab 6.pdf
Restricted to Registered users only

Download (383kB)
[img] Text (BAB VII)
09.Bab 7.pdf
Restricted to Registered users only

Download (693kB)
[img] Text (BAB VIII)
010.Bab 8.pdf
Restricted to Registered users only

Download (321kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
011.DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (7MB)
[img] Text (BANNER)
012.BANNER.pdf
Restricted to Registered users only

Download (954kB)

Abstract

Light Rail Transit (LRT) merupakan salah satu proyek yang dibangun seiring dengan meningkatnya kebutuhan akan adanya transportasi massal di Jabodebek. Kementrian Perhubungan Republik Indonesia sebagai owner ingin mewujudkan suatu transportasi massal yang mudah terintegrasi dengan moda transportasi lainnya. Proyek ini dilaksanakan oleh PT Adhi Karya (Persero) Tbk selaku kontraktor yang terdiri dari enam rute, yaitu Cawang – Cibubur, Cawang – Kuningan – Dukuh Atas, Cawang – Bekasi Timur, Dukuh Atas – Palmerah Senayan, Cibubur – Bogor, dan Palmerah – Grogol. Laporan Kerja Praktek ini membahas hal – hal mengenai proses kegiatan pembangunan, baik dari segi teknis dan struktural maupun dari segi manajemen proyek, serta tinjauan khusus yang di bahas yaitu metode pelaksanaan Pile Integrity Test (PIT) untuk pondasi bore pile pada proyek Light Rail Transit (LRT).

Item Type: Thesis (S1)
Call Number CD: KP/SIP. 17 053
NIM/NIDN Creators: 41114010038
Uncontrolled Keywords: Light Rail Transit (LRT), Kerja Praktik, Pile Integrity Test (PIT)
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 625 Engineering Of Railroads, Roads/Rekayasa Rel Kereta Api, Jalan > 625.4 Rapid Transit Systems
700 Arts/Seni, Seni Rupa, Kesenian > 710 Civic and Lanscape Art/Seni Perkotaan dan Pertamanan > 711 Area Planning/Perencanaan Wilayah Perkotaan dan Pertamanan > 711.7 Plans for Transportation Facilities/Perencanaan untuk Fasilitas Transportasi > 711.75 Railroad Transportation Facilities/Fasilitas Transportasi Kereta Api
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 725 Public Structures Architecture/Arsitektur Struktur Umum > 725.3 Transportation and Storage Buildings/Arsitektur Gedung Sarana Pengangkutan dan Penyimpanan > 725.33 Railroad and Rapid Transit Buildings/Jalan Kereta Api dan Stasiun Persinggahan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Alnisa Hardiyanti
Date Deposited: 13 Jan 2018 03:32
Last Modified: 11 Dec 2024 03:49
URI: http://repository.mercubuana.ac.id/id/eprint/40242

Actions (login required)

View Item View Item