SAPUTRA, EKO ADI (2017) EARNED VALUE ANALYSIS TERHADAP BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN KONSTRUKSI PABRIK SEMEN PROYEK TUBAFA II (STUDI KASUS PT THYSSEN KRUPP INDUTRIAL SOLUTION INDONESIA). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
HAL COVER.pdf Download (950kB) | Preview |
|
|
Text (ABSTRAK)
ABSTRAK.pdf Download (82kB) | Preview |
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (607kB) |
||
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (2MB) |
||
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (3MB) |
||
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (316kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA DAN LAMPIRAN.pdf Restricted to Registered users only Download (571kB) |
Abstract
EARNED VALUE ANALYSIS TERHADAP BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN KONSTRUKSI PABRIK SEMEN PROYEK TUBAFA II (STUDI KASUS PT THYSSEN KRUPP INDUTRIAL SOLUTION INDONESIA)
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FE/MJ. 17 372 |
NIM/NIDN Creators: | 43112120170 |
Uncontrolled Keywords: | Analisa nilai hasil, Konstruksi, biaya, indeks, performa, jadwal, varian |
Subjects: | 300 Social Science/Ilmu-ilmu Sosial > 330 Economics/Ilmu Ekonomi 800 Literatures/Kesusastraan > 800. Literatures/Kesusastraan > 801 Philosophy and Theory of Literatures/Filsafat dan Teori Kesusastraan > 801.3 Value, Influence, Effect/Nilai, Pengaruh, Efek |
Divisions: | Fakultas Ekonomi dan Bisnis > Manajemen |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 29 Apr 2017 11:18 |
Last Modified: | 05 Feb 2024 03:49 |
URI: | http://repository.mercubuana.ac.id/id/eprint/33933 |
Actions (login required)
View Item |