Penetapan Standar Waktu Proses Produksi Dalam Kaitan Dengan Aturan Prioritas Kerja Untuk Meminimalkan Keterlambatan ( Studi Kasus PT. Primaco Panca Indonesia )

Surahmawati, (2012) Penetapan Standar Waktu Proses Produksi Dalam Kaitan Dengan Aturan Prioritas Kerja Untuk Meminimalkan Keterlambatan ( Studi Kasus PT. Primaco Panca Indonesia ). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (Abstrak)
Abstrak.pdf

Download (83kB) | Preview
[img]
Preview
Text (Cover)
Cover.pdf

Download (635kB) | Preview
[img] Text (Bab 1)
Bab 1.pdf
Restricted to Registered users only

Download (167kB)
[img] Text (Bab 2)
Bab 2.pdf
Restricted to Registered users only

Download (233kB)
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Registered users only

Download (179kB)
[img] Text (Bab 4)
Bab 4.pdf
Restricted to Registered users only

Download (308kB)
[img] Text (Bab 5)
Bab 5.pdf
Restricted to Registered users only

Download (89kB)
[img] Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (465kB)
Item Type: Thesis (S1)
Call Number CD: FE/MJ. 12 077
Call Number: SE/31/12/077
NIM/NIDN Creators: 43108010072
Uncontrolled Keywords: Waktu Standar , Studi Waktu , Aturan Prioritas , Dan Pemenuhan Kebutuhan
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: Admin Perpus UMB
Date Deposited: 16 Apr 2012 15:11
Last Modified: 26 May 2017 02:49
URI: http://repository.mercubuana.ac.id/id/eprint/20653

Actions (login required)

View Item View Item